HomeMy WebLinkAboutChange Order - 12CITY OF RENTON Community and Economic Development CONTRACT CHANGE ORDERAGREEMENT 4/24/2026 CONTRACT: CAG-25-257 CONTRACTOR: Andersen Construction Company of Washington, LLC CHANGE ORDER: 12 SUMMARY OF PROPOSEDCHANGE:Per Renton request, Andersen and Seatac were onsite on 4/18 to provide access and support PSE’s installation of thetransformer. Costs include Andersen’s and Seatac Electric’s Foremen for 7 hours. Light ƱƄture is priced to utiliƏe the drivers and decoders that are currently onsite. DESCRIPTION: ORIGINALCONTRACT AMOUNT (W/out WSST) CURRENTCONTRACT AMOUNT (W/out WSST) NETCHANGE THIS ORDER (W/outWSST) REVISEDCONTRACT TOTAL AFTER CHANGE $1,248,000.00 $1,651,390.03 $ 2,792.95 $1,654,182.98 Additional Calendar Days: None SIGNATURES: Contractor:Date: Bogdan Tishchenko, Andersen Construction Company of WA, LLC ProjectManager:Date Paul FintƏ, ProjectManager ApprovedBy:Date: Justin Johnson, Development EngineeringDirector Date: Date: Approved By: Gina Estep, CED Administrator Approved By: Approved by Cheryl Beyer via ema; Cheryl Beyer, Senior Assistant City Attorney Item No.Qty. Description UnitPrice Amount w/WSST 1 7 Andersen Foreman 166.00 $ 1,162.00 21Andersen overhead costs N/A$ 339.00 3 7 Electrician 1,113.75 $ 1,113.75 4 1 Seatac (electrical sub) overhead costs N/A $ 178.20 Totalthis Change Order: $ 2,792.95 "!#           $  $    $    $   CAG-25-257, CO #12-26 4/29/2026 BUILDER OF CHOICE Page 1 of 1 Change Request CR-018 April 23, 2026 Job Name: Legacy Square Phase 2 Job Number: AWA25SP016 Subject: PSE Saturday Work Date Initiated: 2026-04-23 This change request is submitted, as required, for your review and approval. Amount: $2,792.95 Time Extension Requested: Reference: Scope Description: Per Renton request, Andersen and Seatac were onsite on 4/18 to provide access and support PSE’s installation of the transformer. Costs include Andersen’s and Seatac Electric’s Foremen for 7 hours. See attached for reference. Change Request Cost Breakdown Direct Cost of Work Amount Seatac COP 06 $1,291.95 Andersen Foreman (7 hrs) $1,162.00 Subtotal $2,453.95 Cost of Work Add-Ons Volume Driven Liability Insurance (1.25%) $34.00 Bonding (1.00%) $27.00 Overhead / Profit up to the first $50,000 (16%) $186.00 Overhead / Profit up to the first $50,000 for each subcontractor (6%) $77.00 Payroll Driven Liability Insurance (1.25%) $15.00 Total Change Request Amount $2,792.95 Supporting documentation and detailed cost of work is attached as required. Please indicate your approval of this Change Request by signing below and returning one (1) copy of this transmittal letter t o Andersen Construction. The Change Request will be incorporated in a subsequent Contract Change Order. By executing of this Change Order, contractor acknowledges and agrees that it has been fully compensated for all change in th e Contract Sum and Contract Time effected through a written change order, satisfaction for all costs incurred, labor performed, and material and equipment furnished. Contractor: Owner: Andersen Construction Company of Washington LLC Date City of Renton Date Bogdan Tishchenko "!#            5HTXHVWIRU&KDQJH2UGHU    &23     “iϡϙ IJîôŘŜôIJϙĺIJŜťŘŪèťĖĺIJϙϙ ĺČîôIJϙ“ĖŜēèēôIJħĺϙ ϙϙϙϙϙϙϙϙ Viϡϙϙ [ôČÍèƅϙ‹ŗŪÍŘôϙ„ēÍŜôϙ͑ϙi„ϙ͕ϙ‹ÍťŪŘîÍƅϙi“ϙŕôŘϙ„‹(ϙ ϙ “ēÍIJħϙƅĺŪϙċĺŘϙťēôϙĺŕŕĺŘťŪIJĖťƅϙťĺϙŕŘĺŽĖîôϙÍϙīŪıŕϙŜŪıϙŕŘĺŕĺŜÍīϙċĺŘϙťēôϙŕŘĺĤôèťϙIJÍıôîϙÍæĺŽôϟϙ ϙ ®ĺŘħϙ"ôŜèŘĖŕťĖĺIJϡϙϙϙ īôƄϙťĺϙſĺŘħϙ͕ϟ͖͔ϙēĺŪŘŜϙĺċϙi“ϙīÍŜťϙ‹ÍťŪŘîÍƅϙťēôϙ͐͗ťēϙŕôŘϙ„‹(ϙϙ ϙ щ͕͔͐ϙ³ϙ͕ϟ͖͔ϙēĺŪŘŜϙϙϙ щ͐Ϡ͐͐͒ϟ͖͔ϙ ͕͐҇ϙiFЭ„ϡϙ ϙ щ͖͐͗ϟ͑͏ϙ ϙ ϙ ϙ “i“[ϙ>i‡ϙi«(ϡϙ щ͐Ϡ͑͐͘ϟ͔͘ϙ  „ŘĖèôϙĖŜϙČĺĺîϙċĺŘϙĺIJīƅϙ͒͏ϙîÍƅŜϙ ϙ (ƄèīŪŜĖĺIJŜϙ &RQFUHWHVODE 8WLOLW\ZRUNQRWPHQWLRQHGDERYH 8WLOLW\IHHV 6XUYH\;UD\VDZFXWWLQJDQGFRQFUHWHFRULQJ 7UHQFKLQJ%DFNILOO&RPSDFWLQJϙ ϙ ‹ĖIJèôŘôīƅϠϙ ‡ĺææƅϙ@ĺIJIJôŘϙ "!