Loading...
HomeMy WebLinkAboutAdmin Report EXECUTIVE DEPARTMENT    M   E   M   O   R   A   N   D   U   M       DATE: January 8, 2018    TO: Ed Prince, Council President  Members of Renton City Council     FROM: Denis Law, Mayor  Jay Covington, Chief Administrative Officer     SUBJECT: Administrative Report        Inclement Weather Response Reminder:  The Public Works Department would like  to remind residents to help us prevent local residential street flooding by monitoring  catch basins near your home and keeping them clear of leaves and other debris.   Street sweepers are dispatched daily to clean up debris along major arterials.  Also,  snow is not far away.  Please remember that during snow and ice events, the  department sanders and snow plows are dispatched to keep major arterials drivable.   Visit our website at http://rentonwa.gov/living/default.aspx?id=21258 to view our  snow route maps.  It is imperative that motorists do not park or abandon their  vehicles within any portion of the traffic lanes.  Abandoned vehicles impair snow and  ice removal and impact response of emergency vehicles.       Information about preventative street maintenance, traffic impact projects, and  road closures happening this week can be found at  http://rentonwa.gov/trafficimpacts.  Preventative street maintenance, traffic impact  projects, and road closures will be at the following locations:     Monday, January 8th through Wednesday, January 10th, 9:00 a.m. to 3:00 p.m.   The westbound curb lane along NE 4th Street between Union Avenue NE and  Monroe Avenue NE will be closed while crews conduct routine sewer system  maintenance.  Questions may be directed to Rocky Sittner at 425‐902‐2004.      Thursday, January 11th, 8:30 a.m. to 3:30 p.m. Single lane closure along  southbound Talbot Road South north of South 43rd Street for construction at the  Valley Medical Center.  Questions may be directed to Tom Main at 206‐999‐ 1833.     Monday, January 8th through Friday, January 12th, 9:00 a.m. to 2:30 p.m.   Expect intermittent lane closures and traffic delays along Talbot Road South (SR  515) related to the I‐405/SR 167 Interchange Direct Connector Project.  Ed Prince, Council President  Members of Renton City Council  Page 2 of 2  January 8, 2018      In addition, northbound and southbound nighttime lane restrictions and closures  along SR 167 and I‐405 are also scheduled this week related to the project.  The  information outlines specific dates and time of the closure.  Questions may be  directed to Craig Smiley, WSDOT I‐405/SR 167 Corridor Communications, at 425‐ 456‐8624 or visit the project website at  http://www.wsdot.wa.gov/Projects/I405/SR167ICDirectConnector.        Monday, January 8th through approximately Friday, January 19th.  NE 10th  Street will be closed between Harrington Avenue NE and NE Sunset Blvd.  Sunset  Lane NE will be closed just north and just south of NE 10th Street.  These road  closures affect access to the Renton Highlands Library.  The Highlands Library  parking garage will be accessible from the south only during these road closures.   Questions may be directed to project manager Keith Woolley at 425‐430‐7318 or  via email at kwoolley@rentonwa.gov.     Monday, January 8th through Friday, February 16th.  Expect intermittent  daytime lane closures along SE 5th Street from the intersection of SE 5th Street  and SE 6th Street to Pierce Avenue SE to accommodate sidewalk rehabilitation  and replacement.  Questions may be directed to Hebé Bernardo at 206‐503‐ 4194.      Monday, January 8th through August 2018, 8:30 a.m. to 4:45 p.m.  Additional  construction traffic due to the construction of Sartori Elementary School at the  300 block of Park Avenue North and Garden Avenue North.  Questions may be  directed to Patrick DeCaro at 425‐207‐6013.     Monday, January 8th through December 2018.  Road Closure on South 14th  Street between Smithers Avenue South and Davis Avenue South for utility  construction. Questions may be directed to Patrick DeCaro at 425‐207‐6013.     Monday, January 8th through October 2019.  Construction for the Renton Hill  Utility project has commenced and is expected to last 20 months, with  anticipated completion in May 2019.  Following completion of the utility project,  an overlay of affected surface streets will be conducted as part of the 2019  overlay project.  The overlay is scheduled to be completed prior to October 31,  2019.