HomeMy WebLinkAboutChange Order - 12CITY OF RENTON
Community and Economic Development
CONTRACT CHANGE ORDERAGREEMENT
4/24/2026
CONTRACT: CAG-25-257
CONTRACTOR: Andersen Construction Company of Washington, LLC
CHANGE ORDER: 12
SUMMARY OF PROPOSEDCHANGE:Per Renton request, Andersen and Seatac were onsite on 4/18
to provide access and support PSE’s installation of thetransformer. Costs include Andersen’s and
Seatac Electric’s Foremen for 7 hours.
Light ƱƄture is priced to utiliƏe the drivers and decoders that are currently onsite.
DESCRIPTION:
ORIGINALCONTRACT
AMOUNT (W/out WSST)
CURRENTCONTRACT
AMOUNT (W/out WSST)
NETCHANGE THIS ORDER
(W/outWSST)
REVISEDCONTRACT
TOTAL AFTER CHANGE
$1,248,000.00 $1,651,390.03 $ 2,792.95 $1,654,182.98
Additional Calendar Days:
None
SIGNATURES:
Contractor:Date:
Bogdan Tishchenko, Andersen Construction Company of WA, LLC
ProjectManager:Date
Paul FintƏ, ProjectManager
ApprovedBy:Date:
Justin Johnson, Development EngineeringDirector
Date:
Date:
Approved By:
Gina Estep, CED Administrator
Approved By: Approved by Cheryl Beyer via ema;
Cheryl Beyer, Senior Assistant City Attorney
Item
No.Qty. Description UnitPrice
Amount
w/WSST
1 7 Andersen Foreman 166.00 $ 1,162.00
21Andersen overhead costs N/A$ 339.00
3 7 Electrician 1,113.75 $ 1,113.75
4 1 Seatac (electrical sub) overhead costs N/A $ 178.20
Totalthis Change Order: $ 2,792.95
"!#
$
$
$
$
CAG-25-257, CO #12-26
4/29/2026
BUILDER OF CHOICE
Page 1 of 1
Change Request
CR-018
April 23, 2026
Job Name: Legacy Square Phase 2 Job Number: AWA25SP016
Subject: PSE Saturday Work Date Initiated: 2026-04-23
This change request is submitted, as required, for your review and approval.
Amount: $2,792.95
Time Extension Requested:
Reference:
Scope Description:
Per Renton request, Andersen and Seatac were onsite on 4/18 to provide access and support PSE’s installation of the
transformer. Costs include Andersen’s and Seatac Electric’s Foremen for 7 hours. See attached for reference.
Change Request Cost Breakdown
Direct Cost of Work Amount
Seatac COP 06 $1,291.95
Andersen Foreman (7 hrs) $1,162.00
Subtotal $2,453.95
Cost of Work Add-Ons
Volume Driven Liability Insurance (1.25%) $34.00
Bonding (1.00%) $27.00
Overhead / Profit up to the first $50,000 (16%) $186.00
Overhead / Profit up to the first $50,000 for each subcontractor (6%) $77.00
Payroll Driven Liability Insurance (1.25%) $15.00
Total Change Request Amount $2,792.95
Supporting documentation and detailed cost of work is attached as required.
Please indicate your approval of this Change Request by signing below and returning one (1) copy of this transmittal letter t o
Andersen Construction. The Change Request will be incorporated in a subsequent Contract Change Order.
By executing of this Change Order, contractor acknowledges and agrees that it has been fully compensated for all change in th e
Contract Sum and Contract Time effected through a written change order, satisfaction for all costs incurred, labor performed, and
material and equipment furnished.
