HomeMy WebLinkAboutAddendum #1- CAG-26-132School and Pedestrian Crossing No. 2 ADDENDUM NO. 1 June 15, 2026 Page 1 of 2 Addendum No. 1 School and Pedestrian Crossing No. 2 City of Renton Project No. CAG-26-132 Date of Issue: June 15, 2026 Bid Due Date: June 23, 2026 at 3:00 pm Date of Bid Opening: June 25, 2026 at 3:00 pm ATTENTION: ALL BIDDERS AND PLAN HOLDERS: The Bid Documents for the above-named project are modified as described below. Bidders shall take this Addendum into consideration when preparing and submitting their bids. Bidders shall attach this addendum to their copy of the Contract Documents, and shall acknowledge receipt of this Addendum on the Proposal - Signature Page and include a copy of this Addendum with the Proposal. A Proposal may be considered irregular and may be rejected if the receipt of Addenda is not acknowledged and a complete copy of this Addendum is not included with the Proposal. THE CONTRACT DOCUMENTS ARE MODIFIED AS FOLLOWS: 1. APPENDIX B – CITY OF RENTON STANDARD PLANS ADD the following to the end of Appendix B: • 117.1, Arterial Street Decorative Luminaire Pole Detail • 117.1A, Arterial Street Small Cell Decorative Luminaire Pole Details • 117.1B, Arterial Street Small Cell Decorative Luminaire Pole Details • 117.3, Luminaire and Mounting Bracket Detail 2. PLANS REPLACE the drawing sheets listed below with the revised drawings attached to this Addendum. The drawings were revised to reflect the following: • Drawing CR-1, CR-2 and CR-3, Revise Electrical Note 1. o 1. CONSTRUCT FOUNDATION AND INSTALL RRFB POLE ASSEMBLY AND SIGNS PER CITY OF RENTON STANDARD PLANS 141.1, 141.2, 141.4 AND 141.5. FURNISH AND INSTALL POLE TAG PER CITY OF RENTON STANDARD PLAN 139.” School and Pedestrian Crossing No. 2 ADDENDUM NO. 1 June 15, 2026 Page 2 of 2 • Drawing CR-1, CR-2 and CR-3, Revise Electrical Note 5. o 5. CONSTRUCT STREET LIGHT FOUNDATION AND INSTALL AN ARTERIAL STREET DECORATIVE LUMINAIRE STREET LIGHT POLE, WITH A 6-FOOT ARM AND LUMINAIRE PER CITY OF RENTON STANDARD PLANS 115, 117.1, 117.1A, 117.1B, 117.3, 119, 120 AND 121. CONTACT SIGNAL MAINTENANCE SHOP AT (425) 430-7423 TO OBTAIN POLE NUMBERING.” ALL OTHER REQUIREMENTS OF THE CONTRACT DOCUMENTS REMAIN IN EFFECT. CITY OF RENTON _______________________ Chris Barnes Transportation Operations Manager POLE ELEVATION FOUNDATION SHALL SUPPORT POLE SHOWN IN STANDARD PLAN 117.1A FOUNDATION, AND ANCHOR BOLT DETAILS PER STANDARD PLAN 117.1A j jjDocuSign Envelope ID: 9D9B0DA8-0385-4664-AE66-57BFF1561D7F 7/27/2022 | 5:44 PM PDT FOUNDATION DETAILS POLE ELEVATION POLE CHAMBER DETAIL jj jDocuSign Envelope ID: 9D9B0DA8-0385-4664-AE66-57BFF1561D7F 7/27/2022 | 5:44 PM PDT BASE COVER DETAIL CABINET TOP PLATE DETAIL CABINET BOTTOM PLATE DETAIL CABINET CHAMBER DETAIL DocuSign Envelope ID: 9D9B0DA8-0385-4664-AE66-57BFF1561D7F 7/27/2022 | 5:44 PM PDT LUMINAIRE ARM DETAILS