Loading...
HomeMy WebLinkAboutS-43880100 00 I N 1 s I1 � 1 \ 1 SID 1 1 I 1 u 11 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 L � 1 1 � 1 I I ooCIA , ----- ;:: y ::: m ....r' ' •.•• .' : 1 AREA DRAIN, TYPE 1 cn 1 II RIM: 21.64 cn o I II II IE: 16.02 6" (W) EXISTING o IE: 16.18 6" (E) IE: 16.02 6" (E) SEE SHEET C4.2 FOR o D _ • ° t' \ BUILDING M EXISTING SEWER PLAN AND PROFILE v m �Q 8 LF 6" PVC @ 2.00% SSCO #1 r _ 1 T N 1 PRIVATE RIM:21.51 FF: 21.95 — , \ I IE: 15 72 6" (N) ° \ S 1 - ,.. INSTALL BUILDING I OIL/WATERS 2 J I 3 C4.4 SERVICE CONNECTION 1 � � ;I... is ...� 1 5 LF 6" PVC 2.00° ::.W:�:W::::: �; p x m' / c D o r '•'. :•'•: N _ PRIVATE � 0 1 � 2 rn �. 2 � 4 I 3" d �r � 1 ate;: n'b:�'�' o:' i -- _ 3 rT . — 1 So 1 z �mF: r.�. 1. D t:. C AN6CAP SEWER \ � � — m D — 1 ^ ' AT PR PE Y LIN O J: .�C • � c -1 'R\�Tj 1 6 .� d Pf7 ' i i. O. — I :y I O L20 I rn rn L 2 1 _ \ 1 9 I f 7 _22.00 O\ / r__ r 0° W ON CO #2 S - I / m w m r . . . . . . \ n n r d \ I r D r RIM: 21.65.: °°" I TNT ;: ' : y� m IE: 15.33 6" /S D [7:: �: ao z m n:: D Z M.. Z A _ r m M N Z z m 1-r Z7 G� I IE: 15.33 6" N m y: n 4j W N d O m n r r D W O .r 1 D N M ° m O . x7 „� m 'Gi'' Z N N 1 O T •z• m �. �' 1 w 0 :�: 1 m � ' rh I v /' Z t 8 LF 6" PVC 2.00% � pwO� .o. .(' am .o .L7O of+ PRIVATE m� Z N m c' :N N P - Z. N n ao �• -I f+ q. ••r' O �, •i 1 _ m � oc• D m m - m. � z O o I Ul ti• . O Cl: I r o tt D N N m 0 �O I' LF PVC2. �' 3 6 OU°Jo n �— n: :a c � rn n,:' I o N m rn m .I Co !Y : -__ N o'm .p y.: 0o _n �. r m 2 o: -- _ _ - PRIVATE w r .o r \0 3 m N G• :r�j � i�'1: � ' 1'• m a. F--• z . Z —I A' frl' i I m m (n m f+ N O.. y. � m I O r O 0 11 Z Y' m - N i7: V I 76 LF 6" PVC 2.00 y. r 1. @ m.: m C m i O • in: 2 o. N. t7 n • J N D O -- r z• q 1 C 1-1 C PRIVATE m z D tn: m .;r O D rr, r p n N --I r+ m n 1 m n 4 . m: J m 17 O -I 1 N o m ti :D•' O o v (�I n o O m O c1� m � � • • e. ... m z G- D r 1 7JZ 1-,Z 1' m r r -nt. Z 1, O m m• S m A C '9 ea 1 n � � Z r •D: ,n 1 -I N m D O :I Z 1: .m• r — D J m m Z -I Z _Z •F • �tW J D m O w' v _ �^n� z n — O �: � v 1 M (/) m 5 j �a G z \. N' 1 :t _ �V D b. Know what's below. Call before you dig. �+ T. xrj pg WAsgI�� < T A C O M A • S E A T T L E y72o SPOKANE TRI-CITIES ECISTB0 �%0NAL E� 2215 North 30th Street, Suite 300 Tacoma, WA 98403 253.383.2422 TEL 253.383.2572 FAX www.ahbl.com WEB 05/15/2026 O PROP 6" ROOF DRAIN B.O.P= 18.24 1.50' PROP. 6" O SEWER T.O.P= 16.64 Z GRAPHIC SCALE 0 10 20 40 1" = 20 FEET WASTEWATER UTILITY STANDARD NOTES 1 ALL WORK OR AND MATERIAL SHALL BE IN CONFORMANC E WITH THE STANDARD A P S AND SPECIFICATION F O THE CITY OF RENTON PUBLIC WORKS DEPARTMENT AND THE LATEST EDITION OF THE WSDOT/APWA STANDARDS AND SPECIFICATIONS, AS APPROVED AND MODIFIED BY THE CITY OF RENTON STANDARD PLANS & SPECIFICATIONS A APPROVED ET F S O P ROVED PLAN HA S SHALL BE KEPT ON IT T SITE A ALL TIMES DURING CONSTRUCTION 2 DATUM FOR VERTICAL CONTROL SHALL BE NORTH AMERICAN VERTICAL DATUM 1988 HORIZONTAL CONTROL SHALL BE NORTH AMERICAN DATUM 1983/1991 UNLESS OTHERWISE APPROVED BY THE CITY BENCHMARKS AND MONUMENTS O UMENTS SHALL BE RE FERENCED ON THE APPROVED PLANS L NS 3 - A PRE -CONSTRUCTION CTION CONFERENC E AND A 24 HOUR NOTICE SHALL BE REQUIRED PRIOR TO STARTING NEW CONSTRUCTION IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS, INCLUDING STREET USE PERMITS, PRIOR TO STARTING CONSTRUCTION INSPECTION WILL BE ACCOMPLISHED BY A P RE RESENTATIVE F TH E HE CITY. IT SHA LL LL T T BE HE CONTRACTOR'S T C OR'S RESPONSIBILITY TO NOTIFY THE PUBLIC U C WORKS INSPECTOR 24 HOURS IN ADVANCE OF BACKFILLING ALL CONSTRUCTION 4 THE HOURS OF WORK IN THE STREET RIGHT-OF-WAY SHALL BE PER CITY SPECIFICATIONS ON WEEKDAYS UNLESS OTHERWISE APPROVED IN WRITING BY THE PUBLIC WORKS DEPARTMENT AN APPROVED TRAFFIC CONTROL PLAN MUST BE OBTAINED PRIOR TO BEGINNING ANY WORK WITHIN THE PUBLIC RIGHT-OF-WAY 5 CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL REQUIREMENTS. 6. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE THE CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF RCW 19 122 A DIG TICKET SHALL BE OBTAINED A MINIMUM OF TWO BUSINESS DAYS PRIOR TO STARTING ANY EXCAVATION THE CONTRACTOR SHALL HAVE A COPY OF THE DIG TICKET ON SITE AT ALL TIMES 7. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 12-INCHES, MAXIMUM DEPTH 18-INCHES, THOROUGHLY COMPACTING EACH LAYER TO 95 PERCENT OF MAXIMUM DENSITY THESE COMPACTED LAYERS MUST EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TO THE SIDE OF THE TRENCH MATERIALS TO COMPLETE THE FILL OVER THE PIPE SHALL BE EQUIVALENT TO BANK RUN GRAVEL FOR TRENCH BACKFILL (9-03.19). 8 SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) RUBBER-GASKETED ASTM D 3034, SDR 35, C900/C905 OR DUCTILE IRON CLASS 50, UNLESS OTHERWISE APPROVED BY THE CITY 9 SANITARY SEWER PIPES SHALL NOT BE LOCATED UNDER ANY STRUCTURE (WALL, BUILDING FOUNDATION, ETC) UNLESS APPROVED BY THE CITY IF A SANITARY SEWER IS TO BE LOCATED UNDER ANY STRUCTURE (WALL, BUILDING FOUNDATION, ETC.), IT SHALL BE DESIGNED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF WASHINGTON IN ACCORDANCE WITH STANDARD DETAIL 412 10. OPEN -CUT ROAD CROSSINGS FOR UTILITY TRENCHES ON EXISTING TRAVELED ROADWAYS SHALL BE BACKFILLED WITH CRUSHED SURFACING AGGREGATE (WSDOT SPECIFICATION 9-03 9(3) AND MECHANICALLY COMPACTED UNLESS OTHERWISE APPROVED BY THE CITY 11 ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH THE STANDARDS AND SPECIFICATION OF THE CITY AND THE LATEST EDITION OF THE WSDOT/APWA STANDARDS AND SPECIFICATION AS APPROVED AND MODIFIED BY THE CITY IN THE RENTON STANDARD PLANS & SPECIFICATIONS THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL TO A UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE PIPE BEDDING SHALL BE IN ACCORDANCE WITH STANDARD PLAN 405 12 ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED TO THE SATISFACTION OF THE CITY FOR THE PREVENTION OF ON -SITE EROSION BOTH DURING CONSTRUCTION AND AFTER THE COMPLETION OF CONSTRUCTION IN ACCORDANCE WITH THE CURRENT SURFACE WATER DESIGN MANUAL 13 THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH A RECORD DRAWING OF THE SANITARY SEWER SYSTEM WHICH HAS BEEN STAMPED AND SIGNED BY A LICENSED PROFESSIONAL ENGINEER OR LICENSED PROFESSIONAL SURVEYOR • I 5T�,. PLAN - 413 PUBLIC WORKS WASTEWATER UTILITY APPROVE° - �1� DEPARTMENT STANDARD NOTES Martin Pastucha O/26/z P.WlC Works Adm nl,t.ato, DATE 20 1 1 00 O O N T T C) C) C) lII L/ N a J N S-438801