PRELIMINARY
TECHNICAL INFORMATION REPORT
FOR
SINGH SHORT PLAT
CITY OF RENTON IN KING COUNTY, WASHINGTON
Project Manager: Lafe Hermansen
Prepared by: Sheri Murata, P.E.
First Submittal: August 21, 2017
Revised: January 22, 2018
Core No.: 17001
1/22/18
Core Design, Inc. SINGH SHORT PLAT i
Singh Short Plat
Table of Contents
1 PROJECT OVERVIEW ..................................................................................................................... 1
Figure 1-1: Vicinity Map ..................................................................................................... 2
2 CONDITIONS AND REQUIREMENTS SUMMARY ........................................................................... 3
2.1 Core Requirements ............................................................................................................... 3
2.1.1 Core Requirement #1: Discharge at the Natural Location ............................................ 3
2.1.2 Core Requirement #2: Offsite Analysis .......................................................................... 3
2.1.3 Core Requirement #3: Flow Control .............................................................................. 3
2.1.4 Core Requirement #4: Conveyance System .................................................................. 3
2.1.5 Core Requirements #5: Erosion and Sediment Control ................................................. 3
2.1.6 Core Requirement #6: Maintenance and Operations ................................................... 3
2.1.7 Core Requirement #7: Financial Guarantees and Liability ............................................ 3
2.1.8 Core Requirement #8: Water Quality ............................................................................ 3
2.2 Special Requirement #1: Other Adopted Area-Specific Requirements ................................ 4
2.2.1 Critical Drainage Areas ................................................................................................... 4
2.2.2 Master Drainage Plan .................................................................................................... 4
2.2.3 Basin Plans ..................................................................................................................... 4
2.2.4 Salmon Conservation Plans (SCPs) ................................................................................. 4
2.2.5 Stormwater Compliance Plans (SWCPs) ........................................................................ 4
2.2.6 Lake Management Plans (LMPs) .................................................................................... 4
2.2.7 Flood Hazard Reduction Plan Updates (FHRPs) ............................................................. 4
2.2.8 Shared Facility Drainage Plans (SFDPs) .......................................................................... 4
2.3 Special Requirement #2: Floodplain / Floodway Delineation ............................................... 4
2.4 Special Requirement #3: Flood Protection Facilities ............................................................ 4
2.5 Special Requirement #4: Source Controls ............................................................................. 4
2.6 Special Requirement #5: Oil Control ..................................................................................... 4
3 OFFSITE ANALYSIS ......................................................................................................................... 5
TASK 1 Study Area Definition and Maps ..................................................................................... 5
TASK 2 Resource Review ............................................................................................................. 5
Core Design, Inc. SINGH SHORT PLAT ii
TASK 3 Field Investigation ........................................................................................................... 6
Figure 3-1: Upstream Drainage Area ............................................................................... 11
Figure 3-2: Downstream Drainage Exhibit....................................................................... 12
TASK 4 Drainage System Description and Problem Description ............................................... 13
TASK 5 Mitigation of Existing and Potential Problems .............................................................. 13
4 FLOW CONTROL AND WATER QUALITY DESIGN ........................................................................ 16
4.1 Predeveloped Site Hydrology .............................................................................................. 16
4.2 Developed Site Hydrology ................................................................................................... 16
Figure 4-1: Existing Conditions Exhibit ............................................................................ 20
Figure 4-2: Developed Conditions Exhibit ....................................................................... 21
4.3 Performance Standards....................................................................................................... 22
4.4 Flow Control System ........................................................................................................... 23
4.5 Water Quality Calculations ................................................................................................. 27
5 CONVEYANCE SYSTEM ANALYSIS AND DESIGN .......................................................................... 28
5.1 Rational Method ................................................................................................................. 28
5.2 King County Backwater Analysis ......................................................................................... 30
Figure 5-1: Catch Basin Areas Exhibit .............................................................................. 32
6 SPECIAL REPORTS AND STUDIES ................................................................................................. 33
7 OTHER PERMITS .......................................................................................................................... 34
8 ESC ANALYSIS AND DESIGN ........................................................................................................ 35
9 BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT ...................... 36
9.1 Bond Quantities .................................................................................................................. 36
9.2 Facility Summaries .............................................................................................................. 36
9.3 Declaration of Covenant ..................................................................................................... 36
10 OPERATIONS AND MAINTENANCE ........................................................................................... 37
Core Design, Inc. SINGH SHORT PLAT iii
Appendix A – Parcel & Basin Information
King County Parcel Report (0007200196)
Flow Control Map
Appendix B – Resource Review & Off‐site Analysis Documentation
Aquifer Protection Zone
FIRM Map
Coal Mine Hazard Map
Erosion Hazard Map
Slide Hazard Map
Steep Slopes Map
Drainage Complaints Exhibit
Appendix C – Conveyance Calculations
KCBW Results
Core Design, Inc. SINGH SHORT PLAT Page 1
1 PROJECT OVERVIEW
The project site is located in the Black River drainage basin, on the west side of Renton Avenue
S, in between S 9th Street and S 10th Street in the City of Renton, King County. Specifically, the
project is in the northeast quarter of the northwest quarter of Section 20, Township 23 North,
Range 5 East, W.M. It is bordered by single family residential on the north and east, a critical
areas tract owned by WSDOT on the west and a transmission line corridor owned by Puget
Sound Energy on the south. The King County tax parcel ID numbers for the existing parcel is
shown in Table 1 below (refer to the King County Parcel Reports included in Appendix A).
Table 1: Parcel Information
KC Parcel # Site Address Site Area (SF)
0007200196 N/A 140,723
The total project site is 3.23 acres in size and currently completely forested. The site drains to
the west at a slope ranging between 10 and 40 percent. Upstream flow from the residential
developments to the east are piped across Renton Avenue S and discharge into three drainage
channels on site.
Proposed development of the property will include constructing six new lots and the associated
roads, driveways, utilities and stormwater vault. Frontage improvements include 13 feet of
pavement with curb, gutter, an 8-foot planter and 5-foot sidewalk on the west side of Renton
Avenue S. See Figure 1-1: Vicinity Map, provided below.
The project will be designed using the guidelines and requirements established in the 2017 City
of Renton Surface Water Design Manual (2076 RSWDM). The project required to match forested
site conditions (or a Conservation Flow Control) and Basic Water Quality treatment.
The drainage analysis for detention and water quality treatment was completed using
MGSFlood.
Core Design, Inc. SINGH SHORT PLAT Page 2
Figure 1-1: Vicinity Map
Core Design, Inc. SINGH SHORT PLAT Page 3
2 CONDITIONS AND REQUIREMENTS SUMMARY
The proposed project is classified as requiring “Full Drainage Review” per the 2016 KCSWDM.
Therefore, all eight core requirements and five special requirements will be addressed per
Section 1.1 of the 2016 KCSWDM).
2.1 Core Requirements
2.1.1 Core Requirement #1: Discharge at the Natural Location
The project will maintain the natural discharge location on the west side of the parcel to a
drainage course having a confluence with the existing drainage courses through the site within a
quarter mile of the site.
2.1.2 Core Requirement #2: Offsite Analysis
This core requirement is addressed in Section 3 of this report.
2.1.3 Core Requirement #3: Flow Control
The detention vault is designed to match the forested condition or Conservation Flow Control.
This requires that the developed condition discharge durations match the existing condition
durations from 50% of the 2-year to the 50-year storm events and that the developed 2-year
and 10-year peak discharge rates do not exceed the existing 2-year and 10-year peak discharge
rates, respectively.
2.1.4 Core Requirement #4: Conveyance System
A backwater analysis using King County Backwater (KCBW) has been provided in Section 5 to
show that the proposed conveyance system provides sufficient capacity for the 25-year storm as
calculated by the Rational Method.
2.1.5 Core Requirements #5: Erosion and Sediment Control
Erosion and sediment control will be provided through catch basin protection, interceptor
swales, rock check dams, silt fencing and a construction access entrance.
2.1.6 Core Requirement #6: Maintenance and Operations
The City of Renton will be responsible for the maintenance and operations of the stormwater
facility located in Tract B. An Operations and Maintenance Manual will be provided in Section
10 during the Utility Permit process.
2.1.7 Core Requirement #7: Financial Guarantees and Liability
A bond quantities worksheet will be provided in Section 9 as part of the Utility Permit.
2.1.8 Core Requirement #8: Water Quality
Basic water quality treatment will be provided dead storage in the detention vault.
Core Design, Inc. SINGH SHORT PLAT Page 4
2.2 Special Requirement #1: Other Adopted Area-Specific Requirements
2.2.1 Critical Drainage Areas
Per the City’s Aquifer Protection Zone map, the project is not in an aquifer protection zone.
2.2.2 Master Drainage Plan
Not applicable.
2.2.3 Basin Plans
There are no basin plans for this project.
2.2.4 Salmon Conservation Plans (SCPs)
There are no salmon conservation plan for this project.
2.2.5 Stormwater Compliance Plans (SWCPs)
Not applicable.
2.2.6 Lake Management Plans (LMPs)
Not applicable.
2.2.7 Flood Hazard Reduction Plan Updates (FHRPs)
This project is not within a floodplain (see FEMA map included in Appendix B) and is not within
an area with an applicable Flood Hazard Reduction Plan. Therefore, additional requirements
from a Flood Hazard Reduction Plan do not apply.