LUMINAIRE ARM MOUNTING BRACKET DETAILS DocuSign Envelope ID: 9D9B0DA8-0385-4664-AE66-57BFF1561D7F 7/27/2022 | 5:44 PM PDT S S S S S S S S S S S S S S S S S S S S FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W G G G G G G G G G G G G G G G G G G G SSSSSSS S S S S S S S S S S S S S S S S S S S S S S S S S S S S OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH E E E E E E E E E E E E E E E E E E E E E E E E CO M CO M CO M CO M CO M CO M CO M CO M CO M CO M CO M CO M CO M G G G G G G G G G G S S D S 10 4 + 5 0 DD D E E E E EEEEEEEEEE E E E E E E E E E E DDDDDD E E W W W W 1 2 3 4 5 6 7 8 9 10 11 12 13 15 1617 18 19 20 21 22 23 24 25 26 27 28 29 30 31 POWER SERVICE CABINET 0. 5 0 % 1.6 8 % 1.39 % 1.25% 0. 4 6 % 0. 4 6 % 0. 4 6 % 0. 5 0 % 1 . 1 2 % 0 . 7 4 % 1 . 3 5 % 9. 5 4 % 7.73%0. 2 5 % 7.56% 1.5 7 % 9. 6 6 % 2.22% 1.50% 1.50% 0. 5 5 % 0. 3 % 0 . 4 7 % 1 . 0 5 % 1 . 2 4 % 14 3.92% 5.01% LOW PT: 104+66.82 0.61% 0.65% 7.58% 7.96% 8.1 8 % 7.8 1 % 0.65% 0.6 5 % 0 . 6 5 % 0 . 5 5 % 0 . 5 5 % 0. 5 0 % 0. 4 4 % 32 33 1. 5 0 % 1. 0 0 % 9. 8 1 % 1 . 7 9 % 1 . 9 0 % 0.4 8 % 0.04% 9 . 1 7 % 3.31% 2 . 3 3 % 2.70% 3. 4 9 % 1.7 1 % 1.89 % 1.51% 1.75% 1.75% 0 . 4 9 % 1 . 5 6 % 2.0% 0.49% 0.93 % 1.35%1.2% 0.4% 0. 3 % 34 0.0% 1.50% 0.29%1.50% 1.90% 2.10% 0. 9 7 % 0. 0 % 0. 5 1 % 1. 0 3 % 0.59% 1.87% 0. 4 4 % 0. 4 6 % 1. 3 1 % 2. 2 0 % 2. 2 0 % 0 . 7 6 % 1. 9 8 % 0. 3 5 % 0.0% 1.18% 1.60% 1. 5 4 % 0. 3 3 % 0. 3 3 % 0. 0 % 0. 6 0 % 1. 0 5 % 1. 9 0 % 2.08% 1.70% 0. 5 1 % 1. 4 8 % 1.43% 1.35%0. 5 0 % 1.69% 1.5% 0. 3 0 % 0. 9 9 % 0. 6 8 % 0. 6 8 % 1. 5 0 % 1 . 8 1% 1 . 8 1 % 2 . 2 4 % 1 . 5 4 % 0.0% 1 . 9 4 % 2.27 % 0.3 4 % 1. 2 5 % 2. 5 7 % 1.13% 0.80%0.59% 36 " W A T E R ( S P U ) 12" DI WTR 4" CI 2" C O M M 9 . 9 4 % 7.84% 0 . 6 % 0 . 5 5 % STA. 104+33.24, 27.00 LT STA. 104+50.24, 29.00 LT ± ± L=7.18' R=10.00' Δ=41° 08' 03" L=7.38' R=12.00' Δ=35° 13' 17" L=9.22' R=15.00' Δ=35° 13' 03" STA. 104+65.81, 6.94 LT UNION AND 8TH INTERSECTION CURB TABLE CURB PT: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 POINT DESCRIPTION: FLOWLINE FLOWLINE, ANGLE POINT FLOWLINE, PC FLOWLINE, 1/2 Δ FLOWLINE, FLARE TOP, PT FLOWLINE, RAMP TOE FLOWLINE, RAMP TOE FLOWLINE, FLARE TOP, HIGHT POINT FLOWLINE, PC FLOWLINE, 1/2 Δ FLOWLINE, PRC FLOWLINE FLOWLINE FLOWLINE, PT FLOWLINE STATION: 104+18.80 104+23.84 104+26.66 104+29.73 104+33.24 104+38.24 104+42.24 104+47.24 104+50.24 104+53.87 104+57.16 104+59.37 104+62.51 104+65.81 104+72.89 OFFSET: 21.94' LT 21.94' LT 19.47' LT 17.64' LT 17.00' LT 17.00' LT 17.00' LT 17.00' LT 17.00' LT 17.56' LT 19.19' LT 20.48' LT 21.57' LT 21.94' LT 21.94' LT FLOWLINE EL.: 411.19 411.22 411.28 411.33 411.38 411.40 411.42 411.44 411.43 411.40 411.36 411.32 411.29 411.27 411.30 CURB HEIGHT: 6.0" 7.0" 6.0" 6.0" 6.0" 0.0" 0.0" 5.5" 6.0" 6.0" 6.0" 6.0" 7.1" 8.0" 6.0" CURVE DESC.:CURVE CNTR: 6"± (MATCH EX.) 6"± (MATCH EX.) STA. 104+47.70, 42.24 RT STA. 104+43.69, 36.50 RT STA. 104+51.19, 28.50 RT ± ± UNION AND 8TH INTERSECTION CURB TABLE CURB PT: 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 POINT DESCRIPTION: FLOWLINE FLOWLINE, PC FLOWLINE, FLARE TOP FLOWLINE, RAMP TOE FLOWLINE, RAMP TOE FLOWLINE, FLARE TOP FLOWLINE, PCC FLOWLINE, FLARE TOP FLOWLINE, RAMP TOE FLOWLINE, RAMP TOE FLOWLINE, PT FLOWLINE, FLARE TOP, HIGH POINT FLOWLINE, PC FLOWLINE, 1/2 Δ FLOWLINE, PRC FLOWLINE FLOWLINE FLOWLINE, PT, LOW POINT FLOWLINE STATION: 104+22.40 104+22.71 104+23.66 104+25.73 104+27.97 104+31.79 104+33.38 104+35.36 104+38.60 104+42.74 104+43.69 104+47.69 104+51.19 104+54.13 104+56.82 104+58.70 104+60.54 104+62.45 104+66.30 OFFSET: 49.89' RT 41.33' RT 35.38' RT 30.30' RT 26.89' RT 22.95' RT 21.74' RT 20.54' RT 19.23' RT 18.53' RT 18.50' RT 18.50' RT 18.50' RT 18.94' RT 20.24' RT 21.24' RT 21.79' RT 21.97' RT 21.97' RT FLOWLINE EL.: 411.12 411.17 411.21 411.24 411.27 411.31 411.32 411.33 411.35 411.37 411.38 411.40 411.38 411.37 411.34 411.31 411.29 411.28 411.29 CURB HEIGHT: 6.0" 6.0" 5.5" 0.0" 0.0" 5.5" 4.9" 4.3" 0.0" 0.0" 5.5" 6.0" 6.0" 6.0" 6.0" 6.0" 6.0" 6.0" 6.0" CURVE DESC.:CURVE CNTR: 6"± (MATCH EX.) 6"± (MATCH EX.) STA. 104+62.45, 11.97 RT L=23.12' R=25.00' Δ=52° 59' 10" L=10.97' R=18.00' Δ=34° 55' 41" L=5.98' R=10.00' Δ=34° 15' 39" L=5.98' R=10.00' Δ=34° 15' 25" FILE: DRAWN BY: CHECKED BY: ISSUE DATE: APPROVED BY: G & O JOB NO.:25462.00 MAY 2026 CURB_RAMPS.DWG 1130 RAINIER AVENUE SOUTH, SUITE 300 SEATTLE, WASHINGTON 98144 (206) 284-0860 m: \ R E N T O N \ 2 5 4 6 2 s c h o o l a n d p e d x i n g 2 \ 0 0 0 0 G & O \ P l a n s e t \ C i v i l \ C U R B _ R A M P S . d w g , 6/ 1 2 / 2 0 2 6 4 : 3 6 P M , BR Y A N W A N G 29 REVISIONDATENo. DESIGNER: ISSUED FOR:PRELIMINARY, NOT FOR CONSTRUCTION SHEET: DRAWING: OF: OF: 0 1"2" TWO INCHES AT FULL SCALE. IF NOT, SCALE ACCORDINGLY CITY OF RENTON RENTON SCHOOL AND PEDESTRIAN CROSSING NO. 2 APPROVED FOR CONSTRUCTION CITY OF RENTON DATE JA BW TLS 4 BW UN I O N A V E . N E 00 5'10'2.5'5' SCALE:1"=5' REINFORCED CURB AND GUTTER, SEE DETAIL SHEET RD-2. NE 8TH ST. CR-1 13 RAMP CONSTRUCTION NOTES 1.SEE CEMENT CONCRETE SIDEWALK AND JOINTS DETAIL, SEE APPENDIX B. 2.SEE WSDOT STANDARD PLAN F-45.10-03 FOR DETECTABLE WARNING SURFACE DETAILS. SEE APPENDIX C. 3.ONCE CURB STRING LINES AND/OR FORMS HAVE BEEN SET BY THE CONTRACTOR THE CONTRACTING AGENCY WILL REVIEW AND APPROVE THE CURB LINES PRIOR TO POURING. THE CONTRACTOR SHALL ANTICIPATE FIELD ADJUSTMENTS WILL BE REQUIRED AT NO ADDITIONAL COST. THE CONTRACTOR SHALL STRUCTURE HIS BID ACCORDINGLY. 4.CONFIRM ALL LOCATIONS OF BURIED FOUNDATIONS WITH CONTRACTING AGENCY PRIOR TO FORMING. GENERAL NOTES 1.CONTRACTOR TO FIELD VERIFY AND ADJUST RAMP LENGTH TO MEET RAMP SLOPE REQUIREMENTS PER DETAILS. THE CURB RAMP MAXIMUM RUNNING SLOPE AT THE BACK OF THE RAMP SHALL NOT REQUIRE THE RAMP LENGTH TO EXCEED 15-FEET. 2.RAMP. CROSS SLOPE SHALL NOT EXCEED 2.0% AND LONGITUDINAL SLOPE SHALL NOT EXCEED 8.3% (UNLESS NOTED OTHERWISE ON PLANS). 3.LANDING. CROSS SLOPES SHALL NOT EXCEED 2.0% (UNLESS NOTED OTHERWISE ON PLANS). 4.DETECTABLE WARNING SURFACE. 2' MIN. ALONG DIRECTION OF TRAVEL, TYP. FOR ALL APPLICATIONS. 5.PARALLEL CURB RAMP PER PLAN AND WSDOT STANDARD PLAN F-40-12.03 (MOD). SEE SHEET RD-1. 6.PERPENDICULAR CURB RAMP PER PLAN AND WSDOT STANDARD PLAN F-40.15-04 (MOD). SEE SHEET RD-1. 7.SIDEWALK GRADE TRANSITION SECTION, CROSS SLOPE SHALL NOT EXCEED 2.0% AND RUNNING SLOPE SHALL NOT EXCEED 5%. ELECTRICAL NOTES 1.CONSTRUCT FOUNDATION AND INSTALL RRFB POLE, ASSEMBLY AND SIGNS PER CITY OF RENTON STANDARD PLANS 141.1, 141.2, 141.4 AND 141.5. FURNISH AND INSTALL POLE TAG PER CITY OF RENTON STANDARD PLAN 139. 2.CONSTRUCT APS PEDESTRIAN PUSH BUTTON ASSEMBLY ON NEW OR EXISTING POLE 3.FURNISH AND INSTALL RRFB ASSEMBLY ON NEW OR EXISTING STREETLIGHT POLE PER DETAIL SHEET CR-4. 4.CONSTRUCT FOUNDATION AND INSTALL SERVICE CABINET PER CITY OF RENTON STANDARD PLANS 122.1, 122.2 AND 126.1. 5.CONSTRUCT STREET LIGHT FOUNDATION AND INSTALL AN ARTERIAL STREET DECORATIVE LUMINAIRE STREET LIGHT POLE, WITH A 6-FOOT ARM AND LUMINAIRE PER CITY OF RENTON STANDARD PLANS 115, 117.1, 117.1A, 117.1B, 117.3, 119, 120 AND 121. CONTACT SIGNAL MAINTENANCE SHOP AT (425) 430-7423 TO OBTAIN POLE NUMBERING. 6.FURNISH AND INSTALL A JUNCTION BOX TYPE 1, PER WSDOT STANDARD PLANS J-40.10-04 AND FOUNDATION PLAN PAD PER CITY OF RENTON STANDARD PLAN 124. JUNCTION BOX TYPE 1 LOCATED WITHIN WALKWAYS SHALL HAVE SLIP RESISTANT LIDS. 7.CONTRACTOR TO COORDINATE WITH PUGET SOUND ENERGY FOR NEW ELECTRICAL SERVICE METER. 8.CONDUIT/WIRE NOTE, SEE WIRE SCHEDULE ON PLAN SHEET CR-4. 9.FURNISH AND INSTALL RISER CONDUIT, WEATHERHEAD ON EXISTING UTILITY POLE. COORDINATE WITH PSE FOR THE WIRING SERVICE METER. 6 6 7 3 3 2 6 7 4 4 2 6 4 7 3 26 7 CURB RETURN AND RRFB PLAN - SITE 1 8 8 1 5 8 2 3 8 1 6/12/ 2026 ELECTRICAL NOTES REVISION 1 W W W W W W W W W W W W W W W W W W W WWWW WWWW x x x x x x x x x x x D D D D D D D D D D D D D D D D D D S S S S S S S S S S S S S S S S S S G G G G G G G G G G G G G G G G G G G O H OH OH OH O H OH OH OH OH O H OH OH OH O H OH G G G G G G G G G S 30 3 + 5 0 30 4 + 0 0 E E E E E E E E E E E E E E 39 40 41 42 43 44 45 46 48 49 50 51 52 53 54 55 56 1. 5 0 % 1.35% 1.80% 1.87% 1.85%1. 5 0 % 2. 8 0 % 6.3 0% 5.83% 5.83% 6.76 % 8.4 0 % 8 .4 0 % 9.13% 0 . 2 7 % ± 7. 3 6 % 5. 5 2 % 4.14%± 8. 2 4 % 1.4 5 % 1.40 % 10.50 % 10.50% 10.50% 9.13% 9.13 % 2. 7 1 % 1. 4 6 % 5. 6 2 % 5. 6 2 % 5.8 3% 7 .7 1 % 7.2 5 % 0 . 7 9 % 0.52%0.50% 0. 8 4 % 1.53% 1. 8 5 % 0. 0 % 2.19% 6.00% 2 . 3 5 % 2 . 3 5 % 3 . 0 3 % 3 . 8 9 % 4 . 6 5 % 5 . 5 % 5. 5 6 % 1.00% 0.86% 8. 2 7 % 2. 0 0 % 2 1 . 9 % 1. 7 5 % 2.02%4. 4 3 % 5 . 4 9 % 8 . 1 7 %7.9 6 % 10 . 2 % 6.54% 5.21% 5.7 3 % 5.21 % 6 . 7 0 % 1.08% 8 . 2 7 % 8. 2 0 % 1.18% 2.00% 4. 7 5 % 4 . 8 1 % 4. 7 9 % 4 . 5 % ± 35 36 37 38 7.89% 7.5 6 % 8" W T R HOQUIAM AND 5TH INTERSECTION CURB TABLE CURB PT: 35 36 37 38 39 40 41 42 43 44 45 46 POINT DESCRIPTION: FLOWLINE, RAMP TOE, PC, CURB END FLOWLINE, RAMP FLOWLINE, RAMP TOP FLOWLINE, FLARE TOP, PRC FLOWLINE, RAMP TOE, PT FLOWLINE, RAMP TOE, PC FLOWLINE FLOWLINE, FLARE TOP FLOWLINE FLOWLINE, FULL HEIGHT CURB, PT FLOWLINE, DEPRESSED CURB (NO LIP) FLOWLINE, DEPRESSED CURB (NO LIP), CURB END STATION: 303+58.29 303+61.08 303+63.57 303+64.95 303+68.57 303+72.57 303+75.17 303+77.73 303+79.64 303+82.32 303+83.95 303+88.99 OFFSET: 6.66' LT 5.99' LT 4.56' LT 3.24' LT 1.51' LT 1.38' LT 1.52' LT 2.11' LT 2.89' LT 4.57' LT 5.84' LT 9.80' LT FLOWLINE EL.: 445.75 445.90 446.05 446.16 446.43 446.65 446.80 446.92 447.00 447.09 447.14 447.29 CURB HEIGHT: 0.0" 1.2" 2.3" 2.8" 0.0" 0.0" 1.4" 3.0" 4.2" 6.0" 0.0" 0.0" CURVE DESC.:CURVE CNTR: HOQUIAM AND 5TH INTERSECTION CURB TABLE CURB PT: 48 49 50 51 52 53 54 55 56 POINT DESCRIPTION: FLOWLINE, CURB END FLOWLINE FLOWLINE, LANDING/RAMP TOE, PC FLOWLINE, LANDING/RAMP TOE FLOWLINE, 1/2 Δ FLOWLINE FLOWLINE, RAMP TOP, PCC FLOWLINE, ROLLED CURB TRANSITION FLOWLINE, ROLLED CURB STATION: 303+59.21 303+63.21 303+67.21 303+72.89 303+78.60 303+83.99 303+89.04 303+94.13 303+97.97 OFFSET: 24.50' RT 24.50' RT 24.50' RT 24.91' RT 26.15' RT 28.19' RT 30.98' RT 35.10' RT 39.70' RT FLOWLINE EL.: 445.95 446.18 446.40 446.73 447.07 447.41 447.80 448.35 448.86 CURB HEIGHT: 6.0" 4.0" 0.0" 0.0" 2.2" 4.4" 6.0" 5.0" 4.0" CURVE DESC.:CURVE CNTR: STA. 303+68.74, 6.50 LT STA. 303+73.06, 16.37 LT 4"± (MATCH EX.)± STA. 303+67.21, 64.50 RT STA. 303+71.58, 57.80 RT L=10.47' R=15.00' Δ=40° 00' 00" L=23.09' R=40.00' Δ=33° 04' 37" L=12.56' R=32.00' Δ=22° 29' 00" L=7.68' R=10.00' Δ=44° 00' 37" L=4.13' R=5.00' Δ=47° 19' 22" STA. 303+57.38, 3.30 RT FILE: DRAWN BY: CHECKED BY: ISSUE DATE: APPROVED BY: G & O JOB NO.:25462.00 MAY 2026 CURB_RAMPS.DWG 1130 RAINIER AVENUE SOUTH, SUITE 300 SEATTLE, WASHINGTON 98144 (206) 284-0860 m: \ R E N T O N \ 2 5 4 6 2 s c h o o l a n d p e d x i n g 2 \ 0 0 0 0 G & O \ P l a n s e t \ C i v i l \ C U R B _ R A M P S . d w g , 6/ 1 2 / 2 0 2 6 4 : 3 7 P M , BR Y A N W A N G 29 REVISIONDATENo. DESIGNER: ISSUED FOR:PRELIMINARY, NOT FOR CONSTRUCTION SHEET: DRAWING: OF: OF: 0 1"2" TWO INCHES AT FULL SCALE. IF NOT, SCALE ACCORDINGLY CITY OF RENTON RENTON SCHOOL AND PEDESTRIAN CROSSING NO. 2 APPROVED FOR CONSTRUCTION CITY OF RENTON DATE JA BW TLS 4 BW 00 5'10'2.5'5' SCALE:1"=5' CR-2 14 HO Q U I A M A V E N U E N E NE 5TH STREET RAMP CONSTRUCTION NOTES 1.SEE CEMENT CONCRETE SIDEWALK AND JOINTS DETAIL, SEE APPENDIX B. 2.SEE WSDOT STANDARD PLAN F-45.10-03 FOR DETECTABLE WARNING SURFACE DETAILS. SEE APPENDIX C. 3.ONCE CURB STRING LINES AND/OR FORMS HAVE BEEN SET BY THE CONTRACTOR THE CONTRACTING AGENCY WILL REVIEW AND APPROVE THE CURB LINES PRIOR TO POURING. THE CONTRACTOR SHALL ANTICIPATE FIELD ADJUSTMENTS WILL BE REQUIRED AT NO ADDITIONAL COST. THE CONTRACTOR SHALL STRUCTURE HIS BID ACCORDINGLY. 