ENVIRONMENTAL REVIEW COMMITTEE REPORT
ERC MEETING DATE: May 7, 2012
Project Name: Wilson Park II Preliminary Plat and Preliminary PUD
Owner: Robert Wilson and Doravin Wilson
2107360
th
Street East
Lake Tapps, WA 98391
Applicant: Same as owner
Contact: Darrell Qffee, P.E.
Offee Engineers, PLLC
13932 SE
159th
Place
Renton, WA 98058
File Number. LUA122-013, ECF, PP, PPUD
Project Manager: Jennifer Henning, Current Planning Manager
Project Summary: The applicant proposes to subdivide an existing 2.15 acre parcel into 10 lots for
the eventual development of detached single family homes, and 1 tract for
open space. The site is zoned Residential -14 du/ac (R-14) & Residential - 1
du/ac (R-1). The site contains 9,783 s.f. of protected slopes (>40%). Proposed
density averages 6.4 dwelling units per acre across the site, with 9 lots
proposed in the R-14 area, & 1 lot proposed within the R-1. A Planned Urban
Development is proposed in order to modify minimum lots size within the R-1
Zone and provide larger lots within the R-14 zone. Access would be provided
from South 55th Street via new street constructed as part of the approved
Wilson Park #1 plat. A small hydrologically isolated, unregulated wetland is
located on the western portion of the site. The site contains 82 trees, of which
21 would be removed for the construction of the new street serving Wilson
Park #1. Ten (10) trees would be retained, and new trees would be planted
including 2 new trees per lot. The project requires Environmental (SEPA)
Review, Planned Urban Development (PUD) Review, and Preliminary Plat
review.
Project Location: 698 South 55th Street
Exist. Bldg. Area SF: N/A Proposed New Bldg. Area (footprint): N/A
Proposed New Bldg. Area (gross): N/A
Site Area: 2.15 acres Total Building Area GSF: 93,801 s.f.
STAFF Staff Recommends that the Environmental Review Committee issue a
RECOMMENDATION: Determination of Non -Significance - Mitigated (DNS -M).
FRC Report. d oc
City of Renton Department of Community & Economic Development Environmental Review Committee Report
WILSON PARK 2 PRELIMINARY PLAT & PRELIMINARY PUD LUA12-013, PP,PP_UD, ECF_
Report of May 7, 2012 Page 2 of 11
PART ONE: PROJECT DESCRIPTION / BACKGROUND
The applicant proposes to subdivide a 2.15 acre parcel into 10 lots for the eventual development of
detached single family homes, and 1 tract for open space. The site is zoned Residential -14 dwelling units
per acre (R-14) and Residential — 1 dwelling unit per acre (R-1). The R-1 portion of the site is considered to
be Urban Separator, and as such 50% of the Urban Separator area is required to be dedicated as open
space.
New residential lots would range in size from 5,559 square feet to 6,778 square feet. The open space tract
would be 19,164 s.f. in size.
Proposed density averages 6.4 dwelling units per acre across the site, with 9 lots proposed for the portion
within the R-14 Zone, and 1 residential lot proposed within the R-1 Zone. A Planned Urban Development is
proposed in order to modify minimum lots sizes within the R-1 zone and to provide larger lots within the
R-14 zone. Access would be provided from South 55th Street via a new street that would be constructed
as part of the approved Wilson Park I subdivision (LUA09-140, PP, ECF).
The topography of the site slopes upward from the west to the east; an area of steep protected slopes
occurs on the eastern portion of the site, Site soils are comprised of Kame Terrace and Ground Moraine
which are glacial till soils. Approximately 820 cubic yards of material would be excavated and 11,200 cubic
yards of fill would be required to accomplish the project.
A small wetland is located on the western portion of the site. This wetland is not regulated per Renton
Municipal Code. Of the 82 trees onsite, 21 would be removed for the construction of the new street, 10
would be retained, and new trees would be planted, including 2 new trees per lot.
The project requires Environmental (SEPA) Review, Planned Urban Development (PUD) Review, and
Preliminary Plat review.
PART TWO: ENVIRONMENTAL REVIEW
In compliance with RCW 43.21C.240, the following environmental (SEPA) review addresses only those
project impacts that are not adequately addressed under existing development standards and
environmental regulations.
A. Environmental Threshold Recommendation
Based on analysis of probable impacts from the proposal, staff recommends that the Responsible
Officials:
Issue a DNS -M with a 14 -day Appeal Period.
B. Mitigation Measures
1. The applicant shall comply with the recommendations contained in the Geotechnical
Engineering Study, prepared by Liu & Associates, Inc. dated November 22, 2004 and amended
February 15, 2012, for the duration of project construction.
2. The applicant shall provide a Temporary Erosion and Sedimentation Plan designed pursuant to
the Department of Ecology's Erosion and Sediment Control Requirements outlined in Volume II
ERC Report. doe
City of Renton Department of Community & Economic Development Environmental Review Committee Report
WILSON PARK 2 PRELIMINARY PLAT & PRELIMINARY PUD LUA12-013, PP,PPUD, ECF
Report of May 7, 2012 Page 3 of 11
of the 2005 Stormwater Management Manual and provide staff with a Construction Mitigation
Plan prior to issuance of construction permits. This mitigation measure shall be subject to
review and approval of the Development Services Division.
