Major Franchise Permit: MFP26001551
IVR Number: 26001551
Permit Information
Permit Name: Puget Sound Energy - Electric
105109395Address/Location:03/30/2026Application Date:0323059093Parcel Number: 4401 NE SUNSET BLVD
Permit Type:04/30/2026Issue Date:Franchise
Permit Work Class:04/30/2027Expiration Date:Major Utility
Job Number: 105109395Franchise Type:Electric
Description: Puget Sound Energy Electric Crew to take one lane for work in the sidewalk and planter strips @ J01, J02 & J03, and
IP1. De energize/Reenergize J01. At J03, intercept existing primary conduit with 5' W x 10' L x 4' D Work Pit in new
planter strip to remove and install cable and connect conduit. On Private property, crew to install a new Jbox and Vault
for new medical building. All restoration to be completed to city standards.
Contacts
Name Address PhoneTypeBilling
Katie Zimmerman
Puget Sound Energy
1660 Park Lane
Burlington, WA 98233
B: (425) 620-6742
C: (425) 620-6742
ApplicantX
Permits Central 355 110th Ave NE
Bellevue, WA 98004
B: (425) 620-6742
H: (425) 620-6742
C: (425) 620-6742
Applicant
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08
Bellevue, WA 98009
B: (888) 225-5773Emergency
Contact
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Katie Zimmerman
Puget Sound Energy
1660 Park Lane
Burlington, WA 98233
B: (425) 620-6742
C: (425) 620-6742
Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
PUBLIC WORKS DEPARTMENT
Page 1 of 6 | Published: 2/25/2025
Transportation Systems Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 2/25/2025
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK AND FOR TRAFFIC SIGNAL
WORK WITHIN 150 FEET OF THE INTERSECTION AT LEAST FIFTEEN (15) WORKING DAYS BEFORE THE DATE OF WORK.
FOR PURPOSES OF THIS APPLICATION, WORKING DAYS ARE DEFINED AS MONDAY THRU FRIDAY, AND EXCLUDING
CITY HOLIDAYS.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a Traffic
Control Plan (TCP) and obtain City's approval of that plan when construction, repair, or maintenance work is to be
conducted within the City's right-of-way.
1.Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2.All TCPs must conform to all attached requirements. Failure to do so may be subject to resubmittal.
3.Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
4.Resubmittal may be required for TCPs that are incomplete and do not display proper requirements as
described in the guidelines. Additional review time may be needed.
By signing, I certify that the information on this application and within the submittal documents are accurate to the
best of my knowledge and I acknowledge and have read all the requirements and guidelines on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip: ___________
Description of Work:
24 Hour Emergency
Contact Name & Phone:
Approval By: ______________________________________________ Date:____________________
PW/Transportation or CED/Development Engineering Division
Potelco, Inc
6905 S 228th St Kent, WA 98466
Please See Attached
Katie Zimmerman
3/30/2026
105109395-Sunset Blvd Medical Bldg
4401 NE Sunset Blvd
Amy Hill 253-243-5089
Scott Warlick CED 4/30/2026
Monday Friday 8:00am 3:00pm
MFP26001551
Page 2 of 6 | Published: 2/25/2025
This Page Intentionally Left Blank
Page 3 of 6 | Published: 2/25/2025
APPLICANT AGREES TO ALL THE FOLLOWING REQUIREMENTS:
GENERAL
•Applicant is responsible for compliance with all traffic regulations of the City of Renton (City) and the State
of Washington, including codes and regulations not described in this application.
•Work Zone Traffic Control shall be in accordance with Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to Washington State Department of Transportation
(WSDOT) traffic control plans.
•Any lane or street closures not in conformance with the approved Traffic Control Plan (TCP) and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs
or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable
State and City codes.
•Indemnify and hold harmless the City from any and all claims, actions, and judgments, including all costs of
defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved TCPs including claims arising from towing of private vehicles and the acts
of Applicant’s agents and employees.
•Applicant must comply with all conditions of the application.
•The City shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such
event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
•In the event any claim or suit is brought against City within the scope of this application, Applicant is
responsible to pay for legal counsel chosen by the City to defend against same.
•No more than one TCP shall be in use at any given time for a single project. If multiple TCPs are submitted
for review and approval at the same time, the TCPs shall be clearly labeled as separate plans and include
construction phasing and sequencing.
•Previously approved TCPs cannot be combined into a new TCP without review and approval by the City.
•Expired TCP is not valid and shall not be used. Applicant shall resubmit the expired TCP for approval with
the updated date and time and/or any changes to TCP.
•Applicant must have the approved TCP prior to commencing the work.
•Approved TCP must be at the work site during work hours.
•Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
•Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number
at a conspicuous place on the vehicle or equipment.
•At signalized intersections, vehicle detection shall always remain operational, unless approved in this TCP
and notified Transportation Signal Maintenance prior to commencing work. If damage occurs to existing
vehicle detection that is to remain, it is Applicant’s responsibility to replace with video vehicle detection
equipment that meets current City’s standards at Applicant’s expense.
•When not in use, temporary traffic control devices shall be removed or covered immediately. It is the
Applicant’s responsible to cover any temporary traffic control devices when not applicable for the
construction activities. Similarly, when work is suspended for short periods of time, traffic control devices
that are no longer necessary shall be removed or covered. If deemed abandoned, City crews will remove
and may store them at the City’s maintenance shop (3555 NE 2nd Street) for up to sixty (60) days. The City
is not responsible for any private property from City assets and identifying the property owner.
•Applicant is responsible to maintain existing pedestrian accessible routes during work and non-work hours.
At intersections, the work on pedestrian facilities shall be limited to one (1) corner at a time, with the least
possible inconvenience or delay to pedestrians. Pedestrian pushbuttons shall remain accessible at all times,
unless approved pedestrian accessible detour(s) are provided. Accessibility to existing or temporary
Page 4 of 6 | Published: 2/25/2025
pedestrian pushbuttons shall not be impaired. Deficiencies caused by Applicant’s operations shall be
repaired at Applicant’s expense.
•Applicant shall provide complete assistance and accommodation from a dedicated pedestrian escort to all
kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a
work zone.
•Driveway and alley access shall be maintained at all times, also see RMC Chapters 9 and 10 for Street
Closure and Street Excavation for details. Applicant is responsible for coordinating with the property
owners and/or residents prior to commencement of the work.
•Pavement excavation shall be limited to a maximum of one travel lane at a time unless otherwise
approved.
•Accessibility for emergency vehicles shall be maintained at all times.
PUBLIC OUTREACH
•Applicant must notify Transportation Signal Maintenance (425-430-7423) and City inspector (425-430-
7203) at least twenty-four (24) hours before commencing work (lane shift/closure or near a signal)
affecting the vehicle detection.
•Applicant shall notify emergency services (253-852-2121) twenty-four (24) hours before any street closures
or lane closures.
•Applicant shall call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five (5) working days (excluding
weekends and holidays) prior to starting any work.
•Applicant shall coordinate with King County Metro Transit Construction Information Center (206-477-1140
or construction.coord@kingcounty.gov) for any construction or installation activities affecting transit
operations or facilities. Notification information and guidelines can be found at:
https://kingcounty.gov/en/dept/metro/about/contractor-resources/transit-system-impacts.
WORKING DAYS AND TIMES
•Normal working days are Monday through Friday. Work on holidays, weekends or at night shall not occur
without City’s approval. For work times between 10:00 p.m. and 7:00 a.m., see Night Work section below
for details.
•Work time begins when any street or travel lane is fully or partially closed. This includes set up and removal
within the traveled way.
•If the City determines the closure hours adversely affect traffic during the work, the City may require to
adjust or reduce the working hours accordingly. Reduced work hours may be required by the City to
minimize traffic impacts for any work located near a school during pick-up and drop-off times or on an
arterial street. (See WSDOT Functional Classification Map:
https://www.wsdot.wa.gov/data/tools/geoportal/?config=FunctionalClass)
•Applicant may request the City for consideration of extended or modified working hours. Such request
must be approved by the City before changing hours of work.
CLOSURES
•All closure hours and days are subject to local permit and ordinance conditions (such as noise ordinances).
More information can be found on https://www.rentonwa.gov/City-Services/Permit-Center. Total street
closure lasting more than twenty-four (24) hours is subject to City Council authorization per Section 9-9 of
the Renton Municipal Code (RMC).
•Road closure notice – Applicant must install Portable Changeable Message Sign (PCMS) boards no less than
five (5) working days in advance of effective date and time, not including holidays, at location(s) as
identified in the TCP. Other methods of displaying the messages shall be approved by the City.
Page 5 of 6 | Published: 2/25/2025
•Road closure notice messages must include at least the following:
ROAD WILL BE CLOSED
MONTH/DAY – MONTH/DAY
_AM - _PM
•Road and/or sidewalk closure must be evaluated by the City with respect to both the necessity as well as
the impact of the closure to the public. Applicant shall submit detour plans for road closures to
accommodate both motorized and non-motorized users, including accessible pedestrian route(s). Road
closures shall require additional temporary traffic control including advance notification, approach and
detour signage.
•Applicant is responsible to temporarily remove the flags and install bags over the flag holders for any work
requiring the temporary closure of a crosswalk equipped with pedestrian flags. Applicant shall ensure the
bags remain intact and shall replace damaged bags as needed or determined necessary by the City of
Renton inspector. For any misplaced or lost flags, Applicant is responsible to replace at Applicant’s own
expense. Upon restoration of the crosswalk, Applicant shall remove the bags and return all flags to the
holders. Inventory of pedestrian flags must be submitted to the City inspector and reported to City of
Renton Transportation Signal Maintenance (425-430-7423) prior to removal.
