PROJECT SUMMARY
CALCULATION DETAILS
• LOADING = HS20/HS25
• APPROX. LINEAR FOOTAGE = 111 LF
STORAGE SUMMARY
• STORAGE VOLUME REQUIRED = 4,095 CF
• PIPE STORAGE VOLUME = 3,138 CF
• BACKFILL STORAGE VOLUME = 1,029 CF
• TOTAL STORAGE PROVIDED = 4,168 CF
PIPE DETAILS
• DIAMETER = 72"
• CORRUGATION = 5xl
GAGE = 16
• COATING =ALT2
• WALL TYPE = PERFORATED
• BARREL SPACING = 36"
BACKFILL DETAILS
• WIDTH AT ENDS = 12"
• ABOVE PIPE = 0"
• WIDTH AT SIDES = 12"
• BELOW PIPE = 0"-0"
4
NOTES
LA
I
• ALL RISER AND STUB DIMENSIONS ARE TO
CENTERLINE. ALL ELEVATIONS, DIMENSIONS, AND
LOCATIONS OF RISERS AND INLETS, SHALL BE
VERIFIED BY THE ENGINEER OF RECORD PRIOR TO
RELEASING FOR FABRICATION.
• ALL FITTINGS AND REINFORCEMENT COMPLY WITH
ASTM A998.
• ALL RISERS AND STUBS ARE 2%" x )/2" CORRUGATION
AND 16 GAGE UNLESS OTHERWISE NOTED.
• RISERS TO BE FIELD TRIMMED TO GRADE.
• QUANTITY OF PIPE SHOWN DOES NOT PROVIDE
EXTRA PIPE FOR CONNECTING THE SYSTEM TO
EXISTING PIPE OR DRAINAGE STRUCTURES. OUR
SYSTEM AS DETAILED PROVIDES NOMINAL INLET
AND/OR OUTLET PIPE STUB FOR CONNECTION TO
EXISTING DRAINAGE FACILITIES. IF ADDITIONAL PIPE
IS NEEDED IT IS THE RESPONSIBILITY OF THE
CONTRACTOR.
• BAND TYPE TO BE DETERMINED UPON FINAL DESIGN.
• THE PROJECT SUMMARY IS REFLECTIVE OF THE
DYODS DESIGN, QUANTITIES ARE APPROX. AND
SHOULD BE VERIFIED UPON FINAL DESIGN AND
5
APPROVAL. FOR EXAMPLE, TOTAL EXCAVATION DOES
NOT CONSIDER ALL VARIABLES SUCH AS SHORING
AND ONLY ACCOUNTS FOR MATERIAL WITHIN THE
a
ESTIMATED EXCAVATION FOOTPRINT.
• THESE DRAWINGS ARE FOR CONCEPTUAL PURPOSES
o
AND DO NOT REFLECT ANY LOCAL PREFERENCES OR
ASSEMBLY
REGULATIONS. PLEASE CONTACT YOUR LOCAL
CONTECH REP FOR MODIFICATIONS.
SCALE: 1" _ 10'
PROJ31062 : SE45IN DATE:
®
\I//�uTCwu®
..- .-�
DY045199 Sierra Homes Short Plat
"DB2 45,99 are2024
DESIGNED:
DYO
DRAWN:
Dvo
w
inM N,
h�mdua'm:awSealm°%tin•^• v
CONTECH"'
ENGINEERED SOLUTIONS LLC
CMP DETENTION SYSTEMS
Detention System
G
n�
•"nq��.a i„I°,mne^upn Mi'A
www.ContechES.com
CONTECH
Issaquah, WA
CHECKED:
DVG
A➢PROVED:
DYO
o
'
9025 Centre Pointe Dr., Suite 400, West Chester, OH 4506'
DYODS
DRAWING
DETENTION SYSTEM
DATE
REVISION DESCRIPTION
BY
38-1122 513-645-7000 513-645-7
eooa as3FAX
SHEET NO:
1
TEMPORARY COVER FOR
CONSTRUCTION LOADS
HEIGHT
OF
COVER
FINISHED
GRADE
CONSTRUCTION LOADS
FOR TEMPORARY CONSTRUCT ON VEHICLE LOADS, AN EXTRAAMOUNT OF COMPACTED COVER MAY BE REQUIRED OVER
THE TOP OF THE PIPE. THE HEIGHT -OF -COVER SHALL MEET THE MINIMUM REQUIREMENTS SHOWN IN THE TABLE BELOW.
THE USE OF HEAVY CONSTRUCTION EQUIPMENT NECESSITATES GREATER PROTECTION FOR THE PIPE THAN FINISHED
GRADE COVER MINIMUMS FOR NORMAL HIGHWAY TRAFFIC.