3. The applicant shall provide weekly reports on the status and condition of the erosion control
plan with any recommendations of change or revision to maintenance schedules or installation
shall be submitted by the Project Engineer of record to the Public Works inspector.
4. Because of moisture -sensitive fine-grained soils mantling the site and the higher gradient areas
within the site the geotechnical study recommends that grading and foundation construction
be carried out and completed within the dryer period of the year from April 1 through October
31 unless otherwise approved by the Development Services Division. Therefore, the applicant
shall adhere to a construction schedule involving grading and foundation work during the dryer
period of the year.
5. The applicant shall pay a Parks Mitigation Fee based on $530.76 per each new single family lot
prior to recording the final plat.
6. The applicant shall be required to pay a Traffic Mitigation Fee based on $75.00 per each new
average daily vehicle trip associated with the proposed project prior to recording of the final
plat.
7. The applicant shall be required to pay a Fire Mitigation Fee based on $488.00 per each new
single family lot prior to recording the final plat.
C. Exhibits
Exhibit 1 Zoning Map
Exhibit 2 PUD/Plat Map
Exhibit 3 Grading Plan
Exhibit 4 Drainage/Utilities Plan
Exhibit 5 Tree Retention Plan
Exhibit 6 Landscape Plan
Exhibit 7 Comment letter (dated April 15, 2012)
Exhibit S Aerial Photo
D. Environmental Impacts
The Proposal was circulated and reviewed by various City Departments and Divisions to determine
whether the applicant has adequately identified and addressed environmental impacts anticipated to
occur in conjunction with the proposed development. Staff reviewers have identified that the proposal
is likely to have the following probable impacts:
1. Earth
Impacts: The subject site is located on a broad moderate to steep westerly -sloping hillside. This
downward slope is at grades of 13 to 39 percent. Steeper slopes greater than 40% are located on
the eastern portion of the site. The higher gradient portions of the site generally lie within the
eastern 100 to 200 feet and the western 150 to 200 feet of the site. Approximately 820 cubic yards
ERC Report. doc
City of Renton Department of Community & Economic Development Environmental Review Committee Report
WILSON PARK 2 PRELIMINARY PLAT & PRELIMINARY PUD LUA12-013, PP,PPUD, ECF
Report of May 7, 2012 Page 4 of 11
of earth material would be cut and approximately 11,200 cubic yards of fill would be imported for
the proposal.
The applicant submitted a Geotechnical Engineering Study prepared by Liu & Associates, Inc. dated
November 22, 2004 and amended February 15, 2012. The report identifies the soils on the site as
Kame Terrace deposits underlain by Ground Moraine. Kame Terrace deposits consist mostly of silty
sand and gravel to cobble. Locally, they may also contain lenses and pods of till and beds of sand,
silt and clay. According to the Geotechnical Report, these isolated lenses were not encountered on
the subject site. Kame Terrace deposits are of moderately -high to high permeability and can
provide good foundation support to structure in their native undisturbed state. Ground Moraine
deposits are mostly thin ablation till over lodgment till, and were deposited during the retreat of
glaciers during the last Ice Age, more than 14,000 years ago. Lodgment till is generally a compact
mixture of unsorted clay, silt, sand, gravel and cobble, commonly referred to as "hard pan".
Ablation Till is similar to lodgment till, but is much less compact and coherent. Lodgment Till is
practically impervious, except local lenses of sand and gravel. It has the character of low-grade
concrete and can stand in a steep natural or cut slope for long periods. This soil provides excellent
foundation support with little settlement expected. Overlying ablation till is generally looser and is
more compressible and permeable.
The site contains areas of protected slopes (greater than 40%) in the northeastern portion of the
property. This area of protected slopes would be contained within Tract A. There is also a cut
slope on the west portion of the property that slopes up to about 6 to 12 feet. This slope likely
resulted from the original land grading.
Subsurface conditions on the site were explored in November 2004 via six (6) test pits on the
western half of the site. The test pits sampled soil at depths ranging from 5.0 to 8.0 feet. The test
pits identified a layer of loose, organic topsoil from 1.0 to 2.5 feet thick. The topsoil is generally
underlain by a layer of brown Ablation Till soils of loose to medium -dense, silty fine sand, with a
trace of gravel and occasional cobble and boulder, about 1.0 to 3.2 feet thick. Underlying the
Ablation Till to the depths explored is a Lodgment Till deposit of light -brown to light -gray, dense to -
very -dense, weakly -cement, silty fine sand with a trace of gravel.
Additional test pits were explored for the eastern half of the site in February 2012. These recent
test pits included a layer of loose, organic topsoil, from S to 10 inches thick, on the surface. The
topsoil is underlain by a layer of brown to light -brown ablation till (weathered till) of medium -
dense, silty fine sand, with a trace of to some gravel and occasional cobble and boulder, about 3.5
to 4.0 feet thick. Underlying the Ablation Till to the depths explored is a Lodgment Till (fresh till)
deposit of light -brown to light -gray, very -dense, weakly -cement, silty fine sand with some gravel.
The soil conditions of added land are generally similar to that of the original land.
Both report conclude that the subject site is stable and can support the development provided the
recommendations of the November 22, 2004 report are fully implemented and observed during
construction.
The topsoil and loose to medium -dense weathered soils on-site are of low resistance to erosion.