UNIFORMED POLICE OFFICERS (UPO) / FLAGGERS
•Any construction activities within one hundred and fifty (150) feet of a signalized intersection shall require
Uniformed Police Officer(s) (UPO) at the traffic signal, unless otherwise approved in this TCP and evaluated
by City Transportation for the impacts of traffic signal operations and safety.
•Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic
or pedestrian safety or travel.
•For TCPs that require the presence of UPO to manage vehicular traffic and pedestrians at signalized
intersections, Applicant shall coordinate with Transportation Signal Maintenance (425-430-7423) at least
twenty-four (24) hours in advance for any signal that will be placed in red flashing mode. Applicant shall
notify Transportation Signal Maintenance when the intersection is back to the normal traffic signal
operations.
TEMPORARY TRAFFIC SIGNALS OR TRAFFIC SIGNAL MODIFICATION
•Temporary traffic signal programming or modification requires a minimum fifteen (15) working days for
each traffic signal controller to be programmed and tested by City Transportation staff before starting the
work. The Start Date on this TCP shall reflect the time for temporary traffic signal programming or
modification.
TEMPORARY NO-PARKING
•Applicant must post notice of date(s) and time(s) of Temporary No Parking Zone with signs at every
hundred (100) feet at least seventy-two (72) hours in advance of effective date and time.
•Applicant is responsible to show on the TCP the limits of Temporary No Parking Zone, identifying barricade
locations for vacate parking or curb lane usage. The cover sheet of this approved TCP form must be
attached to each Temporary No Parking Sign on the project site.
•Two travel lanes (one for each approach) must be open at all times on arterial streets unless approved in
this TCP.
NIGHT WORK
•Between the hours of 10 p.m. and 7 a.m., approved Noise Variance shall be required (See Section RMC 8-7-
8)for night work. Process may take up to twelve (12) weeks. More information can be found at
https://www.rentonwa.gov/City-Services/Permit-Center/Land-Use-Development/Noise-Variance.
•City may require night work for TCPs that have severe traffic impacts on arterial streets.
Page 6 of 6 | Published: 2/25/2025
•Night work shall always be required if two lanes of traffic (One for each approach) cannot be maintained
on an arterial street.
•Night work shall be required if an evaluation of existing traffic volumes and patterns finds that any TCP will
functionally reduce an arterial or high-volume collector street to only one lane of traffic.
•The following configurations may require night work:
Work at traffic signals that requires shifting one direction of traffic into a left turn pocket where a high
volume of left turns occur.
Work at traffic signals that requires shifting two directions of traffic into left turn pockets.
Work at traffic signals that requires shifting high-volume left-turn movement into a through lane on a
single approach to the intersection.
Work at signals that requires shifting left-turning traffic into a through lane on multiple approaches to
the intersection.
•If City’s initial TCP review finds that night work is required, a pre-construction meeting is mandatory to
confirm the extents of the work required, the duration of work, anticipated noise levels, and any potential
alternatives to mitigate the impact of night work to adjacent residents prior to review and approval of the
TCP.
TRAFFIC CONTROL PLAN (TCP) FORMAT
•TCP must be site and project specific. The TCP shall clearly indicate all existing transportation facilities
impacted by work including roads, bike lanes, sidewalks, transit stops, and driveways. Typical drawings,
taper tables and MUTCD illustrations, by themselves, are insufficient.
•Each construction phase shall be provided with appropriate work zone traffic control. The impacts of utility
relocation, traffic delays, detours and capacity restrictions must be considered and addressed. A suitable
sequence of construction activities must be discussed with City Staff prior to fully developing TCPs based on
the complexity of a project.
•TCPs shall be clearly labeled as separate plans to identify the construction sequencing during each phase
when more than one TCP layout is submitted.
•TCP must be submitted with an electronic copy of TCP layout(s), on 11” X 17” paper size PDF format, which
consist of:
Map(s) showing the location of the project and work area.
All fonts shall be legible and a minimum 10-point font size.
All symbols of viewing or printing shall be clear and contrasting.
All streets shall be labeled, and layout must include a north arrow and scale.
Must show channelizing devices, signing, flagger locations, barricades, PCMS boards, etc.
Show locations where the standard traffic control plans are applied.
