• Inclement Weather Response Reminder: The Public Works Department would like
to remind residents to help us prevent local residential street flooding by monitoring
catch basins near your home and keeping them clear of leaves and other debris.
Street sweepers are dispatched daily to clean up debris along major arterials. It is
still winter and more snow could be in the forecast. Please remember that during
snow and ice events, the department sanders and snow plows are dispatched to
keep major arterials drivable. Visit our website at
http://rentonwa.gov/living/default.aspx?id=21258 to view our snow route maps. It
is imperative that motorists do not park or abandon their vehicles within any portion
of the traffic lanes. Abandoned vehicles impair snow and ice removal and impact
response of emergency vehicles.
• Beginning April 1, 2018, Medicare will start a year-long project to replace all current
Medicare cards for beneficiaries to convert from using social security numbers to
using alphanumeric ID numbers. All new Medicare cards will come in the mail.
Nothing needs to be requested. There is a current scam whereby someone claiming
to be from Medicare will call to say a card is on the way but that a temporary card is
needed and a fee is required for the temporary card. They will ask for personal
information so they can process the temporary card. Remember: Medicare handles
all communications by mail unless you call them.
• Information about preventative street maintenance, traffic impact projects, and
road closures happening this week can be found at
http://rentonwa.gov/trafficimpacts. Preventative street maintenance, traffic impact
projects, and road closures will be at the following locations:
✓ Monday, March 5th through Friday, March 9th, 7:00 a.m. to 3:30 p.m.
Additional truck traffic and hauling will occur in the vicinity of Valley Medical
Hospital related to the construction of the new Medical Office Building.
Questions may be directed to Tom Main at 206-999-1833.
Ed Prince,Council President
Members of Renton City Council
Page 2 of 2
March 5,2018
✓ Monday, March 5th through Friday, March 9th, 9:00 a.m.to 3:00 p.m. Single
lane closure along northbound Talbot Road South between the northbound I-
405 on-ramp and the southbound 1-405 off-ramp for the 1-405 Direct Connector
Project. Questions may be directed to Rohini Nair at 206-999-1822.
✓ Monday, March 5th through Friday, March 9th, 4:30 a.m.to 12:00 p.m. Single
lane closure along southbound Talbot Road South between the northbound I-
405 on-ramp and the southbound 1-405 off-ramp for the 1-405 Direct Connector
Project. Questions may be directed to Rohini Nair at 206-999-1822.
✓ Monday, March 5th through Friday, March 9th, 8:30 a.m.to 3:00 p.m. Single
lane closure along northbound East Valley Road between SW 19th Street and
Maple Avenue SW for the 1-405 Direct Connector Project. Questions may be
directed to Rohini Nair at 425-430-7298.
✓ Monday, March 5th through Friday, March 9th, 9:00 a.m.to 2:30 p.m. Expect
intermittent lane closures and traffic delays along Talbot Road South (SR 515)
related to the I-405/SR 167 Interchange Direct Connector Project.
In addition, northbound and southbound nighttime lane restrictions and closures
along SR 167 and 1-405 are also scheduled this week related to the project.
Questions may be directed to Craig Smiley, WSDOT I-405/SR 167 Corridor
Communications, at 425-456-8624, or visit the project website at
http://www.wsdot.wa.gov/Projects/1405/SR1671CDirectConnector.
✓ Monday, March 5th through August 2018, 8:30 a.m.to 4:45 p.m. Additional
construction traffic due to the construction of Sartori Elementary School at the
300 block of Park Avenue North and Garden Avenue North. Questions may be
directed to Patrick DeCaro at 425-207-6013.
✓ Monday, March 5th through December 2018. Road Closure on South 14th
Street between Smithers Avenue South and Davis Avenue South for utility
construction. Questions may be directed to Patrick DeCaro at 425-207-6013.
✓ Monday, March 5th through October 2019. Construction for the Renton Hill
Utility project has commenced and is expected to last 20 months, with
anticipated completion in May 2019. Following completion of the utility project,
an overlay of affected surface streets will be conducted as part of the 2019
overlay project. The overlay is scheduled to be completed prior to October 31,
2019.