Loading...
HomeMy WebLinkAboutAPPROVED_KC I-Line_CCP_DC3_2026051819+00 20+00 21+00 22+00 23+00 202305-9008 192305-9001 72 3 1 6 0 - 0 5 9 5 C CUT CUT CUT CUT CUT CU T CUT CUT CUT CUT CUT C U T C U T CUT CUT CUT CUT CUT CUT CUT SDSDSDSDSDSDSDSDSD SD SDSDSDSDSDSD SD SD 1 1C9.04 6 -3 . 1 % -1 . 9 % -2 . 2 % -2 . 3 % -2 . 0 % 30 30 30 35 -1 . 5 % -3 . 1 % -1 . 2 % -1 . 3 % -0.6% BOS 31.90 BOS 31.99 BOS 31.81 BOS 32.26 BOS 32.44 TOC 33.21 BOS 33.20 TOC 33.11 FL 31.28 FL 31.37 FL 31.21FL 31.36 FL 31.64 FL 31.82TOC 32.32TOC 32.14 TOC 31.70 TOC 31.71TOC 31.87TOC 31.78 FG 32.14 MATCH EX FG 32.08 MATCH EX FG 32.04 MATCH EX FG 31.68 MATCH EX FG 31.95 MATCH EX FG 32.31 MATCH EX FG 32.52 MATCH EX FG 32.71 MATCH EX BOS 32.44 MATCH EX BOS 32.67 MATCH EX BOS 32.75 MATCH EX BOS 32.71 MATCH EX TOC 32.78 MATCH EX TOC 32.81 MATCH EX TOC 32.64 MATCH EX TOC 32.39 MATCH EX TAL-B 19+13.95, 41.73' RT LP TAL-B 19+64.50, 41.74' RT HP TAL-B 20+46.21, 42.01' RT LP FL 31.17 TAL-B 20+75.63, 43.17' RT GRADE BREAK FL 31.43 FG 31.70 MATCH EX FG 31.93 MATCH EX FG 32.33 MATCH EX FG 32.01 MATCH EX TAL-B 22+49.71, 87.53' RT END CURB AND GUTTER MATCH EX FL 32.68 BOS 33.29 MATCH EX FG 32.82 MATCH EX BOS 32.87 FL 32.61 -1 . 8 % -1 . 7 % TOC 33.23 BOS 31.93 TOC 31.93 FL 31.24 FL 31.42 -1 . 5 % GRADING GENERAL NOTES 1.ALL CURB HEIGHTS TO BE 6" UNLESS OTHERWISE NOTED. 2.SEE ROW, SURVEY CONTROL & ALIGNMENT PLANS FOR ROW INFORMATION. 3.SEE PAVING PLANS FOR EXACT LOCATION OF PROPOSED CIVIL IMPROVEMENTS. 4.GRADING ELEVATIONS PROVIDED AT KEY DESIGN POINTS AND 50 FOOT STATION INTERVALS. 5.SEE LANDSCAPING PLANS FOR PLANTING LAYOUT. 6.SEE STRUCTURAL PLANS FOR LIMIT AND TYPE OF RETAINING WALL. 7.SEE STATION PLANS FOR LIMIT OF STATION AREA AND PEDESTRIAN GUARDRAIL. 8.SEE STATION PLANS FOR GRADING AT STATIONS INCLUDING LOCATION OF FOUNDATIONS FOR SHELTERS AND TECH PYLONS. 9.SEE PAVING PLANS FOR LIMIT OF CONCRETE BUS PAD. 10.SEE DRIVEWAY PLANS FOR DRIVEWAY GRADING AND LIMITS OF DRIVEWAY CONFORMS. 11.SEE CURB RAMP PLANS FOR CURB RAMP GRADING. 12.NEGATIVE SLOPE VALUES ARE SHOWN IN THE DOWNHILL DIRECTION. HMA FULL DEPTH HMA OVERLAY CEMENT CONCRETE CEMENT CONCRETE CROSSWALK LANDSCAPING DETECTABLE WARNING SURFACE RETAINING WALL PEDESTRIAN GUARDRAIL FENCE RIGHT OF WAY (PROPOSED) EXISTING SLOPE PROPOSED SLOPE GRADING LEGEND X.X% X.X% C: \ p w _ w o r k d i r \ d e n 0 0 3 \ j e g _ c r a i g k \ d 0 6 0 1 3 8 9 \ 1 C 1 0 . 1 0 . d w g | L a y o u t : 1 C 1 0 . 