HomeMy WebLinkAboutContractWashington State Department of Transportation
Agency City of Renton
Address 1055 S Grady Way
Renton, WA 98057
GRA-26-019
Local Agency Agreement
ALN No. 28.285 • lligl,wag Pla1111i119 a11d Co11sbuctio11
(Assistance Listing Number) 20.268 Congestion Mitigation and Air Quality
Federal Highway Administration (FHWA) D
Project Number CM-1615(007) Agreement Number LJr 11 '1?(}
For WSDOT Use Only
The Local Agency having complied, or hereby agreeing to comply, with the terms and conditions set forth in (1) Title 23, U.S. Code
Highways, (2) the regulations issued pursuant thereto, (3) 2 CFR Part 200, (4) 2 CFR Part 180-certifying that the local agency is not
excluded from receiving Federal funds by a Federal suspension or debarment, (5) the policies and procedures promulgated by the
Washington State Department of T ransportation, and (6) the federal aid project agreement entered into between the State and Federal
Government, relative to the above project, the Washington State Department of Transportation will authorize the Local Agency to
proceed on the project by a separate notification. Federal funds which are to be obligated for the project may not exceed the amount
shown herein on line r, column 3, without written authority by the State, subject to the approval of the Federal Highway Administration.
All project costs not reimbursed by the Federal Government shall be the responsibility of the Local Agency.
Project Description
Name Rainier Avenue Corridor Improvements -Phase 5
Termini NW 3rd Place to Northern City Limits
Description of Work
Length 0.76 miles
Narrow roadway from five lanes to four with sidewalk and a shared used path and install center median and pedestrian-scale
illumination. Further narrow from four lanes to three at the northern project limit to be consistent with King County's 3-lane cross
section.
Project Agreement End Date 12/31/2029
Advertisement Date
PE
86.5 %
Federal Aid
Participation
Ratio(s) for PE
Right of Way
%
Federal Aid
Participation
Ratio(s) for RW
CN
%
Federal Aid
Participation
Ratio(s) for CN
Type of Work
a.Anr>l)CV
b.Other Consultant
C.Other
d. State Services
e. Total PE Cost Estimate
f. Aaencv
a.Other
h.Other
i. State Services
i. Total R/W Cost Estimate
k.Contract
I.Other
m.Other
n. Other
o.Aaencv
o. State Services
□. Total CN Cost Estimate
r Total Proiect Cost Estimate
Agency Official � _
By � -
j r k) Attest: r ), J
Title Armando Pavone, Mayor
Agency Date 4/28/2026
DOT Form 140-039LP Revised 09/2025• Previous Versions Obsolete •
---------Jason Seth, City Clerk
Indirect Cost Rate 1·-l Yes / No
E ;tlmate of Fundi ,a
(1) (2) (3)
Estimated Total Estimated Agency Estimated Federal
Project Funds Funds Funds
200,000.00 27,000.00 173,000.00
3,479,886.00 469,785.00 3,010,101.00
15,000.00 2,025.00 12,975.00
3,694,886.00 498,810.00 3,196,076.00
0.00 0.00 0.00
0.00 0.00 0.00
3,694,886.00 498,810.00 3,196,076.00
Washington State Department of Transportation
By Stephanie Digitallyslgnedby
Stephanie Tax
Director, Local Programs Tax
Date Executed
Date: 2026.05.11
16:47:15 ·07'00'
Page 1