HomeMy WebLinkAboutTransportation (Aviation) Committee - 15 Jun 2026 - Agenda (4) I-405 RENTON TO BELLEVUE: FULL WEEKEND CLOSURE OF RIPLEY LANE NORTH
1. FOR FISH PASSAGE CULVERT CONSTRUCTION
Public Works Department — Transportation Systems Division recommends adoption of
a resolution authorizing a temporary full street closure of Ripley Ln North from the
Virginia Mason Athletic Center north driveway to the Eastrail Trail Trestle
Undercrossing to occur between June 26, 2026, and October 5, 2026 for the purpose
of constructing a fish passage culvert supporting the I-405 Renton to Bellevue,
Widening and Express Toll Lanes project. Refer to Transportation (Aviation)
Committee
2 EMERGING ISSUES IN TRANSPORTATION
116tn Ave SE Sidewalk Project Update
Transportation Benefit District
•
SUBJECT/TITLE: I-405 Renton to Bellevue: Full Weekend Closure of Ripley Lane
North for Fish Passage Culvert Construction
RECOMMENDED ACTION: Refer to Transportation (Aviation) Committee
DEPARTMENT: Public Works
STAFF CONTACT: Jim Seitz, Transportation Director
EXT.: 7245
. . . . •
There is no fiscal impact to the city by adopting the resolution.
� � • � •
The I-405 Renton to Bellevue Widening and Express Toll Lanes (ETL) Project is intended to increase the
capacity of the I-405 freeway. The project also builds infrastructure for Sound Transit's Stride Bus Rapid
Transit system including a new inline transit station at Northeast 44th Street in Renton. Bus rapid
transit, paired with the ETL system, will provide more reliable transportation options for people.
The contractor is requesting a full weekend closure of Ripley Lane North from north of the Virginia
Mason Athletic Center north driveway entry to just south of the Eastrail Trail Trestle Undercrossing to
complete construction of a fish passage culvert below Ripley Lane North to occur between June 26,
2026, and October 5, 2026.
The contractor will complete the following activities during the full weekend closure:
1. Pavement removal and excavation,
2. Installation of the fish passage culvert,
3. Backfilling around the fish passage culvert,
4. Restoration of the excavated area, and
5. Paving and striping.
The size and length of the precast culvert and the equipment required to set it do not allow the
contractor to maintain one lane of traffic on Ripley Lane North using daytime closures. Completing this
work in one full weekend closure minimizes impact on the residents along Ripley Lane North due to the
shortened duration to complete the work.
The contractor will construct a temporary detour to maintain access for vehicles, pedestrians, cyclists,
and emergency vehicles throughout the duration of the full weekend closure. Notifications will be
provided to the public in accordance with the Public Outreach Plan in Exhibit A.
1
WSDOT's public outreach plans for the requested closure are attached in Exhibit B and include one flier
for businesses and residences within proximity to the local road closure along with the localized detour
plan.
� • � � •
Adopt the resolution authorizing one full weekend closure of Ripley Lane North from the Virginia Mason Athletic
Center north driveway to the Eastrail Trail Trestle Undercrossing to occur between June 26, 2026, and October 5,
2026,for the purpose of constructing a fish passage culvert supporting the I-405, Renton to Bellevue, Widening
and Express Toll Lanes Project.
2
� �
� Washington State `�� �A E �
Department of Transportation N �
I-405 Renton to BellevueWidening and ExpressToll Lanes Project
Full Weekend Closure of Ripley Lane North for Fish Passage Culvert Construction
Ripley Lane North: One full weekend closure—occurring between June 26, 2026,
and October 5, 2026
Scope of work: One full weekend closure of Ripley Lane North to complete fish passage culver
construction. Completing this work supports the construction of WSDOT Express Toll Lanes
and Sound Transit Bus Rapid Transit systems.
