HomeMy WebLinkAboutChange Order - 2! "          #  CAG-25-290, CO #2-26 Approved by Cheryl Beyer via email 5/14/2026 Change Order No. 02 Contract Title: Maplewood Sidewalk Rehabilitation Project Contract No. CAG-25-290 Page 2 of 3 Change Order Form – Revised 12/23/2025 Bid Item: A 01 Roadway Surveying 1. Description of Change: This change order adjusts compensation for Bid Item A01 “Roadway Surveying” a. Proposal Schedule of Prices: Item No. Spec. Section Description Qty Unit Unit Price Amount A01 1-05 Roadway Surveying -1 LS -$11,500.00 -$11,500.00 CO-A01 1-05 SP Roadway Surveying 1 LS $27,000.00 $27,000.00 b. Specification and/or Special Provision: i. Description: GSP 1-05.4 Opt 2 GR1, See attached ii. Construction Requirements: N/A iii. Measurement: Lump Sum. iv. Payment: GSP 1-05.4 Opt 2 GR1, See attached c. Plans: N/A 2. Reason for Change: The contract was bid under WSDOT Standard Specifications 2025, which state in Section 1-05.4 that the Contracting Agency provides construction surveying unless otherwise specified. The bid documents failed to include a specification for contractor supplied surveying services, however it did provide a bid item. This change order provides a special provision for contractor supplied surveying. Compensation is therefore warranted under Section 1-04.4(1) – Changes and Section 1-09.4 – Force Account/Lump Sum Negotiation. 3. Equitable Adjustment: This Change Order does include an equitable adjustment per Section 1-09.4 of the 2025 WSDOT/APWA Standard Specifications. See attached. Estimated Cost, Pay Item: $27,000.00 Extended Overhead: $ Original Bid Item Amount: -$11,500.00 Total $15,500.00 * Type dollar amounts in right-hand column for each of the 1st 3 rows, then right click dollar amount on fourth row and select “update Field”. 4. Critical Path Extension of Time ! "         Change Order No. 02 Contract Title: Maplewood Sidewalk Rehabilitation Project Contract No. CAG-25-290 Page 3 of 3 Change Order Form – Revised 12/23/2025 e: The Time for Completion is not extended any Working Days. 5. Sections 1-04.4 and 1-04.5 of the 2025 WSDOT/APWA Standard Specifications shall govern this Change Order. The Work of the referenced Contract is modified to include the changes detailed herein. The payment provided for herein shall constitute the complete and final settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all other claims that may be made by the Contractor as a result of this change. 