4.CONFIRM ALL LOCATIONS OF BURIED FOUNDATIONS WITH CONTRACTING AGENCY PRIOR TO FORMING. GENERAL NOTES 1.CONTRACTOR TO FIELD VERIFY AND ADJUST RAMP LENGTH TO MEET RAMP SLOPE REQUIREMENTS PER DETAILS. THE CURB RAMP MAXIMUM RUNNING SLOPE AT THE BACK OF THE RAMP SHALL NOT REQUIRE THE RAMP LENGTH TO EXCEED 15-FEET. 2.RAMP. CROSS SLOPE SHALL NOT EXCEED 2.0% AND LONGITUDINAL SLOPE SHALL NOT EXCEED 8.3% (UNLESS NOTED OTHERWISE ON PLANS). 3.LANDING. CROSS SLOPES SHALL NOT EXCEED 2.0% (UNLESS NOTED OTHERWISE ON PLANS). 4.DETECTABLE WARNING SURFACE. 2' MIN. ALONG DIRECTION OF TRAVEL, TYP. FOR ALL APPLICATIONS. 5.PARALLEL CURB RAMP PER PLAN AND WSDOT STANDARD PLAN F-40-12.03 (MOD). SEE SHEET RD-1. 6.PERPENDICULAR CURB RAMP PER PLAN AND WSDOT STANDARD PLAN F-40.15-04 (MOD). SEE SHEET RD-1. 7.SIDEWALK GRADE TRANSITION SECTION, CROSS SLOPE SHALL NOT EXCEED 2.0% AND RUNNING SLOPE SHALL NOT EXCEED 5%. ELECTRICAL NOTES 1.CONSTRUCT FOUNDATION AND INSTALL RRFB POLE, ASSEMBLY AND SIGNS PER CITY OF RENTON STANDARD PLANS 141.1, 141.2, 141.4 AND 141.5. FURNISH AND INSTALL POLE TAG PER CITY OF RENTON STANDARD PLAN 139. 2.CONSTRUCT APS PEDESTRIAN PUSH BUTTON ASSEMBLY ON NEW OR EXISTING POLE 3.FURNISH AND INSTALL RRFB ASSEMBLY ON NEW OR EXISTING STREETLIGHT POLE PER DETAIL SHEET CR-4. 4.CONSTRUCT FOUNDATION AND INSTALL SERVICE CABINET PER CITY OF RENTON STANDARD PLANS 122.1, 122.2 AND 126.1. 5.CONSTRUCT STREET LIGHT FOUNDATION AND INSTALL AN ARTERIAL STREET DECORATIVE LUMINAIRE STREET LIGHT POLE, WITH A 6-FOOT ARM AND LUMINAIRE PER CITY OF RENTON STANDARD PLANS 115, 117.1, 117.1A, 117.1B, 117.3, 119, 120 AND 121. CONTACT SIGNAL MAINTENANCE SHOP AT (425) 430-7423 TO OBTAIN POLE NUMBERING. 6.FURNISH AND INSTALL A JUNCTION BOX TYPE 1, PER WSDOT STANDARD PLANS J-40.10-04 AND FOUNDATION PLAN PAD PER CITY OF RENTON STANDARD PLAN 124. JUNCTION BOX TYPE 1 LOCATED WITHIN WALKWAYS SHALL HAVE SLIP RESISTANT LIDS. 7.CONTRACTOR TO COORDINATE WITH PUGET SOUND ENERGY FOR NEW ELECTRICAL SERVICE METER. 8.CONDUIT/WIRE NOTE, SEE WIRE SCHEDULE ON PLAN SHEET CR-4. 9.FURNISH AND INSTALL RISER CONDUIT, WEATHERHEAD ON EXISTING UTILITY POLE. COORDINATE WITH PSE FOR THE WIRING SERVICE METER. 1 2 3 3 7 4 1 4 6 2 26 3 7 EXISTING ASPHALT WEDGE CURB / THICKENED EDGE 5 25 CURB RETURN AND RRFB PLAN - SITE 2 8 8 8 8 EXISTING ASPHALT WEDGE CURB / THICKENED EDGE 2 1 1 6/12/ 2026 ELECTRICAL NOTES REVISION T V T V TV TV TV TV TV x x x x x x x x x x x x x x x x x x x W W W W W W W W W W W W W W W W W W D D D D D D D D D D D D D D D D D D D D D D D S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO W W W W W W W W W W W W W G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH S 20 3 + 0 0 20 3 + 5 0 D D D D D D D D D D D D D D D D D D D E E > > > > > > > > > E E E E E E E E E E E E E E E E E E E F F F F F F F F F F F F F 60 61 62 63 64 65 66 67 68 69 70 71 72 73 7475 2.38% 1.15 % 0 . 