Outreach methods:
• 14-dayadvancednotificationto -
businesses and residents p >
, 9
• Fliers to businesses and =
residents outlined in the
Figure 1 map to the right :
�
• Flier provided to City of Renton +�«��
for internal distribution
o Notifications also to be
provided to Virginia Lake Washington
Mason Athletic Center
• Social media and WSDOT Blog
posts notifying the public of the
C�OSUre Eastrail7railTreslb �
Undercrossirp t
o Coordination with the
, �
City of Renton to share , _
social media postsfrom �orth�,v�,w,Y��„Y,o `�
the projeet Vuginia 61aso^Athlelic Center '��
• Hotline and project inbox P �
�
information provided on fliers,
blogposts, and project � O ��e1�:
website N
Message boards will be placed C -�o�����a��o�
� area
���
14 days before the closure to
notify the traveling public =�bs��e��m�,�
• Emergency services briefing
ahead of Closure Figure 1: Business flier area
• WSDOT availability for
media
Page � 1
�
Washington State
�� Department of Transportation
Ripley Lane North in Renton closed,
XX, XX, XXXX t h ro u g h XX, XX, XXXX �
Detours will be posted along Ripley Lane North
Description of work
Ripley Lane North will be closed from just north of the
Virginia Mason Athletic Center to just south of the Hertt eHome O ;
Eastrail Trail Trestle Undercrossing for one full weekend CareAd�,r��„�Y _ �
beginning at 11:OOpm on XX, XX, XXXX, until 5:OOam on
XX, XX, XXXX. Vehicular, pedestrian and bike access , �
will remain open using a temporary detour that extends #
t ���,��
the existing Ripley Lane North pavement. �
Crews will be installing a fish passage culvert as part of �
the I-405/Renton to Bellevue Widening and Express Toll Lake Washington
Lanes Project.
:
'p Eastrall Trail Parking Lot
Nearby residents should expect significant construction $ antl7radRemains
a Accassible br Bicyclists
impacts including but not limited to noise typical of ��orthdrivewayentry�o antlPedestrians
Vvqmia Mason Athleh[CeMer
excavators, haul trucks, drill rigs, crew pickups, and � �
Eastreil Treil TresNe
other construction equipment. �,wa,�,���9
Crews will use strategies to minimize noise and mitigate � ,ry�'
disruption to nearby properties, including avoiding ° Q�' �
banging truck tailgates, directing lights away from �
homes, and using ambient sensitive backup warning I� �`�� � �9«�a:
devices. Ear plugs and white noise machines will be " r�'�:�� C --- =de,o�,
provided upon request to further mitigate anticipated �`- .
noise impacts. � l .uo�,�a��m�
Detour route information Stay informed
Access for vehicles remains open using a detour Visit the project webpage to learn more about upcoming
extending the existing Ripley Lane North. Pedestrian construction work and to sign up
and bicyclist access remains open through the Eastrail �_ � for email updates: bit.ly/Renton-
Trail. Access to the Virginia Mason Athletic Center is ❑� �. ���❑� to-Bellevue
maintained throughout the duration of the closure. " : ��' �.
�� :��•
PPO'ect descri t1011 � �'T� Stay informed with the latest
� p ��•:• '��' travel information by
Flatiron-Lane Joint Venture is the contractor selected by � �'• r , downloading the WSDOT mobile
WSDOT to build this project. The project will reduce �.• �• `�h"''� �or by visiting the real-time
congestion and improve safety along I-405 by adding travel map.
highway capacity and making other safety and mobility
improvements between Renton and Bellevue.
This work is being performed under a project noise Email: 1405SR167Proqram(a�wsdot.wa.qov
variance (LUA-24-000001) issued by the City of Renton. 24/7 construction hotline: 425-818-0161
CITY OF RENTON,WASHINGTON
RESOLUTION NO.