6. To be attached to Change Order: ܈܈ a. Estimated Change Order Cost ܈ b. Contractor’s Quote ܈ c. Competing Bids From Other Company ܈ d. Scope Change Report ! "         Outlook CAG 25 290: Roadway Surveying Request for Change Proposal From Wayne Rollins <wrollins@kbacm.com> Date Thu 3/12/2026 11:58 AM To Tyler D. Ceccanti <tylerc@activeconstruction.com>; Austin Roth <austinr@activeconstruction.com>; Eugene Carollo <eugenec@activeconstruction.com> Cc Ambaye Hailu <ahailu@kbacm.com>; Josef Harnden <jharnden@rentonwa.gov> 2 attachments (370 KB) 734.pdf; GSP for Contractor Roadway Surveying.pdf; ACI, The City of Renton is requesƟng a cost proposal to make the following change to the contract: DescripƟon:Provide a cost proposal to provide roadway surveying acƟviƟes in line with the aƩached GSP for Roadway Surveying. Assume you have not performed any work at the Ɵme when puƫng together the quote; it is a brand new item. Materials:Not applicable. Measurement and Payment:Provide a LS cost proposal broken down with sufficient detail for evaluaƟon. Let me know if you have any quesƟons. If you have any immediate quesƟons reach out to me directly. Wayne Rollins, NICET III 425.495.0765 |wrollins@kbacm.com KBA, Inc.|ConstrucƟon Management Professionals Teams That Build Trust ! "         (January 13, 2021) 1 Contractor Surveying - Roadway 2 The Contracting Agency has provided primary survey control in the Plans. 3 4 The Contractor shall be responsible for setting, maintaining, and resetting all alignment 5 stakes, slope stakes, and grades necessary for the construction of the roadbed, 6 drainage, surfacing, paving, channelization and pavement marking, illumination and 7 signals, guardrails and barriers, and signing. Except for the survey control data to be 8 furnished by the Contracting Agency, calculations, surveying, and measuring required 9 for setting and maintaining the necessary lines and grades shall be the Contractor's 10 responsibility. 11 12 The Contractor shall inform the Engineer when monuments are discovered that were 13 not identified in the Plans and construction activity may disturb or damage the 14 monuments. All monuments noted on the plans “DO NOT DISTURB” shall be protected 15 throughout the length of the project or be replaced at the Contractors expense. 16 17 Detailed survey records shall be maintained, including a description of the work 18 performed on each shift, the methods utilized, and the control points used. The record 19 shall be adequate to allow the survey to be reproduced. A copy of each day's record 20 shall be provided to the Engineer within three working days after the end of the shift. 