0 6 PL O T T E D : A p r 0 6 , 2 0 2 6 - 0 8 : 1 4 : 2 3 a m B y C R A I G K XR E F S : X - L E G E N D . d w g ; K C M T D - B O R D E R _ 2 0 2 0 . d w g ; X - A L I G N . d w g ; X - P V _ R E N T O N . d w g ; X - R O W _ P R O P . d w g ; X - R O W _ R E N T O N . d w g ; 1 8 2 2 9 - S V - B S _ R e n t o n . d w g ; X - S T A T I O N _ R E N T O N . d w g ; 1 8 2 2 9 - S V - R O W . d w g ; X - P A R C E L - I N F O . d w g ; X - R D W Y _ R E N T O N . d w g ; X - I T S _ R E N T O N . d w g ; X - I L _ R E N T O N . d w g ; X - E L _ R E N T O N . d w g ; X - S H E E T C U T S _ O v e r a l l . d w g ; X - S N - C H A N N _ R E N T O N . d w g ; X - G R A D _ R E N T O N . d w g ; X - U T _ R E N T O N . d w g ; X - D R _ R E N T O N . d w g IM A G E S : No.REVISION DATEBYAPP'D DESIGNED: DRAWN: CHECKED: CHECKED: APPROVED: PROJECT NO: CONTRACT NO: METRO TRANSIT CAPITAL DIVISION DATE: DRAWING NO: SHEET NO: OF METRO RAPIDRIDE I LINE MARCH 2025G. FRANCO 1134237 KC001396 473K. CHANG YUEN ISSUE FOR CONSTRUCTION MARCH 2025 20'40' SCALE: 1" = 20' 0' TALBOT RD S I - 4 0 5 S B O F F - R A M P (TAL-B-LINE) S R E N T O N V I L L A G E P L RENTON SEGMENT GRADING PLAN TAL-B 18+50 TO TAL-B 23+50 1C10.06 156 A. VILLAR C. WILCOX B. HORN CURB RETURN SCHEDULE 1 RETURN #PC - STA, OFFSET PT - STA, OFFSET RADIUS LENGTH DELTA PC 1/4 1/2 3/4 PT TAL-B 22+12.95, 44.64' RT TAL-B 22+47.49, 73.97' RT 35.00'49.28'80°40'33"32.20 32.29 32.38 32.48 32.58 1C6.08 - 1C6.08 - R-4214156 TE D - 4 0 - 4 2 1 4 TE D - 4 0 - 4 2 1 4 LU A 2 2 - 0 0 0 2 6 0 PR 2 1 - 0 0 0 1 3 2 C2 1 0 0 1 1 2 8 DCR #8 - DRAINAGE UPDATES KLC AHV 04-02-261 1 04/06/2026 WATER UTILITY ABDOUL GAFOUR 05/04/2026 Surface Water Enginering jfarah 05/04/2026 DEVELOPMENT ENGINEERING msippo 05/18/2026 GENERAL NOTES ADJUST INLET OR CATCH BASIN TO GRADE ADJUST MANHOLE TO GRADE ADJUST STORM DRAIN MANHOLE WITH 1' RISER REMOVE INLET OR CATCH BASIN REMOVE STORM DRAIN PIPE REPLACE GRATE WITH SOLID LOCKING METAL COVER PER CITY OF RENTON PWD STD PLAN 204.10 CONNECTION TO EXISTING DRAINAGE STRUCTURE INSTALL CATCH BASIN TYPE 1 PER CITY OF RENTON PWD STD PLAN 200.00 INSTALL CATCH BASIN TYPE 2 PER CITY OF RENTON PWD STD PLAN 201.00 INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STD PLAN 400.2 INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OF RENTON PWD STD PLAN 203.00 INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTON PWD STD PLAN 204.40 INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTON PWD STD PLAN 204.10 INSTALL 4'x6' MODULAR WETLAND WATER QUALITY UNIT INSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNIT INSTALL FLOW CONTROL STRUCTURE PER CITY OF RENTON PWD STD 237.00 CONNECTION TO EXISTING PIPE INSTALL STATION SHELTER DOWNSPOUT THROUGH CURB DRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02 INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING, PER DETAIL 1, DRAWING NO. 1DRD.03 INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OF RENTON PWD STD 240.10 PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OF EXISTING STORM DRAINAGE PIPE INSTALL CONCRETE INLET PER CITY OF RENTON PWD STD PLAN 200.30 INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN 400.1 STORM DRAINAGE NOTES 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET. 2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLES LOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALK SHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PER PROJECT SPECIFICATIONS. 17 18 19 20 21 22 23 34 32 32 3 2 32 32 32 32 32 32 32 3 2 34 3 4 34 3 4 3 2 32 32 32 34 34 32 32 32 30 30 32 32 19+00 20+00 21+00 22+00 23+00 SD S D SD EX SDCB (1-E11)1TAL-B 20+46.20, 41.08 RT RIM EL = 31.19 IE = 28.60 (12" E) SDCB (1-29) CONC INLET 22TAL-B 19+13.95, 40.89 RT RIM EL = 31.26 IE = 25.85 (12" SE) SDCB (1-28B) CB TYPE 2-54" TAL-B 19+40.70, 3.53 RT RIM EL = 32.17 9 13 IE = 25.61 (36" S) IE = 25.61 (12" W) IE = 25.61 (36" N) SDCB (1-28D) CB TYPE 2-48" TAL-B 20+32.31, 3.57 RT RIM EL = 32.06 139 IE = 28.53 (12" W) IN IE = 28.53 (12" NW) OUT SDCB (1-28C) CB TYPE 2-54" TAL-B 20+09.14, 3.54 RT RIM EL = 32.11 9 13 IE = 27.11 (12" SW) IE = 25.61 (36" N) FCS (1-28A) SDMH 54" TAL-B 18+72.40, 3.53 RT RIM EL = 32.32 169 IE = 25.61 (12" W) IE = 25.61 (36" S) 48 LF 12" PP SD 2 LF 36" SRPE SD 39 LF 12" PP SD 2 LF 36" SRPE SD 2 LF 36" SRPE SD 60 LF 48" SRPE SD 40 LF 12" DI SD 6 LF 12" PP SD 7 LF 12" PP SD 2 LF 36" SRPE SD EX SDMH (1-E2)2TAL-B 18+60.56, 50.04 RT RIM EL = 32.00 IE = 23.80 (12" E) IE = 21.60 (18" S) 60 LF 48" SRPE SD OUT IN OUT IE = 23.55 (15" W) OUT OUT IN OUT IN IN IN IN SDCB (1-53) TYPE 2-48"9TAL-B 19+40.71, 13.08 RT RIM EL = 31.98 IE = 25.66 (12" NW) IN IE = 25.66 (12" E) OUT 10 LF 12" PP SD C: \ p w _ w o r k d i r \ d e n 0 0 3 \ j e g _ e l k i n i \ d 0 6 0 1 3 8 9 \ 1 D R . 1 0 . d w g | L a y o u t : 1 D R . 