Loading...
HomeMy WebLinkAboutContractWashington State Department of Transportation Agency City of Renton Address 1055 S Grady Way Renton, WA 98057 GRA-26-019 Local Agency Agreement ALN No. 28.285 • lligl,wag Pla1111i119 a11d Co11sbuctio11 (Assistance Listing Number) 20.268 Congestion Mitigation and Air Quality Federal Highway Administration (FHWA) D Project Number CM-1615(007) Agreement Number LJr 11 '1?(} For WSDOT Use Only The Local Agency having complied, or hereby agreeing to comply, with the terms and conditions set forth in (1) Title 23, U.S. Code Highways, (2) the regulations issued pursuant thereto, (3) 2 CFR Part 200, (4) 2 CFR Part 180-certifying that the local agency is not excluded from receiving Federal funds by a Federal suspension or debarment, (5) the policies and procedures promulgated by the Washington State Department of T ransportation, and (6) the federal aid project agreement entered into between the State and Federal Government, relative to the above project, the Washington State Department of Transportation will authorize the Local Agency to proceed on the project by a separate notification. Federal funds which are to be obligated for the project may not exceed the amount shown herein on line r, column 3, without written authority by the State, subject to the approval of the Federal Highway Administration. All project costs not reimbursed by the Federal Government shall be the responsibility of the Local Agency. Project Description Name Rainier Avenue Corridor Improvements -Phase 5 Termini NW 3rd Place to Northern City Limits Description of Work Length 0.76 miles Narrow roadway from five lanes to four with sidewalk and a shared used path and install center median and pedestrian-scale illumination. Further narrow from four lanes to three at the northern project limit to be consistent with King County's 3-lane cross section. Project Agreement End Date 12/31/2029 Advertisement Date PE 86.5 % Federal Aid Participation Ratio(s) for PE Right of Way % Federal Aid Participation Ratio(s) for RW CN % Federal Aid Participation Ratio(s) for CN Type of Work a.Anr>l)CV b.Other Consultant C.Other d. State Services e. Total PE Cost Estimate f. Aaencv a.Other h.Other i. State Services i. Total R/W Cost Estimate k.Contract I.Other m.Other n. Other o.Aaencv o. State Services □. Total CN Cost Estimate r Total Proiect Cost Estimate Agency Official � _ By � - j r k) Attest: r ), J Title Armando Pavone, Mayor Agency Date 4/28/2026 DOT Form 140-039LP Revised 09/2025• Previous Versions Obsolete • ---------Jason Seth, City Clerk Indirect Cost Rate 1·-l Yes / No E ;tlmate of Fundi ,a (1) (2) (3) Estimated Total Estimated Agency Estimated Federal Project Funds Funds Funds 200,000.00 27,000.00 173,000.00 3,479,886.00 469,785.00 3,010,101.00 15,000.00 2,025.00 12,975.00 3,694,886.00 498,810.00 3,196,076.00 0.00 0.00 0.00 0.00 0.00 0.00 3,694,886.00 498,810.00 3,196,076.00 Washington State Department of Transportation By Stephanie Digitallyslgnedby Stephanie Tax Director, Local Programs Tax Date Executed Date: 2026.05.11 16:47:15 ·07'00' Page 1