PIPE SPAN,
AXLE LOADS (kips)
INCHES
18-50 50-75 1 75-110 110-150
MINIMUM
COVER
(FT)
2.0
2.5
3.0
3.0
12-42
48-72
3.0
3.0
3.5
4.0
78-120
3.0
3.5
4.0
4.0
126-144
3.5
4.0
4.5
4.5
"MINIMUM COVER MAY VARY, DEPENDING ON LOCAL CONDITIONS. THE CONTRACTOR MUST PROVIDE THE ADDITIONAL
COVER REQUIRED TO AVOID DAMAGE TO THE PIPE. MINIMUM COVER IS MEASURED FROM THE TOP OF THE PIPE TO
THE TOP OF THE MAINTAINED CONSTRUCTION ROADWAY SURFACE.
CONSTRUCTION LOADING DIAGRAM
SCALE: N.T.S.
A
ACCESS CASTING TO BE
PROVIDED AND INSTALLED
BY CONTRACTOR.
q 1O d a
d
GASKET MATERIAL °CMP RISER J
SUFFICIENT TO PREVENT a
SLAB FROM BEARING ON o
RISER TO BE PROVIDED BY a -
CONTRACTOR. GB 11"TYP. rn
SECTION VIEW
O eA
#4 DIAGONAL TRIM
BAR (TYP. 4 PLACES),
SEE NOTE 7.
l
O
G
c
OPENING IN
PROTECTION
SLAB FOR
CASTING
SCOPE
PIPE
THIS SPECIFICATION COVERS THE MANUFACTURE AND INSTALLATION OF
THE PIPE SHALL BE MANUFACTURED IN ACCORDANCE TO THEAPPLICABLE
THE DESIGNED DETENTION SYSTEM DETAILED IN THE PROJECT PLANS.
REQUIREMENTS LISTED BELOW:
MATERIAL
ALUMINIZED TYPE 2: AASHTO M-36 OR ASTM A-760
THE MATERIAL SHALL CONFORM TO THE APPLICABLE REQUIREMENTS
LISTED BELOW:
GALVANIZED: AASHTO M-36 OR ASTM A-760
ALUMINIZED TYPE 2 STEEL COILS SHALL CONFORM TO THE
POLYMER COATED: AASHTO M-245 OR ASTM A-762
REQUIREMENTS OF AASHTO M-274 OR ASTM A-92.
ALUMINUM: AASHTO M-196 ORASTM B-745
THE GALVANIZED STEEL COILS SHALL CONFORM TO THE
APPLICABLE
REQUIREMENTS OF AASHTO M-218 OR ASTM A-929.
HANDLING AND ASSEMBLY
SHALL BE IN ACCORDANCE WITH NCSP'S (NATIONAL CORRUGATED STEEL
THE POLYMER COATED STEEL COILS SHALL CONFORM TO THE
PIPE ASSOCIATION) FOR ALUMINIZED TYPE 2, GALVANIZED OR POLYMER
REQUIREMENTS OF AASHTO M-246 OR ASTM A-742.
COATED STEEL. SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S
RECOMMENDATIONS FOR ALUMINUM PIPE.
THE ALUMINUM COILS SHALL CONFORM TO THE APPLICABLE
REQUIREMENTS
OF AASHTO M-197 OR ASTM B-744.
INSTALLATION
SHALL BE IN ACCORDANCE WITH AASHTO STANDARD SPECIFICATIONS FOR
CONSTRUCTION LOADS
HIGHWAY BRIDGES, SECTION 26, DIVISION II DIVISION II OR ASTM A-798 (FOR
CONSTRUCTION LOADS MAY BE HIGHER THAN FINAL LOADS. FOLLOW THE
ALUMINIZED TYPE 2, GALVANIZED OR POLYMER COATED STEEL) OR ASTM
MANUFACTURER'S OR NCSPA GUIDELINES.
B-788 (FORALUMINUM PIPE)AND IN CONFORMANCE WITH THE PROJECT
PLANS AND SPECIFICATIONS. IF THERE ARE ANY INCONSISTENCIES OR
CONFLICTS THE CONTRACTOR SHOULD DISCUSS AND RESOLVE WITH THE
SITE ENGINEER.
NOTE:
THESE DRAWINGS ARE FOR CONCEPTUAL
IT IS ALWAYS THE RESPONSIBILITY OF THE CONTRACTOR TO FOLLOW OSHA
PURPOSES AND DO NOT REFLECT ANY LOCAL
GUIDELINES FOR SAFE PRACTICES.
PREFERENCES OR REGULATIONS. PLEASE
CONTACT YOUR LOCAL CONTECH REP FOR
MODIFICATIONS.
Encomr)ass
ENGINEERING & SURVEYING
Western Washington Division
165 NE Juniper Street, Suite 201 • Issaquah, WA 98027 It Phone: (425) 392-0250
Eastern Washington Division
407 Swiftwater Blvd. • Cle Elum, WA 98922 It Phone: (509) 674-7433
INTERRUPTED BAR
REPLACEMENT, SEE
NOTE 6.