0 6 PL O T T E D : A p r 2 8 , 2 0 2 6 - 0 2 : 3 4 : 1 4 p m B y e l k i n i XR E F S : X - L E G E N D . d w g ; K C M T D - B O R D E R _ 2 0 2 0 . d w g ; X - A L I G N . d w g ; X - R O W _ P R O P . d w g ; X - R O W _ R E N T O N . d w g ; X - S T A T I O N _ R E N T O N . d w g ; X - D R _ R E N T O N . d w g ; X - R D W Y _ R E N T O N . d w g ; X - P V _ R E N T O N . d w g ; 1 8 2 2 9 - S V - B S _ R e n t o n . d w g ; 1 8 2 2 9 - S V - R O W . d w g ; X - S U R F A C E _ R E N T O N . d w g ; X - U T _ R E N T O N . d w g ; X - I L _ R E N T O N . d w g ; X - L D _ R E N T O N . d w g IM A G E S : No.REVISION DATEBYAPP'D DESIGNED: DRAWN: CHECKED: CHECKED: APPROVED: PROJECT NO: CONTRACT NO: METRO TRANSIT CAPITAL DIVISION DATE: DRAWING NO: SHEET NO: OF METRO RAPIDRIDE I LINE MARCH 2025G. FRANCO 1134237 KC001396 473K. CHANG YUEN 33200 ISSUE FOR CONSTRUCTION MARCH 2025 20'40' SCALE: 1" = 40' 0' TALBOT RD S I - 4 0 5 S B O F F - R A M P (TAL-B-LINE) S R E N T O N V I L L A G E P L RENTON SEGMENT DRAINAGE PLAN TAL-B 18+50 TO TAL-B 23+50 1DR.06 219 J. GREEN H. JOHNSON J. ETULAIN TREATMENT MW (1-2) TAL-B 20+21.84, 3.53 RT RIM EL=32.68 IE=28.51 (12" S) IN IE=27.18 (12" N) OUT 7 7 5 1 15 21 R-4214219 TE D - 4 0 - 4 2 1 4 TE D - 4 0 - 4 2 1 4 LU A 2 2 - 0 0 0 2 6 0 PR 2 1 - 0 0 0 1 3 2 C2 1 0 0 1 1 2 8 DCR 8- DRAINAGE STRUCTURE UPDATES1 1 1 1 04/29/26 WATER UTILITY ABDOUL GAFOUR 05/04/2026 DEVELOPMENT ENGINEERING msippo 05/18/2026 GENERAL NOTES ADJUST INLET OR CATCH BASIN TO GRADE ADJUST MANHOLE TO GRADE ADJUST STORM DRAIN MANHOLE WITH 1' RISER REMOVE INLET OR CATCH BASIN REMOVE STORM DRAIN PIPE REPLACE GRATE WITH SOLID LOCKING METAL COVER PER CITY OF RENTON PWD STD PLAN 204.10 CONNECTION TO EXISTING DRAINAGE STRUCTURE INSTALL CATCH BASIN TYPE 1 PER CITY OF RENTON PWD STD PLAN 200.00 INSTALL CATCH BASIN TYPE 2 PER CITY OF RENTON PWD STD PLAN 201.00 INSTALL SHALLOW MANHOLE PER CITY OF RENTON PWD STD PLAN 400.2 INSTALL OPEN CURB FACE FRAME AND GRATE PER CITY OF RENTON PWD STD PLAN 203.00 INSTALL RECTANGULAR VANED GRATE PER CITY OF RENTON PWD STD PLAN 204.40 INSTALL RECTANGULAR SOLID COVER PER CITY OF RENTON PWD STD PLAN 204.10 INSTALL 4'x6' MODULAR WETLAND WATER QUALITY UNIT INSTALL 8'x12' MODULAR WETLAND WATER QUALITY UNIT INSTALL FLOW CONTROL STRUCTURE PER CITY OF RENTON PWD STD 237.00 CONNECTION TO EXISTING PIPE INSTALL STATION SHELTER DOWNSPOUT THROUGH CURB DRAIN, PER DETAIL 1, DRAWING NO. 1DRD.02 INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING, PER DETAIL 1, DRAWING NO. 1DRD.03 INSTALL 7.5'X5.0' OIL WATER SEPARATOR UNIT PER CITY OF RENTON PWD STD 240.10 PLUG EXISTING INLET OR OUTLET DUE TO REMOVAL OF EXISTING STORM DRAINAGE PIPE INSTALL CONCRETE INLET PER CITY OF RENTON PWD STD PLAN 200.30 INSTALL MANHOLE PER CITY OF RENTON PWD STD PLAN 400.1 STORM DRAINAGE NOTES 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1.UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET. 2.ALL CATCH BASINS, MANHOLES, AND MAINTENANCE HOLES LOCATED IN A SIDEWALK, WALKING PATH, OR CROSSWALK SHALL BE FITTED WITH A NON-SLIP OR NON-SKID COVER PER PROJECT SPECIFICATIONS. 