21 22 The meaning of words and terms used in this provision shall be as listed in "Definitions 23 of Surveying and Associated Terms" current edition, published by the American 24 Congress on Surveying and Mapping and the American Society of Civil Engineers. 25 26 The survey work shall include but not be limited to the following: 27 28 1. Verify the primary horizontal and vertical control furnished by the Contracting 29 Agency, and expand into secondary control by adding stakes and hubs as well 30 as additional survey control needed for the project. Provide descriptions of 31 secondary control to the Contracting Agency. The description shall include 32 coordinates and elevations of all secondary control points. 33 34 2. Establish, the centerlines of all alignments, by placing hubs, stakes, or marks 35 on centerline or on offsets to centerline at all curve points (PCs, PTs, and PIs) 36 and at points on the alignments spaced no further than 50 feet. 37 38 3. Establish clearing limits, placing stakes at all angle points and at intermediate 39 points not more than 50 feet apart. The clearing and grubbing limits shall be 5 40 feet beyond the toe of a fill and 10 feet beyond the top of a cut unless 41 otherwise shown in the Plans. 42 43 4. Establish grading limits, placing slope stakes at centerline increments not more 44 than 50 feet apart. Establish offset reference to all slope stakes. If Global 45 Positioning Satellite (GPS) Machine Controls are used to provide grade 46 control, then slope stakes may be omitted at the discretion of the Contractor 47 48 5. Establish the horizontal and vertical location of all drainage features, placing 49 offset stakes to all drainage structures and to pipes at a horizontal interval not 50 greater than 25 feet. 51 52 ! "         6. Establish roadbed and surfacing elevations by placing stakes at the top of 1 subgrade and at the top of each course of surfacing. Subgrade and surfacing 2 stakes shall be set at horizontal intervals not greater than 50 feet in tangent 3 sections, 25 feet in curve sections with a radius less than 300 feet, and at 10-4 foot intervals in intersection radii with a radius less than 10 feet. Transversely, 5 stakes shall be placed at all locations where the roadway slope changes and 6 at additional points such that the transverse spacing of stakes is not more than 7 12 feet. If GPS Machine Controls are used to provide grade control, then 8 roadbed and surfacing stakes may be omitted at the discretion of the 9 Contractor. 