#4 DIAGONAL TRIP
BAR (TYR 4 PLACES
SEE NOTE-,
2" COVER
(TYP)
�I t
OPENING I
PROTECTIO
SLAB FOI
CASTINI
REINFORCING TABLE
—BEARING
0 CMP
RISER
A
0 B
REINFORCING
PRESSURE
(PSF)
24"
0 4'
26"
#5 @ 12" OCEW
2,410
4'X4'
#5 @ 12" OCEW
1,780
o 4'1"
32
#5 @ 12" OCEW
2,120
4'-6" X 4'-6"
#5 @ 12" OCEW
1,530
36
.5' 5'
38
#5 @ 10" OCEW
1,890
X 5'
ifs @ 10" OCEW
1,350
42"
0 V-6" 5'-6"
44"
#5 @ 10" OCEW
1,720
X 5'-6"
#5 @ 9" OCEW
1,210
48"
e 6' 6'
S06'
#5 @ 9" OCEW
1,600
X
#5@8"OCEW
1,100
"" ASSUMED SOIL BEARING CAPACITY
\\ STANDARD STANDARD
\t
v— REINFORCING, REINFORCING,
y eB INTERRUPTED BAR
SEE TABLE SEE TABLE
REPLACEMENT,
SEE NOTE 6.
ROUND OPTION PLAN VIEW
SQUARE OPTION PLAN VIEW
NOTES:
1. DESIGN IN ACCORDANCE WITH AASHTO, 171h EDITION.
7. TRIM OPENING WITH DIAGONAL #4 BARS, EXTEND
BARS MINIMUM OF 12" BEYOND OPENING, BEND
2. DESIGN LOAD HS25.
BARS AS REQUIRED TO MAINTAIN BAR COVER.
3. EARTH COVER = 1' MAX.
8. PROTECTION SLAB AND ALL MATERIALS TO BE
PROVIDED AND INSTALLED BY CONTRACTOR.
4. CONCRETE STRENGTH = 3,500 psi
9. DETAIL DESIGN BY DELTA ENGINEERING, BINGHAMTON, NY.
5. REINFORCING STEEL= ASTM A615, GRADE 60.
6. PROVIDE ADDITIONAL REINFORCING AROUND
MANHOLE CAP DETAIL
OPENINGS EQUAL TO THE BARS INTERRUPTED,
HALF EACH SIDE. ADDITIONAL BARS TO BE IN
THE SAME PLANE.
SCALE: N.T.S.
IL
CMP DETENTION SYSTEMS
CONTECH
DYODS
DRAWING
r
I PER CITY COMMENTS
2 SITE PLAN & DRAINAGE PER CITY COMMENTS
REVISION
CJA
03108124
SURVEYED:
DBM
NEM
08121118
DESIGNED:
SS
DRAWN:
PS
CHECKED:
CA
BY
DATE
AP P R
APPROVED:
CA
TABLE 1:
DIAMETER, D
MIN.
COVER
CORR.
PROFILE
W-10"
12"
1 1/2" x 114"
12"-48"
12"
2 2/3"x 1/2"
>48"-96"
12"
3" x 1", 5" x 1"
>96"
D/8
3" x 1", 5" x 1"
• STRUCTURAL BACKFILL MUST EXTEND TO
LIMITS OF THE TABLE
• TOTAL HEIGHT OF COMPACTED COVER FOR
CONVENTIONAL HIGHWAY LOADS IS
MEASURED FROM TOP OF PIPE TO BOTTOM
OF FLEXIBLE PAVEMENT OR TOP OF RIGID
PAVEMENT.
TRENCH 1�FILL ENVELOPE EMBANKMENT
MINIMUM WIDTH DEPENDS ON SITE CONDITIONS AND ENGINEERING JUDGEMENT
INSTALLATION NOTES
1. WHEN PLACING THE FIRST LIFTS OF BACKFILL IT IS
IMPORTANT TO MAKE SURE THAT THE BACKFILL IS PROPERLY
COMPACTED UNDER AND AROUND THE PIPE HAUNCHES.
2. OTHERALTERNATE BACKFILL MATERIAL MAY BE ALLOWED
DEPENDING ON SITE SPECIFIC CONDITIONS, AS APPROVED BY
SITE ENGINEER.
3. AN HDPE MEMBRANE LINER WILL BE PLACED ON THE CROWN
OF EACH PIPE TO PROVIDE AN IMPERMEABLE BARRIER
AGAINST ENVIRONMENTAL CHANGES THAT MAYADVERSELY
AFFECT THE SYSTEM OVER TIME. PLEASE REFER TO THE
CORRUGATED METAL PIPE DETENTION DESIGN GUIDE FOR
ADDITIONAL TECHNICAL DETAILS.
