318686-167236
225 kVA 120/208V (ABC)
318700-167266
DWY
318676-167219
25kVA 120/240V (B)
EOP
70'
318660-167178
25kVA 120/240V (B)
PRE
14
PRE
14
AØAEIP573
BØAEIP574
CØAEIP575
318666-167249
150 kVA 208V (ABC)
318659-167248
50 kVA (A)
318659-167248
50 kVA (A)
318659-167275
4400
4308
4308
N/O
4300
MAP & RECORDS NOTE:
FLOW DIRECTION IS
OPPOSITE BETWEEN
318668-167115 &
318700-167266
BLDG
AA
BLDG
Z
BLDG
B
BLDG
A
318685-167233
J
J
J
3-19B
3-21
105109395
Perm Service 517063365 104374579
Panel A
3003558097
SITE PLAN
N
Vicinity Map
47.504, -122.160
Owner / Developer Contact Info
officeATTN:
ADF PROPERTIES LLC
15007 WOODINVILLE-REDMOND RD
WOODINVILLE, WA 98072
DALE FONK 206-799-3247
OVERHEAD CIRCUIT MAP 2305E040
SCALE: 6" = 1 MILE
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
PRE-14
1/20/2026
347 290 344
6 6 6
353 296 350
NOT TO SCALE
UNDERGROUND CIRCUIT MAP 2305E011
POWER GENERAL NOTES - COMMERCIAL PROJECT
8.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point.
Inclement weather conditions may cause delays in construction times and dates.
1.
2.
3.
4.
5.
6.
7.
9.
11.
10.
SCALE: 1" = 50'
10
5
1
0
9
3
9
5
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
PROJECT PHASE
PWR
NOTIF#
Superior 516299632
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:AMY HILL
253-243-5089
AMY.HILL@PSE.COM
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
AMY HILL 253-243-5089 11/10/25
A. BETTENCOURT 206-584-4182 11/10/25
A. BETTENCOURT 206-584-4182 11/10/25
RW-31525 RENTON
SUNSET BLVD MEDICAL
PRI LE/NEW UG XFMR/NEW UG SVC
4401 NE SUNSET BLVD , RENTON, WA 98056
N/A N/A
N/A 105109395
AS NOTED 1 OF 3
KING N/A N/A CSPSKEPM
NE 19-23N-05E N/A N/A
2305E011 2305E040 2305E011 PRE-14
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
SITE SPECIFIC NOTES:
V01 - NEW #318686-167236
-INSTALL (1) HH 7' X 7' X 4' W/60" X 24" ACCESS PER STD 6045.5000 (PM3P15M)
-INSTALL (1) 225kVA 120/208V PADMOUNT XFMR (MID: 6258150)
-INSTALL (3) 12KV ELBOW KIT PER STD 6041.1000 (ELB10J)
-INSTALL (4) 4-POS SECONDARY BAR CONNECTORS FOR #2 TO 500 KCMIL (MID 7651002)
-INSTALL (12) MOUNTING BOLT KITS (MID 7651008)
-INSTALL GRID #
- INSTALL CABLE TAGS PER ONE LINE
- CONNECT (3) RUNS OF CUSTOMER OWNED, INSTALLED, & MAINTAINED 250 ALUM WIRE
J01 - EXISTING #318660-167178
-EXISTING VAULT AND EQUIPMENT TO REMAIN
- DE-ENERGIZE 3Ø PRI. CABLES EIP573, EIP574, EIP575 TO ALLOW WORK TO BE PERFORMED
- RE-ENERGIZE 3Ø PRI. CABLES AFTER WORK IS COMPLETED
J02 - EXISTING #318676-167219
-EXISTING VAULT AND EQUIPMENT TO REMAIN
- DISCONNECT 3Ø PRI. CABLES AEC594, AEC595, AEC596
-INSTALL (3) 12KV ELBOW KIT PER STD 6041.1000 (ELB10J)
- REMOVE EXISTING CABLE TAGS
- INSTALL NEW CABLE TAGS PER ONE LINE
J03 - NEW #318685-167233
-INSTALL (1) HH 5' X 7' X 6' W/2-3' SQ DOORS PER STD 6055.1030 (JBOX3AS)
-INSTALL (3) 4-POS JBOX(MID: 7625900)
-INSTALL (9) 12KV ELBOW KIT PER STD 6041.1000 (ELB10J)