10 11 7. Establish intermediate elevation benchmarks as needed to check work 12 throughout the project. 13 14 8. Provide references for paving pins at 25-foot intervals or provide simultaneous 15 surveying to establish location and elevation of paving pins as they are being 16 placed. 17 18 9. For all other types of construction included in this provision, (including but not 19 limited to channelization and pavement marking, illumination and signals, 20 guardrails and barriers, and signing) provide staking and layout as necessary 21 to adequately locate, construct, and check the specific construction activity. 22 23 10. Contractor shall determine if changes are needed to the profiles or roadway 24 sections shown in the Contract Plans in order to achieve proper smoothness 25 and drainage where matching into existing features, such as a smooth 26 transition from new pavement to existing pavement. The Contractor shall 27 submit these changes to the Engineer for review and approval 10 days prior to 28 the beginning of work. 29 30 The Contractor shall provide the Contracting Agency copies of any calculations and 31 staking data when requested by the Engineer. 32 33 The Contractor shall ensure a surveying accuracy within the following tolerances: 34 35 Vertical Horizontal 36 Slope stakes r0.10 feet r0.10 feet 37 Subgrade grade stakes set 38 0.04 feet below grade r0.01 feet r0.5 feet 39 (parallel to alignment) 40 r0.1 feet 41 (normal to alignment) 42 43 Stationing on roadway N/A r0.1 feet 44 Alignment on roadway N/A r0.04 feet 45 Surfacing grade stakes r0.01 feet r0.5 feet 46 (parallel to alignment) 47 r0.1 feet 48 (normal to alignment) 49 50 ! "         Roadway paving pins for 1 surfacing or paving r0.01 feet r0.2 feet 2 (parallel to alignment) 3 r0.1 feet 4 (normal to alignment) 5 6 The Contracting Agency may spot-check the Contractor's surveying. These spot-7 checks will not change the requirements for normal checking by the Contractor. 8 9 When staking roadway alignment and stationing, the Contractor shall perform 10 independent checks from different secondary control to ensure that the points staked 11 are within the specified survey accuracy tolerances. 