2.2.8 Shared Facility Drainage Plans (SFDPs)
Not applicable.
2.3 Special Requirement #2: Floodplain / Floodway Delineation
This project is not located within the 100-year floodplain (see FEMA Map included in Appendix
B).
2.4 Special Requirement #3: Flood Protection Facilities
As this project is not located within a 100-year floodplain there are no levees, revetments or
berms within the project.
2.5 Special Requirement #4: Source Controls
These requirements are not applicable as the project is not a commercial, industrial or multi-
family development.
2.6 Special Requirement #5: Oil Control
This requirement does not apply because the project is not a commercial or industrial
development nor is it expected to have more than 15,000 vehicles per day.
Core Design, Inc. SINGH SHORT PLAT Page 5
3 OFFSITE ANALYSIS
TASK 1 Study Area Definition and Maps
The proposed project contains parcel number 0007200196. A map of the downstream can be found in
Figure 3-1 Downstream Drainage Exhibit.
TASK 2 Resource Review
Basin Reconnaissance Summary Reports:
No Basin Reconnaissance Summary Reports appear to be available for the area that is within one mile of
this project site.
FEMA Maps:
A FEMA map dated May 16, 1995 number 53033C0977F was reviewed. The site is not located within a
floodplain as it is covered by “Zone X – Outside of 500-year floodplain. The FEMA Map is included in
Appendix B.
Sensitive Areas Folio:
The City of Renton Sensitive Areas Maps, this project is located in a moderate coal mine hazard, erosion
hazard, moderate landslide hazard, and steep slopes.
Soils
The Geotechnical Report was completed by the Riley Group on March 14, 2017. It was determined that
the “soils encountered during field exploration include loose to medium dense silty sand with varying
amounts of gravel over medium dense to very dense and very stiff to hard weathered bedrock
comprised of silty sand and sandy silt.”
Downstream Drainage Complaints
Drainage complaints were researched within the study area. King County does not list any complaints
within a quarter mile of the downstream discharge point. There is one drainage compliant just beyond a
quarter mile, but it was closed in 1996. See the Drainage Complaint Exhibit in Appendix B.
Restrictive Well Covenant
There is no existing well onsite.
Core Design, Inc. SINGH SHORT PLAT Page 6
TASK 3 Field Investigation
Upstream Tributary Area
The residential developments to the east drain to three piped connections crossing Renton Avenue N
and drain into three drainage channels onsite. See Figure 3-1 Upstream Drainage Area at the end of this
section.
Field Investigation
Downstream Analysis
A Level 1 downstream analysis was completed on March 10, 2017. The weather was cloudy and raining.
The project site lies within Black River drainage basin. See Figure 3-2 Downstream Drainage Exhibit at
the end of this section.
Runoff on site generally drains to the south and west on-site. Runoff leaves the site through two small
channels, one to the north and one to the south. The channel to the north leaves the site heading west
(Point A) and then turns and heads southwest after leaving the project site. The channel to the south
becomes a deeper ravine that runs southwest across the project site and continues southwest after
leaving the project site (Point B).
The channel to the north heads generally southwest through heavy brush and grass for approximately
400 feet after leaving the project site. It then flows onto a green plastic bedding material (Point C) which
continues for about 100 feet before reaching a very steep drop off. The stream flows over the drop off
through a rock lined spillway and enters Thunder Hills Creek at the bottom of the hill just east of I-405
(Point D).
The channel on the south side of the project site leaves flowing southwest and flows through thick brush
for approximately 200 feet. It then flows over a dirt access road (Point E) and continues heading
southwest through thick brush for another 150 feet. The runoff then reaches the steep drop off. This
channel also flows over the drop off and down into Thunder Hills Creek just east of I-405 (Point F).
Thunder Hills Creek collects both small channels leaving the project site. Thunder Hills Creek flows to the
northwest toward I-405. Based on an as-built schematic from a WSDOT report titled “Final Hydraulic
Report I-405/I-5 to SR 169 Stage 2 and SR 515 Interchange Project”, Thunder Hills Creek enters a large
culvert (Point G) approximately 36-inches in diameter and crosses under I-405 and Benson Rd South.
The culvert continues to head northwest and outlets just east of the parking lot behind a store called
Sam’s Club (Point H).
At this point, the stream flows into a concrete channel and flows southwest along the edge of the Sam’s
Club parking lot. The stream flows in the concrete channel for about 850 feet still heading southwest.
The concrete channel then transitions to a grass and dirt lined stream which runoff reaches the ¼ mile
downstream point in, near the southern exit to the Sam’s Club parking lot (Point I).
Core Design, Inc. SINGH SHORT PLAT Page 7
Based on King County iMap, beyond the quarter mile downstream point runoff enters a wetland area
just east of Talbot Road and south of the Sam’s Club parking lot. After leaving the wetland area, runoff
eventually makes its way west to the Black River. The Black River flows north and then turns west where
it joins the Green River to create the Duwamish River. The Duwamish River flows northwest and
eventually outlets into Puget Sound.
Level 2 Downstream Analysis:
After preliminary review by the City of Renton, a Level 2 downstream was requested. The Level 2
downstream analysis was completed on January 19, 2018. The weather was cloudy with light rain and
the temperature was approximately 50 degrees.
According to the 2016 KCSWDM section 1.2.2.1, a Level 2 downstream analysis requires a rough
quantitative analysis of the drainage components including non-survey field data and uniform flow
analysis.
During the site visit on January 19, 2018 dimension data was collected on Thunder Hills Creek where the
onsite channels flow into the creek before entering the culvert under I-405. Dimension data was also
collected on the channel on the west side of I-405 that Thunder Hills Creek drains to after crossing under
I-405 and Rolling Hills Creek that the concrete channel drains into. See tables below for dimension data
and the Downstream Drainage Exhibit for locations that dimension data was taken. A uniform flow
analysis has been completed below for the flow capacity at each point the dimension data was taken.
The uniform flow analysis was completed using Manning’s Equation per section 4.4.1.2 of the 2017
RSWDM.
Core Design, Inc. SINGH SHORT PLAT Page 8
Point 1: Thunder Hills Creek
Creek Top Width 5’
Creek Bottom Width 3’
Creek Depth 3’
Creek Side Slope 1:3
Approximate Slope 3%
Bed Lining Medium Rocks
Manning’s “n” 0.050
Q =1.49n A R23 S 12
A = Area = 12 ft2
S = Slope = 0.03 ft/ft
R = Hydraulic Radius = 12/9.7 = 1.24 ft
Flow Capacity Q = 71.38 CFS
1
3
3’
5’
Core Design, Inc. SINGH SHORT PLAT Page 9
Point 2: Concrete Rectangular Channel
Channel Width 4’
Channel Depth 3’
Approximate Slope 2%
Bed Lining Concrete
Manning’s “n” 0.018
Q =1.49n A R23 S 12
A = Area = 12 ft2
S = Slope = 0.02 ft/ft
R = Hydraulic Radius = 12/10 = 1.2 ft
Flow Capacity Q = 158.6 CFS
3’
4’
Core Design, Inc. SINGH SHORT PLAT Page 10
Point 3: Rolling Hills Creek
Creek Top Width 6’
Creek Bottom Width 4’
Creek Depth 2’
Creek Side Slope 1:2
Approximate Slope 2%
Bed Lining Grass/Dirt
Manning’s “n” 0.04
Q =1.49n A R23 S 12
A = Area = 11 ft2
S = Slope = 0.02 ft/ft
R = Hydraulic Radius = 11/8.48 = 1.30
Flow Capacity Q = 69.02 CFS
1
2
4’
6’
4,000
333
Upstream Drainage Area
This map is a user generated static output from an Internet mapping site and
is for reference only. Data layers that appear on this map may or may not be
accurate, current, or otherwise reliable.
7/5/2017
Legend
2270 113
THIS MAP IS NOT TO BE USED FOR NAVIGATION
Feet
Notes
227
WGS_1984_Web_Mercator_Auxiliary_Sphere
City and County Boundary
Other
City of Renton
Parcels
100' Primary
100' Intermediate
20' Primary
20' Intermediate
5' Primary
5' Intermediate
2' Primary
2' Intermediate
Network Structures
Inlet
Manhole
Utility Vault
Unknown Structure
Control Structure
Pump Station
Discharge Point
Water Quality
Detention Facilities
Pond
Tank
Vault
Wetland
FIGURE 3-1
Core Design, Inc. SINGH SHORT PLAT Page 13
TASK 4 Drainage System Description and Problem Description
See the Drainage Complaints Map and drainage complaint request in Appendix B.
TASK 5 Mitigation of Existing and Potential Problems
Downstream Drainage Problems Requiring Special Attention
Type 1 – Conveyance System Nuisance Problems
There are no known, reported or observed current downstream conveyance nuisance problems.
Type 2 – Severe Erosion Problems
There are no known, reported or observed current downstream severe erosion problems.
Type 3-Severe Flooding Problems
There are no known, reported or observed current downstream severe flooding problems.
Downstream Water Quality Problems Requiring Special Attention
Type 1 – Bacteria Problems
There are no known or reported downstream bacteria problems.
Type 2 – Dissolved Oxygen (DO) Problems
There are no known or reported downstream dissolved oxygen problems.
Type 3 – Temperature Problems
There are no known or reported downstream temperature problems.
Type 4 – Metals Problems
There are no known or reported downstream metals problems.
Type 5 – Phosphorous Problems
There are no known or reported downstream phosphorous problems.
Type 6 – Turbidity Problems
There are no known or reported downstream turbidity problems.
Core Design, Inc. SINGH SHORT PLAT Page 14
Type 7 – High pH Problems
There are no known or reported downstream high pH problems.
Bioassessment
Rolling Hills Creek is a Category 5 for bioassessment.
Core Design, Inc. SINGH SHORT PLAT Page 15
Drainage Adjustments
There are no proposed drainage adjustments.
Core Design, Inc. SINGH SHORT PLAT Page 16
4 FLOW CONTROL AND WATER QUALITY DESIGN
4.1 Predeveloped Site Hydrology
The project area is approximately 1.63 acres. The project site and upstream area (from Figure 3-1) drain
to two existing drainage courses that discharge from the west portion of the site into Thunder Hills
Creek with a quarter mile of the site. The entire site is completely forested and drains to the west at
slope ranging between 10 to 40 percent. Upstream drainage area shown consisting of about 17.9 acres
drains through three 12-inch pipes crossing Renton Avenue S between S 9th Street and S 10th Street and
discharge into drainage courses on site. Historic site conditions are assumed for all existing onsite areas
per Section 1.2.3.1 of the 2016 KCSWDM (page 1-43) and are modeled as Till Forest, except for the
existing pavement on Renton Avenue S that is west of the ROW centerline. The predeveloped areas are
summarized in Table 4-1 below and Figure 4-1 Predeveloped Conditions.
Table 4-1 Predeveloped Conditions Areas
GROUND COVER AREA (acres)
Till-Forest 1.45
Existing Peak Flows
Predeveloped Scenario from MGSFlood and peak flow rates:
4.2 Developed Site Hydrology
In the developed condition, the two existing drainage courses conveying the upstream area will be
combined into one drainage course located in between lots 4 and 5, which will continue to discharge to
Thunder Hill Creek. Lots 1-4 will be captured drain directly to the vault. Due to topographical
constraints, the lower pads of lots 5 and 6 are unable to drain to the vault and existing impervious area
on Renton Avenue S will be detained in lieu of the lower roofs of Lots 5 and 6. The proposed detention
vault will discharge west to an existing drainage course near the west property line. This drainage
course continues west through the WSDOT mitigation area where the channel of the creek has been
reinforced with chicken wire, rip rap, and geotextile matting. See photo below.
Core Design, Inc. SINGH SHORT PLAT Page 17
Looking downstream at the drainage course from the southwest corner of the WSDOT property
Table 4-2 Developed Area for Lots 5 and 6
Lot Total Area
Land Use Area
Total
Impervious Effective Impervious Pervious (Grass)
sf acre sf acre sf acre sf acre
5 8,675 0.20 4,000 0.09 3,913 0.09 4,762 0.11
6 8,507 0.20 4,000 0.09 3,915 0.09 4,592 0.11
TOTAL 17,182 0.39 8,000 0.18 7,828 0.18 9,354 0.21
Effective Impervious Area from Lots 5 and 6 = 7,828 square feet
Existing Impervious Area on Renton Avenue S = 3,345 square feet
(assumed to be equal to Roof Area of Lower Pads)
Roof Area of Upper Pads = 4,483 square feet
Therefore, the impervious area draining to the vault in Table 4-3 below from Lots 5 and 6 is 4,483 square
feet.
Frontage improvements include 13 feet of pavement with curb, gutter, an 8-foot planter and 5-foot
sidewalk on the west side of Renton Avenue S. The developed condition areas are summarized in Table
4-3 below and Figure 4-2 Developed Conditions Map.
Core Design, Inc. SINGH SHORT PLAT Page 18
Table 4-3 Developed Conditions Areas (to Vault)
Lot Total Area
Land Use Area
Total Impervious Effective2
Impervious Pervious (Grass)
sf acre sf acre sf acre sf acre
1 7,827 0.18 4,000 0.09 3,922 0.09 3,905 0.09
2 7,825 0.18 4,000 0.09 3,922 0.09 3,903 0.09
3 7,824 0.18 4,000 0.09 3,922 0.09 3,902 0.09
4 9,996 0.23 4,000 0.09 3,900 0.09 6,096 0.14
51 3,954 0.09 2,242 0.05 2,242 0.05 1,712 0.04
61 4,833 0.11 2,242 0.05 2,242 0.05 2,591 0.06
ROW 8,070 0.08 3,657 0.08 3,657 0.08 4,413 0.10
Ex Upstream 3,345 0.08 3,345 0.08 3,345 0.08 0 0.00
Tract C 5,413 0.12 387 0.01 387 0.01 5,026 0.12
Offsite 4,236 0.10 1,259 0.03 1,259 0.03 2,977 0.07
TOTAL to
Vault 63,323 1.45 29,131 0.67 28,796 0.66 34,527 0.79
1 Total area for lots 5 and 6 is the area draining to the vault, NOT the actual lot area. The impervious area for each
lot was calculated as follows:
(Effective Impervious Area – Ex Upstream Area)/2
= (7,828 sf – 3,345)/2
= 2,242 sf per lot
2 The effective impervious area was calculated assuming that basic dispersion would be applied to each lot to meet
the minimum 10% lot BMP requirement. For example, on Lot 1:
(0.10 x 7,827 sf) = 783 sf
(0.10 x 783 sf) = 78 sf Per Table 1.2.9.A, Basic Dispersion is modeled as 90% impervious,
10% grass
7,827 sf – 78 sf = 3,922 sf
Developed Peak Flows
The Developed scenario from MGSFlood is shown below:
Core Design, Inc. SINGH SHORT PLAT Page 19
Core Design, Inc. SINGH SHORT PLAT Page 22
4.3 Performance Standards
All stormwater facilities will be designed in accordance with the 2016 KCSWDM with Conservation Flow
Control Standards. The proposed water quality treatment system will meet requirements from the Basic
Water Quality Protection Menu.
Flow Control: Conservation Flow Control Standard
The Conservation Flow Control Standard requires maintaining the durations of high flows at their pre-
development levels for all flows greater than one-half of the 2-year peak flow through the 50-year peak
flow. The pre-development peak flow rates for the 2-year and 10-year runoff events must also be
maintained under this requirement.
Conveyance Capacity:
The proposed conveyance system has been designed with sufficient capacity to convey and contain the
25-year peak flow as determined by the Rational Method. It will also be verified that the 100-year peak
flow will not create or aggravate a severe flooding or erosion problem per Section 1.2.2.
Water Quality: Basic Water Quality Menu
The Basic Water Quality Menu includes one pollutant removal targets:
• Total Suspended Solids = 80% reduction
The Basic Water Quality Menu, described in detail in Section 6.1.1 of the 2016 KCSWDM (page 6-4),
provides eight options to meet the pollutant removal targets listed above.
• Option 1: Biofiltration Swale
• Option 2: Filter Strip
• Option 3: Wetpond
• Option 4: Wetvault
• Option 5: Stormwater Wetland
• Option 6: Combined Detention and Wetpool Facilities
• Option 7: Sand Filter
• Option 8: StormFilter
The project proposes to apply Option 4, a Wetvault. More detailed discussion and preliminary sizing
calculations of the flow control and water quality treatment facility proposed for this project follows
later in this section. More detailed discussion and preliminary sizing calculations of the flow control and
water quality treatment facility proposed for this project follows later in this section.
Core Design, Inc. SINGH SHORT PLAT Page 23
4.4 Flow Control System
Calculation of Lot Impervious Area
The impervious area per lot applied to the developed basin time series file was determined using the
criteria in the 2016 KCSWDM page 3-27. The proposed development is urban residential. The site is
zoned R-8 (see parcel information in Appendix A). The minimum impervious area per lot per the 2016
KCSWDM (page 3-27) would either be 4,000 square feet or the maximum impervious area based on
zoning, whichever is less. The maximum impervious surface allowed in the R-8, zone in the City of
Renton, is 70%.
Small Lot BMP Requirements
If the proposed project is on a site/lot smaller than 22,000 square feet, then flow control BMPs must
be applied as specified in the requirements below or the project must demonstrate compliance with the
LID Performance Standard (described in Section 1.2.9.1.B, p. 1-83) using an approved continuous runoff
model. This project is not in compliance with the LID performance standard and has evaluated the
following BMPs in order of precedence:
1. Full Dispersion – A native flowpath of 100 feet and no steeper than 20% per the requirements of
Appendix C, Section C2.1.1 cannot be met so full dispersion is infeasible. The project site is also
located in an erosion and landslide hazard area.
2. Full Infiltration of Roof Runoff – Full infiltration is not feasible because the project is located in
an erosion and landslide hazard area.
3. All target surfaces not mitigated by requirements 1 and 2 above, must be mitigated to the
maximum extent feasible using one or more of the BMPs from the following list:
• Full Infiltration, Limited Infiltration, Bioretention and Permeable Pavement are also
infeasible because the project is located in an erosion and landslide hazard area.
4. All target surfaces not mitigated by requirements 1, 2 and 3 above, must be mitigated to the
maximum extent feasible using basic dispersion. The project site is located in an erosion and
landslide hazard area so the application of basic dispersion must be approved by a geotechnical
engineer. The use of basic dispersion on each will be confirmed at the time of building permits.
5. BMPs must be implemented, at a minimum for an impervious area equal to at least 10% of the
site/lot for site/lots up to 11,000 square feet and at least 20% of the site/lot for site/lot sizes
between 11,000 and 22,000 square feet. If these minimum areas are not mitigated using
feasible BMPs from Requirements 1, 2, 3 and 4 above either a fee in lieu of the required
minimum BMPs must be paid (requires that the City has established a program for determining
Core Design, Inc. SINGH SHORT PLAT Page 24
and utilizing the fees for stormwater focused retrofit projects) or one or more of the BMPs from
the following list are required to be implemented to achieve compliance.
• Reduced Impervious Surface Credit – A reduced impervious surface credit will be applied to
the remaining area not covered by basic dispersion to meet the minimum 10 percent lot
BMP area.
• Native Grown Protection Credit – It is not anticipated that a native growth protection credit
will be used.
6. The soil moisture capacity of new pervious surfaces must be protected in accordance with the
City’s standards.
The soil moisture capacity of the developed pervious surfaces will be protected per the City’s
standards.
7. Any proposed connection of roof downspouts to the local drainage system must be via a
perforated pipe connection.
Perforated pipe connections are not proposed because the site is located in an erosion and
landslide hazard drainage area.
Small Road Improvement and Urban Road Improvement Projects BMP Requirements
If the proposed project is a road improvement project that is within the UGA or is on a site/parcel less
than 5 acres in size, then flow control BMPs must be applied as specified in the requirements below:
1. Full Dispersion – A native flowpath of 100 feet and no steeper than 20% per the requirements of
Appendix C, Section C2.1.1 cannot be met so full dispersion is infeasible. The project site is also
located in an erosion and landslide hazard area.
2. All target surfaces not mitigated by requirements 1 and 2 above, must be mitigated to the
maximum extent feasible using one or more of the BMPs from the following list:
• Full Infiltration, Limited Infiltration, Bioretention and Permeable Pavement are also
infeasible because the project is located in an erosion and landslide hazard area.
3. All target surfaces not mitigated by requirements 1, and 2 above, must be mitigated to the
maximum extent feasible using basic dispersion. Basic Dispersion for the road has been
determined to be infeasible because the project is located in an erosion and landslide hazard
drainage area.
Core Design, Inc. SINGH SHORT PLAT Page 25
Flow Control
A 64’x31’ detention vault will be located in Tract B, with access off of Cedar Avenue S. The detention
vault summary is located below and the full report has been included in Appendix C.
MGS Flood Pond Calculation
Link Name: Vault
Link Type: Structure
Downstream Link: None
Prismatic Pond Option Used
Pond Floor Elevation (ft) : 216.50
Riser Crest Elevation (ft) : 227.00
Max Pond Elevation (ft) : 227.50
Storage Depth (ft) : 10.50
Pond Bottom Length (ft) : 64.0
Pond Bottom Width (ft) : 30.0
Pond Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00
Bottom Area (sq-ft) : 1920.
Area at Riser Crest El (sq-ft) : 1,920.
(acres) : 0.044
Volume at Riser Crest (cu-ft) : 20,160.
(ac-ft) : 0.463
Area at Max Elevation (sq-ft) : 1920.
(acres) : 0.044
Vol at Max Elevation (cu-ft) : 21,504.
(ac-ft) : 0.494
Massmann Infiltration Option Used
Hydraulic Conductivity (in/hr) : 0.00
Depth to Water Table (ft) : 100.00
Bio-Fouling Potential : Low
Maintenance : Average or Better
Riser Geometry
Riser Structure Type : Circular
Riser Diameter (in) : 18.00
Common Length (ft) : 0.000
Riser Crest Elevation : 227.00 ft
Hydraulic Structure Geometry
Number of Devices: 3
---Device Number 1 ---
Device Type : Circular Orifice
Control Elevation (ft) : 216.50
Diameter (in) : 0.38
Orientation : Horizontal
Elbow : No
---Device Number 2 ---
Device Type : Circular Orifice
Core Design, Inc. SINGH SHORT PLAT Page 26
Control Elevation (ft) : 223.50
Diameter (in) : 0.62
Orientation : Horizontal
Elbow : Yes
---Device Number 3 ---
Device Type : Circular Orifice
Control Elevation (ft) : 225.00
Diameter (in) : 0.94
Orientation : Horizontal
Elbow : Yes
The proposed detention vault includes a three-orifice control structure. The first orifice is 3/8 inches in
diameter and is at the bottom of the riser. The second orifice is at elevation 223.50 and is 9/16 inches in
diameter. The third orifice is at elevation 225.00 and is 15/16 inches in diameter. The 100-year water
surface elevation is 226.87.
********** Link: Vault ********** Link WSEL Stats
WSEL Frequency Data(ft)
(Recurrence Interval Computed Using Gringorten Plotting Position)
Tr (yrs) WSEL Peak (ft)
======================================
1.05-Year 219.853
1.11-Year 220.124
1.25-Year 220.995
2.00-Year 222.851
3.33-Year 223.880
5-Year 224.531
10-Year 225.548
25-Year 226.178
50-Year 226.484
100-Year 226.870
The flow duration plot below indicates that the vault passes the flow control performance criteria with
no positive excursions.
Core Design, Inc. SINGH SHORT PLAT Page 27
The vault will discharge with outlet projection to an existing drainage course .
4.5 Water Quality Calculations
Option 4 of the Basic Water Quality Protection Menu is a wetvault.
Wetvault
Wetvaults are sized with a volume equal to the 91% treatment volume and meets the Basic Water
Quality goal of 80% TSS removal. The MGSFlood modeling results below show that the required water
quality treatment volume is 4,011 cubic feet.
********** Link: Vault **********
Basic Wet Pond Volume (91% Exceedance): 4011. cu-ft
Computed Large Wet Pond Volume, 1.5*Basic Volume: 6016. cu-ft
The dead storage provided in the vault is as follows:
Cell 1 – 64’ x 15.5’ x 4’ = 3,968 cf
Cell 2 – 64’ x 15.5’ x 3’ = 2,976 cf
Total Volume = 6,944 cf provided
Core Design, Inc. SINGH SHORT PLAT Page 28
5 CONVEYANCE SYSTEM ANALYSIS AND DESIGN
The onsite conveyance system has been analyzed using the King County Back Water (KCBW) program
per the requirements described in Chapter 4 of the 2017 RSWDM. The KCBW program applies the
Manning equation in the Backwater Analysis Method described in Section 4.2.1.2 (page 4-21) of the
2017 RSWDM. Refer to Figure 5-1: Tributary CB Areas located at the end of this Section to aid in the
following discussion.
5.1 Rational Method
The conveyance system has been designed to provide sufficient capacity to convey and contain, at a
minimum, the 25-year peak developed condition flow as determined by the Rational Method. Section
3.2.1 of the 2017 RSWDM outlines the process for determining QR for the project site area. The peak
25-year flow is determined by the following equation:
Equation 3-1 𝑄𝑄𝑅𝑅=𝐶𝐶𝐶𝐶𝐼𝐼𝑅𝑅𝐴𝐴
Where: QR = peak flow for a storm of return frequency R
CC = composite estimated runoff coefficient (0.55, see “C” Value Calculation below)
IR = peak rainfall intensity for a storm of return frequency R (varies, see “IR” Peak
Rainfall Intensity Calculation below)
A = drainage subbasin area
“C” Value Calculation
The allowable runoff coefficients to be used in the Rational Method are shown in Table 3.2.1.A of the
2017 RSWDM (page 3-13) by type of land cover. The composite “C” value, CC, is determined by the
following equation:
Equation 3-2 𝐶𝐶𝐶𝐶=(𝐶𝐶1 𝐴𝐴1 +𝐶𝐶2 𝐴𝐴2 +⋯+𝐶𝐶𝑛𝑛𝐴𝐴𝑛𝑛)/𝐴𝐴𝑇𝑇
Where: AT = total area (1.45 acres)
A1,2,…n = areas of land cover types (acres, see table below)
C1, 2,…n = runoff coefficients for each land cover type ( see table below)
Table 5-1 Composite “C” Value
Cover Type C A
Lawns / landscaping 0.25 0.79
Pavement and roofs 0.90 0.66
CC = 0.55 AT = 1.45
Core Design, Inc. SINGH SHORT PLAT Page 29
“IR” Peak Rainfall Intensity Calculation
The peak rainfall intensity, IR, for the specified design storm of return frequency R (25-year) is
determined using the following equations:
Equation 3-3 𝐼𝐼𝑅𝑅=(𝑃𝑃𝑅𝑅)(𝑖𝑖𝑅𝑅) Equation 3-4 𝑖𝑖𝑅𝑅=(𝑎𝑎𝑅𝑅)(𝑇𝑇𝑐𝑐)−𝑏𝑏𝑅𝑅
Where: IR = peak rainfall intensity
PR = total precipitation at the project site for the 24-hour, 25-year storm (3.4 in,
Figure 3.2.1.C, page 3-16)
iR = unit peak rainfall intensity factor (0.80 in/hr, Equation 3-4)
Tc = time of concentration (6.3 minutes at furthest catch basin upstream, see “Tc”
Time of Concentration Calculation below)
aR, bR = Table 3.2.1.B (25-year) adjustment coefficients 2.66 and 0.65 respectively)
“Tc” Time of Concentration Calculation
The time of concentration is defined as “…the time it takes runoff to travel overland (from the onset of
precipitation) from the most hydraulically distant location in the drainage basin to the point of
discharge.” The value for time of concentration, Tc, used in equation 3-4 above is the sum total of the
time of concentration for each overland flowpath segment, Tt. The equations for calculating Tc,
therefore, are as follows:
Equation 3-5 𝑇𝑇𝑐𝑐=𝑇𝑇1 +𝑇𝑇2 +⋯+𝑇𝑇𝑛𝑛 Equation 3-6 𝑇𝑇1,2,…𝑛𝑛=𝐿𝐿60𝑉𝑉
Where: T1, 2,…n = travel time (6.3 minutes, see calculation and discussion below)
L = distance of flow across a given segment
V = average velocity across the land cover =𝑘𝑘𝑅𝑅�𝑠𝑠0 )
kR = time of concentration velocity factor (per Table 3.2.1.C, page 3-13)
s0 = slope of flowpath
A minimum time of concentration of 6.3 minutes was used at the furthest catch basin upstream. With
each progression downstream the time of concentration was recalculated to include the travel time in
the pipe per equation 3-6.
Core Design, Inc. SINGH SHORT PLAT Page 30
Tributary Flow, Q Calculation
The time of concentration increases as you progress downstream, so therefore the intensity, I decreases
as you progress downstream. At each catch basin the peak flow rate is calculated from the ∑(A*C) x Tc x
IR.
Qratio Calculation
The Q Ratio is the ratio of new flow introduced at the pipe section to the main flow or cumulative flow
in the system.
For example, the Q Ratio at CB 1:
= (QLateral + Qgrate)/QCB2
= (0.0cfs + 0.27 cfs)/1.45 cfs
= 0.18
The areas and corresponding catchment flow rates summarized in Table 5-2 below and are graphically
represented on Figure 5-1: Tributary CB Areas.
Table 5-2 - Catch Basin Areas
CB Area (ac) Q Q Q25
Grate Lateral New Cum Qratio
CB1 0.18 0.27 0.27 1.72 0.18
CB2 0.36 0.54 0.54 1.45 0.58
CB3 0.23 0.34 0.34 0.92 0.59
CB4 0.00 0.00 0.00 0.58 0.00
CB5 0.12 0.19 0.19 0.58 0.48
CB6 0.26 0.39 0.39 0.39
5.2 King County Backwater Analysis
The King County Backwater Program was used to analyze the conveyance system. The total cumulative
flow for each pipe section is input as the discharge flow analyzed (minimum and maximum, 1 cfs
increments), with the overflow elevation set to the rim elevation for the catch basin at the upper end of
the pipe run. The KCBW results are included at the end of this section.
Core Design, Inc. SINGH SHORT PLAT Page 31
The KCBW input file (.bwx) is shown below:
8 MainMenu:Perform Backwater on PIPES
17001.bwp Pipe Filename
F broad-crested weir at Intermediate junctions
F UTW:Use HW/TW File for Tailwater
226.87 Tailwater elevation [only read when UTW=False]
(specify) Tailwater Filename [only read when UTW=True]
1.72000 Minimum discharge
1.72000 Maximum discharge
1.00000 discharge Increment
17001 Documentation Filename (Specify) for NONE
1 1=Standard,2=Condensed,3=Expanded output
1 1=no weir,2=Broad,3=Sharp
285.75 Overflow Elevation
2.00000 Weir Length [used only for Broad/Sharp weirs]
0.000000 Weir Height above overflow [used only for Broad/Sharp weirs]
T UVF:Upstream Velocity Fixed?
3.00000 Upstream Velocity [used only for UVF=True]
3.00000 Channel Width [used only for UVF=False]
0 Return to Main Menu
15 MainMenu:Exit KCBW Program
The starting tailwater for the west line was set at the maximum water surface elevation of the vault. All
conveyance systems are designed to safely convey the 25-year storm event per Core Requirement #4 in
the 2017 RSWDM. Tables 5-3 below shows the calculated freeboard at each catch basin analyzed.
During the 25-year storm event, the minimum height of freeboard provided will 1.94 feet at CB 3.
Table 5-3 KCBW Results
CB HGL Rim Freeboard
CB1 256.96 263.77 6.81
CB2 257.54 262.68 5.15
CB3 259.76 261.81 1.94
CB4 259.91 264.05 4.10
CB5 279.58 285.86 6.28
CB6 283.48 285.75 2.27
Core Design, Inc. SINGH SHORT PLAT Page 33
6 SPECIAL REPORTS AND STUDIES
Geotechnical Report
Prepared by: Kristina Weller
Dated: March 14, 2017
Riley Group
17522 Bothell Way NE
Bothell, WA 98011
Critical Areas Report
Prepared by: Habitat Technologies
Dated: April 22, 2017
P.O. Box 1088
Puyallup, WA 98371
Arborist Report
Prepared by: Daniel Maple
Dated: June 29, 2017
A.B.C. Consulting Arborist LLC
12402 N Division #294
Spokane, WA 99218
Core Design, Inc. SINGH SHORT PLAT Page 34
7 OTHER PERMITS
Utilities Permit
Building Permits
ROW Use Permit
NPDES Permit
Core Design, Inc. SINGH SHORT PLAT Page 35
8 ESC ANALYSIS AND DESIGN
The site will utilize Appendix D of the 2017 RSWDM for the erosion and sedimentation control design to
reduce the discharge of sediment-laden runoff from the site. Clearing limits will be established prior to
any earthwork on the project site. Perimeter protection will be provided by silt fencing as shown on the
erosion control plans to limit the downstream transport of sediment to neighboring properties. A
temporary construction entrance will be used to reduce the amount of sediment transported onto
paved roads by construction vehicles and, if required dust control will be provided by a water truck.
The permanent detention vault will be used as a temporary sediment pond and calculations will be
provided during the Construction Permit.
Core Design, Inc. SINGH SHORT PLAT Page 36
9 BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF
COVENANT
9.1 Bond Quantities
A Site Improvement Bond Quantity Worksheet to be provided with the Construction Permit.
9.2 Facility Summaries
A facility summary sheet will be provided with the submittal of the final plat.
9.3 Declaration of Covenant
Not applicable.
Core Design, Inc. SINGH SHORT PLAT Page 37
10 OPERATIONS AND MAINTENANCE
The operations and maintenance information will be provided with the Utilities Permit through select
portions from Appendix A of the 2016 KCSWDM and Site Development Permit plan set.
Appendix A
Fair, Equitable, and Understandable Property Valuations
You're in: Assessor >> Look up Property Info >> eReal Property
Department
of
Assessments
500 Fourth
Avenue,
Suite ADM-
AS-0708,
Seattle, WA
98104
Office Hours:
Mon - Fri
8:30 a.m. to
4:30 p.m.
TEL: 206-
296-7300
FAX: 206-
296-5107
TTY: 206-
296-7888
Send us
mail
ADVERTISEMENT
New
Search
Property
Tax
Bill
Map
This
Property
Glossary
of
Terms
Area
Report
Print
Property
Detail
PARCEL DATA
Parcel 000720-0196
Name SOUND & STEVE LLC
Site Address
Residential Area 030-002 (SW Appraisal
District)
Property Name
Jurisdiction RENTON
Levy Code 2100
Property Type R
Plat Block / Building Number
Plat Lot / Unit Number
Quarter-Section-Township-
Range NW-20-23-5
Legal Description
TOBIN H H-D C # 37 POR OF D C SLY OF LOTS 4 & 5 HIGHLAND ADD WLY OF W LN RENTON ST PROD S ELY
OF C/L CEDAR ST PROD S & NLY OF PSP & L R/W
PLat Block:
Plat Lot:
LAND DATA
Highest & Best Use As If Vacant SINGLE FAMILY
Highest & Best Use As
Improved (unknown)
Present Use Vacant(Single-family)
Land SqFt 140,341
Acres 3.22
Percentage Unusable 0
Unbuildable NO
Restrictive Size Shape NO
Zoning R-8
Water WATER DISTRICT
Sewer/Septic (none)
Road Access PUBLIC
Parking
Street Surface PAVED
Views Waterfront
Rainier
Territorial AVERAGE
Olympics AVERAGE
Cascades
Seattle Skyline
Puget Sound
Lake Washington
Lake Sammamish
Lake/River/Creek
Other View
Waterfront Location
Waterfront Footage 0
Lot Depth Factor 0
Waterfront Bank
Tide/Shore
Waterfront Restricted Access
Waterfront Access Rights NO
Poor Quality NO
Proximity Influence NO
Designations Nuisances
Historic Site
Current Use (none)
Nbr Bldg Sites
Adjacent to Golf Fairway NO
Adjacent to Greenbelt NO
Other Designation NO
Deed Restrictions NO
Development Rights Purchased NO
Easements NO
Native Growth Protection
Easement NO
DNR Lease NO
Topography YES
Traffic Noise MODERATE
Airport Noise
Power Lines YES
Other Nuisances NO
Problems
Water Problems NO
Transportation Concurrency NO
Other Problems NO
Environmental
Environmental NO
BUILDING
TAX ROLL HISTORY
Account Valued
Year
Tax
Year
Omit
Year
Levy
Code
Appraised
Land
Value ($)
Appraised
Imps
Value ($)
Appraised
Total
Value ($)
New
Dollars
($)
Taxable
Land
Value
($)
Taxable
Imps
Value
($)
Taxable
Total
Value
($)
Tax
Value
Reason
000720019603 2016 2017 2100 143,000 0 143,000 0 143,000 0 143,000
000720019603 2015 2016 2100 143,000 0 143,000 0 143,000 0 143,000
000720019603 2014 2015 2100 137,000 0 137,000 0 137,000 0 137,000
ADVERTISEMENT
Reference
Links:
King County Tax
Links
Property Tax Advisor
Washington State
Department of
Revenue (External
link)
Washington State
Board of Tax
Appeals (External
link)
Board of
Appeals/Equalization
Districts Report
iMap
Recorder's Office
Scanned images of
surveys and other
map documents
Scanned images of
plats
Search Kingcounty.gov
Home How do I... Services About King County Departments
King County Department of Assessments
Information for...
Residents
Businesses
Job seekers
Volunteers
King County employees
Do more online
Trip Planner
Property tax information & payment
Jail inmate look up
Parcel viewer or iMap
Public records
More online tools...
Get help
Contact us
Customer service
Phone list
Employee directory
Stay connected! View King County social media
© King County, WA 2016 Privacy Accessibility Terms of use
000720019603 2013 2014 2100 125,000 0 125,000 0 125,000 0 125,000
000720019603 2012 2013 2100 125,000 0 125,000 0 125,000 0 125,000
000720019603 2011 2012 2100 125,000 0 125,000 0 125,000 0 125,000
000720019603 2010 2011 2100 17,000 0 17,000 0 17,000 0 17,000
000720019603 2009 2010 2100 17,000 0 17,000 0 17,000 0 17,000
000720019603 2008 2009 2100 17,000 0 17,000 0 17,000 0 17,000
000720019603 2007 2008 2110 17,000 0 17,000 0 17,000 0 17,000
000720019603 2006 2007 2110 17,000 0 17,000 0 17,000 0 17,000
000720019603 2005 2006 2110 17,000 0 17,000 0 17,000 0 17,000
000720019603 2004 2005 2110 16,000 0 16,000 0 16,000 0 16,000
000720019603 2003 2004 2110 16,000 0 16,000 0 16,000 0 16,000
000720019603 2002 2003 2110 6,000 0 6,000 0 6,000 0 6,000
000720019603 2001 2002 2110 6,000 0 6,000 0 6,000 0 6,000
000720019603 2000 2001 2110 6,000 0 6,000 0 6,000 0 6,000
000720019603 1999 2000 2110 6,000 0 6,000 0 6,000 0 6,000
000720019603 1998 1999 2110 6,000 0 6,000 0 6,000 0 6,000
000720019603 1997 1998 2110 0 0 0 0 6,000 0 6,000
000720019603 1996 1997 2110 0 0 0 0 68,500 0 68,500
000720019603 1994 1995 2110 0 0 0 0 68,500 0 68,500
000720019603 1992 1993 2110 0 0 0 0 85,700 0 85,700
000720019603 1990 1991 2110 0 0 0 0 72,600 0 72,600
000720019603 1988 1989 2110 0 0 0 0 58,800 0 58,800
000720019603 1986 1987 2110 0 0 0 0 65,300 0 65,300
000720019603 1984 1985 2110 0 0 0 0 72,500 0 72,500
000720019603 1982 1983 2110 0 0 0 0 72,500 0 72,500
SALES HISTORY
Excise
Number
Recording
Number
Document
Date Sale Price Seller Name Buyer Name Instrument Sale
Reason
2758145 20150928000657 9/15/2015 $145,000.00 RAFEL LAW
GROUP PLLC
SOUND &
STEVE LLC
Statutory
Warranty
Deed
None
2652884 20140210000443 2/7/2014 $0.00 DEFOOR TERRY
MARK+GWC INC
RAFEL LAW
GROUP PLLC
Statutory
Warranty
Deed
Foreclosure
2164485 20051026001112 9/29/2005 $270,000.00
KAO WEI
KANG+CHIU-CHU
TUAN ET AL
GWC INC
Statutory
Warranty
Deed
None
1107586 198912291919 12/27/1989 $0.00
KAO WEI-
KANG+CHIU CHU
TUAN
TENG LENG
SHENG+HSU
MEI-YU
Quit Claim
Deed Settlement
REVIEW HISTORY
PERMIT HISTORY
HOME IMPROVEMENT EXEMPTION
New
Search
Property
Tax
Bill
Map
This
Property
Glossary
of
Terms
Area
Report
Print
Property
Detail
ADVERTISEMENT
Updated: March 17, 2016
Share Tweet Email Print
Information for...Do more online
Get help
§¨¦405
¬«167
¬«169
Ginger CreekSpringbrook CreekGarrison CreekKennyda
l
e
C
r
e
e
k
Rolling Hills CreekMadsen Creek
J
o
h
n
s
C
r
e
e
k
Maple
wood
Creek
May Creek
Gypsy
C
r
e
e
k
Mo
l
a
s
s
e
s
C
r
e
e
k
Panther CreekC
e
d
a
r
R
i
v
e
r
Mola
s
se
s
C
ree
kThunder
H
i
l
l
s
C
r
eekGreen RiverMay
C
r
e
e
k
Ma
d
s
e
n
C
r
e
e
k
Ho
n
e
y
C
r
e
e
k
Mill CreekBig
S
o
o
s
C
r
e
e
k
Ce
d
a
r
R
i
v
e
rSpringbrook
CreekBig
Soos
CreekMad
s
en
C
r
e
e
k
S
p
r
i
n
g
b
r
o
o
k
C
r
e
e
k Panther CreekBN Inc RdSR 167Cedar Riv
S 135th
S
t Rain
ier AveGreen River TrlSW 27th St
Sidn
e
y
A
v
e
N
Jones Ave NEoa
l
M
i
n
e
R
d
S
S 132n
d
S
t
Industry DrSE 196th
D
r
89th Ave S66
t
h
L
n
S
N 33rd Pl
N 35th St
75th A
ly
S
Fir Ln
Puget Dr SEL
a
k
e
Y
o
u
n
g
s
T
r
a
i
l
W
a
l
k143rd Pl SES
E
1
7
1
s
t
W
a
y
SE
J
o
n
e
s
R
d
SE
8
3
r
d
P
l
183rd Ave SESE 160th PlLake Washington TrlLogan Ave NSE 132nd St
SE 91st St
110th Ave SESE
SE 64th St
SE 20
NE 27th
S
t
S
o
o
s
C
r
e
e
k
T
r
lSR 515SE Carr RdCostco Dr Nile Ave NES 32nd St
72nd Ave S77th Ave SEWo
o
d
s
i
d
e
D
r
S
E
S 77th PlSE 68th St
SE 3rd Pl
98th Pl S183rd Way SE113th Pl SES 129th St
M
e
a
d
o
w
L
n
99th Pl S120th Ave SE118th Pl SE83rd Ave SES 23rd St SE 100
th
S
t
S Taft St
Gl
e
n
w
o
o
d
A
v
e
S
E
SE 187th St
S 196th St
184th Pl SE
103rd Pl SES 45th Pl
Lake Youngs Service RdS 36th Pl
0th St N 41st Pl161st Pl SESE 179th Pl
SE 133rd St94th Ave SESE 72nd Pl
S
1
1
6
t
h
P
l
S 126th
St
166th Pl SES 55th St
N 38th St
Rosario Pl NES 112th St
Renton Ave SNE 7th St
NE 9th St
87th Ave S105th Ave SEN 8th St
SE 123rd Pl
SE 82nd St
125th Ave SERipley Ln NInterurban TrlSE 188th Way
N 31st St90th
Ave
SE
SW 34th St Mo
n
t
e
r
e
y
P
l
NE
S 48th St 174th Ave SE129th Ave SEFor
e
s
t
A
v
e
S
NE 4th St61st Ave SS 75th Pl1
7
1
s
t
A
v
e
S
E
SE 180th St
S 119th St63rd Ave SSE 141st
St
S 199th Pl 80th Pl SBenson Rd SAndover Park E184th Ave SE16
9
t
h
A
v
e
S
E
111th Ave SES
E
8
9
t
h
P
l
157th Pl SEDuvall Ave NES 113th St
S 115th St 178th Ave SESE 159th Pl
163rd Pl SESW 41st St
S 117th Pl
Renton Maple Valley Rd
SE 10
106th Ave SESE 128th S
136th Pl SESE 191st StMain Ave SSE 2nd St121st Ave SESE 170th Lind Ave SWNE 21st St
West Valley Hwy132nd Ave SENE 8th St122nd Ave SE77th Ave SHard
ie
Ave
SW
SW 19th St
68th Ave SSE 95th Wa
y
SE 200th St
SE 160th St
118th Pl
116th Ave SEAvalon Dr173rd
A
ve
SE177th Ave SESE 102n
SE 120th St
SE 72nd St
SE 208th St117th Ave SE85th Pl SEMonster
R
d
S
W
Forest Dr SE
NE 5th
S
t
76th Ave SSE 121st Pl
96th Ave SNE 25th St
166th Ave SEB
e
a
c
o
n
W
a
y
S
1
4
3
r
d
A
v
e
SES 123rd St84th Ave S80th Ave SES 184th StSE 79th Pl113th Ave SE24th St
S 116th St
SE 204th Pl
SE 139th Pl
NE 24th StNE 23rd Pl
NE 2nd St
NE 16th
St
164th Ave SESE 168th St
SE 186th St nd Ave SE112th Ave SESE 172nd Pl
108th Ave SEPark Ave NNewcast
l
e
G
o
l
f
C
l
u
b
R
d
S 3rd St
118th Ave SE148th Pl SE124th Ave SES 2nd St
SE 63rd St
S
E
1
7
0
t
h
P
l
ai
n
i
e
r
A
v
e
S
66th Ave SPie
rce
Ave
SE
SE
M
a
y
V
a
l
l
e
y
R
d
SE 192nd D
r
N 4th St
109th Ave SESW Grady
W
a
y 151st
Ave
SE
d
S 128th St
SE P
e
t
r
o
v
i
t
s
k
y
R
d
S Tobin St
SE 190th St
S 212th Way156th Ave SEMonroe Ave NE1
5
9
t
h
A
v
e
SEE Mercer WayNE 20th Pl
Aberdeen Ave NESE 201st Pl 168th Pl SE
SE 116th StNE 10th St
168th Ave SES 188th St
SE 112th St
138th Ave SE80th Ave SS 130th St
92nd Ave SSW 39th StMaule
Ave
S134th Ave SE65th Ave SMap
l
e
V
a
l
l
e
y
H
w
y
SE 184th St
140
t
h
W
a
y
S
E
t Lakemont Blv164th Pl SE13
6
t
h
A
v
e
S
E
NE 6th Pl
Boeing AcRd
S 190th St Lind Ave NW129th P
l SE180th Ave SE181st Ave
SE142nd Ave SESE
SE
1
6
1
s
t
P
l
S 121st St
S 114th St 135th
P
l
SE148th Ave SES 194th St 84th Ave SP
e
d
e
s
t
r
i
a
n
W
a
l
k 183rd Ave SEI-405 Ram
p
116th Ave SESR 515
N
E
2
7
t
h
S
t
NE 7th St
East Valley Rdwy
SE 188th St
S 132nd St NE 3rd St
Talbot Rd SSE May V
a
l
l
e
y
R
d
110th Ave SE1
7
1
s
t
A
v
e
S
E
148th Ave SEI-4SE 82n
d
St
SE 120th St 174
th
A
ve
SEstrian WalkSE Jones Rd
80th Ave SS 116th
P
l
Private RdPedestrian WalkLak
e
Young
s
T
ra
i
l
Wa
l
k
SE Jones
R
d
SR 167SE 208th St
Ra
i
n
i
e
r
A
v
e
S
eek TrlS 190th St 116th Ave SEPri
v
a
t
e
R
dSunset Blvd NESE 159th PlSR 167S 200th St
Flow Control Standards
Peak Rate Flow Control Standard (Existing Site Conditions)
Flow Control Duration Standard (Existing Site Conditions)
Flow Control Duration Standard (Forested Conditions)
Renton City Limits
Potential Annexation Area
±
012Miles
Flow Control Application Map
Printed 1/14/2010
Reference 11-A
Appendix B
LAKE WASHINGTON
Big Soos CreekLAKE WASHINGTON
M a y C r e e k
Cedar RiverCedar River
Cedar RiverLAKE YOUNGS
PANTHER LAKE
LAKE WASHINGTON
Soos CreekLAKE WASHINGTONLAKE WASHINGTON
60003000
k
k
k
k
k
k
k
k
k
k k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
kk
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k HoquiamAveNEE Valley Hwy84thAveSNEParkD r
SW 7th St
SE 128th St
SE 192nd StLindAveSWMainAveSS 132nd St
Factory
PlN
Talbot
Rd
SN 3rd St
RainierAveS
164thAveSETukwila Pk w y SPuget Dr
NE 4th St
S 3rd St
S 1 2 9 th S t68thAveSSWSunsetBlvd
SW 16th St
116thAveSEN 4th St
I
n
t
e
r
u
r
b
a
n
Av
e
S WilliamsAveNBronsonW a y N
NE7thSt
124thAveSES 7th St SERenton IssaquahRd
Rai
ni
er
AveNNewcastle Way
CoalCr
e
e
k
PkwySESW 41st St
T
a
ylo
r
P
l
N
WNESunsetBlvdWellsAveNUnionAveNEN E 3 rd S tHa
r
die
A
v
eSWS180th St
Maple Valley Hwy
140thAveSES G ra d yWayS 2 1 s tSt
BensonRdSRe
nt
o
n
AveS87thAveS128thAveSE148thAveSESW 43rd St SEC arrR d
SE 168th St
Beaco
n
A
v
e
S
68thAveSLoganAveN108thAveSEForestDr SE
S2ndSt
141
s
tAve
S
ERainierAveS 156thAveSES E 183rd StBenson Dr
SS 124th StS 43rd St
Airport Way
S W G radyW a y
S E J o n e s RdSunsetBlvdN
Puget Dr SESE 204th W aySW 34th StMo
n
s
ter
RdSW
S E 1 4 2 n d P lWestValleyHwySSEMay ValleyRd
SunsetBlvdNS C a r r RdHouserWayNNewcastle GolfClubRd
S 133rd St
WilliamsAveSWellsAveSEMercerWay154thPlSEDuvallAveNELoganAveSMonroeAveNESunsetBlvdNEEdmondsAveNEStevens AveNWRai
ni
er
AveSTalbotRdSOakesdaleAveSWTaylorAveNW164thAveSERainierAveSWestVal
leyHwyWestValleyHwyParkAveN108thAveSE6
6
t
h
Av
e
SWMercerWayWMercer
W
ay LakemontBlvdSE132ndAve SELakeWashingtonBlvdNE140thWaySE
East Valley Rd68thAveS³City of RentonSensitive Areas
0 0.5 10.25
Miles
Information Technology - GISmapsupport@rentonwa.govPrinted on: 11/12/2014
Data Sources: City of Renton, King County
This document is a graphic representation, not guaranteedto survey accuracy, and is based on the best informationavailable as of the date shown. This map is intended forCity display purposes only.
Renton City Limits
k Education
Fire Station
K Valley Medical Center
Coal Mine Hazards
Severity
HIGH
MODERATE
UNCLASSIFIED
Coordinate System: NAD 1983 HARN StatePlane Washington North FIPS 4601 FeetProjection: Lambert Conformal ConicDatum: North American 1983 HARN
k
k
k
k
k
k
k
k
k
k k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
kk
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k HoquiamAveNEE Valley Hwy84thAveSNEParkD r
SW 7th St
SE 128th St
SE 192nd StLindAveSWMainAveSS 132nd St
Factory
PlN
Talbot
Rd
SN 3rd St
RainierAveS
164thAveSETukwila Pk w y SPuget Dr
NE 4th St
S 3rd St
S 1 2 9 th S t68thAveSSWSunsetBlvd
SW 16th St
116thAveSEN 4th St
I
n
t
e
r
u
r
b
a
n
Av
e
S WilliamsAveNBronsonW a y N
NE7thSt
124thAveSES 7th St SERenton IssaquahRd
Rai
ni
er
AveNNewcastle Way
CoalCr
e
e
k
PkwySESW 41st St
T
a
ylo
r
P
l
N
WNESunsetBlvdWellsAveNUnionAveNEN E 3 rd S tHa
r
die
A
v
eSWS180th St
Maple Valley Hwy
140thAveSES G ra d yWayS 2 1 s tSt
BensonRdSRe
nt
o
n
AveS87thAveS128thAveSE148thAveSESW 43rd St SEC arrR d
SE 168th St
Beaco
n
A
v
e
S
68thAveSLoganAveN108thAveSEForestDr SE
S2ndSt
141
s
tAve
S
ERainierAveS 156thAveSES E 183rd StBenson Dr
SS 124th StS 43rd St
Airport Way
S W G radyW a y
S E J o n e s RdSunsetBlvdN
Puget Dr SESE 204th W aySW 34th StMo
n
s
ter
RdSW
S E 1 4 2 n d P lWestValleyHwySSEMay ValleyRd
SunsetBlvdNS C a r r RdHouserWayNNewcastle GolfClubRd
S 133rd St
WilliamsAveSWellsAveSEMercerWay154thPlSEDuvallAveNELoganAveSMonroeAveNESunsetBlvdNEEdmondsAveNEStevens AveNWRai
ni
er
AveSTalbotRdSOakesdaleAveSWTaylorAveNW164thAveSERainierAveSWestVal
leyHwyWestValleyHwyParkAveN108thAveSE6
6
t
h
Av
e
SWMercerWayWMercer
W
ay LakemontBlvdSE132ndAve SELakeWashingtonBlvdNE140thWaySE
East Valley Rd68thAveS³City of RentonSensitive Areas
0 0.5 10.25
Miles
Information Technology - GISmapsupport@rentonwa.govPrinted on: 11/12/2014
Data Sources: City of Renton, King County
This document is a graphic representation, not guaranteedto survey accuracy, and is based on the best informationavailable as of the date shown. This map is intended forCity display purposes only.
Renton City Limits
k Education
Fire Station
K Valley Medical Center
Erosion Hazard
Severity
High
Coordinate System: NAD 1983 HARN StatePlane Washington North FIPS 4601 FeetProjection: Lambert Conformal ConicDatum: North American 1983 HARN
k
k
k
k
k
k
k
k
k
k k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
kk
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k HoquiamAveNEE Valley Hwy84thAveSNEParkD r
SW 7th St
SE 128th St
SE 192nd StLindAveSWMainAveSS 132nd St
Factory
PlN
Talbot
Rd
SN 3rd St
RainierAveS
164thAveSETukwila Pk w y SPuget Dr
NE 4th St
S 3rd St
S 1 2 9 th S t68thAveSSWSunsetBlvd
SW 16th St
116thAveSEN 4th St
I
n
t
e
r
u
r
b
a
n
Av
e
S WilliamsAveNBronsonW a y N
NE7thSt
124thAveSES 7th St SERenton IssaquahRd
Rai
ni
er
AveNNewcastle Way
CoalCr
e
e
k
PkwySESW 41st St
T
a
ylo
r
P
l
N
WNESunsetBlvdWellsAveNUnionAveNEN E 3 rd S tHa
r
die
A
v
eSWS180th St
Maple Valley Hwy
140thAveSES G ra d yWayS 2 1 s tSt
BensonRdSRe
nt
o
n
AveS87thAveS128thAveSE148thAveSESW 43rd St SEC arrR d
SE 168th St
Beaco
n
A
v
e
S
68thAveSLoganAveN108thAveSEForestDr SE
S2ndSt
141
s
tAve
S
ERainierAveS 156thAveSES E 183rd StBenson Dr
SS 124th StS 43rd St
Airport Way
S W G radyW a y
S E J o n e s RdSunsetBlvdN
Puget Dr SESE 204th W aySW 34th StMo
n
s
ter
RdSW
S E 1 4 2 n d P lWestValleyHwySSEMay ValleyRd
SunsetBlvdNS C a r r RdHouserWayNNewcastle GolfClubRd
S 133rd St
WilliamsAveSWellsAveSEMercerWay154thPlSEDuvallAveNELoganAveSMonroeAveNESunsetBlvdNEEdmondsAveNEStevens AveNWRai
ni
er
AveSTalbotRdSOakesdaleAveSWTaylorAveNW164thAveSERainierAveSWestVal
leyHwyWestValleyHwyParkAveN108thAveSE6
6
t
h
Av
e
SWMercerWayWMercer
W
ay LakemontBlvdSE132ndAve SELakeWashingtonBlvdNE140thWaySE
East Valley Rd68thAveS³City of RentonSensitive Areas
0 0.5 10.25
Miles
Information Technology - GISmapsupport@rentonwa.govPrinted on: 11/12/2014
Data Sources: City of Renton, King County
This document is a graphic representation, not guaranteedto survey accuracy, and is based on the best informationavailable as of the date shown. This map is intended forCity display purposes only.
Renton City Limits
k Education
Fire Station
K Valley Medical Center
Landslide HazardSeverityVery HighHighModerateUnclassified
Coordinate System: NAD 1983 HARN StatePlane Washington North FIPS 4601 FeetProjection: Lambert Conformal ConicDatum: North American 1983 HARN
k
k
k
k
k
k
k
k
k
k k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
kk
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k HoquiamAveNEE Valley Hwy84thAveSNEParkD r
SW 7th St
SE 128th St
SE 192nd StLindAveSWMainAveSS 132nd St
Factory
PlN
Talbot
Rd
SN 3rd St
RainierAveS
164thAveSETukwila Pk w y SPuget Dr
NE 4th St
S 3rd St
S 1 2 9 th S t68thAveSSWSunsetBlvd
SW 16th St
116thAveSEN 4th St
I
n
t
e
r
u
r
b
a
n
Av
e
S WilliamsAveNBronsonW a y N
NE7thSt
124thAveSES 7th St SERenton IssaquahRd
Rai
ni
er
AveNNewcastle Way
CoalCr
e
e
k
PkwySESW 41st St
T
a
ylo
r
P
l
N
WNESunsetBlvdWellsAveNUnionAveNEN E 3 rd S tHa
r
die
A
v
eSWS180th St
Maple Valley Hwy
140thAveSES G ra d yWayS 2 1 s tSt
BensonRdSRe
nt
o
n
AveS87thAveS128thAveSE148thAveSESW 43rd St SEC arrR d
SE 168th St
Beaco
n
A
v
e
S
68thAveSLoganAveN108thAveSEForestDr SE
S2ndSt
141
s
tAve
S
ERainierAveS 156thAveSES E 183rd StBenson Dr
SS 124th StS 43rd St
Airport Way
S W G radyW a y
S E J o n e s RdSunsetBlvdN
Puget Dr SESE 204th W aySW 34th StMo
n
s
ter
RdSW
S E 1 4 2 n d P lWestValleyHwySSEMay ValleyRd
SunsetBlvdNS C a r r RdHouserWayNNewcastle GolfClubRd
S 133rd St
WilliamsAveSWellsAveSEMercerWay154thPlSEDuvallAveNELoganAveSMonroeAveNESunsetBlvdNEEdmondsAveNEStevens AveNWRai
ni
er
AveSTalbotRdSOakesdaleAveSWTaylorAveNW164thAveSERainierAveSWestVal
leyHwyWestValleyHwyParkAveN108thAveSE6
6
t
h
Av
e
SWMercerWayWMercer
W
ay LakemontBlvdSE132ndAve SELakeWashingtonBlvdNE140thWaySE
East Valley Rd68thAveS³City of RentonSensitive Areas
0 0.5 10.25
Miles
Information Technology - GISmapsupport@rentonwa.govPrinted on: 11/12/2014
Data Sources: City of Renton, King County
This document is a graphic representation, not guaranteedto survey accuracy, and is based on the best informationavailable as of the date shown. This map is intended forCity display purposes only.
Renton City Limits
k Education
Fire Station
K Valley Medical Center
Steep Slopes
Percent Range
>15% & <=25%
>25% & <=40%
>40% & <=90%
>90%
Coordinate System: NAD 1983 HARN StatePlane Washington North FIPS 4601 FeetProjection: Lambert Conformal ConicDatum: North American 1983 HARN
King C ou n ty
Dow nstre am D rainage Complai nts
Date: 7 /5/201 7 Notes:
±Th e infor matio n in clu de d on t his map has been comp ile d b y Kin g Count y staf f from a variety of source s an d is su bject to cha ng ewithout n otice. Kin g Co unt y makes no re present ations o r wa rra nties, exp re ss o r im plied , a s to accu ra cy, complet en ess, t ime lin ess,or rig hts to the use of such informa tion . This d ocu me nt is not intended for u se as a survey pr od uct. King Cou nty shall n ot be lia blefor a ny g en er al, sp ecial, indirect, incide ntal, o r conse qu en tial damag es including , but not limited to , lost revenu es or lo st profitsresulting from th e use or m isu se of t he info rmat ion cont aine d on this map . An y sale of this map or in formation o n t his map isprohibited except by written p er mission of King County.
Appendix C
BACKWATER COMPUTER PROGRAM FOR PIPES
Pipe data from file:17001.bwp
Surcharge condition at intermediate junctions
Tailwater Elevation:226.87 feet
Discharge Range:1.72 to 1.72 Step of 1. [cfs]
Overflow Elevation:285.75 feet
Weir:NONE
Upstream Velocity:3. feet/sec
PIPE NO. 1: 120 LF - 12"CP @ 25.98% OUTLET: 225.00 INLET: 256.17 INTYP: 1
JUNC NO. 1: OVERFLOW-EL: 263.77 BEND: 90 DEG DIA/WIDTH: 2.0 Q-RATIO: 0.18
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
1.72 0.79 256.96 * 0.012 0.56 0.20 1.87 1.87 0.56 ***** 0.79
PIPE NO. 2: 99 LF - 12"CP @ 0.60% OUTLET: 256.17 INLET: 256.76 INTYP: 1
JUNC NO. 2: OVERFLOW-EL: 262.68 BEND: 0 DEG DIA/WIDTH: 2.0 Q-RATIO: 0.58
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
1.46 0.78 257.54 * 0.012 0.52 0.50 0.79 0.79 0.52 ***** 0.78
PIPE NO. 3: 105 LF - 12"CP @ 2.30% OUTLET: 256.76 INLET: 259.18 INTYP: 1
JUNC NO. 3: OVERFLOW-EL: 261.81 BEND: 0 DEG DIA/WIDTH: 2.0 Q-RATIO: 0.59
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.92 0.58 259.76 * 0.012 0.41 0.27 0.78 0.78 0.41 ***** 0.58
PIPE NO. 4: 25 LF - 12"CP @ 0.88% OUTLET: 259.18 INLET: 259.40 INTYP: 1
JUNC NO. 4: OVERFLOW-EL: 264.05 BEND: 45 DEG DIA/WIDTH: 2.0 Q-RATIO: 0.00
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.58 0.51 259.91 * 0.012 0.32 0.28 0.58 0.58 0.35 0.51 0.44
PIPE NO. 5: 120 LF - 12"CP @ 16.51% OUTLET: 259.40 INLET: 279.21 INTYP: 1
JUNC NO. 5: OVERFLOW-EL: 285.86 BEND: 45 DEG DIA/WIDTH: 2.0 Q-RATIO: 0.48
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.58 0.37 279.58 * 0.012 0.32 0.14 0.51 0.51 0.32 ***** 0.37
PIPE NO. 6: 24 LF - 12"CP @ 16.71% OUTLET: 279.21 INLET: 283.22 INTYP: 1
Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI
*******************************************************************************
0.39 0.26 283.48 * 0.012 0.26 0.11 0.37 0.37 0.26 ***** 0.14