CMP RETENTION STANDARD BACKFILL SPECIFICATIONS
MATERIAL LOCATION
MATERIAL SPECIFICATION
DESCRIPTION
MINIMUM TRENCH WIDTH MUSTALLOW ROOM FOR PROPER COMPACTION OF
MINIMUM EMBANKMENT WIDTH (IN FEET) FOR INITIAL FILL ENVELOPE:
HAUNCH MATERIALS UNDER THE PIPE.
PIPE <24": 3.OD
FILL ENVELOPE WIDTH
PER ENGINEER OF RECORD
THE SUGGESTED MINIMUM TRENCH WIDTH, OR FOR RECOMMENDATION:
.OD
PIPE 24"- 144":
PIPE15 12": D + 16"
PIPE > 144" D + 10'0"
PIPE > 12": 1.5D + 12"
FOUNDATION
AASHTO 26.5.2 - PER ENGINEER OF RECORD
PRIOR TO PLACING THE BEDDING, THE FOUNDATION MUST BE CONSTRUCTED TO A UNIFORM AND STABLE GRADE. IN THE EVENT THAT UNSUITABLE FOUNDATION MATERIALS ARE
ENCOUNTERED DURING EXCAVATION THEY SHALL BE REMOVED AND FOUNDATION BROUGHT BACK TO GRADE WITH A FILL MATERIAL APPROVED BY THE ENGINEER OF RECORD.
ENGINEER OF RECORD TO DETERMINE IF BEDDING IS REQUIRED. PIPE MAY BE PLACED ON THE TRENCH BOTTOM OF A RELATIVELY LOOSE, NATIVE SUITABLE WELL GRADED GRANULAR
BEDDING
AASHTO M 43: 3, 357, 4, 467, 5, 56, 57
MATERIAL THAT IS ROUGHLY SHAPED TO FIT THE BOTTOM OF THE PIPE, 2" MIN DEPTH. THE BEDDING MATERIAL MAY BE SUITABLE OPEN GRADED GRANULAR BEDDING CONFORMING TO
AASHTO SOIL CLASSIFICATIONS Al, A2, ORA3 WITH MAXIMUM PARTICLE SIZE OF 3" PER AASHTO 26.3.8.1
CORRUGATED METAL PIPE
HAUNCH ZONE MATERIAL SHALL BE HAND SHOVELED OR SHOVEL SLICED INTO PLACE TO ALLOW FOR PROPER COMPACTION WITHOUT SOFT SPOTS. BACKFILL SHALL BE PLACED IN 8" -1-
NI AN LA A
SE LIFTS AND COMPACTED TO 90% STANDARD PROCTOR PER AASHTO T 99. BACKFILL SHALL BE PLACED SUCH THAT THERE IS NO MORE THAN A TWO LIFT (16") DIFFERENTIAL BETWEEN
BACKFILL
M 3, , 4, 5, 57 OR APPROVED
NY OF THE PIPES AT ANYTIME DURING THE BACKFILL PROCESS. THE BACKFILL SHOULD BE ADVANCED ALONG THE LENGTH OF THE SYSTEM TO AVOID DIFFERENTIAL LOADING. WHERE
EQUAL"
CONVENTIONAL COMPACTION TESTING IS NOT PRACTICAL, THE MATERIAL SHALL BE MECHANICALLY COMPACTED UNTIL NO FURTHER YIELDING OF MATERIAL IS OBSERVED UNDER THE
COMPACTOR. "IN
AREAS WITH HIGH WATER TABLE FLUCTUATIONS THAT INTERACT WITH THE PIPE ZONE, CONSIDER INSTALLING A GEOTEXTILE SEPARATION LAYER TO PREVENT SOIL MIGRATION.
COVER MATERIAL UP
FO MIN. COVER -AASHTO M 145: A-1, A-2, A3 ABOVE
COVER MATERIAL MAY INCLUDE NON -BITUMINOUS, GRANULAR ROADBASE MATERIAL WITHIN MIN COVER LIMITS
MIN. COVER - PER ENGINEER OF RECORD
RIGID OR FLEXIBLE PAVEMENT (IF
PER ENGINEER OF RECORD
FLEXIBLE PAVEMENT SHOULD NOT BE COUNTED AS PART OF THE FILL HEIGHT OVER THE CMP. FINAL BACKFILL MATERIAL SELECTION AND COMPACTION REQUIREMENTS SHALL FOLLOW THE
APPLICABLE)
PROJECT PLANS AND SPECIFICATIONS PER THE ENGINEER OF RECORD.
OPTIONAL SIDE GEOTEXTILE
NONE
GEOTEXTILE LAYER IS RECOMMENDED ON SIDES OF EXCAVATION TO PREVENT SOIL MIGRATION.