Erosion may occur in the weaker surficial soils over the higher gradient areas if they are devoid of
vegetation. Progressive erosion can lead to shallow, skin -type mudflows. The geotechnical report
recommends preservation and maintenance of vegetation outside of construction limits to mitigate
this potential hazard. The study also recommends that concentrated stormwater should not be
discharged uncontrolled onto the ground. Stormwater from impervious surfaces should be
ERC Report.doc
City of Renton Department of Community & Economic Development Environmental Review Committee Report
WILSONPARK2 PRELIMINARY PLAT& PRELIMINARYPUD LUA12-013, PP,PPUD, ECF
Report of May 7, 2012 Page 5 of 11
captured by underground drain line systems connected to roof downspouts or by catch basins
installed in roadways and driveways. Temporary erosion control measures are also recommended
and these include: a thin layer of quarry spalls placed over excavated areas to protect the subgrade
soils from disturbance by construction traffic; silt fences installed along the downhill sides of
construction areas to prevent sediment from being transported onto adjacent properties or
streets; and ditches or interceptor trench drains installed on the uphill sides of construction areas
to intercept and drain away storm runoff and near -surface groundwater seepage.
In order to mitigate for potential geotechnical impacts such as erosion, staff recommends a
mitigation measure which requires compliance with the recommendations contained in the
Geotechnical Engineering Study, prepared by Liu & Associates, Inc. dated November 22, 2004 and
amended February 15, 2012. Staff also recommends that the applicant provide a Temporary
Erosion and Sedimentation Plan designed pursuant to the Department of Ecology's Erosion and
Sediment Control Requirements outlined in Volume II of the 2005 Stormwater Management
Manual and provide staff with a Construction Mitigation Plan prior to issuance of construction
permits. This mitigation measure shall be subject to review and approval of the Development
Services Division. Staff further recommends that weekly reports on the status and condition of the
erosion control plan with any recommendations of change or revision to maintenance schedules or
installation shall be submitted by the Project Engineer of record to the Public Works inspector.
Because of moisture -sensitive fine-grained soils mantling the site and the higher gradient areas
within the site the geotechnical study recommends that grading and foundation construction be
carried out and completed within the dryer period of the year from April 1 through October 31
unless otherwise approved by the Development Services Division. Staff recommends that as a
mitigation measure that the applicant adhere to a construction schedule involving grading and
foundation work during the dryer period of the year.
Mitigation Measures:
1. The applicant shall comply with the recommendations contained in the Geotechnical
Engineering Study, prepared by Liu & Associates, Inc. dated November 22, 2004 and
amended February 15, 2012, for the duration of project construction.
2. The applicant shall provide a Temporary Erosion and Sedimentation Plan designed pursuant
to the Department of Ecology's Erosion and Sediment Control Requirements outlined in
Volume II of the 2005 Stormwater Management Manual and provide staff with a
Construction Mitigation Plan prior to issuance of construction permits. This mitigation
measure shall be subject to review and approval of the Development Services Division.
3. The applicant shall provide weekly reports on the status and condition of the erosion
control plan with any recommendations of change or revision to maintenance schedules or
installation shall be submitted by the Project Engineer of record to the Public Works
inspector.
4. Because of moisture -sensitive fine-grained soils mantling the site and the higher gradient
areas within the site the geotechnical study recommends that grading and foundation
construction be carried out and completed within the dryer period of the year from April 1
through October 31 unless otherwise approved by the Development Services Division.
Therefore, the applicant shall adhere to a construction schedule involving grading and
foundation work during the dryer period of the year.
ERC Report.doc
City of Renton Department of Community & Economic Development Environmental Review Committee Report
WILSON PARK 2 PRELIMINARY PLAT & PRELIMINARY PUD LUA12-013, PP,PPUD, ECF
Report of May 7, 2012 Page 6 of 11
Nexus: SEPA Environmental Regulations
2. Storm Water
Impacts: A Technical Information Report (dated May 5, 2009) was prepared by Baima and
Holmberg Inc, for the previous Wilson Park l Plat. An addendum to this report was prepared by
Baima and Holmberg on February 28, 2012 to consider the current proposal. The May 2009 report
includes an analysis of upstream tributary drainage which states that the parcel to the east drains
onto the site, with no problems related to runoff. The Level 1 Downstream Drainage Analysis in the
report states that runoff from the site flows west into lots in the adjacent Geneva Court
development. The majority of these flows collect in a drain constructed along the back yards of the
westernmost lots of the Geneva Court development and then flow into the storm system in South
53rd Place. This flow collects in a stormwater pond/bioswale facility located at the intersection of
Talbot Road S and South
53rd
Place approximately 750 -feet downstream from the site. This facility
outfalls through an 18 -inch pipe to the west side of Talbot Road S into a poorly defined channel
flowing into the woods. The flows then pass through a 12 -inch culvert under a walking path and
continue to flow west to a wooded wetland area more than a quarter mile downstream from the
site. Flows into the ditch along S
55th
Street continue west in a rock lined channel along the north
side of the street to the intersection of Talbot Road S and S
55th
Street. The channel is eroded and
shows signs of flowing into the street. Flows from the ditch along Talbot Road 5 collect in the
storm system about 850 -feet downstream from the site eventually flowing into Springbrook Creek
at about 1,800 -feet downstream from the site. The Creek continues flowing west to about one-half
mile downstream of the site where it enters a box culvert crossing SR 167. The Technical
Information Report indicates that there are no apparent drainage problems.