V01
J03
J02
IP01
W20-1
R
O
A
D
W
O
R
K
A
H
E
A
D
RI
G
H
T
L
A
N
E
C
L
O
S
E
D
A
H
E
A
D
W20-5R
W4-2R
X'≥
X'≥
X'≥
ARRW-BRD 4401
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
NE SUN
S
E
T
B
L
V
D
18
18
1616
CR
O
S
S
H
E
R
E
S/W
C
L
O
S
E
D
R9-11A
DE
T
O
U
R
M4-9B
C
R
O
S
S
H
E
R
E
S/
W
C
L
O
S
E
D
A
H
E
A
D
R9-11
D
E
T
O
U
R
M4-9B
PLACE SIGNS AT SW CORNER OF
NE SUNSET BLVD. & UNION AVE NE RESIDENT(S) WILL BE INFORMED OF
TEMPORARY DRIVEWAY CLOSURE
X
'
≥
X
'
≥
A
N
A
C
O
R
T
E
S
A
V
E
N
E
1
1
1
1
1
2
1
1
1
1
V01
J03
IP01
4401
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
W20-1
R
O
A
D
W
O
R
K
A
H
E
A
D
NE SUN
S
E
T
B
L
V
D
18
18
1616
CRO
S
S
H
E
R
E
S/W
C
L
O
S
E
D
AH
E
A
D
R9-11
DE
T
O
U
R
M4-9B
S
/
W
C
L
O
S
E
D
R9-9
PLACE SIGNS AT SW CORNER OF
NE SUNSET BLVD. & UNION AVE NE RESIDENT(S) WILL BE INFORMED OF
TEMPORARY DRIVEWAY CLOSURE
W
2
0
-
1
ROAD
WORK
AHEAD
X
'
≥
W
2
0
-
1
ROAD
WORK
AHEAD
X
'
≥
A
N
A
C
O
R
T
E
S
A
V
E
N
E
1
1
1
1
1
2
1
1
1
1
S
/
W
C
L
O
S
E
D
R9-9
N
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
Project Address:
Page
PSE PUGETSOUNDENERGY
Designer:
Job #
REV
Sultan Wakid
425-424-6658
Sultan.Wakid@pse.com
1 OF 14401 NE SUNSET BLVD, RENTON, WA
1
516299632
03/27/2026
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated,
if indicated use ADA compliant channelization.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. All signs shall be sized as outlined in sections 6G and 6H
of the MUTCD unless otherwise specified.
5. Crew is required to leave a minimum of 10' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place during approved work hours as
per jurisdictional requirements. (Generally between 9
a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3
p.m. on arterials. If night time work is approved,
signaling and flaggers shall conform to WAC
296-155-305. Night time work to take place between
_____________and ______________.)
8. All Flagger and Downstream tapers shall be 50'-100'.
LEGEND
28" TRAFFIC CONE
SIGN LOCATION
TRAFFIC FLOW
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
WORK AREA
CHEVRONARROW BOARD
FLAGGER
UNIFORMEDPOLICE OFFICERPOLICE
STOP
UG/BOX/VAULTVAULT
MINIMUM TAPER LENGTH=L (FT.)
LANE
WIDTH
10
11
12
20
70
75
80
25
105
115
125
30
150
165
180
35
205
225
245
40
270
295
320
45
475
495
540
POSTED SPEED (MPH)
50
500
550
600
55
550
605
660
60
-
660
720
65
-
-
780
70
-
-
840
TEMPORARY TRAFFIC CONTROL PLAN
Puget Sound EnergyTraffic Control Supervisor:John Crofoot
Card No. IS 6 100071
Card Exp. 10/10/28
John.Crofoot@pse.com
(425)424-6658
MFP26001551
V01
J03
J02
IP01
W20-1
R
O
A
D
W
O
R
K
A
H
E
A
D
RI
G
H
T
L
A
N
E
C
L
O
S
E
D
A
H
E
A
D
W20-5R
W4-2R
X'≥
X'≥
X'≥
ARRW-BRD 4401
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
W20-1
R
O
A
D
W
O
R
K
A
H
E
A
D
NE SUN
S
E
T
B
L
V
D
18
18
1616
CR
O
S
S
H
E
R
E
S/W
C
L
O
S
E
D
R9-11A
DET
O
U
R
M4-9B
S/
W
C
L
O
S
E
D
R9-9
C
R
O
S
S
H
E
R
E
S/
W
C
L
O
S
E
D
A
H
E
A
D
R9-11
DE
T
O
U
R
M4-9B
PLACE SIGNS AT SW CORNER OF
NE SUNSET BLVD. & UNION AVE NE RESIDENT(S) WILL BE INFORMED OF
TEMPORARY DRIVEWAY CLOSURE
STOP
THE CREW SHALL CEASE
WORK AND ESCORT PEDESTRIANS
AROUND/THRU WORK AREA
W
2
0
-
1
ROAD
WORK
AHEAD
RIGHT LANE
CLOSED
AHEAD W
2
0
-
5
R
X
'
≥
X'
≥
W
2
0
-
1
ROAD
WORK
AHEAD
RIGHT LA
N
E
CLOSED
AHEAD
W
2
0
-
5
R
X
'
≥
X'
≥
A
N
A
C
O
R
T
E
S
A
V
E
N
E
1
1
1
1
1
2
1
1
1
1
N
Project Address:
Page
PSE PUGETSOUNDENERGY
Contact:
Job #
REV
John Crofoot
425-424-6658
John.Crofoot@pse.com
1 OF 1 4401 NE SUNSET BLVD, RENTON, WA
0
516299632
02/17/2026
Notes:
1. All signs and spacing to conform to the MUTCD and City
of Renton standards.
2. All sidewalks, driveways, exits and egresses shall be
completely clear unless otherwise indicated,if indicated use
ADA compliant channelization.