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, AUTHORIZING
TEMPORARY FULL STREET CLOSURE OF RIPLEY LANE NORTH BETWEEN
THE VIRGINIA MASON ATHLETIC CENTER NORTH DRIVEWAY AND
EASTRAIL TRAIL TRESTLE.
WHEREAS, the Washington State Department of Transportation (WSDOT) is
constructingthe I-405 Renton to Bellevue Widening and Express Toll Lanes(ETL) project;and
WHEREAS, this construction activity will require a temporary street closure of Ripley
Lane North between the Virginia Mason Athletic Center North Driveway and Eastrail Trail
Trestle; and
WHEREAS, the weekend closure minimizes impacts to the residents along Ripley
Lane North due to the shortened duration to complete the work; and
WHEREAS, the contractor will construct a temporary detour to maintain access for
vehicles, pedestrians, cyclists, and emergency vehicles throughout the duration of the full
weekend closure; and
WHEREAS, pursuant to section 9-9-3 of the Renton Municipal Code, such street
closures require City Council authorization by means of a resolution;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON,
DO RESOLVE AS FOLLOWS:
SECTION I. The City Council does hereby authorize the temporary closure of Ripley
Lane North between the Virginia Mason Athletic Center north driveway and Eastrail Trail
Trestle for one full weekend closure between June 26, 2026, and October 5, 2026, for the
1
RESOLUTION NO.
purpose of constructing a fish passage culvert in support of the I-405 Renton to Bellevue
Widening and Express Toll Lanes (ETL) project.
SECTION II. Notice of the closure shall be posted and published as required by
RMC 9-9-2 and RMC 9-9-3.
PASSED BY THE CITY COUNCIL this day of , 2026.
Jason A. Seth, City Clerk
APPROVED BY THE MAYOR this day of_ , 2026.
Armondo Pavone, Mayor
Approved as to form:
Shane Moloney, CityAttorney
RES-CED:26RES020:05.15.26
2
�
� WSDOT
I -405 Renton to Bel levue Widen i n
� g
a n d Ex ress To I I La n es P ro ' ect
p J
One Full Weekend Closure :
• Ripley Lane North - from north of the Virginia
Mason Athletic Center north driveway to south
of the Eastrail Trail Trestle Undercrossing
June 2026 `�� �
LANE �
Agenda
• Project overview
• Planned work overview
• Closure overview
• Intended detour routes
• Outreach plans
� Questions
`��' LANE �
�
. .
Renton to Bellevue Project Overview E6thStreet gellevue
`� �
� Two Express Toll Lanes
� � I SE Sth Street
Ma�or multimodal pro�ect elements � GeneralPurposeLanes
Additional General
• New capacity and interchange improvements � PurposeCapacity � -
• Dual express toll lane system
• Direct access ramps
.
Northeast 44th Street in Renton "ZthA�eSE
• 112th Avenue Southeast
• Main Street Bridge replacement
.
Bus Rapid Transit infrastructure (with Sound Transit) NE44thStreet
• Eastrail segments (with King County)
NE 30th Street
• Coordination with Mountains to Sound Greenway trail
� � NE Park Drive
Status: `�
Rent�n'1 Sunset Blvd N
• Construction work along the corridor on-going
_-�
�169
167
`��' LANE �
�
. .
Full Weekend Closure of Ripley Lane North
Extent:
• One full weekend closure of Ripley Lane North from north of the Virginia Mason Athletic Center driveway
to south of the Eastrail Trail Trestle Undercrossing to take place between June 26, 2026 and October 5,
2026.
Work during this closure period will include:
• Pavement removal and excavation,
• Installation of a fish passage culvert,
• Backfilling around the fish passage culvert,
• Restoration of the excavated area, and
• Paving and striping.
`��' LANE �
�
. .
.
Detour Route
�--- Vehicular Detour Routes:
• Access for motorists and emergency vehicles remains
HMI1MjeHomeo open using a detour extending the existing Ripley Lane
CeIC t f '�r ,
� , North. Access to the Virginia Mason Athletic Center is
� � maintained throughout the duration of the closure.
