Loading...
HomeMy WebLinkAboutIndepth Excavation Acknowedgement1 Heather Bray From:Dillon Aschenbrenner <Dillon@indepthex.com> Sent:Tuesday, May 19, 2026 8:22 AM To:Heather Bray; Jin Yun Cc:thomaschung_1999@yahoo.com; Brad Stocco; Jeffrey Miller Subject:Re: C22005922 Shum Short Plat - Preconstruction Meeting Heather, I agree to the terms and conditions of the Pre-Construction Meeting Notes 20251229 Thank you Dillon Aschenbrenner In-Depth Excavation 425-367-1521 From: Heather Bray <HBray@rentonwa.gov> Sent: Tuesday, May 19, 2026 7:32 AM To: Jin Yun <jinyun425@gmail.com> Cc: thomaschung_1999@yahoo.com <thomaschung_1999@yahoo.com>; Brad Stocco <BStocco@Rentonwa.gov>; Dillon Aschenbrenner <Dillon@indepthex.com>; Jeffrey Miller <Jeffm@indepthex.com> Subject: RE: C22005922 Shum Short Plat - Preconstruction Meeting Hello All, This is a reminder that the City has NOT received confirmation that the contractor has read the preconstruction meeting notes. Please note that In-depth Excavation, Inc. is not approved to work on the Shum Short Plat until the City receives this confirmation (via email). HEATHER BRAY, Civil Engineer III City of Renton // Development Engineering Virtual Permit Center // Online Applications and Inspections office 425-430-7383 NOTICE OF PUBLIC DISCLOSURE: This message complies with Washington State’s Public Records Act – RCW 42.56 From: Jin Yun <jinyun425@gmail.com> Sent: Wednesday, May 13, 2026 5:58 PM To: Heather Bray <HBray@rentonwa.gov> Cc: thomaschung_1999@yahoo.com; Brad Stocco <BStocco@Rentonwa.gov>; Dillon <dillon@indepthex.com>; jeffm@indepthex.com Subject: Re: C22005922 Shum Short Plat - Preconstruction Meeting CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. 2 Hi Dillon, Please see Heather’s email regarding precon notes. I think the first email got sent to the company email. Thank you, Sent from my iPhone On May 13, 2026, at 8:03 AM, Heather Bray <HBray@rentonwa.gov> wrote: Dillon, Good morning! The City of Renton has been informed that you will be a contractor for the Shum Short Plat Civil Construction Permit located at 1157 Queen Ave NE, Renton, WA with an anticipated construction start date of May 25th, 2026. A preconstruction meeting is required to be held for the contractor’s benefit at the start of any Civil Construction Permit within the City of Renton. However, since this project has already had the preconstruction meeting, we are offering the following in lieu of holding the meeting: • As the representing contractor for the Shum Short Plat (C22005922), you must thoroughly read the document provided in this email (Pre-Con Meeting Notes 20251229) • Ask any questions you may have about the notes attached in this email • Provide written notice (it can be via email) that you agree to the terms and conditions of the Pre-Construction Meeting Notes 20251229 In addition, if you haven’t already, please apply for a City of Renton business license. We will need an active City of Renton business license prior to any earthwork on this permit. Thanks! HEATHER BRAY, Civil Engineer III City of Renton // Development Engineering Virtual Permit Center // Online Applications and Inspections office 425-430-7383 NOTICE OF PUBLIC DISCLOSURE: This message complies with Washington State’s Public Records Act – RCW 42.56 CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe.