Loading...
HomeMy WebLinkAboutAdmin Report EXECUTIVE DEPARTMENT    M   E   M   O   R   A   N   D   U   M       DATE: April 16, 2018    TO: Ed Prince, Council President  Members of Renton City Council     FROM: Denis Law, Mayor  Jay Covington, Chief Administrative Officer     SUBJECT: Administrative Report        The Solid Waste Utility is launching the “Bring Your Own Bag (BYOB)” campaign in  efforts to reduce plastic bag use and litter throughout the city.  The public is  encouraged to bring reusable bags when shopping and complete an online survey  about plastic bag use.  The survey is available at rentonwa.gov/plasticbag through  June 6th.  Questions may be directed to Solid Waste Senior Program Specialist Jina  Kim at Jkim@rentonwa.gov or by calling 425‐430‐7391.     Join Renton Police Officers at one of the Coffee with a Cop events.  The mission of  Coffee with a Cop is to break down barriers between police officers and the citizens  they serve by removing agendas and allowing opportunities to ask questions, voice  concerns, and get to know the officers in your neighborhood.  The next Coffee with a  Cop will take place on Thursday, April 19th from 10:00 a.m. to 12:00 p.m. at  Starbucks, 641 Rainier Avenue South, Renton, WA 98057.     Information about preventative street maintenance, traffic impact projects, and  road closures happening this week can be found at  http://rentonwa.gov/trafficimpacts.  Preventative street maintenance, traffic impact  projects, and road closures will be at the following locations:     Monday, April 16th through Tuesday, April 17th, 7:00 a.m. to 5:00 p.m.   Weather permitting, Harrington Avenue NE between NE 7th Street and NE 8th  Place will have flaggers during pavement restoration associated with the  Harrington Avenue Green Connector project.  Drivers are cautioned to expect  long delays for the duration of this pavement restoration.  Questions may be  directed to Dan Carey at 425‐430‐7293 or Todd Freih at 206‐999‐1832.     Monday, April 16th through Friday, April 20th, 8:30 a.m. to 4:45 p.m.  North  4th Street will be reduced to two lanes between Garden Avenue North and Park  Avenue North due to the construction of curbs and gutters for the new Sartori  Ed Prince, Council President  Members of Renton City Council  Page 2 of 3  April 16, 2018      Elementary School.  Questions may be directed to Patrick DeCaro at 425‐207‐ 6013.     Monday, April 16th through Friday, April 20th, 9:00 a.m. to 3:00 p.m.  Possible  single lane closure at the intersection of SW 41st Street and East Valley Road for  construction at Valley Medical Center.  Questions may be directed to Tom Main  at 425‐999‐1833.       Monday, April 16th through Friday, April 20th, 9:00 a.m. to 3:00 p.m.  Single  lane closure at the northeast intersection of Talbot Road South and South 15th  Street due to red light camera installation.  Questions may be directed to Pat  Miller at 206‐794‐6162.     Monday, April 16th through Friday, April 20th, 9:00 a.m. to 3:00 p.m.  Single  lane closure at the northeast intersection of Talbot Road South and Grady Way  South due to red light camera installation.  Questions may be directed to Pat  Miller at 206‐794‐6162.     Monday, April 16th through Friday, April 20th, 9:00 a.m. to 3:00 p.m. Single  lane closure along northbound Talbot Road South between the northbound I‐ 405 on‐ramp and the southbound I‐405 off‐ramp for the I‐405 Direct Connector  Project.  Questions may be directed to Justin Johnson at 425‐430‐7291.     Monday, April 16th through Friday, April 20th, 4:30 a.m. to 12:00 p.m. Single  lane closure along southbound Talbot Road South between the northbound I‐ 405 on‐ramp and the southbound I‐405 off‐ramp for the I‐405 Direct Connector  Project.  Questions may be directed to Justin Johnson at 425‐430‐7291.     Monday, April 16th through Friday, April 20th, 9:00 a.m. to 3:00 p.m.  Single  lane closure on the Talbot Road South ramp to northbound I‐405 for the I‐405  Direct Connector Project.  Questions may be directed to Justin Johnson at 425‐ 430‐7291.     Monday, April 16th through Friday, April 20th, 9:00 a.m. to 2:30 p.m.  Expect  intermittent lane closures and traffic delays along Talbot Road South (SR 515)  related to the I‐405/SR 167 Interchange Direct Connector Project.  In addition, northbound and southbound nighttime lane restrictions and closures  along SR 167 and I‐405 are also scheduled this week related to the project.   Questions may be directed to Craig Smiley, WSDOT I‐405/SR 167 Corridor  Communications, at 425‐456‐8624, or visit the project website at  http://www.wsdot.wa.gov/Projects/I405/SR167ICDirectConnector.       Ed Prince, Council President  Members of Renton City Council  Page 3 of 3  April 16, 2018       Monday, April 16th through Friday, April 27th, 7:00 a.m. to 4:00 p.m.  City  maintenance crews will be repaving and replacing curb, gutter, and sidewalk at  907 Rainier Avenue North, the location of the February storm system failure and  massive sinkhole.  Expect intermittent lane closures in the vicinity of this project.   Questions may be directed to John Kalmbach at 425‐766‐6183.     Monday, April 16th through December 2018.  Road closure on South 14th Street  between Smithers Avenue South and Davis Avenue South for utility construction.   Questions may be directed to Patrick DeCaro at 425‐207‐6013.     Monday, April 16th through October 2019.  The Renton Hill Utility Replacement  Project has commenced with anticipated completion in May 2019.  Following  completion of the utility project, an overlay of the affected surface streets will be  conducted as part of the 2019 overlay project.  The overlay is scheduled to be  completed prior to October 31, 2019.