17 18 19 20 21 22 23 1 1 2 11 0 108 108 106 104 108 11 0 112 112 108 106 112 110 110 104 106 108 11 0 86+00 87+00 88+00 89+00 90+00 91+00 UD UD UD UDUD S D SDCB (1-35) TYPE 1 TAL-21 89+06.29, 21.15 RT RIM EL = 108.45 118 IE = 105.97 (12" E) OUT SDCB (1-36) TYPE 1 TAL-21 88+86.31, 21.07 LT RIM EL = 108.46 128 IE = 105.73 (12" W) IN IE = 105.73 (12" E) OUT SDCB (1-52) TYPE 1 TAL-21 88+86.22, 25.85 LT RIM EL = 108.99 138 IE = 105.60 (12" W) IN IE = 105.60 (12" S) IN IE = 105.60 (12" N) OUT 47 LF 12" DI SD 5 LF 12" DI SDSDCB (1-32) TYPE 1 TAL-21 88+11.86, 24.14 LT RIM EL = 108.48 8 13 IE = 104.71 (12" S) IN IE = 105.38 (4" E) IN IE = 104.71 (12" N) OUT C: \ p w _ w o r k d i r \ d e n 0 0 3 \ j e g _ e l k i n i \ d 0 6 0 1 3 8 9 \ 1 D R . 1 0 . d w g | L a y o u t : 1 D R . 1 1 PL O T T E D : A p r 2 8 , 2 0 2 6 - 0 2 : 4 8 : 2 9 p m B y e l k i n i XR E F S : X - L E G E N D . d w g ; K C M T D - B O R D E R _ 2 0 2 0 . d w g ; X - A L I G N . d w g ; X - R O W _ P R O P . d w g ; X - R O W _ R E N T O N . d w g ; X - S T A T I O N _ R E N T O N . d w g ; X - D R _ R E N T O N . d w g ; X - R D W Y _ R E N T O N . d w g ; X - P V _ R E N T O N . d w g ; 1 8 2 2 9 - S V - B S _ R e n t o n . d w g ; 1 8 2 2 9 - S V - R O W . d w g ; X - S U R F A C E _ R E N T O N . d w g ; X - U T _ R E N T O N . d w g ; X - I L _ R E N T O N . d w g ; X - L D _ R E N T O N . d w g IM A G E S : No.REVISION DATEBYAPP'D DESIGNED: DRAWN: CHECKED: CHECKED: APPROVED: PROJECT NO: CONTRACT NO: METRO TRANSIT CAPITAL DIVISION DATE: DRAWING NO: SHEET NO: OF METRO RAPIDRIDE I LINE MARCH 2025G. FRANCO 1134237 KC001396 473K. CHANG YUEN 33200 ISSUE FOR CONSTRUCTION MARCH 2025 20'40' SCALE: 1" = 40' 0' TALBOT RD S (TAL-21-LINE) RENTON SEGMENT DRAINAGE PLAN TAL-21 86+00 TO TAL-21 91+00 1DR.11 224 J. GREEN H. JOHNSON J. ETULAIN 181 18 9 LF 3" SD 9 LF 3" SD 4" PERFORATED PVC PIPE. SEE RETAINING WALL PLAN AND ELEVATION, SHEET 1R1.04 UNDERDRAIN IE = 106.00 AT LOW POINT OF WALL, DAYLIGHT TO LANDSCAPED AREA 4" PERFORATED PVC PIPE. SEE RETAINING WALL PLAN AND ELEVATION, SHEET 1R1.03 10 LF 4" PVC UD CLEANOUT IE = 109.87 CLEANOUT IE = 110.37 CLEANOUT IE = 106.04 CLEANOUT IE = 106.00 CLEANOUT IE = 106.31 17 17 17 17 R-4214224 TE D - 4 0 - 4 2 1 4 TE D - 4 0 - 4 2 1 4 LU A 2 2 - 0 0 0 2 6 0 PR 2 1 - 0 0 0 1 3 2 C2 1 0 0 1 1 2 8 1 13 DCR 8- DRAINAGE STRUCTURE UPDATES1 1 1 1 04/29/26 WATER UTILITY ABDOUL GAFOUR 05/04/2026 DEVELOPMENT ENGINEERING msippo 05/18/2026 10 20 30 40 50 60 10 20 30 40 50 60 TR E A T M E N T M W ( 1 - 2 ) RI M = 3 2 . 6 8 IE 2 8 . 5 1 ( 1 2 " S ) IE 2 7 . 1 8 ( 1 2 " N ) 10 20 30 40 50 60 10 20 30 40 50 60 48 LF 12" PP SD @ 3.77% 2 LF 36" SRPE SD @ 0.00% 60 LF 48" SRPE SD @ 0.00% 2 LF 36" SRPE SD @ 0.00% 2 LF 36" SRPE SD @ 0.00% 60 LF 48" SRPE SD @ 0.00% 2 LF 36" SRPE SD @ 0.00% 6 LF 12" PP SD @ 0.36% 40 LF 12" DI SD @ 0.17% 39 LF 12" PP SD @ 0.50% EX P EX 2 " G EX 1 2 " G EX 2 " G EX 1 2 " G EX 2 " G EX 1 2 " G 7 LF 12" PP SD @ 0.00%EX 24" W PROP 24" W FC S ( 1 - 2 8 A ) S D M H 5 4 " RI M 3 2 . 3 2 IE 2 5 . 6 1 ( 1 2 " W ) IE 2 5 . 6 1 ( 3 6 " S ) EX S D M H ( 1 - E 2 ) IE 2 3 . 8 0 ( 1 2 " E ) IE 2 1 . 6 0 ( 1 8 " S ) RI M 3 2 . 0 0 SD C B ( 1 - 2 8 B ) C B T Y P E 2 - 5 4 " RI M 3 2 . 1 7 IE 2 5 . 6 1 ( 3 6 " S ) IE 2 5 . 6 1 ( 1 2 " W ) IE 2 5 . 6 1 ( 3 6 " N ) SD C B ( 1 - 2 8 C ) C B T Y P E 2 - 5 4 " RI M 3 2 . 1 1 IE 2 7 . 1 1 ( 1 2 " S W ) IE 2 5 . 6 1 ( 3 6 " N ) SD C B ( 1 - 2 8 D ) C B T Y P E 2 - 4 8 " RI M 3 2 . 0 6 IE 2 8 . 5 3 ( 1 2 " W ) IE 2 8 . 5 3 ( 1 2 " N W ) SD C B ( 1 - 2 9 ) C O N C I N L E T RI M 3 1 . 2 6 IE 2 5 . 8 5 ( 1 2 " S E ) SD C B ( 1 - 2 8 B ) C B T Y P E 2 - 5 4 " RI M 3 2 . 1 7 IE 2 5 . 6 1 ( 3 6 " S ) IE 2 5 . 6 1 ( 1 2 " W ) IE 2 5 . 6 1 ( 3 6 " N ) EX S D C B ( 1 - E 1 1 ) IE 2 8 . 6 0 ( 1 2 " E ) RI M 3 1 . 1 9 EX 24"W EX SD EX 12" SD DR D . 0 7 1 DR D . 0 5 1 SD C B ( 1 - 5 3 ) T Y P E 2 - 4 8 " RI M 3 1 . 9 8 IE 2 5 . 6 6 ( 1 2 " N W ) IE 2 5 . 6 6 ( 1 2 " E ) 10 LF 12" PP SD @ 0.50% IE 2 3 . 5 5 ( 1 5 " W ) EX GRADE FINISH GRADE FINISH GRADE EX GRADE 10 20 30 40 50 60 10 20 30 40 50 60 SD C B ( 1 - 1 7 ) T Y P E 1 RI M 2 7 . 1 7 IE 2 3 . 5 0 ( 1 2 " N E ) IE 2 3 . 4 9 ( 1 2 " S W ) SD C B ( 1 - 1 6 ) T Y P E 1 RI M 2 7 . 5 0 IE 2 4 . 0 9 ( 1 2 " N E ) IE 2 4 . 0 9 ( 1 2 " S W ) SD C B ( 1 - 1 5 ) T Y P E 1 RI M 2 7 . 8 7 IE 2 4 . 7 6 ( 1 2 " N E ) IE 2 4 . 7 6 ( 1 2 " S W ) 134 LF 12" PP SD @ 0.50%58 LF 12" PP SD @ 0.50% 19 LF 12" PP SD @ 0.50% 118 LF 12" PP SD @ 0.50% EX T - T O B E R E L O C A T E D B Y O T H E R S EX W TO BE REMOVED EX W - T O B E R E M O V E D EX W - T O B E R E M O V E D EX W - T O B E R E M O V E D EX W - T O B E R E M O V E D EX W - T O B E R E M O V E D EX T EX W - T O B E R E M O V E D PROP 6" W PROP 6" W SD C B ( 1 - 1 4 ) T Y P E 2 - 4 8 " RI M 2 8 . 