GEOTEXTILE BETWEEN LAYERS
NONE
IF SOIL TYPES DIFFER ATANY POINTABOVE PIPE INVERT, A GEOTEXTILE LAYER IS RECOMMENDED TO BE PLACED BETWEEN THE LAYERS TO PREVENT SOIL MIGRATION.
NOTES:
• FOR MULTIPLE BARREL INSTALLATIONS, THE RECOMMENDED STANDARD SPACING BETWEEN PARALLEL PIPE RUNS SHALL BE THE PIPE DIAMETER /2 BUT NO LESS THAN 12" FOR DIAMETERS <72". FOR 72" AND LARGER DIAMETERS, THE MINIMUM SPACING IS 36". CONTACT
YOUR CONTECH REPRESENTATIVE FOR NONSTANDARD SPACING.
" APPROVED REGIONAL EQUIVALENTS FOR SECTION 5 INCLUDE CA-7, MIDOT 6AA, 6A, OR 5G, PROVIDED THEY MEET THE PARTICLE SIZES INDICATED.
MANUFACTURER RECOMMENDED BACKFILL
NOT TO SCALE
�I7� • w I/�VTCwV® PROs1G.: SE45IN DAE:
_ V DY045199 Sierra Homes Short Plat NEE: 45199 382024
C� NTECH DESIGNED DRAWN
ENGINEERED SOLUTIONS LLC CMP DETENTION SYSTEMS Detention System DYO Dvo
www.ContechES.com Issaquah, WA CHECKED: A➢PROVED:
po„"nm CONTECH DVG DYO
9025 Centre Pointe Dr., Suite 400, West Chester, OH 45069 DYODS
800-338-1122 513-645-7000 513-645-7993 FAX DRAWING DETENTION SYSTEM SHEET NO:
DATE REVISION DESCRIPTION BY 1
CMP DETENTION SYSTEM INSPECTION AND
CMP DETENTION INSTALLATION GUIDE IN -SITU TRENCH WALL MAINTENANCE
WHEN FLOWABLE FILL IS USED, YOU MUST PREVENT PIPE FLOATATION.
PROPER INSTALLATION OF A FLEXIBLE UNDERGROUND DETENTION SYSTEM IF EXCAVATION IS REQUIRED, THE TRENCH WALL NEEDS TO BE CAPABLE OF TYPICALLY, SMALL LIFTS ARE PLACED BETWEEN THE PIPES AND THEN UNDERGROUND STORMWATER DETENTION AND INFILTRATION SYSTEMS MUST
WILL ENSURE LONG-TERM PERFORMANCE. THE CONFIGURATION OF THESE SUPPORTING THE LOAD THAT THE PIPE SHEDS AS THE SYSTEM IS LOADED. IF ALLOWED TO SET-UP PRIOR TO THE PLACEMENT OF THE NEXT LIFT. THE BE INSPECTED AND MAINTAINED AT REGULAR INTERVALS FOR PURPOSES OF
SYSTEMS OFTEN REQUIRES SPECIAL CONSTRUCTION PRACTICES THAT SOILS ARE NOT CAPABLE OF SUPPORTING THESE LOADS, THE PIPE CAN DEFLECT. ALLOWABLE THICKNESS OF THE CLSM LIFT IS A FUNCTION OF A PROPER PERFORMANCE AND LONGEVITY.
DIFFER FROM CONVENTIONAL FLEXIBLE PIPE CONSTRUCTION. CONTECH PERFORM A SIMPLE SOIL PRESSURE CHECK USING THE APPLIED LOADS TO BALANCE BETWEEN THE UPLIFT FORCE OF THE CLSM, THE OPPOSING
WEIGHT OF THE PIPE, AND THE EFFECT OF OTHER RESTRAINING INSPECTION
ENGINEERED SOLUTIONS STRONGLY SUGGESTS SCHEDULING A DETERMINE THE LIMITS OF EXCAVATION BEYOND THE SPRING LINE OF THE MEASURES. THE PIPE CAN CARRY LIMITED FLUID PRESSURE WITHOUT
PRE -CONSTRUCTION MEETING WITH YOUR LOCAL SALES ENGINEER TO OUTER MOST PIPES. PIPE DISTORTION OR DISPLACEMENT, WHICH ALSO AFFECTS THE CLSM INSPECTION IS THE KEY TO EFFECTIVE MAINTENANCE OF CMP DETENTION
DETERMINE IF ADDITIONAL MEASURES, NOT COVERED IN THIS GUIDE, ARE LIFT THICKNESS. YOUR LOCAL CONTECH SALES ENGINEER CAN HELP SYSTEMS AND IS EASILY PERFORMED. CONTECH RECOMMENDS ONGOING,
IN MOST CASES THE REQUIREMENTS FOR ASAFE WORK ENVIRONMENT AND DETERMINE THE PROPER LIFT THICKNESS. ANNUAL INSPECTIONS. SITES WITH HIGH TRASH LOAD OR SMALL OUTLET
APPROPRIATE FOR YOUR SITE. PROPER BACKFILL PLACEMENTAND COMPACTION TAKE CARE OF THIS CONCERN.
