Loading...
HomeMy WebLinkAboutOwner Acknowledgement1 Heather Bray From:Joe Bernasconi <joe@jabbuilds.com> Sent:Tuesday, April 28, 2026 12:12 PM To:Heather Bray; thielellc@gmail.com Cc:Brad Stocco Subject:RE: C26001272 Bernasconi - Approved Civil Construction Plans Hi Heather, Thanks for the info. I have read and understand the notes. Best, Joe From: Heather Bray <HBray@rentonwa.gov> Sent: Tuesday, April 28, 2026 12:08 PM To: Joe Bernasconi <joe@jabbuilds.com>; thielellc@gmail.com Cc: Brad Stocco <BStocco@Rentonwa.gov> Subject: RE: C26001272 Bernasconi - Approved Civil Construction Plans All, Thank you for attending the pre-con meeting today, April 28th, 2026. Below is a summary of the meeting with items that had additional discussion listed. Please let me know if you have any questions or would like to make additions. • Pre-construction notes were read to the group • Discussed haul routes, staging and project phasing • Discussed 5-day wait period for TCP Attached are the precon notes that we discussed today. I will need verification (via email) that the owner and contractor have read and understand these notes. After I get a PDF of the City of Renton business license, I can issue the permit. HEATHER BRAY, Civil Engineer III City of Renton // Development Engineering Virtual Permit Center // Online Applications and Inspections o3ice 425-430-7383 NOTICE OF PUBLIC DISCLOSURE: This message complies with Washington State’s Public Records Act – RCW 42.56 From: Heather Bray Sent: Monday, April 27, 2026 12:52 PM To: 'Joe Bernasconi' <joe@jabbuilds.com> CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. 2 Cc: Brad Stocco <BStocco@Rentonwa.gov> Subject: RE: C26001272 Bernasconi - Approved Civil Construction Plans Joe, Please see attached for the precon notes for tomorrow’s meeting at 10:00 am. We will meet on-site next to the project. Please forward these notes to the contractor. After the meeting, I will need an email from you (owner) and contractor acknowledging that you have read and understand the notes. We can issue the permit as early as tomorrow afternoon, after receiving the Renton business license and acknowledgements. HEATHER BRAY, Civil Engineer III City of Renton // Development Engineering Virtual Permit Center // Online Applications and Inspections o3ice 425-430-7383 NOTICE OF PUBLIC DISCLOSURE: This message complies with Washington State’s Public Records Act – RCW 42.56 From: Joe Bernasconi <joe@jabbuilds.com> Sent: Monday, April 27, 2026 8:19 AM To: Heather Bray <HBray@rentonwa.gov> Subject: Re: C26001272 Bernasconi - Approved Civil Construction Plans Thank you for the update, Heather. Will circle back hopefully before lunch with them all satisfied. Joe Bernasconi JAB Development 253-740-2119 On Apr 27, 2026, at 8:10 AM, Heather Bray <HBray@rentonwa.gov> wrote: Joe, We are getting close to scheduling a precon. We just need the following items from you: The following items are required to be received prior to scheduling the pre-construction meeting (items in green are complete): 1. Receipt of the required Surety Device 1. Acceptable Documents can be found on the City website: Performance Guarantees 2. Required Surety Amount: $15,763.79 2. Certificate of Insurance with coverages as outlined in the City’s Certificate of Insurance Guidelines (Approved) CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. 3 3. A copy of the Civil Contractor’s license (Verified online) 4. A copy of the Civil Contractors City of Renton business license 5. Contact Information (Name, address, phone number, and email) for the Specialized Billing Contact who will be responsible for any overtime inspection billing and any work performed by the City on the Applicant’s behalf. (Received) 6. Approved Modification (Complete) 7. Paid invoice (Complete) 8. Two sets of plans (Received) HEATHER BRAY, Civil Engineer III City of Renton // Development Engineering Virtual Permit Center // Online Applications and Inspections o3ice 425-430-7383 NOTICE OF PUBLIC DISCLOSURE: This message complies with Washington State’s Public Records Act – RCW 42.56 From: Heather Bray Sent: Wednesday, April 1, 2026 8:07 AM To: 'Joe Bernasconi' <joe@jabbuilds.com> Subject: C26001272 Bernasconi - Approved Civil Construction Plans Hello Joe, The approved construction plans for the referenced project have been signed and are ready for printing. You can access the signed plans at the above link. Please print 2-copies (22”x34”) of the signed plans and return them to my attention at your earliest convenience. Approved Plans: https://fileshare.rentonwa.gov:8443/WebClientNew/index.html/?ShareToken=DFDC68FDAFDB1A 14AF406711003F9E6B3B20D972 The following items are required to be received prior to scheduling the pre-construction meeting: 9. Receipt of the required Surety Device 1. Acceptable Documents can be found on the City website: Performance Guarantees 2. Required Surety Amount: $15,763.79 10. Certificate of Insurance with coverages as outlined in the City’s Certificate of Insurance Guidelines (See City Website) 11. A copy of the Civil Contractor’s license 12. A copy of the Civil Contractors City of Renton business license 13. Contact Information (Name, address, phone number, and email) for the Specialized Billing Contact who will be responsible for any overtime inspection billing and any work performed by the City on the Applicant’s behalf. The Invoice for the Civil Construction Permit is attached. Payment must be received prior to commencement of the Pre-Construction Meeting. You can pay the invoice on the First Floor of City Hall prior to the Meeting or at the link below: https://permitting.rentonwa.gov/#/invoice/2c4db39b-f4fd-406f-a2a7-b39466b61bbc/true 4 Please let me know if you have any questions regarding any of the above requirements. Thank you, HEATHER BRAY, Civil Engineer III City of Renton // Development Engineering Virtual Permit Center // Online Applications and Inspections o3ice 425-430-7383 NOTICE OF PUBLIC DISCLOSURE: This message complies with Washington State’s Public Records Act – RCW 42.56