12 13 The Contractor shall calculate coordinates for the alignment. The Contracting Agency 14 will verify these coordinates prior to issuing approval to the Contractor for commencing 15 with the work. The Contracting Agency will require up to seven calendar days from the 16 date the data is received. 17 18 Contract work to be performed using contractor-provided stakes shall not begin until the 19 stakes are approved by the Contracting Agency. Such approval shall not relieve the 20 Contractor of responsibility for the accuracy of the stakes. 21 22 Stakes shall be marked in accordance with Standard Plan A10.10. When stakes are 23 needed that are not described in the Plans, then those stakes shall be marked, at no 24 additional cost to the Contracting Agency as ordered by the Engineer. 25 26 Payment 27 Payment will be made for the following bid item when included in the proposal: 28 29 "Roadway Surveying", lump sum. 30 31 The lump sum contract price for "Roadway Surveying" shall be full pay for all labor, 32 equipment, materials, and supervision utilized to perform the Work specified, including 33 any resurveying, checking, correction of errors, replacement of missing or damaged 34 stakes, and coordination efforts. 35 ! "         ! "         ESM CONSULTING ENGINEERS PROPOSAL WORKSHEET FOR RENTON MAPLEWOOD SIDEWALK CONSTRUCTION STAKING JOB NO. HOURLY ESTIMATES IT E M TASK RE I M B U R S A B L E S SR . R E G . L . S . PR I N C I P A L S U R V E Y O R SU R V E Y P . M . SR . S U R V E Y T E C H . 2 M A N C R E W TO T A L $1.00 $195.00 $220.00 $190.00 $155.00 $225.00 1 PROJECT COORDINATION 3 660.00 2 SET H & V CONTROL 1 1 4 1310.00 3 STAKE CLEARING LIMITS - ROW ALONG PROJECT 1 2 12 3300.00 4 0.00 5 0.00 6 0.00 7 0.00 8 0.00 9 STAKE RD. CL SUBGRADE 1 2 8 2400.00 10 0.00 11 STAKE SANITARY SEWER 0.00 12 STAKE SANITARY STUBS 0.00 13 STAKE STORM SYSTEM (9 STRUCTURES) 1 3 8 2590.00 14 STAKE WATER LINE 0.00 15 STAKE FH, VALVES, METERS, ETC.0.00 16 0.00 17 STAE GRADE HUBS (CENTERLINE ONLY) 1 2 8 2400.00 18 0.00 19 0.00 20 STAKE SIDEWALK 1 4 16 4580.00 21 STAKE CURB & GUTTER 2 6 24 6980.00 22 STAKE PEDESTRIAN RAMPS 1 2 8 2400.00 23 0.00 24 STAKE SIGNS, STRIPING 1 2 8 2400.00 25 0.00 26 STAKE STREET LIGHTS 0.00 27 STAKE POWER VAULTS 0.00 28 0.00 29 0.00 30 0.00 HOUR TOTALS 0 0 13 24 0 96 SUBTOTALS - CONST. STAKING 0.00 0.00 2860.00 4560.00 0.00 21600.00 $29,020.00 NOTES: Estimated by : ZL on 3/13/2026 M:\PROPOSAL\2026\City of Renton\Maplewood 6th St\Survey\[SURVEY PROPOSAL SPREADSHEET.xls]CONST. STAKING 