CONTROL ORIFICES MAY NEED MORE FREQUENT INSPECTIONS. THE RATE AT
BACKFILL- WELLGRADED WHICH THE SYSTEM COLLECTS POLLUTANTS WILL DEPEND MORE ON SITE
FOUNDATION LIVE LOAD t..UTARANDSMALLER STAGE POURSAS REQUIREDTO SPECIFIC ACTIVITIES RATHER THAN THE SIZE OR CONFIGURATION OF THE
CONSTRUCTA FOUNDATION THAT CAN SUPPORT THE DESIGN LOADING CO NTROLFLOATATIONAND PIPE SYSTEM.
\ APPLIED BY THE PIPE AND ADJACENT BACKFILL WEIGHT AS WELL AS MAINTAIN EMBANKMENT DISTORTIONMISPLACEMENT
\ cLSM
ITS INTEGRITY DURING CONSTRUCTION. INSPECTIONS SHOULD BE PERFORMED MORE OFTEN IN EQUIPMENT
GEOTEXTILE SERA ON EMBANIOAENT WASHDOWN AREAS, IN CLIMATES WHERE SANDING AND/OR SALTING
IF SOFT OR UNSUITABLE SOILS ARE ENCOUNTERED, REMOVE THE POOR SOILS \.�/ \ \ \ \,\ �, \ \' �; \r \ (ABOVE
ABOADBELOWWITH UNIFORMLY / OPERATIONS TAKE PLACE, AND IN OTHER VARIOUS INSTANCES IN WHICH ONE
DOWN TO A SUITABLE DEPTH AND THEN BU ILD UP TO THE APPROPRIATE�i��i ��i��i/T�/i///% BEDDING)\�
�\ GRADED BEDDING LAYER. ./ /j '' WOULD EXPECT HIGHER ACCUMULATIONS OF SEDIMENT OR ABRASIVE/
ELEVATION WITH A COMPETENT BACKFILL MATERIAL. THE STRUCTURAL FILL BEDDING-WELLGRADED� / \i/ - \ CORROSIVE CONDITIONS. A RECORD OF EACH INSPECTION IS TO BE
MATERIAL GRADATION SHOULD NOTALLOW THE MIGRATION OF FINES, WHICH GRANULARAND SMALLER \
//\T \ MAINTAINED FOR THE LIFE OF THE SYSTEM
CAN CAUSE SETTLEMENT OF THE DETENTION SYSTEM OR PAVEMENT ABOVE. WEIGHTED PIPE WITH MOBILE
IF THE STRUCTURAL FILL MATERIAL IS NOT COMPATIBLE WITH THE CONCRETE BARRIERS
UNDERLYING SOILS AN ENGINEERING FABRIC SHOULD BE USED AS BACKFILL PLACEMENT (OR OTHER REMOVABLE WEIGHTS) MAINTENANCE
SEPARATOR. IN SOME CASES, USING ASTIFF REINFORCING GEOGRID
REDUCES OVER EXCAVATION AND REPLACEMENT FILL QUANTITIES. CMP DETENTION SYSTEMS SHOULD BE CLEANED WHEN AN INSPECTION
MATERIAL SHALL BE WORKED INTO THE PIPE HAUNCHES BY MEANS OF REVEALS ACCUMULATED SEDIMENT OR TRASH IS CLOGGING THE DISCHARGE
GEOGRID USEDTO REDUCE BACKFILL COVER SHOVEL -SLICING, RODDING, AIR TAMPER, VIBRATORY ROD, OR OTHER EFFECTIVE
THEAMOUNTOF UNDERCUT GEOGRIDWASNTUSED METHODS. CONSTRUCTION LOADING ORIFICE.