,
�� Pedestrian and Cyclist Detour Routes:
Lake Washington � Pedestrian and cyclist access remains open through the
Eastrail Trail.
�
� Eastrad Trail Parking Lot
and Trad Remains
� Accessible tor Bicyclists
north dnveway entry to and Pedesfians
V�rg�rna Mason Athlet�c Center
F �
Eastrad Trad 7resNe
Undercrossing
.
�
�
�
�
P q• r-
� . O , ,
:,n�. : Legend:
.
N �j��' C -'- =detour
�P ��
4. i Nc.
` �
i
�A�� , =C�OSUfe IIR11�5
`��' LANE �
�
. .
Outreach Strate
gY
Outreach methods: {�^�°�erH,°���� o <
• Send mailer to residents and businesses as outlined in
the figure to the right 14 days in advance of the �
���
closure,
s
• Notifications provided 14 days in advance of the �
closure to the Virginia Mason Athletic Center� LakeWashington
• Flier provided to City of Renton for internal distribution,
• Social media and WSDOT Blog posts notifying the '�µn,,
p u b I i c of t h e c I o s u re� UndeC1ro551npreSlFe t
• Coordination with the City of Renton to share social � £
media posts from the project� ^onhdrrvewayentrylo ���
Vvgmla Mason Athlehc Center ,�
• Hotline and project inbox information provided on o . , � ;
fliers, blogposts, and project website,
�
• Messa e boards will be laced 14 da s rior to the � � ��e�:
9 p Y p N
closure to notify the traveling public, ' � � -areacat�on
. '�`
Emergency services briefing ahead of the closure, and I .�,,re1�,,�
• WSDOT availability for media.
`��' LANE �
�
. .
.
Staff Recommends
One Full Weekend Closure of Ripley Lane North from north of the Virginia Mason Athletic Center north
driveway to south of the Eastrail Trail Trestle Undercrossing to occur between June 26, 2026 and October 5,
2026, for the purpose of constructing a fish passage culvert supporting the I-405, Renton to Bellevue,
Widening and Express Toll Lanes Project.
. .
. �
ues � ons .
`��' LANE �
�
. . •
�.I�..,�' , • i'f . C � �; 1;i, . � P, n '_r�r ,
, L� Sr� � = � � , . ,�J � ' • . �� � � . � � �
.� �t'�� ' � , . ' ,•y � � ., �� ^ . t 1 ' �.
� • �T ; - , �d � .�� 'ti , . _ .. . �
t �' '1?`1 •, �!� j�J,�, , ` =r � l� y�•�. h.t M i j�-, �..� ` t �; •
�' 7ti�i �'�/ �'� �7' ��: � . �
� .�, '„L! 7{ �., � . , �, . �'�� �'�' ''t t
M. .' '�C� � •
� �► �• . r� � � � • • � . - � - ,� �r� � �� � �
• ` �' �:'.:`,;(,'?� ; ;� �,S t,, -` - .: .. r ,-. � �i .� � , . ,�
. y ' ,� , - '[ !� � 1� ��1L� � ,~t ; `� � t r•_
_ . . - � - . . � � -fh _ � � r
, , � � .9 -�.,�� �
- � . - ve � �. .. �
� , . . . , . . i . , .
,•t _ _ '��� • �► ' � , � �� r _ � • •
�� � � 1 h��J. _ � .w� .�i'' ,• �
� � ` ,�.� � ,�. � .'', � �� - . � � .�
r,����� ' `� Y O
. � , G ,�`
. • � � j �i *�
.��t,�� � �'�� ( � � '� � ��, �'�� ��
.� 1 T ,w� ' . �_ ' •r � / � 1 .s� �
_ 1 t .. . � ' � .rr .
, �PF N T �� �' _ - - --
r
� �� :}�, ♦ _ y r � .
