Inclement Weather Response Reminder: The Public Works Department would like
to remind residents to help us prevent local residential street flooding by monitoring
catch basins near your home and keeping them clear of leaves and other debris.
Street sweepers are dispatched daily to clean up debris along major arterials. Also,
snow is not far away. Please remember that during snow and ice events, the
department sanders and snow plows are dispatched to keep major arterials drivable.
Visit our website at http://rentonwa.gov/living/default.aspx?id=21258 to view our
snow route maps. It is imperative that motorists do not park or abandon their
vehicles within any portion of the traffic lanes. Abandoned vehicles impair snow and
ice removal and impact response of emergency vehicles.
Information about preventative street maintenance, traffic impact projects, and
road closures happening this week can be found at
http://rentonwa.gov/trafficimpacts. Preventative street maintenance, traffic impact
projects, and road closures will be at the following locations:
Monday, January 22nd through Friday, January 26th, 8:30 a.m. to 3:00 p.m.
Northbound East Valley Road between SW 19th Street and Maple Avenue SW
will be closed for the I‐405 Direct Connector Project. Questions may be directed
to Rohini Nair at 206‐999‐1822.
Monday, January 22nd through Friday, January 26th, 9:00 a.m. to 3:00 p.m.
Single lane closure along northbound Talbot Road South between the
northbound I‐405 on‐ramp and the southbound I‐405 off‐ramp for the I‐405
Direct Connector Project. Questions may be directed to Rohini Nair at 206‐999‐
1822.
Ed Prince, Council President
Members of Renton City Council
Page 2 of 2
January 22, 2018
Monday, January 22nd through Friday, January 26th, 9:00 a.m. to 2:30 p.m.
Expect intermittent lane closures and traffic delays along Talbot Road South (SR
515) related to the I‐405/SR 167 Interchange Direct Connector Project.
In addition, northbound and southbound nighttime lane restrictions and closures
along SR 167 and I‐405 are also scheduled this week related to the project.
Questions may be directed to Craig Smiley, WSDOT I‐405/SR 167 Corridor
Communications, at 425‐456‐8624 or visit the project website at
http://www.wsdot.wa.gov/Projects/I405/SR167ICDirectConnector.
Monday, January 22nd through approximately Monday, January 29th. NE 10th
Street will be closed between Harrington Avenue NE and NE Sunset Blvd. Sunset
Lane NE will be closed just north and just south of NE 10th Street. These road
closures affect access to the Renton Highlands Library. The Highlands Library
parking garage will be accessible from the south only during these road closures.
Questions may be directed to project manager Keith Woolley at 425‐430‐7318 or
via email at kwoolley@rentonwa.gov.
Monday, January 22nd through Friday, February 16th. Expect intermittent
daytime lane closures along SE 5th Street from the intersection of SE 5th Street
and SE 6th Street to Pierce Avenue SE to accommodate sidewalk rehabilitation
and replacement. Questions may be directed to Hebé Bernardo at 206‐503‐
4194.
Monday, January 22nd through August 2018, 8:30 a.m. to 4:45 p.m. Additional
construction traffic due to the construction of Sartori Elementary School at the
300 block of Park Avenue North and Garden Avenue North. Questions may be
directed to Patrick DeCaro at 425‐207‐6013.
Monday, January 22nd through December 2018. Road Closure on South 14th
Street between Smithers Avenue South and Davis Avenue South for utility
construction. Questions may be directed to Patrick DeCaro at 425‐207‐6013.
Monday, January 22nd through October 2019. Construction for the Renton Hill
Utility project has commenced and is expected to last 20 months, with
anticipated completion in May 2019. Following completion of the utility project,
an overlay of affected surface streets will be conducted as part of the 2019
overlay project. The overlay is scheduled to be completed prior to October 31,
2019.