/ �\\E.EANKMENT MAXIMUM UNBNANCE LIMITED ACCUMULATED SEDIMENTAND TRASH CAN TYPICALLY BE EVACUATED
T021-1—(APPROX.1s) TYPICALLY, THE MINIMUM COVER SPECIFIED FORA PROJECTASSUMES H-20 THROUGH THE MANHOLE OVER THE OUTLET ORIFICE. IF MAINTENANCE IS NOT
EMBANKMENT LIVE LOAD. BECAUSE CONSTRUCTION LOADS OFTEN EXCEED DESIGN LIVE PERFORMED AS RECOMMENDED, SEDIMENTAND TRASH MAY ACCUMULATE IN
\ IPEPIPPIPED PIPE D \ LOADS, INCREASED TEMPORARY MINIMUM COVER REQUIREMENTS ARE FRONT OF THE OUTLET ORIFICE. MANHOLE COVERS SHOULD BE SECURELY
NECESSARY. SINCE CONSTRUCTION EQUIPMENT VARIES FROM JOB TO JOB, SEATED FOLLOWING CLEANING ACTIVITIES. CONTECH SUGGESTS THAT ALL
SYSTEMS BE DESIGNED WITH AN ACCESS/INSPECTION MANHOLE SITUATED AT
\ \ GEOGRI IT IS BEST TO ADDRESS EQUIPMENT SPECIFIC MINIMUM COVER
\ \ \ \ OR NEAR THE INLET AND THE OUTLET ORIFICE. SHOULD IT BE NECESSARY TO
BEDDING UNSUTABLESOILSPLACE \ \/\ \//\ \ REQUIREMENTS WITH YOUR LOCAL CONTECH SALES ENGINEER DURING GET INSIDE THE SYSTEM TO PERFORM MAINTENANCE ACTIVITIES, ALL
GRADE THE FOUNDATION SUBGRADE TO A UNIFORM OR SLIGHTLY SLOPING R. LOOSE LIFTS BEDDING YOUR PRE -CONSTRUCTION MEETING. APPROPRIATE PRECAUTIONS REGARDING CONFINED SPACE ENTRYAND OSHA
GRADE. IF THE SUBGRADE IS CLAY OR RELATIVELY NON -POROUS AND THE REGULATIONS SHOULD BE FOLLOWED.
CONSTRUCTION SEQUENCE WILL LAST FORAN EXTENDED PERIOD OF TIME, ANNUAL INSPECTIONS ARE BEST PRACTICE FOR ALL UNDERGROUND SYSTEMS.
IT IS BEST TO SLOPE THE GRADE TO ONE END OF THE SYSTEM. THIS WILL IF AASHTO T99 PROCEDURES ARE DETERMINED INFEASIBLE BY THE DURING THIS INSPECTION, IF EVIDENCE OF SALTING/DE-ICING AGENTS IS
ALLOW EXCESS WATER TO DRAIN QUICKLY, PREVENTING SATURATION OF THE GEOTECHNICAL ENGINEER OF RECORD, COMPACTION IS CONSIDERED ADDITIONAL CONSIDERATIONS OBSERVED WITHIN THE SYSTEM, IT IS BEST PRACTICE FOR THE SYSTEM TO BE
SUBGRADE. ADEQUATE WHEN NO FURTHER YIELDING OF THE MATERIAL IS OBSERVED RINSED, INCLUDING ABOVE THE SPRING LINE SOON AFTER THE SPRING THAW
UNDER THE COMPACTOR, OR UNDER FOOT, AND THE GEOTECHNICAL BECAUSE MOST SYSTEMS ARE CONSTRUCTED BELOW -GRADE, RAINFALL AS PART OF THE MAINTENANCE PROGRAM FOR THE SYSTEM.
ENGINEER OF RECORD (OR REPRESENTATIVE THEREOF) IS SATISFIED WITH CAN RAPIDLY FILL THE EXCAVATION; POTENTIALLY CAUSING FLOATATION
THE LEVEL OF COMPACTION. MAINTAINING AN UNDERGROUND DETENTION OR INFILTRATION SYSTEM IS
GEOMEMBRANE BARRIER AND MOVEMENT OF THE PREVIOUSLY PLACED PIPES. TO HELP MITIGATE EASIEST WHEN THERE IS NO FLOW ENTERING THE SYSTEM. FOR THIS
A SITE'S RESISTIVITY MAY CHANGE OVER TIME WHEN VARIOUS TYPES OF FOR LARGE SYSTEMS, CONVEYOR SYSTEMS, BACKHOES WITH LONG POTENTIAL PROBLEMS, IT IS BEST TO STARTTHE INSTALLATION AT THE REASON, IT IS A GOOD IDEA TO SCHEDULE THE CLEANOUT DURING DRY
SALTING AGENTS ARE USED, SUCH AS ROAD SALTS FOR DEICING AGENTS. IF REACHES OR DRAGLINES WITH STONE BUCKETS MAY BE USED TO PLACE DOWNSTREAM END WITH THE OUTLETALREADY CONSTRUCTED TO ALLOW WEATHER.