Contractor: Owner:
Andersen Construction Company of
Washington LLC
Date City of Renton Date
Bogdan Tishchenko
"!#
5HTXHVWIRU&KDQJH2UGHU
&23
iϡϙ
IJîôŘŜôIJϙĺIJŜťŘŪèťĖĺIJϙϙ
ĺČîôIJϙĖŜēèēôIJħĺϙ
ϙϙϙϙϙϙϙϙ
Viϡϙϙ
[ôČÍèƅϙŗŪÍŘôϙēÍŜôϙ͑ϙiϙ͕ϙÍťŪŘîÍƅϙiϙŕôŘϙ(ϙ
ϙ
ēÍIJħϙƅĺŪϙċĺŘϙťēôϙĺŕŕĺŘťŪIJĖťƅϙťĺϙŕŘĺŽĖîôϙÍϙīŪıŕϙŜŪıϙŕŘĺŕĺŜÍīϙċĺŘϙťēôϙŕŘĺĤôèťϙIJÍıôîϙÍæĺŽôϟϙ
ϙ
®ĺŘħϙ"ôŜèŘĖŕťĖĺIJϡϙϙϙ
īôƄϙťĺϙſĺŘħϙ͕ϟ͖͔ϙēĺŪŘŜϙĺċϙiϙīÍŜťϙÍťŪŘîÍƅϙťēôϙ͐͗ťēϙŕôŘϙ(ϙϙ
ϙ
щ͕͔͐ϙ³ϙ͕ϟ͖͔ϙēĺŪŘŜϙϙϙ щ͐Ϡ͐͐͒ϟ͖͔ϙ
͕͐҇ϙiFЭϡϙ ϙ щ͖͐͗ϟ͑͏ϙ ϙ ϙ
ϙ
i[ϙ>iϙi«(ϡϙ щ͐Ϡ͑͐͘ϟ͔͘ϙ
ŘĖèôϙĖŜϙČĺĺîϙċĺŘϙĺIJīƅϙ͒͏ϙîÍƅŜϙ
ϙ
(ƄèīŪŜĖĺIJŜϙ
&RQFUHWHVODE
8WLOLW\ZRUNQRWPHQWLRQHGDERYH
8WLOLW\IHHV
6XUYH\;UD\VDZFXWWLQJDQGFRQFUHWHFRULQJ
7UHQFKLQJ%DFNILOO&RPSDFWLQJϙ
ϙ
ĖIJèôŘôīƅϠϙ
ĺææƅϙ@ĺIJIJôŘϙ
"!#
Employee Name Hours
GC Signature: ______________________________Foreman Signature: _________________________
Employee Name Hours
Materials Used QuantMaterials Used Quant
Time & Material Daily Log
Date: ____________________________________
Job #: ___________________________________
Foreman: _________________________________Contractor: ________________________________
Job Name: ________________________________
Work Performed
"!#
CAUTION:This email originated from outside the City of Renton. Do not click links, reply or open attachments
unless you know the content is safe.
Outlook
RE: Legacy Square Phase II - Fiber & PSE Work
From Paul Hintz <PHintz@Rentonwa.gov>
Date Thu 4/16/2026 10:11 AM
To Bogdan Tishchenko <btishchenko@andersen-const.com>
Cc Casey Armstrong <carmstrong@AsiStructures.com>
Bogdan,
We’ll pay for your electrical sub and a foreman to be onsite Saturday; please ensure they’re onsite by 7
AM – the PSE crew might leave the site if no one is onsite to grant them access.
Please submit a CO for this with the OT rates shown (I doubt we’ll be able to get it signed before
Saturday, but that’s okay). Again, if the work takes less than eight hours, I’ll expect to have the total
decreased accordingly.
Thank you,
PAUL HINTZ,Redevelopment Manager
City of Renton // Planning
Virtual Permit Center //Online Applications and Inspections
425-430-7436
NOTICE OF PUBLIC DISCLOSURE: This message complies with Washington State’s Public Records Act – RCW 42.56
From:Bogdan Tishchenko <bƟshchenko@andersen-const.com>
Sent:Wednesday, April 15, 2026 4:41 PM
To:Paul Hintz <PHintz@Rentonwa.gov>
Cc:Casey Armstrong <carmstrong@AsiStructures.com>
Subject:Re: Legacy Square Phase II - Fiber & PSE Work
Paul,
Here is the cost for the Overtime for Saturday (4/18). We can use this as an allowance and track actual
costs on T&M:
Seatac Electric = $1531.20 (8hrs)
Andersen Foreman = $1688.00 (8hrs)
Total with Markups = $3683.00 (track T&M).
We can move the fence around to accommodate PSE.
"!#
CAUTION:This email originated from outside the City of Renton. Do not click links, reply or open attachments
unless you know the content is safe.
Thank you,
Bogdan Tishchenko
PROJECT MANAGER
CELL 253.880.5296
__________________________________
ANDERSEN CONSTRUCTION
An Employee-Owned Company
Seattle Office
5601 6th Ave S St. 550
Seattle, WA 98108
206.763.6712
__________________________________
Builder of Choice
ANDERSEN-CONST.COM
From:Paul Hintz <PHintz@Rentonwa.gov>
Sent:Wednesday, April 15, 2026 2:34 PM
To:Bogdan Tishchenko <bƟshchenko@andersen-const.com>
Cc:Casey Armstrong <carmstrong@AsiStructures.com>
Subject:RE: Legacy Square Phase II - Fiber & PSE Work
Bogdan,
Please provide a quote for up to eight hours of your electrician’s time to be onsite this Saturday. If we
agree to pay for this time, we would only pay for the actual time he is onsite.
Also, Jenny/PSE noted that the construction fencing near transformer vault will need to be removed or
otherwise open for their crew and for truck access. Please let me know if this is feasible.
Thanks,
PAUL HINTZ,Redevelopment Manager
City of Renton // Planning
Virtual Permit Center //Online Applications and Inspections
425-430-7436
NOTICE OF PUBLIC DISCLOSURE: This message complies with Washington State’s Public Records Act – RCW 42.56
From:Bogdan Tishchenko <bƟshchenko@andersen-const.com>
Sent:Tuesday, April 14, 2026 4:47 PM
To:Paul Hintz <PHintz@Rentonwa.gov>
Cc:Casey Armstrong <carmstrong@AsiStructures.com>
Subject:Fw: Legacy Square Phase II - Fiber & PSE Work
"!#