-INSTALL (3) INSULATED CAPS (MID: 7630600)
-INSTALL NEW CABLE TAGS PER ONE LINE
J04 - EXISTING 318700-167266
- EXISTING VAULT AND EQUIPMENT TO REMAIN
- INSTALL (3) 12KV ELBOW KIT PER STD 6041.1000 (ELB10J)
-REMOVE EXISTING CABLE TAGS
- INSTALL NEW CABLE TAGS PER ONE LINE
M01 NEW METER BASE
- PSE METER DEPT. TO INSTALL (3) 200 AMP METER SERVICE
SPAN NOTE:
-SEE SITE PLAN, ONE-LINE DIAGRAMS, & TABLES FOR REMOVALS AND INSTALLS
JOB SITE
JOB SITE
517307140
Panel B
House Panel
CIRCUIT FEET ADDED:
SQ. FOOTAGE:
PANEL SIZE:
HEAT TYPE:
EST. DEMAND:
LRC:
% V. DROP:
% FLICKER:
545'
5200
600A
N/A
42.9kW
372A
0.8% @ V01
1.2% @ V01
CIRCUIT FEET REMOVED: 455'
517307142
517307147
(3)2-57
2-59
(3)2-57
JOB SITE
3003558143
3003558182
108178526UG Cable Retirement
(3)2-57
318686-167236
225 kVA 120/208V (ABC)
318676-167219
1-4" SCH 80
EXISTING CONDUIT
1-4" SCH 80
CONDUIT
318700-167266
1-4" SCH 80
CONDUIT
1-4" SCH 80
EXISTING CONDUIT
1-4" SCH 80
CONDUIT
318685-167233
J
318686-167236
225 kVA 120/208V (ABC)
318676-167219
(2-55)
3Ø 1/0 AL JKT
UG PRI CABLE ±40'
AØEKE781
BØEKE782
CØEKE783
(3-19b)
318700-167266
3Ø 1/0 AL JKT
UG PRI CABLE ±140'
AØEKE775
BØEKE776
CØEKE777
(2-55)
3Ø 1/0 AL JKT
UG PRI CABLE ±365'
AØEKE778
BØEKE779
CØEKE780
(2-55)
318685-167233
J
AØAEC594
318675-167217
318700-167266
318676-167219
25kVA 120/240V (B)
BØAEC595
CØAEC596
PRE
14
REMOVE
J
J
318675-167217
318686-167236
225 kVA 120/208V (ABC)
318700-167266
318676-167219
25kVA 120/240V (B)
NEW
CABLE TAGS
PRE
14
NEW
CABLE TAGS
AØEKE778BØEKE779
CØEKE780
AØEKE781BØEKE782
CØEKE783
AØEKE775BØEKE776
CØEKE777
NEW
CABLE TAGS
J
J
10
5
1
0
9
3
9
5
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
AMY HILL 253-243-5089 11/10/25
A. BETTENCOURT 206-584-4182 11/10/25
A. BETTENCOURT 206-584-4182 11/10/25
RW-31525 RENTON
SUNSET BLVD MEDICAL
PRI LE/NEW UG XFMR/NEW UG SVC
4401 NE SUNSET BLVD , RENTON, WA 98056
N/A N/A
N/A N/A
AS NOTED 2 OF 3
KING N/A N/A CSPSKEPM
NE 19-23N-05E N/A N/A
2305E011 2305E040 2305E011 PRE-14
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
Installed at site:
Grid Number:
kVA Rating:
TRANSFORMER INSTALLATION (PM)
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
Foreman to redline the following information
225kVA 120/208v
6258150
V01
318686-167236
CUSTOMER OWNED AND INSTALLED SECONDARY WIRE TABLE
BLDG.# OF
METERS SOURCE # OF
RUNS WIRE SIZE REMARKS
4401 4 V01 3 250 ALUM
WIRE -
ALL CUSTOMER-OWNED WIRE MUST BE INSTALLED ACCORDING TO THIS TABLE
Vault & Equipment Table
Work
Location
Grid
Number
Vault Size
& Cover
Type & Size
Equipment
In Vault
Primary Bushings Transformer
ID Numbers
(Company ID)
ASBUILT INFORMATION
Foreman-CompleteLBDC
V01 318686-167236 PM3P15M (7'x7'x4')PAD-3P-12-120/2
08-225 (225 kVA)3 0
J03 318685-167233 JBOX15L (5'x7'x5')JBOX 9 3
SCALE: NONE
NEW CONDUIT DIAGRAM
Primary Cable & Conduit Table (Foreman to Complete)
LOCATION CONDUIT PRIMARY CABLE
QTY OF LUBE
(gal.)
