Loading...
HomeMy WebLinkAboutConditions for Permit C22006395DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Conditions for Permit C22006395 Engineering 1 The Street Modification Land Use Permit (LUA26-000165) to retain the existing power distribution and telecom line must be approved and all conditions of the land user permit shall be met prior to any frontage improvements along Lake Washington Blvd N. 2 The photometric analysis shall be updated to assess existing street trees impact on the street lighting levels along Lake Washington Blvd N. Additional street lights shall be provided and/or the proposed street lights shall be relocated to meet the lighting level requirements per Renton Municipal Code (RMC) 4-6-060.I. No work shall occur along lake Washington Blvd N until the revised lighting plan and photometric analysis are provided and approved by development engineering project manager. 3 A King County Special Use Permit (SUP) is required prior to construction of the roundabout at the intersection of 43rd Street and Lake Washington Blvd N. A copy of the issued permit shall be provided to development engineering project manager. 4 A structural analysis for the lighting pole foundations must be approved and provided by development engineering project manager prior to installation of the streetlights. Page 1 of 1