BACKFILL. ONCE MINIMUM COVER FOR CONSTRUCTION LOADING ACROSS A ROUTE FOR THE WATER TO ESCAPE. TEMPORARY DIVERSION MEASURES
SALTING AGENTS ARE USED ON OR NEAR THE PROJECT SITE, A GEOMEMBRANE
THE ENTIRE WIDTH OF THE SYSTEM IS REACHED, ADVANCE THE EQUIPMENT MAY BE REQUIRED FOR HIGH FLOWS DUE TO THE RESTRICTED NATURE OF THE FOREGOING INSPECTION AND MAINTENANCE EFFORTS HELP ENSURE
BARRIER IS RECOMMENDED WITH THE SYSTEM. THE GEOMEMBRANE LINER IS TO THE END OF THE RECENTLY PLACED FILL, AND BEGIN THE SEQUENCE UNDERGROUND PIPE SYSTEMS USED FOR STORMWATER STORAGE CONTINUE
INTENDED TO HELP PROTECT THE SYSTEM FROM THE POTENTIAL ADVERSE AGAIN UNTIL THE SYSTEM IS COMPLETELY BACKFILLED. THIS TYPE OF THE OUTLET PIPE. TO FUNCTION AS INTENDED BY IDENTIFYING RECOMMENDED REGULAR
EFFECTS THAT MAY RESULT FROM THE USE OF SUCH AGENTS INCLUDING CONSTRUCTION SEQUENCE PROVIDES ROOM FOR STOCKPILED BACKFILL INSPECTION AND MAINTENANCE PRACTICES. INSPECTION AND MAINTENANCE
DIRECTLY BEHIND THE BACKHOE, AS WELLAS THE MOVEMENT OF CATCH BASIN RELATED TO THE STRUCTURAL INTEGRITY OF THE PIPE OR THE SOUNDNESS
PREMATURE CORROSION AND REDUCED ACTUAL SERVICE LIFE. CONSTRUCTION TRAFFIC. MATERIAL STOCKPILES ON TOP OF THE INLET OF PIPE JOINT CONNECTIONS IS BEYOND THE SCOPE OF THIS GUIDE.
THE PROJECTS ENGINEER OF RECORD IS TO EVALUATE WHETHER SALTING BACKFILLED DETENTION SYSTEM SHOULD BE LIMITED TO 8- TO 10-FEET HIGH WATER —WATER vAvsD PARKING LOT
AGENTS WILL BE USED ON OR NEAR THE PROJECT SITE, AND USE HIS/HER AND MUST PROVIDE BALANCED LOADING ACROSS ALL BARRELS. TO \\
BEST JUDGEMENT TO DETERMINE IF ANYADDITIONAL PROTECTIVE DETERMINE THE PROPER COVER OVER THE PIPES TO ALLOW THE
MEASURES ARE REQUIRED. BELOW IS ATYPICAL DETAIL SHOWING THE MOVEMENT OF CONSTRUCTION EQUIPMENT SEE TABLE I, OR CONTACT YOUR
PLACEMENT OF A GEOMEMBRANE BARRIER FOR PROJECTS WHERE SALTING LOCAL CONTECH SALES ENGINEER. WATER ELEVATION IN
DETENTION SYSTEM
AGENTS ARE USED ON OR NEAR THE PROJECT SITE.
FINISHED FUNCTIONING SYSTEM
ry TYPICALSACKFILLSEQUENCE TROL
i iur OUTLET CON
-1r ar Tr Tr' \ BAN KME
Nr
IMM -1
/ \
remaeoo;°°� PROJECT- So.
DY045199 Sierra Homes Short Plat
No.: DATE:
A��I/�„TCwu® 31062 45IN 318/2024
wmmWv meeue wnows` µam �1►,i\ r=r� DESIGNED: DRAWN:
C�1INTECH®
(N"I,aNm,""yINNIm°«.n�n.•dII�N, ENGINEERED SOLUTIONS LLC CMP DETENTION SYSTEMS Detention System DYO Dvo
www.ContechES.com Issaquah, WA CHECKED: A➢PROVED:
CONTECH DVG DYO
9025CentrePointeDr.,Suite400, West Chester, OH45069 DYODS
BooJ38-„22 5,3E48-7o00 513-645-7993 FAX DRAWING DETENTION SYSTEM
SHEET NO:
DATE REVISION DESCRIPTION BY 1
SCALE:
1 "=20'
ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
VERTICAL: NAVD 1988
HORIZONTAL: NAD 1983/1991
DATU M
Know what's beIow.
Call before you dig.
• CITY OF
PRI RENTON
•
Planning/Building/Public Works Dept.
A
N
'CN
0—
CM
N
�N''�
O
/
O/�\
co
N
,
On
N
N
Q
J
I—
R-428309ii
J
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
I—
DEVELOPMENT ENGINEERING -. O
HHuynh 09/27/2024 =
cry
cn
LIJ
2E
DATE: O
SIERRA HOMES SHORT PLAT 06/19/2024 =
L LI A 2 2- 0 0 0 315 FIELDBOOK:
PAGE:
DRAWING NO:
CONSTRUCTION DETAILS III 21706 L.Lj
SHEET: 9 OF:
10 V)