Loading...
HomeMy WebLinkAboutNOA_Project Acceptance_20260501DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 www.rentonwa.gov NOTICE OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: May 1, 2026 PROJECT NAME/NUMBER: Loop Compost Pilot Project / LUA26-000150, PR26-000001 PROJECT LOCATION: 1200 Monster Rd SW, Renton, WA 98057 (APN 2423049006) APPLICANT/PROJECT CONTACT PERSON: Jordyn Marxen, King County WTD / 201 South Jackson St, Seattle, WA 98104 / jmarxen@kingcounty.gov LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://rb.gy/9947wc PROJECT DESCRIPTION: King County Wastewater Treatment Division is applying for a Tier 2 Temporary Use Permit (TUP) to continue the work under a previous TUP (LUA21- 000141) for the Loop Biosolid Composting project at King County’s South Treatment Plant. Under LUA21-000141, issued in May of 2021, the applicant obtained a Tier 2 Temporary Use Permit to construct a pilot compost system at King County’s South Treatment Plant which further processes Class B Loop® biosolids into a Class A Loop compost. The pilot project is located near the center of the property and occupies approximately 0.8 acres of the Treatment Plant located at 1200 Monster Rd SW (APN 2423049006). The 72.34-acre parcel is zoned Heavy Industrial (IH). The applicant is applying for another TUP to allow the pilot program to continue operation until sufficient data can be collected as proof of concept for a future permanent program. The current application requests a five (5) year approval. The parcel contains moderate coal mine hazards, regulated shoreline - shoreline high intensity, high seismic hazards, regulated slopes, moderate/high landslide hazards, special flood hazard areas, and wetlands. DATE OF APPLICATION: April 29, 2026 NOTICE OF COMPLETE APPLICATION: May 1, 2026 PERMITS/REVIEW REQUESTED: Temporary Use Tier 2 OTHER PERMITS WHICH MAY BE REQUIRED: None REQUESTED STUDIES: Drainage report, Geotechnical Report Comments on the above application must be submitted in writing by 5:00 PM on May 15, 2026. Please submit comments online at https://forms.rentonwa.gov/Forms/LandUsePublicComment. Alternatively, you may Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://forms.rentonwa.gov/Forms/LandUsePublicComment or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: Loop Compost Pilot Project / LUA26-000150, PR26-000001 Name: __________________________________ Email: _______________________ Phone No. ___________________ Mailing Address: __________________________________City/State/Zip: _____________________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. For more information about this proposal, contact the Project Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Jill Ding, Senior Planner, 425-430-6598, jding@rentonwa.gov