0 6 IE 2 5 . 2 0 ( 8 " N W ) IE 2 5 . 0 5 ( 1 2 " S W ) EX S D C B ( 1 - E 5 ) IE 2 3 . 4 0 ( 1 2 " N E ) IE 2 3 . 2 0 ( 1 2 " N W ) IE 2 3 . 4 0 ( 6 " N ) IE 2 3 . 3 0 ( 1 2 " S E ) RI M 2 7 . 3 9 EX GRADE FINISH GRADE 180 190 200 210 220 230 180 190 200 210 220 230 19 LF 12" DI SD @ 4.16% SD C B ( 1 - 3 0 ) C O N C I N L E T RI M 1 9 5 . 0 0 IE 1 9 1 . 9 7 ( 1 2 " N ) EX S D C B ( 1 - E 1 2 ) IE 1 9 1 . 1 9 ( 1 2 " S ) IE 1 9 2 . 9 0 ( 1 2 " N E ) IE 1 9 1 . 2 0 ( 1 2 " S W ) RI M 1 9 5 . 7 3 EX GRADE FINISH GRADE 90 100 110 120 130 140 90 100 110 120 130 140 5 LF 12" DI SD @ 2.66% 47 LF 12" DI SD @ 0.51% SD C B ( 1 - 5 2 ) T Y P E 1 RI M 1 0 8 . 9 9 IE 1 0 5 . 6 0 ( 1 2 " W ) IE 1 0 5 . 6 0 ( 1 2 " S ) IE 1 0 5 . 6 0 ( 1 2 " N ) SD C B ( 1 - 3 6 ) T Y P E 1 RI M 1 0 8 . 4 6 IE 1 0 5 . 7 3 ( 1 2 " W ) IE 1 0 5 . 7 3 ( 1 2 " E ) SD C B ( 1 - 3 5 ) T Y P E 1 RI M 1 0 8 . 4 5 IE 1 0 5 . 9 7 ( 1 2 " E ) EX T EX W EX G DE P T H U N K N O W N EX G DE P T H U N K N O W N FINISH GRADE EX GRADE C: \ p w _ w o r k d i r \ d e n 0 0 3 \ j e g _ e l k i n i \ d 0 6 0 1 3 8 9 \ 1 D R P . 0 1 . d w g | L a y o u t : 1 D R P . 0 3 PL O T T E D : A p r 2 8 , 2 0 2 6 - 0 3 : 0 6 : 2 7 p m B y e l k i n i XR E F S : X - S H E E T C U T S _ O v e r a l l . d w g ; K C M T D - B O R D E R _ 2 0 2 0 . d w g ; R e n t o n _ W o r k i n g _ D r a i n a g e P r o f i l e s . d w g IM A G E S : No.REVISION DATEBYAPP'D DESIGNED: DRAWN: CHECKED: CHECKED: APPROVED: PROJECT NO: CONTRACT NO: METRO TRANSIT CAPITAL DIVISION DATE: DRAWING NO: SHEET NO: OF METRO RAPIDRIDE I LINE MARCH 2025G. FRANCO 1134237 KC001396 473K. CHANG YUEN 33200 ISSUE FOR CONSTRUCTION MARCH 2025 20'40' HORIZONTAL SCALE 0'10'20' VERTICAL SCALE 0' RENTON SEGMENT DRAINAGE PROFILES 3 OF 4 1DRP.03 233 W. HICKEY H. JOHNSON J. ETULAIN SCALE: TALBOT RD S STA18+72 TO 20+46 DRAINAGE PROFILE SHOWN NOTE: SEE DRAWING 1 DR.06 SCALE: TALBOT RD S STA 18+72 TO 19+38 DRAINAGE PROFILE SHOWN NOTE: SEE DRAWING 1 DR.06 SCALE: S GRADY WAY STA 19+45 TO 22+74 DRAINAGE PROFILE SHOWNNOTE: SEE DRAWING 1 DR.03 SCALE: TALBOT RD S STA 25+69 TO 25+71 DRAINAGE PROFILE SHOWN NOTE: SEE DRAWING 1 DR.08 SCALE: TALBOT RD S STA 88+90 TO 89+15 DRAINAGE PROFILE SHOWN NOTE: SEE DRAWING 1 DR.11 SAME STRUCTURE R-4214233 TE D - 4 0 - 4 2 1 4 TE D - 4 0 - 4 2 1 4 LU A 2 2 - 0 0 0 2 6 0 PR 2 1 - 0 0 0 1 3 2 C2 1 0 0 1 1 2 8 DCR 8- DRAINAGE STRUCTURE UPDATES1 1 1 1 1 1 1 04/29/26 WATER UTILITY ABDOUL GAFOUR 05/04/2026 DEVELOPMENT ENGINEERING msippo 05/18/2026