The amended February 28, 2012 report evaluates the addition of the subject 10 -lot plat. The
original stormwater system for Wilson Park I and located within the street that would serve both
Wilson Park I and II was sized to accommodate Wilson Park I lots and the new streets including the
access street located within Wilson Park II. The addendum provides calculations intended to
evaluate the sizing of the storm treatment facility for the two projects. The report notes that City
of Renton's 2009 Drainage Manual requires Best Management Practices (BMP's) for new
developments. One BMP's is to restrict impervious areas on future lots to help reduce runoff,
mitigate for development, and minimize the treatment system needed for the project. This is
known as a "Restrictive Covenant" provision and was utilized as part of a preliminary sizing of the
future system for both Wilson Park I and II. The applicant intends to utilize the Restrictive
Covenant provision and limit impervious surface on each of the new lots in both Wilson Park I and li
to 3,300 square feet per lot. By limiting the impervious area for homes, patios, driveways and
walkways, the proposed stormwater vault will be of an appropriate size to accommodate both
developments. The applicant has also intended to develop both plats at the same time.
Comments received from surrounding property owners expressed concern as to whether the vault
was sized appropriately to accommodate both projects. The applicant has stated that the vault is
sized to the 2009 drainage manual and will provide the necessary volume and capacity for both
projects.
Mitigation Measures: No further mitigation necessary.
Nexus: Not applicable.
ERC Report. doc
City of Renton Deportment of Community & Economic Development Environmentol Review Committee Report
WIL50N PARK 2 PRELIMINARY PLAT & PRELIMINARY PUD LUA12-013, PP,PPUD, ECF
Report of May 7, 2012 Page 7 of 11
3. Water (Wetlands)
Impacts: The applicant submitted a letter from Altmann Oliver Associates, LLC, dated March 11,
2011, that documents the wetland reconnaissance conducted on the subject property March 1,
2011. The primary focus of the reconnaissance was to verify the results of a wetland determination
report prepared by Alder NW (dated October 19, 2004), which indicated the presence of a small
less than 800 s.f.) hydrologically isolated wet area in the western portion of the site, immediately
adjacent to a remnant foundation of an old loafing shed. The Alder NW report previously indicated
that this small wetland area was unregulated as it was significantly disturbed. Altmann Oliver's
reconnaissance concurred with the previous findings, describing the wetland as a small Category 3
wetland. Altmann also confirmed that the drainage course flowing from east to west through the
southern portion of the site is from an outfall of a storm drain line that collects surface water
runoff from South 192nd Street. Therefore, the drainage course is not considered to be stream and
is not regulated by City of Renton.
Mitigation Measures: No further mitigation required.
Nexus: Not applicable.
4. Vegetation
Impacts: The applicant submitted a Tree Inventory and Retention Plan and a Tree Retention with
the project application. There are 82 total trees on the project site, of which 21 would be removed
for construction of the roadway, and 3 trees are within the protected slope area. There are 21
trees within the R-1 zoned area of the site, and 37 trees within the R-14 zoned area. City Code
requires that 30% of the trees in the R-1 (or 6.3 trees) and 10% of the trees in the R-14 (3.7 trees)
be retained. The applicant is proposing to retain 10 trees and plant street trees and provide
enhanced landscaping in the open space tract.
The portion of the site zoned R-1 is within the Talbot Urban Separator Overlay. The purpose of the
Urban Separator Overlay includes providing a continuous open space and wildlife corridor. The
applicant proposes to retain trees within the critical area and buffer, to plant two trees per each
new lot, and to enhance Tract A with native and ornamental trees, shrubs and groundcover. The
enhancement area will be located proximate to the comparable area within Wilson Park I to
provide for the continuous open space corridor.
Mitigation Measures: No further mitigation necessary.
Nexus. Not Applicable.
5. Parks and Recreation
Impacts: It is anticipated that the proposed development would generate future residents who
would use City park and recreation facilities and programs. Staff recommends that the applicant be
required to pay a Parks Mitigation Fee based on $530.76 per each new single family lot to be
payable prior to recording the final plat. The fee is estimated at $5,307.60 (10 new lots x $530.76 =
5,307.60).
Mitigation Measures:
1. The applicant shall pay a Parks Mitigation Fee based on $530.76 per each new single
family lot prior to recording the final plat.
ERC Report.doc
City of Renton Department of Community & Economic Development Environmental Review Committee Report
WILSONPARK2 PRELIMINARY PLAT& PRELIMINARYPUD LUA12-013, PP,PPUD, ECF
Report of May 7, 2012 Page 8 of 11
Nexus: SEPA Environmental Regulations; Parks Mitigation Fee Resolution No. 3082, Ordinance No.
4527
4. Transportation
Impacts: Access to the site would be from S
55th
Street via a 50 -foot wide right-of-way that was
identified on an access easement through the subject site for the Wilson Park I Plat. The roadway
would be constructed to serve both plats (Wilson Park I and II) and would be dedicated as a public
right-of-way. The roadway will have two 13 -foot wide travel lanes, 8 -foot planter strips on each
side, and 5 -foot wide sidewalks.