#          Employee Name Hours GC Signature: ______________________________Foreman Signature: _________________________ Employee Name Hours Materials Used QuantMaterials Used Quant Time & Material Daily Log Date: ____________________________________ Job #: ___________________________________ Foreman: _________________________________Contractor: ________________________________ Job Name: ________________________________ Work Performed "!#          CAUTION:This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. Outlook RE: Legacy Square Phase II - Fiber & PSE Work From Paul Hintz <PHintz@Rentonwa.gov> Date Thu 4/16/2026 10:11 AM To Bogdan Tishchenko <btishchenko@andersen-const.com> Cc Casey Armstrong <carmstrong@AsiStructures.com> Bogdan, We’ll pay for your electrical sub and a foreman to be onsite Saturday; please ensure they’re onsite by 7 AM – the PSE crew might leave the site if no one is onsite to grant them access. Please submit a CO for this with the OT rates shown (I doubt we’ll be able to get it signed before Saturday, but that’s okay). Again, if the work takes less than eight hours, I’ll expect to have the total decreased accordingly. Thank you, PAUL HINTZ,Redevelopment Manager City of Renton // Planning Virtual Permit Center //Online Applications and Inspections 425-430-7436 NOTICE OF PUBLIC DISCLOSURE: This message complies with Washington State’s Public Records Act – RCW 42.56 From:Bogdan Tishchenko <bƟshchenko@andersen-const.com> Sent:Wednesday, April 15, 2026 4:41 PM To:Paul Hintz <PHintz@Rentonwa.gov> Cc:Casey Armstrong <carmstrong@AsiStructures.com> Subject:Re: Legacy Square Phase II - Fiber & PSE Work Paul, Here is the cost for the Overtime for Saturday (4/18). We can use this as an allowance and track actual costs on T&M: Seatac Electric = $1531.20 (8hrs) Andersen Foreman = $1688.00 (8hrs) Total with Markups = $3683.00 (track T&M). We can move the fence around to accommodate PSE. "!#          CAUTION:This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. Thank you, Bogdan Tishchenko PROJECT MANAGER CELL 253.880.5296 __________________________________ ANDERSEN CONSTRUCTION An Employee-Owned Company Seattle Office 5601 6th Ave S St. 550 Seattle, WA 98108 206.763.6712 __________________________________ Builder of Choice ANDERSEN-CONST.COM From:Paul Hintz <PHintz@Rentonwa.gov> Sent:Wednesday, April 15, 2026 2:34 PM To:Bogdan Tishchenko <bƟshchenko@andersen-const.com> Cc:Casey Armstrong <carmstrong@AsiStructures.com> Subject:RE: Legacy Square Phase II - Fiber & PSE Work Bogdan, Please provide a quote for up to eight hours of your electrician’s time to be onsite this Saturday. If we agree to pay for this time, we would only pay for the actual time he is onsite. Also, Jenny/PSE noted that the construction fencing near transformer vault will need to be removed or otherwise open for their crew and for truck access. Please let me know if this is feasible. Thanks, PAUL HINTZ,Redevelopment Manager City of Renton // Planning Virtual Permit Center //Online Applications and Inspections 425-430-7436 NOTICE OF PUBLIC DISCLOSURE: This message complies with Washington State’s Public Records Act – RCW 42.56 From:Bogdan Tishchenko <bƟshchenko@andersen-const.com> Sent:Tuesday, April 14, 2026 4:47 PM To:Paul Hintz <PHintz@Rentonwa.gov> Cc:Casey Armstrong <carmstrong@AsiStructures.com> Subject:Fw: Legacy Square Phase II - Fiber & PSE Work "!#