9 1 % 0 . 9 1 % 1. 1 4 % 1.14 % 1.14 % 1.52% 1.50% 7. 7 5 % 0.5% 5. 2 0 % 1. 1 0 % 1.60% 1.25 % 0. 2 4 % 1.8% 3.4 % 1.60% 1.5 8 % 0.4 9 % 1.1 0 % 1. 0 0 % 2 . 0 % 1. 0 2 % 1. 1 2 % 1 . 9 0 % 1.47% 1. 2 2 % 0. 6 0 % 2.25% 1 . 6 0 % 2.64% 2.56% 1.62% 1. 2 % 2.08% 1. 2 2 % 4.26% 2.5% 2.54% 1.69% 1. 0 % 1.72% 1.2% 1. 0 9 % 7. 7 5 % 1. 1 % 1.18% 1.55% 1.50% 7.87% 7.93% 7.58% 1. 0 0 % 1. 0 0 % 1.5 6 % 1.37% 1.60% 10.21%3.55% 1. 0 0 % 1.49% 1.7% 1. 8 1 % 0.79% 7 . 0 7 % 4.3% 1.0 6 % 3.3 0 % 1.13% 2 . 0 5 % 2 . 0 2 % 2.93% 2" GAS 4" G A S 5.00' 1.49 % 1.61% 1.81% 6.1'± 1.18% 1.05% 1.00% 1.1 3 % 1.12% 1.56% 1.12% 1.98% 1.97% 1.8 4 % 1.30% 2.20% 2.20 % 1. 9 6 % 1. 7 0 % 1. 7 0 % 2 . 0 5 % 2 . 0 8 % 2 . 0 1 % 2 . 6 3 % 2 . 6 3 % 2 . 0 2 % 1. 6 6 % 2. 3 0 % 116TH AVE AND 165TH ST INTERSECTION CURB TABLE CURB PT: 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 POINT DESCRIPTION: FLOWLINE, RAMP TOE, CURB END FLOWLINE, RAMP TOP FLOWLINE, PC FLOWLINE, 1/2 Δ, RAMP TOP FLOWLINE, PRC FLOWLINE, 1/2 Δ FLOWLINE, RAMP TOE, PCC FLOWLINE, LANDING (LIP TOP) FLOWLINE, LANDING (NO LIP) FLOWLINE, LANDING (NO LIP), PCC FLOWLINE, LANDING (NO LIP) FLOWLINE, LANDING (NO LIP) FLOWLINE, LIP TOP FLOWLINE FLOWLINE, PT, LIP TOP FLOWLINE, CURB END STATION: 203+02.50 203+10.00 203+11.00 203+13.88 203+16.06 203+18.50 203+21.12 203+24.09 203+26.08 203+30.97 203+35.16 203+38.51 203+39.59 203+40.56 203+41.00 203+41.00 OFFSET: 21.25' LT 21.25' LT 21.25' LT 20.83' LT 19.88' LT 18.85' LT 18.50' LT 18.57' LT 18.71' LT 19.31' LT 20.86' LT 23.83' LT 25.51' LT 27.95' LT 31.12' LT 33.12' LT FLOWLINE EL.: 466.69 466.78 466.79 466.82 466.86 466.92 466.96 466.99 467.02 467.07 467.11 467.16 467.18 467.22 467.30 467.35 CURB HEIGHT: 0.0" 6.0" 6.0" 6.0" 4.2" 2.3" 0.5" 0.0" 0.0" 0.0" 0.0" 0.0" 0.5" 0.5" 0.5" 0.0" CURVE DESC.:CURVE CNTR: STA. 203+21.12, 28.50 LT STA. 203+21.12, 78.50 LT STA. 203+29.00, 31.15 LT L=5.31' R=10.00' Δ=30° 24' 06" L=9.89' R=60.00' Δ=9° 26' 23" L=16.84' R=12.00' Δ=80° 23' 55" L=5.31' R=10.00' Δ=30° 24' 06" STA. 203+11.00, 11.25 LT FILE: DRAWN BY: CHECKED BY: ISSUE DATE: APPROVED BY: G & O JOB NO.:25462.00 MAY 2026 CURB_RAMPS.DWG 1130 RAINIER AVENUE SOUTH, SUITE 300 SEATTLE, WASHINGTON 98144 (206) 284-0860 m: \ R E N T O N \ 2 5 4 6 2 s c h o o l a n d p e d x i n g 2 \ 0 0 0 0 G & O \ P l a n s e t \ C i v i l \ C U R B _ R A M P S . d w g , 6/ 1 2 / 2 0 2 6 4 : 3 7 P M , BR Y A N W A N G 29 REVISIONDATENo. DESIGNER: ISSUED FOR:PRELIMINARY, NOT FOR CONSTRUCTION SHEET: DRAWING: OF: OF: 0 1"2" TWO INCHES AT FULL SCALE. IF NOT, SCALE ACCORDINGLY CITY OF RENTON RENTON SCHOOL AND PEDESTRIAN CROSSING NO. 2 APPROVED FOR CONSTRUCTION CITY OF RENTON DATE JA BW TLS 4 BW 00 5'10'2.5'5' SCALE:1"=5' CR-3 15 11 6 T H A V E N U E S E SE 165TH STREET RAMP CONSTRUCTION NOTES 1.SEE CEMENT CONCRETE SIDEWALK AND JOINTS DETAIL, SEE APPENDIX B. 2.SEE WSDOT STANDARD PLAN F-45.10-03 FOR DETECTABLE WARNING SURFACE DETAILS. SEE APPENDIX C. 3.ONCE CURB STRING LINES AND/OR FORMS HAVE BEEN SET BY THE CONTRACTOR THE CONTRACTING AGENCY WILL REVIEW AND APPROVE THE CURB LINES PRIOR TO POURING. THE CONTRACTOR SHALL ANTICIPATE FIELD ADJUSTMENTS WILL BE REQUIRED AT NO ADDITIONAL COST. THE CONTRACTOR SHALL STRUCTURE HIS BID ACCORDINGLY. 4.CONFIRM ALL LOCATIONS OF BURIED FOUNDATIONS WITH CONTRACTING AGENCY PRIOR TO FORMING. GENERAL NOTES 1.CONTRACTOR TO FIELD VERIFY AND ADJUST RAMP LENGTH TO MEET RAMP SLOPE REQUIREMENTS PER DETAILS. THE CURB RAMP MAXIMUM RUNNING SLOPE AT THE BACK OF THE RAMP SHALL NOT REQUIRE THE RAMP LENGTH TO EXCEED 15-FEET. 2.RAMP. CROSS SLOPE SHALL NOT EXCEED 2.0% AND LONGITUDINAL SLOPE SHALL NOT EXCEED 8.3% (UNLESS NOTED OTHERWISE ON PLANS). 3.LANDING. CROSS SLOPES SHALL NOT EXCEED 2.0% (UNLESS NOTED OTHERWISE ON PLANS). 4.DETECTABLE WARNING SURFACE. 2' MIN. ALONG DIRECTION OF TRAVEL, TYP. FOR ALL APPLICATIONS. 5.PARALLEL CURB RAMP PER PLAN AND WSDOT STANDARD PLAN F-40-12.03 (MOD). SEE SHEET RD-1. 6.PERPENDICULAR CURB RAMP PER PLAN AND WSDOT STANDARD PLAN F-40.15-04 (MOD). SEE SHEET RD-1. 7.SIDEWALK GRADE TRANSITION SECTION, CROSS SLOPE SHALL NOT EXCEED 2.0% AND RUNNING SLOPE SHALL NOT EXCEED 5%. ELECTRICAL NOTES 1.CONSTRUCT FOUNDATION AND INSTALL RRFB POLE, ASSEMBLY AND SIGNS PER CITY OF RENTON STANDARD PLANS 141.1, 141.2, 141.4 AND 141.5. FURNISH AND INSTALL POLE TAG PER CITY OF RENTON STANDARD PLAN 139. 2.CONSTRUCT APS PEDESTRIAN PUSH BUTTON ASSEMBLY ON NEW OR EXISTING POLE 3.FURNISH AND INSTALL RRFB ASSEMBLY ON NEW OR EXISTING STREETLIGHT POLE PER DETAIL SHEET CR-4. 4.CONSTRUCT FOUNDATION AND INSTALL SERVICE CABINET PER CITY OF RENTON STANDARD PLANS 122.1, 122.2 AND 126.1. 5.CONSTRUCT STREET LIGHT FOUNDATION AND INSTALL AN ARTERIAL STREET DECORATIVE LUMINAIRE STREET LIGHT POLE, WITH A 6-FOOT ARM AND LUMINAIRE PER CITY OF RENTON STANDARD PLANS 115, 117.1, 117.1A, 117.1B, 117.3, 119, 120 AND 121. CONTACT SIGNAL MAINTENANCE SHOP AT (425) 430-7423 TO OBTAIN POLE NUMBERING. 6.FURNISH AND INSTALL A JUNCTION BOX TYPE 1, PER WSDOT STANDARD PLANS J-40.10-04 AND FOUNDATION PLAN PAD PER CITY OF RENTON STANDARD PLAN 124. JUNCTION BOX TYPE 1 LOCATED WITHIN WALKWAYS SHALL HAVE SLIP RESISTANT LIDS. 7.CONTRACTOR TO COORDINATE WITH PUGET SOUND ENERGY FOR NEW ELECTRICAL SERVICE METER. 8.CONDUIT/WIRE NOTE, SEE WIRE SCHEDULE ON PLAN SHEET CR-4. 9.FURNISH AND INSTALL RISER CONDUIT, WEATHERHEAD ON EXISTING UTILITY POLE. COORDINATE WITH PSE FOR THE WIRING SERVICE METER. 4 6 2 25 1 3 7 4 CURB RETURN AND RRFB PLAN - SITE 3 1 9 86 8 4 7 8 8 8 8 SERVICE CABINET NO. 11517 1 1 6/12/ 2026 ELECTRICAL NOTES REVISION