The applicant submitted a Traffic Impact Analysis Report prepared by TraffEx (Northwest Traffic
Experts, dated June 23, 2004 and supplemented January 25, 2012). The report indicates that the
proposal would utilize the same access to South
55th Street s the approved Wilson Park I Plat. The
site access street intersects South 55th Street on the outside of a horizontal curve on South
55th
Street to optimize sight distance in both the east and west direction for vehicles entering and
exiting the site. The report also indicates that the horizon year for the study is considered to be
2014, as that is the year construction of both plats is anticipated. The study indicated the increase
in traffic with the proposal and determined that the traffic would operate at acceptable levels at
the intersection of South 55th Street and the new street within the plat. The Level -of -Service (LOS)
with the project was determined to be LOS B for future 2014 conditions.
Previously, the site distance on South 55th was evaluated as part of Wilson Park I. It was
determined then that the City of Renton intersection and stopping sight distance requirements in
both the east and west directions would be met.
Comments received from surrounding property owners concern the ability of school buses to safely
serve the plat. The applicant has observed that presently the Renton School District buses travel
east on South 55th in the morning, stopping in South 55th to pick-up students. The buses then
travel west in the afternoon, stopping in South 551h to drop-off students. It is anticipated that this
practice would continue with the project, and that children would wait together for pick-up. While
this is not necessarily a concern for SEPA environmental review; staff will study the issue further
and make recommendations to the Hearing Examiner during the Plat and Planned Urban
Development Nearing.
The proposal would result in an increase in traffic trips to the City's street system. Therefore, staff
recommends that the applicant pay a Traffic Mitigation Fee based on a rate of $75.00 per
additional average daily vehicle trip. Each new residence is expected to generate 9.57 trips; credit
is given for the existing residence on the subject property. The Traffic Mitigation Fee is estimated
to be $7,177.50 (10 new lots x 9.57 trips x $75.00 = $7,177.50) and would be payable prior to
recording the final plat.
Mitigation Measures:
1. The applicant shall be required to pay a Traffic Mitigation Fee based on $75.00 per each
new average daily vehicle trip associated with the proposed project prior to recording of the
final plat.
Nexus: SEPA Environmental Regulations; Transportation Mitigation Fee Resolution No. 3100,
Ordinance 4527
ERC Report. doc
City of Renton Department of Community & Economic Development Environmental Review Committee Report
WILSON PARK PRELIMINARY PLAT& PRELIMINARY PUD LUA12-013, PP,PPUD, ECF
Report of May 7, 2012 Page 9 of 11
5. Fire & Police
Impacts: Fire Prevention staff indicates that sufficient resources exist to furnish services to the
proposed development subject to the condition that the applicant provides the required
improvements and fees. As the proposal could potentially add 10 new residences, staff
recommends that the applicant be required to pay a Fire Mitigation Fee in the amount of $488.00
per each new single family lot. The total fee is estimated to be $4,880.00 (10 new lots X $488.00 =
4,880.00).
Mitigation Measures:
1. The applicant shall be required to pay a Fire Mitigation Fee based on $488.00 per each
new single family lot prior to recording the final plat.
Nexus: <add Nexus info here>
E. Comments of Reviewing Departments
The proposal has been circulated to City Department and Division Reviewers. Where applicable, their
comments have been incorporated into the text of this report and/or "Advisory Notes to Applicant."
v' Copies of all Review Comments are contained in the Official File and may be attached to this
report.
Environmental Determination Appeal Process: Appeals of the environmental determination must be
filed in writing on or before 5:00 PM, May 25, 2012.
Renton Municipal Code Section 4-8-110.6 governs appeals to the Hearing Examiner. Appeals must be filed
in writing at the City Clerk's office along with the required fee. Additional information regarding the
appeal process may be obtained from the City Clerk's Office, Renton City Hall - 7th Floor, 1055 S. Grady
Way, Renton WA 98057.
ADVISORY NOTES TO APPLICANT
The following notes are supplemental information provided in conjunction with the
administrative land use action. Because these notes are provided as information only,
they are not subject to the appeal process for the land use actions.
Planning:
1. RMC section 4-4-030.C.2 limits haul hours between 8:30 am to 3:30 pm, Monday
through Friday unless otherwise approved by the Development Services Division.
2. Commercial, multi -family, new single family and other nonresidential construction
activities shall be restricted to the hours between seven o'clock (7:00) a.m. and eight
o'clock (8:00) p.m., Monday through Friday. Work on Saturdays shall be restricted to
the hours between nine o'clock (9:00) a.m. and eight o'clock (8:00) p.m. No work
shall be permitted on Sundays.
3. Within thirty (30) days of completion of grading work, the applicant shall hydroseed
or plant an appropriate ground cover over any portion of the site that is graded or
ERC Report. doc
City of Renton Department of Communi Economic Development E nmental Review Committee Report
WILSON PARK2 PRELIMINARY PLAT & PRELIMINARYPUD LUA12-013, PP,PPUD, ECF
Report of May 7, 2012 Page 10 of 11
cleared of vegetation and where no further construction work will occur within ninety
90) days. Alternative measures such as mulch, sodding, or plastic covering as
specified in the current King County Surface Water Management Design Manual as
adopted by the City of Renton may be proposed between the dates of November 1st
and March 31st of each year. The Development Services Division's approval of this
work is required prior to final inspection and approval of the permit.