3/13/2026 3:00 PM ! "         ^ƚĂŶĚĂƌĚ/ƚĞŵEƵŵďĞƌ hŶŝƚKĨDĞĂƐƵƌĞ /ƚĞŵĞƐĐƌŝƉƚŝŽŶ :ŽďEƵŵďĞƌ ŽŶƚƌĂĐƚEƵŵďĞƌ ĂƚĞ WůĂŶŶĞĚYƵĂŶƚŝƚLJ >ŽǁŝĚ ^ĞĐŽŶĚŝĚ dŚŝƌĚŝĚ ϳϬϯϴ >͘^͘ ZKtz^hZsz/E' ϮϯϬϬϴ yϯϰϯϯ ϬϱͬϬϭͬϮϬϮϯ ϲϬ͕ϬϬϬ͘ϬϬ ΨϮϭ͕ϬϬϬ͘ϬϬ ΨϮϰ͕ϬϬϬ͘ϬϬ ΨϬ͘ϬϬ ϳϬϯϴ >͘^͘ ZKtz^hZsz/E' ϮϯϬϬϯ yϯϰϯϱ ϬϱͬϬϭͬϮϬϮϯ ϭϬ͕ϬϬϬ͘ϬϬ ΨϰϮ͕ϲϲϱ͘ϬϬ Ψϰϴ͕ϱϬϬ͘ϬϬ ΨϬ͘ϬϬ ϳϬϯϴ >͘^͘ ZKtz^hZsz/E' ϮϮϬϮϯ yϯϰϲϭ ϬϳͬϭϬͬϮϬϮϯ ϭϭ͕ϱϬϬ͘ϬϬ Ψϯϴ͕ϴϲϬ͘ϬϬ ΨϬ͘ϬϬ ΨϬ͘ϬϬ ϳϬϯϴ >͘^͘ ZKtz^hZsz/E' ϮϯϬϭϴ yϯϱϬϵ ϬϮͬϭϮͬϮϬϮϰ Ϯϭ͕ϱϴϬ͘ϬϬ Ψϭϰ͕ϵϴϴ͘ϬϬ ΨϯϬ͕ϬϬϬ͘ϬϬ ΨϯϬ͕ϬϬϬ͘ϬϬ ϳϬϯϴ >͘^͘ ZKtz^hZsz/E' ϮϯϬϮϳ yϯϱϯϮ ϬϰͬϬϴͬϮϬϮϰ ϯϯ͕ϯϬϬ͘ϬϬ ΨϮϳ͕ϳϯϴ͘ϱϳ ΨϯϮ͕ϱϬϬ͘ϬϬ Ψϯϴ͕ϬϱϮ͘ϬϬ ϳϬϯϴ >͘^͘ ZKtz^hZsz/E' ϮϰϬϭϱ yϯϱϵϰ ϬϭͬϮϳͬϮϬϮϱ ϮϬ͕ϬϬϬ͘ϬϬ ΨϮϯ͕ϲϱϬ͘ϬϬ ΨϯϮ͕ϭϱϬ͘ϬϬ ΨϮϵ͕ϬϬϬ͘ϬϬ ϳϬϯϴ >͘^͘ ZKtz^hZsz/E' ϮϯϬϭϱ yϯϰϰϴ ϬϱͬϯϬͬϮϬϮϯ ϮϬ͕ϬϬϬ͘ϬϬ Ψϭϱ͕ϬϬϬ͘ϬϬ Ψϭϱ͕ϳϬϬ͘ϬϬ ΨϯϬ͕ϬϬϬ͘ϬϬ ϳϬϯϴ >͘^͘ ZKtz^hZsz/E' ϮϱϬϬϱ yϯϲϬϭ ϬϮͬϭϴͬϮϬϮϱ ϯϱ͕ϬϬϬ͘ϬϬ Ψϰϱ͕ϬϬϬ͘ϬϬ ΨϯϬ͕ϬϬϬ͘ϬϬ ΨϯϮ͕ϵϬϬ͘ϬϬ ϳϬϯϴ >͘^͘ ZKtz^hZsz/E' ϮϮϱϮϱ ϬϬϵϵϬϮ ϬϱͬϬϭͬϮϬϮϯ ϴϲ͕ϬϬϬ͘ϬϬ ΨϭϬϬ͕ϬϬϬ͘ϬϬ Ψϭϭϭ͕ϱϬϬ͘ϬϬ Ψϭϲϱ͕ϬϬϬ͘ϬϬ ϳϬϯϴ >͘^͘ ZKtz^hZsz/E' ϮϮϱϯϯ yϯϰϯϮ ϬϰͬϮϰͬϮϬϮϯ ϭϬϬ͕ϬϬϬ͘ϬϬ Ψϲϱ͕ϬϬϬ͘ϬϬ Ψϲϱ͕ϬϬϬ͘ϬϬ Ψϲϲ͕ϱϬϬ͘ϬϬ ϳϬϯϴ >͘^͘ ZKtz^hZsz/E' ϮϭϱϮϳ yϯϰϰϯ ϬϱͬϭϱͬϮϬϮϯ ϭϭ͕ϬϬϬ͘ϬϬ Ψϯϭ͕ϬϬϬ͘ϬϬ ΨϬ͘ϬϬ ΨϬ͘ϬϬ ϳϬϯϴ >͘^͘ ZKtz^hZsz/E' ϮϬϱϮϬ yϯϰϰϲ ϬϱͬϮϮͬϮϬϮϯ ϵϬ͕ϬϬϬ͘ϬϬ ΨϭϱϬ͕ϬϬϬ͘ϬϬ Ψϭϭϰ͕ϬϬϬ͘ϬϬ ΨϴϬ͕ϬϬϬ͘ϬϬ ϳϬϯϴ >͘^͘ ZKtz^hZsz/E' ϮϮϱϭϬ yϯϰϲϬ ϬϳͬϬϯͬϮϬϮϯ Ϯ͕ϬϬϬ͘ϬϬ Ψϰ͕ϯϱϬ͘ϬϬ Ψϯ͕ϱϬϬ͘ϬϬ Ψϴ͕ϱϬϬ͘ϬϬ ϳϬϯϴ >͘^͘ ZKtz^hZsz/E' ϮϯϱϬϰ yϯϰϲϴ ϬϴͬϭϰͬϮϬϮϯ ϱϬ͕ϬϬϬ͘ϬϬ ΨϱϬ͕ϬϬϬ͘ϬϬ ΨϰϬ͕ϬϬϬ͘ϬϬ ΨϱϬ͕ϬϬϬ͘ϬϬ ϳϬϯϴ >͘^͘ ZKtz^hZsz/E' ϮϯϱϬϴ yϯϱϭϮ ϬϮͬϭϮͬϮϬϮϰ ϱ͕ϬϬϬ͘ϬϬ ΨϮϴ͕ϳϱϬ͘ϬϬ ΨϮϰ͕ϳϲϬ͘ϬϬ Ψϰϱ͕ϬϬϬ͘ϬϬ ϳϬϯϴ >͘^͘ ZKtz^hZsz/E' ϮϯϱϬϱ yϯϱϯϲ ϬϰͬϭϱͬϮϬϮϰ ϮϬ͕ϬϬϬ͘ϬϬ ΨϮϲ͕ϬϬϬ͘ϬϬ Ψϯϱ͕ϬϬϬ͘ϬϬ ΨϬ͘ϬϬ ϳϬϯϴ >͘^͘ ZKtz^hZsz/E' ϮϰϱϬϳ yϯϱϱϭ ϬϱͬϮϴͬϮϬϮϰ ϮϬ͕ϬϬϬ͘ϬϬ Ψϭϴ͕ϮϰϬ͘ϬϬ Ψϭϱ͕ϬϬϬ͘ϬϬ ΨϭϬ͕ϭϬϬ͘ϬϬ ϳϬϯϴ >͘^͘ ZKtz^hZsz/E' ϮϯϱϬϲ yϯϱϱϱ ϬϲͬϭϳͬϮϬϮϰ Ϯϲ͕ϲϮϱ͘ϬϬ Ψϭϳ͕ϱϬϬ͘ϬϬ Ψϯϰ͕ϮϲϬ͘ϬϬ Ψϯϴ͕ϬϬϬ͘ϬϬ ϳϬϯϴ >͘^͘ ZKtz^hZsz/E' ϮϰϱϬϲ yϯϲϭϭ ϬϯͬϮϰͬϮϬϮϱ ϳϬ͕ϬϬϬ͘ϬϬ ΨϴϬ͕ϬϬϬ͘ϬϬ ΨϴϬ͕ϮϲϬ͘ϬϬ ΨϴϬ͕ϱϯϴ͘ϲϳ ϳϬϯϴ >͘^͘ ZKtz^hZsz/E' ϮϰϱϬϮ yϯϲϮϲ ϬϰͬϭϰͬϮϬϮϱ ϮϬ͕ϬϬϬ͘ϬϬ Ψϭϱ͕ϬϬϬ͘ϬϬ Ψϭϰ͕ϰϱϳ͘ϱϱ ΨϬ͘ϬϬ ϳϬϯϴ >͘^͘ ZKtz^hZsz/E' Ϯϰϱϭϵ yϯϲϯϬ ϬϰͬϮϭͬϮϬϮϱ ϯϬ͕ϴϴϱ͘ϬϬ ΨϭϬ͕ϱϬϬ͘ϬϬ ΨϭϬ͕ϱϭϱ͘ϬϬ ΨϮϱ͕ϬϬϬ͘ϬϬ ϳϬϯϴ >͘^͘ ZKtz^hZsz/E' ϮϯϬϭϬ yϯϰϴϮ ϭϬͬϬϮͬϮϬϮϯ ϭϱ͕ϬϬϬ͘ϬϬ Ψϲ͕ϬϬϬ͘ϬϬ ΨϮϳ͕ϭϬϬ͘ϬϬ ΨϯϬ͕ϬϬϬ͘ϬϬ ϳϬϯϴ >͘^͘ ZKtz^hZsz/E' ϮϰϬϬϮ yϯϱϯϱ ϬϰͬϭϱͬϮϬϮϰ ϰϬ͕ϬϬϬ͘ϬϬ Ψϯϲ͕ϬϬϬ͘ϬϬ ΨϲϬ͕ϵϱϬ͘ϬϬ ΨϬ͘ϬϬ ϳϬϯϴ >͘^͘ ZKtz^hZsz/E' ϮϰϬϭϮ yϯϱϰϱ ϬϱͬϬϲͬϮϬϮϰ Ϯϱ͕ϬϬϬ͘ϬϬ ΨϮϯ͕ϯϱϬ͘ϬϬ ΨϮϬ͕ϬϬϬ͘ϬϬ ΨϬ͘ϬϬ ϳϬϯϴ >͘^͘ ZKtz^hZsz/E' ϮϰϬϭϱ yϯϱϰϲ ϬϱͬϭϯͬϮϬϮϰ ϱϬ͕ϬϬϬ͘ϬϬ ΨϮϱ͕ϬϬϬ͘ϬϬ ΨϮϬ͕ϬϬϬ͘ϬϬ ΨϬ͘ϬϬ ŝĚ/ƚĞŵhŶŝƚWƌŝĐĞdĂďƵůĂƚŝŽŶ^ƚĂŶĚĂƌĚ/ƚĞŵƐ ZĞŐŝŽŶ͗^ƚĂƚĞtŝĚĞŽŶƚƌĂĐƚƐĂǁĂƌĚĞĚĨƌŽŵϰͬϴͬϮϬϮϯƚŚƌƵϰͬϴͬϮϬϮϲdŽƚĂůƌĞĐŽƌĚƐĨŽƵŶĚ͗ϱϭ EŽƌƚŚĞŶƚƌĂů ĂƐƚĞƌŶ KůLJŵƉŝĐ EŽƌƚŚǁĞƐƚ ! "