3. Channelizing devices are 28" traffic cones.Use traffic
drums (barrels) with steady burningType C lights on all
State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and shall not
obstruct pedestrian access.
5. Crew is required to leave a minimum of 10' for traveling
lane width.
6. Alert affected residents and businesses.
7. Work to take place during approved work hours as per
jurisdictional requirements. (Generally between 9 a.m. and 4
p.m. on non-arterials and from 9 a.m. to 3 p.m. on arterials.
If night time work is approved, signaling and flaggers shall
conform to WAC 296-155-305. Night time work to take place
between_____________and ______________.)
8. All Flagger and Downstream tapers shall be 50'-100'.
TEMPORARY TRAFFIC CONTROL PLAN
Puget Sound EnergyTraffic Control Supervisor:
Jason Bisenius
Card No. ES2 000394
Card Exp. 01/31/2028
Jason.Bisenius@pse.com
(425)424-7316
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
MINIMUM TAPER LENGTH=L (FT.)
LANE
WIDTH
10
11
12
20
70
75
80
25
105
115
125
30
150
165
180
35
205
225
245
40
270
295
320
45
475
495
540
POSTED SPEED (MPH)
50
500
550
600
55
550
605
660
60
-
660
720
65
-
-
780
70
-
-
840
LEGEND
28" TRAFFIC CONE
SIGN LOCATION
TRAFFIC FLOW
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
WORK AREA
CHEVRONARROW BOARD
FLAGGER
UNIFORMED
POLICE OFFICERPOLICE
STOP
WORK PIT
UG/BOX/VAULTVAULT
J01
J04
MFP26001551
4411
4601
4311
4325
AN
A
C
O
R
T
E
S
A
V
E
N
E
NE SU
N
S
E
T
B
L
V
D
NE SU
N
S
E
T
B
L
V
D
4401
ROW
90'
MAP
16
318675-167217
318686-167236
225 kVA 120/208V (ABC)
318700-167266
DWY
318676-167219
25kVA 120/240V (B)
EOP
70'
318660-167178
25kVA 120/240V (B)
PRE
14
PRE
14
AØAEIP573
BØAEIP574
CØAEIP575
318666-167249
150 kVA 208V (ABC)
318659-167248
50 kVA (A)
318659-167248
50 kVA (A)
318659-167275
4400
4308
4308
N/O
4300
MAP & RECORDS NOTE:
FLOW DIRECTION IS
OPPOSITE BETWEEN
318668-167115 &
318700-167266
BLDG
AA
BLDG
Z
BLDG
B
BLDG
A
318685-167233
J
J
J
3-19B
3-21
105109395
Perm Service 517063365 104374579
Panel A
3003558097
SITE PLAN
N
Vicinity Map
47.504, -122.160
Owner / Developer Contact Info
officeATTN:
ADF PROPERTIES LLC
15007 WOODINVILLE-REDMOND RD
WOODINVILLE, WA 98072
DALE FONK 206-799-3247
OVERHEAD CIRCUIT MAP 2305E040
SCALE: 6" = 1 MILE
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
PRE-14
1/20/2026
347 290 344
6 6 6
353 296 350
NOT TO SCALE
UNDERGROUND CIRCUIT MAP 2305E011
POWER GENERAL NOTES - COMMERCIAL PROJECT
8.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point.
Inclement weather conditions may cause delays in construction times and dates.
1.
2.
3.
4.
5.
6.
7.
9.
11.
10.
SCALE: 1" = 50'
10
5
1
0
9
3
9
5
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
PROJECT PHASE
PWR
NOTIF#
Superior 516299632
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:AMY HILL
253-243-5089
AMY.HILL@PSE.COM
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
AMY HILL 253-243-5089 11/10/25
A. BETTENCOURT 206-584-4182 11/10/25
A. BETTENCOURT 206-584-4182 11/10/25
RW-31525 RENTON
SUNSET BLVD MEDICAL
PRI LE/NEW UG XFMR/NEW UG SVC
4401 NE SUNSET BLVD , RENTON, WA 98056
N/A N/A
N/A 105109395
AS NOTED 1 OF 3
KING N/A N/A CSPSKEPM
NE 19-23N-05E N/A N/A
2305E011 2305E040 2305E011 PRE-14
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
SITE SPECIFIC NOTES:
V01 - NEW #318686-167236
-INSTALL (1) HH 7' X 7' X 4' W/60" X 24" ACCESS PER STD 6045.5000 (PM3P15M)
-INSTALL (1) 225kVA 120/208V PADMOUNT XFMR (MID: 6258150)
-INSTALL (3) 12KV ELBOW KIT PER STD 6041.1000 (ELB10J)
-INSTALL (4) 4-POS SECONDARY BAR CONNECTORS FOR #2 TO 500 KCMIL (MID 7651002)
-INSTALL (12) MOUNTING BOLT KITS (MID 7651008)
-INSTALL GRID #
- INSTALL CABLE TAGS PER ONE LINE
- CONNECT (3) RUNS OF CUSTOMER OWNED, INSTALLED, & MAINTAINED 250 ALUM WIRE
J01 - EXISTING #318660-167178
-EXISTING VAULT AND EQUIPMENT TO REMAIN
- DE-ENERGIZE 3Ø PRI. CABLES EIP573, EIP574, EIP575 TO ALLOW WORK TO BE PERFORMED
- RE-ENERGIZE 3Ø PRI. CABLES AFTER WORK IS COMPLETED
J02 - EXISTING #318676-167219
-EXISTING VAULT AND EQUIPMENT TO REMAIN
- DISCONNECT 3Ø PRI. CABLES AEC594, AEC595, AEC596
-INSTALL (3) 12KV ELBOW KIT PER STD 6041.1000 (ELB10J)
- REMOVE EXISTING CABLE TAGS
- INSTALL NEW CABLE TAGS PER ONE LINE
J03 - NEW #318685-167233
-INSTALL (1) HH 5' X 7' X 6' W/2-3' SQ DOORS PER STD 6055.1030 (JBOX3AS)
-INSTALL (3) 4-POS JBOX(MID: 7625900)
-INSTALL (9) 12KV ELBOW KIT PER STD 6041.1000 (ELB10J)
-INSTALL (3) INSULATED CAPS (MID: 7630600)
-INSTALL NEW CABLE TAGS PER ONE LINE
J04 - EXISTING 318700-167266
- EXISTING VAULT AND EQUIPMENT TO REMAIN
- INSTALL (3) 12KV ELBOW KIT PER STD 6041.1000 (ELB10J)
-REMOVE EXISTING CABLE TAGS
- INSTALL NEW CABLE TAGS PER ONE LINE
M01 NEW METER BASE
- PSE METER DEPT. TO INSTALL (3) 200 AMP METER SERVICE
SPAN NOTE:
-SEE SITE PLAN, ONE-LINE DIAGRAMS, & TABLES FOR REMOVALS AND INSTALLS
JOB SITE
JOB SITE
517307140
Panel B
House Panel
CIRCUIT FEET ADDED:
SQ. FOOTAGE:
PANEL SIZE:
HEAT TYPE:
EST. DEMAND:
LRC:
% V. DROP:
% FLICKER:
545'
5200
600A
N/A
42.9kW
372A
0.8% @ V01
1.2% @ V01
CIRCUIT FEET REMOVED: 455'
517307142
517307147
(3)2-57
2-59
(3)2-57
JOB SITE
3003558143
3003558182
108178526UG Cable Retirement
(3)2-57
MFP26001551
This permit is for Major construction work in the ROW and will be billed at an additional
$158/HR for inspections. After hours and weekend work will be billed at $175/HR
318686-167236
225 kVA 120/208V (ABC)
318676-167219
1-4" SCH 80
EXISTING CONDUIT
1-4" SCH 80
CONDUIT
318700-167266
1-4" SCH 80
CONDUIT
1-4" SCH 80
EXISTING CONDUIT
1-4" SCH 80
CONDUIT
318685-167233
J
318686-167236
225 kVA 120/208V (ABC)
318676-167219
(2-55)
3Ø 1/0 AL JKT
UG PRI CABLE ±40'
AØEKE781
BØEKE782
CØEKE783
(3-19b)
318700-167266
3Ø 1/0 AL JKT
UG PRI CABLE ±140'
AØEKE775
BØEKE776
CØEKE777
(2-55)
3Ø 1/0 AL JKT
UG PRI CABLE ±365'
AØEKE778
BØEKE779
CØEKE780
(2-55)
318685-167233
J
AØAEC594
318675-167217
318700-167266
318676-167219
25kVA 120/240V (B)
BØAEC595
CØAEC596
PRE
14
REMOVE
J
J
318675-167217
318686-167236
225 kVA 120/208V (ABC)
318700-167266
318676-167219
25kVA 120/240V (B)
NEW
CABLE TAGS
PRE
14
NEW
CABLE TAGS
AØEKE778BØEKE779
CØEKE780
AØEKE781BØEKE782
CØEKE783
AØEKE775BØEKE776
CØEKE777
NEW
CABLE TAGS
J
J
10
5
1
0
9
3
9
5
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
AMY HILL 253-243-5089 11/10/25
A. BETTENCOURT 206-584-4182 11/10/25
A. BETTENCOURT 206-584-4182 11/10/25
RW-31525 RENTON
SUNSET BLVD MEDICAL
PRI LE/NEW UG XFMR/NEW UG SVC
4401 NE SUNSET BLVD , RENTON, WA 98056
N/A N/A
N/A N/A
AS NOTED 2 OF 3
KING N/A N/A CSPSKEPM
NE 19-23N-05E N/A N/A
2305E011 2305E040 2305E011 PRE-14
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
Installed at site:
Grid Number:
kVA Rating:
TRANSFORMER INSTALLATION (PM)
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
Foreman to redline the following information
225kVA 120/208v
6258150
V01
318686-167236
CUSTOMER OWNED AND INSTALLED SECONDARY WIRE TABLE
BLDG.# OF
METERS SOURCE # OF
RUNS WIRE SIZE REMARKS
4401 4 V01 3 250 ALUM
WIRE -
ALL CUSTOMER-OWNED WIRE MUST BE INSTALLED ACCORDING TO THIS TABLE
Vault & Equipment Table
Work
Location
Grid
Number
Vault Size
& Cover
Type & Size
Equipment
In Vault
Primary Bushings Transformer
ID Numbers
(Company ID)
ASBUILT INFORMATION
Foreman-CompleteLBDC
V01 318686-167236 PM3P15M (7'x7'x4')PAD-3P-12-120/2
08-225 (225 kVA)3 0
J03 318685-167233 JBOX15L (5'x7'x5')JBOX 9 3
SCALE: NONE
NEW CONDUIT DIAGRAM
Primary Cable & Conduit Table (Foreman to Complete)
LOCATION CONDUIT PRIMARY CABLE
QTY OF LUBE
(gal.)
AS BUILT
INFORMATION
From To Size
(in)Qty
Design
Length
(ft)
Actual
Length
(ft)
TYPE BENDS PULL
(lbs)
PULL
Rev (lbs)Cable
Size Design
Length
(ft)
Actual
Length
(ft)
CABLE NUMBERS MANUFACTURING INFORMATION FOR FEEDER CABLE
ONLY Check applicable box
DB120 HDPE SCH 80 90°45°22°11°A B C Manufacturer Compound Year Tape CN #4/0 NEU Design As Built Actual Amount Installed
(Conduit & Cable)
J02 J03 EXISTING CONDUIT 112 106 3Ø 1/0 140 EKE775 EKE776 EKE777
IP1 J03 4"1 15 X CONDUIT ONLY
J03 IP1 4"1 15 X CONDUIT ONLY
J03 J04 4"1 EXISTING CONDUIT 148 171 3Ø 1/0 365 EKE778 EKE779 EKE780
J03 V01 4"1 20 X 45 44 3Ø 1/0 40 EKE781 EKE782 EKE783
**ALL CONDUIT WILL BE PROVIDED BY PSE & INSTALLED BY THE CUSTOMER.
ALL TRENCHING & WORK PITS WILL BE PROVIDED BY THE CUSTOMER, SEE
CUSTOMER DEVELOPMENT NOTES FOR DETAILS.**
SCALE: NONE
NEW CABLE DIAGRAM
**ALL CABLE WILL BE PROVIDED & INSTALLED BY PSE**
ABANDONED / REMOVE / REPLACED CABLE SCHEDULE
CABLE
NO.
SAP
EQUIP
LOCATIONS CABLE
(LF) EST
EXISTING CABLE
MFG. NAME
EXISTING CABLE
MFG. DATE
CABLE
REPLACED?FROM TO
AEC594 11430702 J02 J04 455
AEC595 11430703 J02 J04 455
AEC596 11430704 J02 J04 455
TOTAL 1365'
PRE CONSTRUCTION DIAGRAM
POST CONSTRUCTION DIAGRAM
TOTAL 4" SCH'L 80: 50'TOTAL PRI 3Ø 12KV 1/0 UG: 545'
SCALE: NONE
SCALE: NONE
DEDICATED FACILITIES
SITE SPAN ADDITIONAL REMARKS LABOR UNITS
#FROM TO FOOTAGE
----UPGRADE 45kVA TO 225kVA
TOTAL FT=##
DEVELOPER & CUSTOMER NOTES:
A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER
PRIOR TO STARTING ANY SITE WORK.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION
& RESTORATION PER
PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**
CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:
VAULTS & WORK PITS
-PROVIDE A 5' X 10' WORK PIT AT IP1/IP2.
-PROVIDE A 11' X 11' WORKPIT & 6" BEDDING OF 5/8" CRUSHED ROCK AT V01.
-PROVIDE A 9' X 11' WORK PIT & 6" BEDDING OF 5/8" CRUSHED ROCK AT J03.
TRENCHING & CONDUIT
-REQUIRED TO PROVIDE ±15' TRENCH FROM IP1/IP2 TO J03
-REQUIRED TO PROVIDE ±15' TRENCH FROM J03 TO IP1
- REQUIRED TO PROVIDE ±20' TRENCH FROM J03 TO V01
JOB SITE READINESS
-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO
CONSTRUCTION DATE.
-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER
AND LOCAL MUNICIPALITY.
-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY",
INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED
CONSTRUCTION DATE.
-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR
WORK PITS, VAULTS & TRENCH AT ALL TIMES.
-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF
CONSTRUCTION TO COMPLETE BACKFILLING.
-IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.
-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER
THE PERMIT.
-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR WSDOT, A PSE PROJECT
MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY
BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .
POTHOLE ALL EXISTING UTILITIES
RESTORATION PER CITY OF RENTON STANDARDS
10
5
1
0
9
3
9
5
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
AMY HILL 253-243-5089 11/10/25
A. BETTENCOURT 206-584-4182 11/10/25
A. BETTENCOURT 206-584-4182 11/10/25
RW-31525 RENTON
SUNSET BLVD MEDICAL
PRI LE/NEW JBOX/NEW UG SVC
4401 NE SUNSET BLVD , RENTON, WA 98056
N/A N/A
N/A 105109395
AS NOTED 3 OF 3
KING N/A N/A CSPSKEPM
NE 19-23N-05E N/A N/A
2305E011 2305E040 2305E011 PRE-14
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
2"
Excavation - 20 cubic yards
8'-0"
or 10'-0"
7'-0"
8'-0"8"
4'-2"
SIDE VIEW
4'-6"Crushed
6"
Rock
11'
11'
TOP VIEW
3'-6"
7'-0"
6045.5000Not to scale
VAULT & EXCAVATION DETAIL
FLOW DIRECTION
LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,
SECURE WITH PEA GRAVEL BAGS.
6'
3'
8"
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
SILT FENCE DETAIL
Not to Scale 0150.3200
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PADMOUNT TRANSFORMER AND VAULT
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
1.5' MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
Not to scale
1.5' MIN
3'
MIN
3' MIN
3' MIN
10' MIN
3'
MIN
6"6"
MIN
GUARD POST INSTALLATION
MIN
CONCRETE 2'-6"
PAINTED
YELLOW
3'-6"
6'-0"
The following styles of guard posts are approved for Puget Sound Energy transformers:
- 6 ft x 4 in. diameter Schedule 40 or better galvanized steel pipe filled with concrete.
The concrete shall have a minimum compressive strength of 3000 psi after 28 days.
The exposed portion of the post shall be painted traffic yellow.
- 6 ft x 9 in. diameter precast steel-reinforced concrete post.
Available from Utility Vault Company, Auburn, WA; or Hanson Inc., Tacoma, WA.
The exposed portion of the post shall be painted traffic yellow.
LENGTH
GUARD POST INSTALLATION
Not to scale 0700.1600-03
18"
PAD &
GUARD POST LOCATIONS
XFMR
FRONT
GUARD
POSTS 3'
MIN
MIN
5'
MAX
5'
MAX
TYPICAL
3' MIN 5'
MAX
5'
MAX
5'
MAX
18"
MIN
5'
MAX
5'
MAX
5'
MAX
5'
MAX
5'
MAX
Excavated Dirt Pile
Final Grade
24" Min
Backfill for Schedule 80 Conduit
(NO Rocks over 10" Diameter
or foreign objects)Separation
12" Min
18" Min
JOINT TRENCH DETAIL
Primary-Schedule 80 (NTS)
48"
Max
36"
Min
Cover
Phone & TV Primary Power Cable
in Customer Provided
Schedule 80 Conduit
ROADSIDE
To Excavated Dirt Pile
FR
O
N
T
TOP VIEW 18" MIN
3' MIN WORKING
SPACE
18" MIN
3' MIN 4' MIN
6' MAX5' PREFERRED
6" MIN
6' MAX
3' MIN
3' MIN
Neares
t
S
i
d
e
W
a
l
l
or Ob
s
t
r
u
c
t
i
o
n
An
y
O
b
s
t
r
u
c
t
i
o
n
Ab
o
v
e
M
e
t
e
r
CT
E
n
c
l
o
s
u
r
e
Working Spa
c
e
CT Clearances
SCALE: NONE
PM XFMR VAULT B-FLY DETAIL (V01)
SCALE: NONE
Prop 4" (J03)
J-BOX B-FLY DETAIL (J03)
SCALE: NONE
Customer Owned Service
Prop 4" (V01)
Prop 4" (J02)
Prop 4" (J04)
PROPOSED UG CONDUIT
EXISTING UG CONDUIT
CONDUIT ELBOWS
CONDUIT INTERCEPTION DETAIL
SCALE: NONE
4'-0"
1'-0"
5'-8"
8"
7'-0"
Tubes for 1"
adjustable bolts ( 4)
Cover
2,490 lbs
Top Section
1,835 lbs
Base
4,760 lbs
4'-8"
(2) 3' Square
Plate Doors
NOTE: For Installations in pavement or sidewalks with adjustable cover
SIDE VIEW
TOP VIEW
9'-0"
11'-0"
2"
6'-0"
6"Crushed
Rock
3-piece handhole, increase excavation Depth to 6'-6" and 24 cubic yards.
4'-8" x 7' Handhole ( 575) w/adjustable Cover
MID#: 7663206
VAULT & EXCAVATION DETAIL
Not to scale 6051.1500
Excavation - 20 cubic yards
FR
O
N
T
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Conditions for Permit MFP26001551
Engineering
1 Engineering General Conditions
Night work shall not take place until the Noise Variance has been issued
Page 1 of 1