4. A National Permit Discharge Elimination System (NPDES) permit is required when
more than one acre is being cleared.
5. The applicant may not fill, excavate, stack or store any equipment, dispose of any
materials, supplies or fluids, operate any equipment, install impervious surfaces, or
compact the earth in any way within the area defined by the drip line of any tree to
be retained.
6. The applicant shall erect and maintain six foot (6) high chain link temporary
construction fencing around the drip lines of all retained trees, or along the perimeter
of a stand of retained trees. Placards shall be placed on fencing every fifty feet (50')
indicating the words, "NO TRESPASSING — Protected Trees" or on each side of the
fencing if less than fifty feet (50'). Site access to individually protected trees or groups
of trees shall be fenced and signed. Individual trees shall be fenced on four (4) sides.
In addition, the applicant shall provide supervision whenever equipment or trucks are
moving near trees.
Fire Prevention:
1. The Fire Mitigation Fees are applicable at the rate of $488.00 per single family unit.
This fee is paid prior to the recording of the plat.
2. The fire flow requirement for a single family home is 1,000 gpm minimum for
dwellings up to 3,600 square feet (including garage and basements). If the dwelling
exceeds 3,600 square feet, a minimum of 1,500 gpm fire flow would be required. A
minimum of one fire hydrant is required within 300-feeet of the proposed buildings and
two hydrants if the fire flow goes up to 1,500 gpm. Existing hydrants can be counted
toward the requirement as long as they meet current code, including 5 -inch storz fittings.
3. Fire Department apparatus access roadways are required to be minimum 20 -feet wide
fully paved, with 25 -feet inside and 45 -feet outside turning radius. Fire access roadways
shall be constructed to support a 30 -ton vehicle with 322 -psi point loading. Access is
required within150-feet of all points on the buildings. Maximum grade of 15% is allowed.
Dead end streets that exceed 150 -feet in length require an approved turnaround.
Plan Review: Water
1. Water service will be provided by Soos Creels Water and Sewer District. A water availability
certificate will be required to be submitted to the City with the site plan application.
Plan Review: Sanitary Sewer
1. Extension of an 8 -inch sewer main in the new roadway is required. Sewer stubs are required
to be provided to each lot.
2. System development fees for sewer are based on the size of the new domestic waters to
serve the new homes on the new lots. Sewer fee for a 3/- inch water meter is $1,591.00. Sewer
ERC Report.doe
City of Renton Department of Communi Economic Development E nmental Review Committee Report
WILSON PARK2 PRELIMINARY PLAT& PRELIMMARYPUD LUA12-013, PP,PPUD, ECF
Report of May 7, 2012 Page 11 of 11
fee for a 1 -inch water meter is $3,977.00. An"approved" water plan from Soos Creek Water and
Sewer District will be required to be submitted to the City.
Property Services:
1. See attached memo for comments from Property Services.
ERC Report. doc
DEPARTMENT OF COMMUNITY Cit'Uf OeR.
AND ECONOMIC DEVELOPMENT
DATE: April 17, 2412
TO: Kayren Kittrick
FROM: Bob Mac Onie M
SUBJECT: Wilson Park II, LUA-12-013-pp
Format and Legal Description Review
I have reviewed the above referenced short plat submittal and have the following
comments:
Note the City of Renton land use action number and land record number, LLA -12 -013 -
FP and LN D-10-0489, respectively, on the final short plat submittal. The type size used
for the land record number should be smaller than that used for the land use action
number. please note that the land use action number provided will change when this
subdivision changes from preliminary to final plat status.
Show two ties to the City of Renton Survey Control Network. The geometry will be
checked by the city when the ties have been provided.
Provide sufficient information to determine how the plat boundary was established.
Include a statement of equipment and procedures used, per WAC32-134-100.
Note the date the existing city monuments were visited, per WAC 332-130-150, and
what was found.
Provide lot closure calculations.
Indicate what has been, or is to be, set at the corners of the proposed lots.
Note discrepancies between bearings and distances of record and those measured or
calculated, if any.
The lot addresses will be provided by the city as soon as possible after the initial final
plat submittal. Note said addresses and the street name on the plat drawing.
hAfile sysllnd - land subdivision & surveying records\h)d-10 - plats14489(wilson park ii)1rv120417.doc
Page 2 of 2
04/17/2012
On the final plat submittal, remove all references pertaining to utilities facilities, trees,
concrete, gravel, decks and other items not directly impacting the subdivision. These
items are provided only for preliminary plat approval.
Do note encroachments.
Remove from the "LEGEND" block all tree items, utilities facilities and mailbox
references, but do include in said "LEGEND" block the symbols and their details that are
used in the short plat drawing.
Do not include a utility provider's block, an owner's block, an engineer/surveyor block
and an architect block.
Do not include any references to use, density or zoning on the final submittal
If the properties to the north are platted, do note the lot numbers and plat name on the
drawing.
Do not show building setback lines for the proposed lots. Setbacks are determined at
the time that building permits are issued.
Note the research resources on the plat submittal.
Note all easements, covenants and agreements of record on the short plat drawing.
The City of Renton "APPROVALS" block is signed by the City of Renton Administrator
Department of Public Works.
Include a DEDICATIOM block on the drawing,.
A pertinent approval block is also needed for the King County Assessor's Office. Provide
signature lines as required.