AS BUILT
INFORMATION
From To Size
(in)Qty
Design
Length
(ft)
Actual
Length
(ft)
TYPE BENDS PULL
(lbs)
PULL
Rev (lbs)Cable
Size Design
Length
(ft)
Actual
Length
(ft)
CABLE NUMBERS MANUFACTURING INFORMATION FOR FEEDER CABLE
ONLY Check applicable box
DB120 HDPE SCH 80 90°45°22°11°A B C Manufacturer Compound Year Tape CN #4/0 NEU Design As Built Actual Amount Installed
(Conduit & Cable)
J02 J03 EXISTING CONDUIT 112 106 3Ø 1/0 140 EKE775 EKE776 EKE777
IP1 J03 4"1 15 X CONDUIT ONLY
J03 IP1 4"1 15 X CONDUIT ONLY
J03 J04 4"1 EXISTING CONDUIT 148 171 3Ø 1/0 365 EKE778 EKE779 EKE780
J03 V01 4"1 20 X 45 44 3Ø 1/0 40 EKE781 EKE782 EKE783
**ALL CONDUIT WILL BE PROVIDED BY PSE & INSTALLED BY THE CUSTOMER.
ALL TRENCHING & WORK PITS WILL BE PROVIDED BY THE CUSTOMER, SEE
CUSTOMER DEVELOPMENT NOTES FOR DETAILS.**
SCALE: NONE
NEW CABLE DIAGRAM
**ALL CABLE WILL BE PROVIDED & INSTALLED BY PSE**
ABANDONED / REMOVE / REPLACED CABLE SCHEDULE
CABLE
NO.
SAP
EQUIP
LOCATIONS CABLE
(LF) EST
EXISTING CABLE
MFG. NAME
EXISTING CABLE
MFG. DATE
CABLE
REPLACED?FROM TO
AEC594 11430702 J02 J04 455
AEC595 11430703 J02 J04 455
AEC596 11430704 J02 J04 455
TOTAL 1365'
PRE CONSTRUCTION DIAGRAM
POST CONSTRUCTION DIAGRAM
TOTAL 4" SCH'L 80: 50'TOTAL PRI 3Ø 12KV 1/0 UG: 545'
SCALE: NONE
SCALE: NONE
DEDICATED FACILITIES
SITE SPAN ADDITIONAL REMARKS LABOR UNITS
#FROM TO FOOTAGE
----UPGRADE 45kVA TO 225kVA
TOTAL FT=##
DEVELOPER & CUSTOMER NOTES:
A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER
PRIOR TO STARTING ANY SITE WORK.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION
& RESTORATION PER
PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**
CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:
VAULTS & WORK PITS
-PROVIDE A 5' X 10' WORK PIT AT IP1/IP2.
-PROVIDE A 11' X 11' WORKPIT & 6" BEDDING OF 5/8" CRUSHED ROCK AT V01.
-PROVIDE A 9' X 11' WORK PIT & 6" BEDDING OF 5/8" CRUSHED ROCK AT J03.
TRENCHING & CONDUIT
-REQUIRED TO PROVIDE ±15' TRENCH FROM IP1/IP2 TO J03
-REQUIRED TO PROVIDE ±15' TRENCH FROM J03 TO IP1
- REQUIRED TO PROVIDE ±20' TRENCH FROM J03 TO V01
JOB SITE READINESS
-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO
CONSTRUCTION DATE.
-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER
AND LOCAL MUNICIPALITY.
-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY",
INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED
CONSTRUCTION DATE.
-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR
WORK PITS, VAULTS & TRENCH AT ALL TIMES.
-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF
CONSTRUCTION TO COMPLETE BACKFILLING.
-IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.
-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER
THE PERMIT.
-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR WSDOT, A PSE PROJECT
MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY
BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .
10
5
1
0
9
3
9
5
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
AMY HILL 253-243-5089 11/10/25
A. BETTENCOURT 206-584-4182 11/10/25
A. BETTENCOURT 206-584-4182 11/10/25
RW-31525 RENTON
SUNSET BLVD MEDICAL
PRI LE/NEW JBOX/NEW UG SVC
4401 NE SUNSET BLVD , RENTON, WA 98056
N/A N/A
N/A 105109395
AS NOTED 3 OF 3
KING N/A N/A CSPSKEPM
NE 19-23N-05E N/A N/A
2305E011 2305E040 2305E011 PRE-14
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
2"
Excavation - 20 cubic yards
8'-0"
or 10'-0"
7'-0"
8'-0"8"
4'-2"
SIDE VIEW
4'-6"Crushed
6"
Rock
11'
11'
TOP VIEW
3'-6"
7'-0"
6045.5000Not to scale
VAULT & EXCAVATION DETAIL
FLOW DIRECTION
LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,
SECURE WITH PEA GRAVEL BAGS.
6'
3'
8"
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
SILT FENCE DETAIL
Not to Scale 0150.3200
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PADMOUNT TRANSFORMER AND VAULT
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
1.5' MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
Not to scale
1.5' MIN
3'
MIN
3' MIN
3' MIN
10' MIN
3'
MIN
6"6"
MIN
GUARD POST INSTALLATION
MIN
CONCRETE 2'-6"
PAINTED
YELLOW
3'-6"
6'-0"
The following styles of guard posts are approved for Puget Sound Energy transformers:
- 6 ft x 4 in. diameter Schedule 40 or better galvanized steel pipe filled with concrete.
The concrete shall have a minimum compressive strength of 3000 psi after 28 days.
The exposed portion of the post shall be painted traffic yellow.
- 6 ft x 9 in. diameter precast steel-reinforced concrete post.
Available from Utility Vault Company, Auburn, WA; or Hanson Inc., Tacoma, WA.
The exposed portion of the post shall be painted traffic yellow.
LENGTH
GUARD POST INSTALLATION
Not to scale 0700.1600-03
18"
PAD &
GUARD POST LOCATIONS
XFMR
FRONT
GUARD
POSTS 3'
MIN
MIN
5'
MAX
5'
MAX
TYPICAL
3' MIN 5'
MAX
5'
MAX
5'
MAX
18"
MIN
5'
MAX
5'
MAX
5'
MAX
5'
MAX
5'
MAX
Excavated Dirt Pile
Final Grade
24" Min
Backfill for Schedule 80 Conduit
(NO Rocks over 10" Diameter
or foreign objects)Separation
12" Min
18" Min
JOINT TRENCH DETAIL
Primary-Schedule 80 (NTS)
48"
Max
36"
Min
Cover
Phone & TV Primary Power Cable
in Customer Provided
Schedule 80 Conduit
ROADSIDE
To Excavated Dirt Pile
FR
O
N
T
TOP VIEW 18" MIN
3' MIN WORKING
SPACE
18" MIN
3' MIN 4' MIN
6' MAX5' PREFERRED
6" MIN
6' MAX
3' MIN
3' MIN
Neares
t
S
i
d
e
W
a
l
l
or Ob
s
t
r
u
c
t
i
o
n
An
y
O
b
s
t
r
u
c
t
i
o
n
Ab
o
v
e
M
e
t
e
r
CT
E
n
c
l
o
s
u
r
e
Working Spa
c
e
CT Clearances
SCALE: NONE
PM XFMR VAULT B-FLY DETAIL (V01)
SCALE: NONE
Prop 4" (J03)
J-BOX B-FLY DETAIL (J03)
SCALE: NONE
Customer Owned Service
Prop 4" (V01)
Prop 4" (J02)
Prop 4" (J04)
PROPOSED UG CONDUIT
EXISTING UG CONDUIT
CONDUIT ELBOWS
CONDUIT INTERCEPTION DETAIL
SCALE: NONE
4'-0"
1'-0"
5'-8"
8"
7'-0"
Tubes for 1"
adjustable bolts ( 4)
Cover
2,490 lbs
Top Section
1,835 lbs
Base
4,760 lbs
4'-8"
(2) 3' Square
Plate Doors
NOTE: For Installations in pavement or sidewalks with adjustable cover
SIDE VIEW
TOP VIEW
9'-0"
11'-0"
2"
6'-0"
6"Crushed
Rock
3-piece handhole, increase excavation Depth to 6'-6" and 24 cubic yards.
4'-8" x 7' Handhole ( 575) w/adjustable Cover
MID#: 7663206
VAULT & EXCAVATION DETAIL
Not to scale 6051.1500
Excavation - 20 cubic yards
FR
O
N
T