�
\��
L
. � "• �4
- � , `t� • ' �'�`w,•4
� .rat r� r.�=�� ,
� '. • , �� •�' + . .��_�?, •
,� �, ,• � _ � '� � . •� ti ` ,� � ' ��r � � /r���
ti --R: _�� s - � � ,
. . . r��• ,. .. . , � ,
. �1. �.'' � . _ ' , _: •_ TRANSPORTATION C01'�/IMITT � , '�� . � .��.��-, , ,-'_,��
� . .� � ., .
_ � ? BLAKE COSTA, - i ���. . �
�� , !
, � �
�
I � ° 4' ' = � � 1
.I�.��' �__�:'�i���. �' • , ,�, -
Existi n Con itions
�
Paved shoulder with storm water ditch
"� 1 1` �� ��\_� -'-` `_
:
l I' __
� 1 . .. �������///���'._�'L�' :� C .
� /- /� �t ..' -
_ - ��, ,_ .-y _ .� \1 V1 - ' �.���`_ ��..'' r.r-{�
ii
r s , : S � .3 �'" ��: �,� t� \ �' `� � 'grq- rq��-
�' { - i.� ti� `��,� � � ' I � .. ,�� ��x
'�'�� � ����� �� '�,� � �,�' �--;-- ��� r�,s �. �
y �� ,'r• .� x� .lh�� � �R`� . .- h:.� �J �I
k. #'� � ��. -i1. �r ti + .� � j r gi • �
5 �; � � � t I „�,
-.� �i�� .■�• , - .lr . ,��'. �. t - �I � 1. . � ' -_
. _ .�a�ftf�' _> � •.s s, ^t,` � t�, a'�'t'`� w� �„! . .� ..� .;{, j'+—,�,z�"--
� -- .. _ r: �irt�.+'�ati- r�, ti} ��=J _ � � .,�, � `_ "�` . ��L�- �
�8� •.�'� Il1A
'.�.� . , . .. 71 ; �f' �`, - �
�.`y - _ - . - � �' � --- � ' . ! .. ���� f ;��•''"
�H'r� ...... a's.,. � �, R �a- , � � ".* � . �--+7�c
�,•� �_ _ ' _ � �II,�WM�iIA!- . _ 7C�� '� �t`�,� '. _ � .
_ _ "�h^i' �r� Yr{Y . `� , _ .� �',�$}...,�' _ y-�.
, � ���{` II'.`�•. ' -. � �. . , . . � � . �� .
� �', lSt7�+ ;F . �i f ��1� i����..� t - _�' �� .
�'
_ A � . � +r . � F ��� r )I V� \ . i _ ..
a.` _ � r r_.. :%�' .. "�' � =#'; _ _ +i�x� �t;, ° u ��. � " .+R•� .
� •;''; : r; t 2� :v. . � �, � SY,,�: , ,a �
� 51 '�,
'�. � t �� ,,f �. - �i �4 t4,.y s��� t . .. +�,Si •
�e.F�..��'�' � ..: .- .. Sc,s�vt�.s:;.. ,,. .,.. _ . . . - _ ... , . .... ,.;,.. �. . �..s�r,��t' � � � �.. . ''_
� �
�
,Y.L�. I�I `.�QA��`�'�.� ...
� yi �,
`,� , SE 160th St '��
. .
� �� �� •
. � � 1:,' 1�..
P r I n D i n .�..
o ect G oa a es _ _ �. .
J � - _ �
. - � �
� �����-�
�P � � � - t � I� `���
Project Goal
,
s�oth St� �� �
�� �, . �._ - ..
Improve pedestrian safety and accessibility along �;�
� ,,t-: --- �,:
116th Ave SE, near Cascade Elementary School & ,� � ', �,��,� F��
Family First Center == � ; ��h ,�. J', �—
�
Q L � �
Project Design "��°a .' _ � '�
�
� �t
�
Sidewalk curb ram s i ed storm water "� � �Ty � � �
, p , pp � � _ }. �._
drainage along the west side of 116th Ave SE, ' � �'r ;} ` i� �
.'�� -'�..I ` � �
between SE 160th St and SE 162nd St w ` '
�� �� - �-�
� � �
Rectangular rapid flashing beacon (RRFB) � _ ..I �� . �,, �
crossing treatments at two existing marked { . � , �
crosswalks at SE 160th St and SE 162nd St with sE 16znd st � i � �
new ADA ramps . � '
� �
.,. .� �� � �-� �w � — � �
�
Construction
Construction will begin on June 22nd, 2026 — first Monday
after school is out for summer vacation
Temporary traffic control is not anticipated to include road
closures, and a north-south pedestrian route will be
maintained around the work zone
The construction schedule will be updated weekly by the
Contractor — includes upcoming activities and estimated
completion date
� �
�
� �
�
Armondo Pavone // Mayor
Public Works // Martin Pastucha,Administrator
RENTON TRANSPORTATION BENEFIT DISTRICT
OFFICIAL NOTICE OF 2025 ANNUAL REPORT
NOTICE IS HEREBY GIVEN that the City Council is issuing the Renton Transportation Benefit
District 2025 Annual Report to the Renton residents.
The Renton Transportation Benefit District (RTBD)was created on August 14, 2023. The creation
of the RTBD established the boundaries as the entire City of Renton as it currently existed or any
adjustments to the boundaries in the future. In December of 2023 the City Council authorized the
RTBD to collect one tenth of one percent sales tax for a period of 10 years.
Revenues from this tax are to be dedicated for the purpose of ongoing transportation
improvements that preserve, maintain, and as appropriate, construct or reconstruct the
transportation infrastructure of the City of Renton.
The RTBD is governed by the City of Renton Council. The RTBD began receiving sales tax receipts
in April 2024.
2025 FINANCIAL REPORT
2025 Financial Summary of the RTBD activity(as of 12/31/25):
Sales Tax and Investment Income $4,415,913
Total Revenues $4.415.913
Street Overlay Program $804,323
116t"Ave SE Sidewalk 362,550
Walkway Program 19,594
Total Expenditures $1.186.467
1055 S Grady Way, Renton,WA 98057 // rentonwa.gov
Page 2 of 4
June 11, 2026
2026 TBD FUNDED PROJECTS
Below are the projects scheduled to utilize RTBD funding in 2026:
STREET OVERLAY PROGRAM
Scope:This program funds resurfacing and other pavement preservation treatments for city
streets and alleyways. In 2024 and 2025, this program provided for the application of Type II slurry
seal across 12.2 miles at over 100 sites across Renton and design work for the annual pavement
preservation program.
The 2026 Overlay Program delivers 5.7 miles of slurry seal applications and 2.41 miles of asphalt
overlay. The major items of work include the removal of the top layer of existing asphalt, subbase
repairs, the placement of new hot-mix-asphalt pavement, and the installation of new roadway
markings.
Schedule: Design and Construction is scheduled to be completed in 2026.
TBD Funding: $3,880,000 (design and construction)
�
0+ '' ' 1 ,
i
^. f . � �� � ��, y
r
' �/�+y �^� / �r y7
u ,-� i
�!+ i�..;'a '� _s
�"i�l���f+�-c c. C"` - .
�`7�W
`� � - - ti �, This picture shows Doolitt(e
� � � ,� � � -�.
�- ,, ; ���^ ��. Construction using a
���� �;_- � � '��'�� specia(ized truck to pour s(urry
�, t ':''� + _ Y� ;�-
- 1 y* ,� �j�����. � • sea(over the road surface.
d � . n.. �vfl�� '�. .
1���!�/��� �
. - 1{''f � ���.� " ��'.`� � __ � __ ,
.F..�� �� . ' . . —v.�.�r� .. - .
l�) �
.7 .�' Y i{• . �: ' '. -
. '
��� Y�4�� .���� Jr� ..��
� �
�
1055 S Grady Way,Renton,WA 98057 // rentonwa.gov .
Page 3 of 4
June 11, 2026
, � ;� ,� ,�,. - ,,,
�' � - »' : " � '"�, k•
-.4'� i+`.l+,'~� Vc�,. ._
.� �.�`4 �,y . . ...
n ��.
�.,�.�.fL, �Tj" �� ��p'�
\!M�'� �'�'. .�Y
After the mixture is poured onto the ,� *�-:s ��"°.. . y:_+ � +�. . `
road surface, workers use '-` � �� "`�� � ° , :- f'
squeegees to spread it even(y. .. � " " ",.'"����
� '` �" ���'`' � /
--L,�--
�. �-=
_:,;,,,_- �-:.�, :
;T�,;
> zx �.
�.,
_.�;:.
.:.: ....:
�, :
�=_ .�;
..: �....
,�,_ ..
_ _..
, ,.3,.
_ ,. � .�--
-f�-,, :�-
116T"AVE SE SIDEWALK PROJECT
Scope:This project will install sidewalk, curb and gutter, drainage, curb ramps, and rectangular
rapid flashing beacon (RRFB) crossings along 116t"Ave SE from SE 162nd St to SE 160t" St.
Schedule: Construction is scheduled to be completed in 2026.
TBD Funding: $637,450 (Construction)
, , �,
� ,
� � �� .� ;3 �� _ _,��-.�--,
' '� � ' � �- ��� z , ��.fi- This picture shows the
1
� }.� ' ��, �-�, �.
�k�� � �'"� ` „� � �`� existingconditionsa(ong
�� �� � . �� _. .� . - ' 116`h Ave SE. Sidewa(k wi(l
_ i. .. v.
v � -- _ _ _
, _...
- � = be insta(led and the ditch
- _ :j :.a:
� � � ,:� -r
§:,:, , � on the left wil(be replaced
��� � � � ,,� , �, ��r��f �
:� +` � { � 1'� ��'' �`� RA� with a piped stormwater
r ,� s, ,�
� I �i ° � f�� �I��
�� � � � t� � � � � drainage system.
��* `"^�:"��"� ��' - . - .
�'
,.
_— �;'�
s,, .,.� t
� .;«� 'n�
� y "�
f�a� �� ��
.,,..,.. :. ..a.,,.., . . .
� �
�
1055 S Grady Way,Renton,WA 98057 // rentonwa.gov .
� �
�
Armondo Pavone // Mayor
Public Works // Martin Pastucha,Administrator
NE 24t"STREET SIDEWALK PROJECT
Scope:This project will install sidewalk, curb and gutter, drainage, curb ramps, streetlights and
bulb-outs along NE 24t" Street from Aberdeen Avenue NE to Blaine Avenue NE.
Schedule: Design is scheduled to be completed in 2026 with construction scheduled to be
completed in 2027.
TBD Funding: $200,000 (design)
TALBOT ROAD SOUTH WALKWAY PROJECT
Scope:The scope of work for the project will be defined in 2026 with the goal of providing
pedestrian and bicycle access to the Cleavland-Richardson Park which is currently being
designed.
Schedule: Planning/pre-design work is scheduled to be completed in 2026 with design beginning
in 2027. Scheduling of construction will be coordinated with the construction of the new park.
TBD Funding: $250,000 (planning, design)
SARTORI TRAFFIC SAFETY IMPROVEMENTS
Scope:The work includes signage, channelization, and signal upgrades to enhance pedestrian
safety and functionality of the streets and intersections around Sartori Elementary School.
Schedule: Design and construction is scheduled to be completed in 2026.
TBD Funding: $245,000 (design, construction)
1055 S Grady Way, Renton,WA 98057 // rentonwa.gov