All vested owner(s) of the subject plat, at the time of recording, need to sign the final
plat submittal. For the street dedication process, include a current title report noting
the vested property owner.
h:lfile sysllnd - land subdivision & surveying recordsllnd-10 - plats10489(wilson park ii)Vv120417.doc
ZONING MAP BOOK
PW Ir"NICAL5ERVW-15
PRINTED ON 13/13109
rrrer.r...ar rr.w,.,...
H3 - 30 T23N R5E E 112
J3 - 06 T22N R5E E 1/2
0 ?p0 Opp
Feet
1;4.800
EXHIBIT 1
I3
31 T23N R5E E 112
5331
ern ivuana
N NWIMYG Y 9M
y I LL7l,rm-,wnw m, NOS1E1Yt iLi38DL!
O
IN6m11lfYMiO[EY
SM3bUDNR R"p Z# )4UVd NOSTAA a
ILI
H
OR
i
1
WOO
t
J r 1,7164+1A44 FMt
5 i 5 I's
Mg
77-
WL MAN rw.Lw la-
w
AN
EXHIBIT 2
IOFJ5if
6
I3Il,
Tl'YRJ'AAA+1]YJlnl
YNRmlQI
Ylf illl Mt
s ra ta amp
r
A
Id ONIaV80
NOS -11M 183SOL1
Z# )fHVd NOSIIAA
Z
rV Z
o
Ail !
Via
E
r i
1
1
r
J
30.
EXHIBIT 3
4L' ANIINIHSY\ WMMI Ai0.1KHH &.
qaL )WII NOSIA d0 )Jj3 gram^ _-
3D)m IIp V 1tl/m
owmrc.w o+lo vls
S'l1HflmDN3 M.
NYld i111N30VNPdaQ
NOS lt/ i1
11313ONAAZ# NH d WSW
I
1 _ /
Itoo !M
I 1 ' I 1 11xm
EXHIBIT 4
NOi'JNIHSVAI 'NOIN'211 Ai0J.N88H. - L/ XWd MOSAM t id© ALID
x "y HL1131311 33x1
urwo M uomm s I r
Noslim LTJ3soa
RUOMHSW X"
EXHIBIT 5
Rt':-RSR=Rha'-.=:t=..a='Res s?•2rs=
tttcctt =--ei;ec
C,
1.I u s K
W ZW 22
4
NGC N \ N NI
44N'flll
W W t Li Li
RUOMHSW X"
EXHIBIT 5
Voy YT[' E!ss1i !i4 iV
mO.LQmHvpw, WA
I -- co Xpr" 1 mos- 1M
4 mr
it
is 9d 4AA
EXHIBIT G
9 y
April 15, 2012
CITY OF RENTON
RECEIVED
APR 16 2012
Jennifer Henning, Current Planning Manager BUILDING DIVISION
CED -- Planning Division
1055 South Grady Way
Renton, WA 98057
RE: LUA12-013, ECF, PP, PPUD (Wilson Park 2 Preliminary Plat)
Ms. Henning:
Thank you for the opportunity to provide comments on the above application. As the
owners of property adjacent to the subject site (located directly northwest of the site), we
have an interest in insuring negative impacts are avoided and appropriate measures are
taken in the possible development of this site. We also commented on Wilson Plat 1.
In as much as the development of this site is directly related to and is proposed to be done
concurrently with Wilson Park 1(approved by the City in 2010), some of these comments
will be related to this development in its entirety.
Comments/Concerns:
1. DRAINAGE
Development of proposed Wilson Park 2, as well as Wilson Park 1, will certainly
change the current site drainage due to increased impervious surfaces. Significant
changes to the existing slopes and changes in the current vegetation/tree coverage
will mean a change in the current natural drainage of the sites. The Wilson 2 Plat
proposal indicates it would be using the detention vault proposed for the Wilson 1
Plat. We are concerned that the vault be engineered to accept this significantly
increased additional use. We are further concerned that the outflow be properly
managed. Should the open drainage ditches along S. 55th Street be used for this
increased outflow due to development, measures should be in place to insure these
ditches to not overflow.
Under new City practices, it is assumed that the City will be the owner of the
detention vault and responsible for its maintenance and repair. Due to the unusual
location (beneath a public street), design/engineering should insure that the vault
can accept the gross vehicle weights of large trucks (garbage trucks, large fire
engines, etc.).
EXHIBIT 7
2. ROADS
The roads serving the proposed plat are outlined in the Wilson Park 1 plat and
indicate that parking will be allowed on one side of the street. As this is the case, we
recommend the City identify ahead of time which side of the road vehicles will be
allowed to park. Our neighborhood is also on a hill and based on our HOA
experiences, we suggest for Wilson Plat 2 that parking be on the east side of the road
entering the plat and the south side of the road in the Wilson 1 plat. We suggest the
sidewalks mirror parking and be "only" on the side of the road where parking is
allowed.
The suggestions for east/south side parking are: This may aid in minimizing a risk
issue identified in the Plat 1 application, that being road conditions (the down slope
of the east -west roadway) during winter weather. Parking "only" on the east/south
side may give a Wilson Plat 1 homeowner more "road" to maneuver in "icy road
conditions" especially at the bottom on the curve area. If people are parked there,
there is no place to maneuver one's vehicle without hitting another vehicle.
