Loading...
HomeMy WebLinkAboutAdmin Report  EXECUTIVE DEPARTMENT    M   E   M   O   R   A   N   D   U   M       DATE: June 11, 2018    TO: Ed Prince, Council President  Members of Renton City Council     FROM: Denis Law, Mayor  Robert Harrison, Chief Administrative Officer     SUBJECT: Administrative Report        The Renton Farmers Market welcomes back its partners at Kaiser Permanente  Washington, who will host ‘National Call Your Doctor Day’ tomorrow, Tuesday, June  12th.  The market will be filled with fresh flowers and a bounty of farm fresh  produce this and every Tuesday from 3:00 p.m. until 7:00 p.m. through September  25th in the beautiful Piazza Park, located in Downtown Renton at the corner of  South 3rd Street and Burnett Avenue South.  In addition to market fare, shoppers  will enjoy live music, tips from Master Gardeners, cooking demonstrations, and  children’s activities.       Join us on Saturday, June 16th for Renton’s first Juneteenth Celebration.  The  celebration will take place from 9:00 a.m. to 9:00 p.m. and will include a 3‐on‐3  basketball tournament, music, food trucks, workshops, and more.  Join us again on  Tuesday, June 19th from 6:00 to 8:00 p.m. at Carco Theatre for our Juneteenth  Concert.  For more information, please visit rentonwa.gov/Juneteenth.      A Department of Ecology grant in the amount of $2,075,095 was received for the NE  16th Street Jefferson Avenue NE Stormwater Green Connections Project.  This grant  amount is $565,649 more than what was originally anticipated.  The project will be  funded by this grant, plus city matching funds of $608,365.       Information about preventative street maintenance, traffic impact projects, and  road closures happening this week can be found at  http://rentonwa.gov/trafficimpacts.  Preventative street maintenance, traffic impact  projects, and road closures will be at the following locations:     Monday, June 11th through Friday, June 15th, 8:30 a.m. to 4:45 p.m.  North 4th  Street will be reduced to two lanes between Garden Avenue North and Park  Avenue North due to the construction of curbs and gutters for the new Sartori  Ed Prince, Council President  Members of Renton City Council  Page 2 of 3  June 11, 2018      Elementary School.  In addition, one to two eastbound lanes of North 3rd Street  between North Park and North Garden Avenues will be closed for construction  of curbs and gutters for Sartori Elementary. Questions may be directed to  Patrick DeCaro at 425‐207‐6013.     Monday, June 11th through Friday, June 15th, 7:00 a.m. to 5:00 p.m.  The  intersection of East Valley Road and SW 19th Street will be closed for the I‐405  Direct Connector Project.  Questions may be directed to Justin Johnson at 425‐ 430‐7291.     Monday, June 11th through Friday, June 15th, 9:00 a.m. to 3:00 p.m. Single  lane closure along northbound Talbot Road South between the northbound I‐ 405 on‐ramp and the southbound I‐405 off‐ramp for the I‐405 Direct Connector  Project.  Questions may be directed to Justin Johnson at 425‐430‐7291.     Monday, June 11th through Friday, June 15th, 9:00 a.m. to 3:00 p.m. Single  lane closure along the Talbot Road South ramp to northbound I‐405 for the I‐405  Direct Connector Project.  Questions may be directed to Justin Johnson at 425‐ 430‐7291.     Monday, June 11th through Friday, June 15th, 9:00 a.m. to 2:30 p.m.  Expect  intermittent lane closures and traffic delays along Talbot Road South (SR 515)  related to the I‐405/SR 167 Interchange Direct Connector Project.  In addition, northbound and southbound nighttime lane restrictions and closures  along SR 167 and I‐405 are also scheduled this week related to the project.  The  information outlines specific dates and time of the closure.  Questions may be  directed to Craig Smiley, WSDOT I‐405/SR 167 Corridor Communications, at 425‐ 456‐8624 or visit the project website at  http://www.wsdot.wa.gov/Projects/I405/SR167ICDirectConnector.      Monday, June 11th through Friday, June 15th.  King County will be conducting  pavement resurfacing projects on the following roads:    o 154th Place SE between SE Jones Road and the Renton city limits at 156th  Avenue SE:  Nightly work June 11th to June 15th between 7:00 p.m. and  5:00 a.m.  The road will be reduced to one lane with flaggers directing  traffic.      o SE 142nd Street between 144th Avenue SE to 154th Avenue SE:  Daily  work June 11th to June 15th between 8:00 a.m. and 4:00 p.m.  The road  will be reduced to one lane with flaggers directing traffic.      Ed Prince, Council President  Members of Renton City Council  Page 3 of 3  June 11, 2018      o 144th Avenue SE between SE 136th Street and SE 142nd Street:  Daily  work June 11th to June 15th between 8:00 a.m. and 4:00 p.m.  The road  will be reduced to one lane with flaggers directing traffic.    Questions about these projects may be directed to King County Road Services by  calling 206‐477‐8100 or 1‐800‐527‐6237 (1‐800‐KC‐ROADS).  You may also e‐mail  King County Road Services at maint.roads@kingcounty.gov or visit their website  at https://www.kingcounty.gov/depts/transportation/roads.aspx for more  information and a list of projects.     Monday, June 11th through Friday, June 15th, 7:00 a.m. to 4:30 p.m.  Street  maintenance crews will be repaving the area affected by the February storm  water system failure that resulted in a massive sinkhole at 901 Rainier Avenue  North.  Expect significant lane reductions both directions of Rainier Avenue  North in this vicinity.  Please note it is possible the lane restrictions could extend  beyond 4:30 p.m. as crews work to expedite completion of the project.   Questions may be directed to Street Maintenance Supervisor John Kalmbach at  425‐766‐6183.     Monday, June 11th through Friday, June 29th, 7:00 a.m. to 4:00 p.m.  Utility  maintenance crews will be doing a sewer main extension project along NE 25th  Street between Edmonds Avenue NE and Ferndale Avenue NE.  This project will  result in daytime closure of NE 25th Street.  A detour will be in place that will  route traffic along Edmonds Avenue NE and NE 24th Street.  Questions may be  directed to Rocky Sittner at 425‐902‐2004.      Monday, June 11th through December 2018.  Road closure on South 14th Street  between Smithers Avenue South and Davis Avenue South for utility construction.   Questions may be directed to Patrick DeCaro at 425‐207‐6013.     Monday, June 11th through October 2019.  The Renton Hill Utility Replacement  Project is underway with anticipated completion in May 2019.  Following  completion of the utility project, an overlay of the affected surface streets will be  conducted as part of the 2019 overlay project.  The overlay is scheduled to be  completed prior to October 31, 2019.