Prohibiting vehicles being parked on the west and north sides of the road at the
curve area of the two new roads may avoid parked vehicles being struck by vehicles
sliding downhill during poor weather road conditions. Keeping people parking on the
east and south side of the roadway may also minimize vehicles parking illegally on
City streets by parking in the "wrong direction" (RCW 46.61.575). This RCW mentions
vehicles parking with tires against the "right side of the curb". Parking on the east
and south sides encourages this as drivers tend to enter and park to the right curb as
opposed to turning their vehicles around (facing downhill) prior to parking on the
opposite side of the street.
The proposed road entering from S. 55u' Street is indicated as being 26 feet wide with
parking allowed on one side of the road. RMC 4-6-060 (2009) requires that 6' parking
lanes be allowed for on one side of a residential street. This same RMC requires an 8'
parking lane on arterial streets. It is confusing that the RMC seems to indicate that
vehicles parked on residential streets needs less width to park than vehicles parked
on arterial streets. On paper, for calculation purposes, the required 6' parking lane
subtracted from the 26' road width leaves 20' for vehicles access (particularly
emergency vehicles). In reality, the parking width needed for a legally parked vehicle
is 8', subtracted from 26', leaves an 18' width for emergency vehicles (below
recognized nation standards). While the submitted roads within the plat meet the
current RMC, the City made consider revisiting the long-term impacts of allowing
substandard street widths on residential streets.
Plat 2 indicates sidewalks on both sides of the street and Plat 1 indicates Sidewalks
only on one side of the street. We suggest that if sidewalks are only required on one
side that they be placed only on the 'parking only' of the street. Moving the sidewalk
to the south side of the street in Plat 1 would allow a connected flow between the
plats and tie them together with the walking path in Plat 2. Elimination of the west
side sidewalk in Plat 2 would allow for a wider roadway (creating better parking
space on the east side of the street).
There remain significant concerns over the protection of the four (4) Geneva Court
subdivision properties located west of the new roads serving Plat 1 and 2. These new
roads run directly ABOVE the adjacent homeowners lots. Headlights from vehicles
driving in a westerly direction on the street in Plat 1 at night will be aimed directly at
the rear of the houses in the adjoining Geneva Court neighborhood. We are also
concerned if vehicles on the new road lose control at the bottom of their hill, they
will breach our wooden 5 foot current fences and end up in our backyard. Lastly, we
are concerned with noise and visual impacts that minimize our enjoyment of our
properties.
We feel the Impact could be minimized by installation of a safe, sturdy, tall
retaining/barrier wall across the back of all 4 current horses (along the entire
western section of Plat 1). Currently there is only a 5 foot wooden fence on a slope.
We suggest a retaining wall which is at least 6 foot tall and concrete. The concrete
wall would be to the east of our current wooden fence. To the east of the new
concrete barrier wall, we ask that Evergreen trees (such as fast growing Leland
Cypress trees) be planted as they will also help with noise and visual impacts.
3. ACCESS
The issue of access to the Wilson Plats from and to S. 55th
Street was identified and
addressed in the Plat 1 process. Concern remains that this access point will become
problematic, due to the serpentine nature of the road, the narrow width of the
existing S.
55th
Street and the significant slope of the roadway on S. S50'. Concerns
exist over how school buses will safely (for students and other drivers) serve these
new homes as well as delivery trucks, garbage trucks, etc. While sidewalks are being
required for the new plats, there are currently NO sidewalks on S.
55th
Street. So the
Wilson Plat sidewalks do not lead to "anywhere". Due to the narrow existing
shoulder and narrow road width, pedestrian foot traffic on S. 55th (outside of and
serving the Wilson Plat) is either not possible or done at a risk that is beyond
acceptable — especially to children.
4. MISC
During the Wilson Plat 1 process, the establishment of a homeowners association
HOA) was identified as a requirement. It is recommended that with Wilson 1 and 2
being developed concurrently that only one homeowners association be established
serving both Wilson 1 and 2 (as opposed to two separate associations).
During the Wilson Plat 1 process, concerns from adjacent homeowners as well as
from the Hearing Examiner were made about impacts (visual and safety issues) along
the adjoining boundary with the existing Geneva Court subdivision (located to the
west of the site). These concerns remain and it is requested that part of the
concurrent Wilson 1 & 2 development address these (safety & visual). A safe and
adequate separating retaining wall (prefer a minimal height of 6 feet and concrete)
along the entire western section of Plat 1 is requested. Currently there is only a 5
foot wooden fence on a slope. The maintenance of this retaining wall shall be the
responsibility of the Wilson HOA.
Candidly, it has been difficult to determine what has been approved for the final
Wilson Plat 1. Our understanding is that no final plat site map exists indicating final
outcomes of the Hearing Examiner (4/1/10), the appealed changes, or the Council's
actions (8/16/10). Absent drawings that reflect the written changes, if it difficult to
make informed comments on development impacts.
Respectfully submitted,
Paul & Frieda Witt
617 S.
53rd
Place
Renton, WA 98055
425) 227-5462
Jonathan Vu
622 S 53rd Place
Renton, WA 98055
808) 218-4403
Khanh Nguyen
616553 rd Place
Renton, WA 98055
425) 271-3691.
Quang Dang and Kim Duong '
623S53 rd
Place
Renton, WA 98055
425) 917-9733
Ia6: