Loading...
HomeMy WebLinkAboutW-43880500 00 C'7 i N 9e° SEND CAP PLUG TEE 45° BIND 22 '2- BEND D 11 �4' BEND MINIMUM BEARING AREA AGAINST UNDISTURBED SOIL NSF) PIPE PRESSURE SIZE (PSI'' � - - 41p 2DO 2/(1) 1/(NONE) 1/(NCRE) NONE NONE 300 3A2) 2/(2) 2/11) 1/(1) 1/(1) NONE 3J(NONE) „ 200 4/(3) 3/12) 3/(1) 300 .6/(4) 4/(3) 3/{2) A1) 1/(NONE) a„ 20D 71(5) 5/13) 4/(3) 2/(2) 1/(Ii 300 11/(8) 8/15) 8A6) 0/(4) 61(4) 3/12) 3A2) 2/(1) 2/(1) - 200 11/0) 275 16/(11) 11/(7) 11/(8) RI(6) 90) 50 3/(2) 1'2" 200 161(11) 5A3) 3A2) 250 24/(16) I7/(11) 13/0) TA5) 41(3) 14" 200 22/(13) 26/(11) 121(8) 6/(4) 3/(2) 250 33/(22) 23/(1G) 18/(12) MIS) 5/(3) 16" 200 29/(191 21A14) 16/(11) 8/(6) 50 225 .32/(21) 36/(24) 23/(16] 26/(17) 17)(12) .. 20/(131 9/(6) 5/13)_ 5/(4) 1B" 200 101(7) 2QK 200 45/(29} 3.2/{21) 24/(16) 13/(8) 7/{4) 24" I 200 64/(431 1S/(12) 9/(6) 46/(30) 35/(23) * VALUES BASED ON SAFE BEARING LOAD OF 2,000/(3,00) PS SOIL TYPE SAFE BEARING LOAD (PSF E -- MUCK OR PFAT 0 SOFT CLAY 1,000 SAND 2,000 SAND AND GRAVEL 3,Do0 CEMENTED WITH CLAY 4,000 HARD SHALE 10,000 MOTES: 1. MINIMUM BEARING AREA MUST BE A DJ LISTED FOR PIPE SIZE, PRESSURE, AND SOIL CONDITIONS, 2. FITTING5 SMALL BE POLYWRAPPED PRIOR TO POURING CONCRETE BLOCKING, 3. CONCRETE BLOCKING SHALL BE CAST IN PLACE AND SHALL HAVE A MINIMUM OF 0.25 5F BEARING AREA AGAINST THE FITTING. 4. CONCRETE BLOCKING SHALL BEAR AGAINST FITTINGS ONLY AND SHALL BE CLEAR OF J01NITS TO PE RMIT TAKING UP 0R DISMANTLING JOINT. S. CONTRACTOR SHALL INSTALL BLOCKING ADEQUATE TO WITHSTAND FULL HYDROSTATIC TEST PRESSURE AS WELL AS TO CONTINUOUSLY ITHSTAN D OPERATING PRESSURE UNDER ALL CONDITIONS OF SERVICE, 6. ALLCONCRETE SHALL BE MECHANICALLY MIXED_ JOB SITE MIXING, HAND -MIXED CONCRETE, AND MOBILE CONCRETE MIXERS ARE r4OT ALLOWED. 7. [N MUCK OR PEAT, ALL THRUSTS SHALL BE RESTRAINED BY PILES OR TIE HODS TO SOLID FOUNDATION OR MUCK OR PEAT SHALL BE REMOVED AND REPLACED W1THH BALLAST OF SOPFIGIENT STABILJTY TO RESIST THRUST, 8. CONCRETE BLOCKING SHALL BE LEFT OPEN OR SHEETED FOR MINIMUM 24 HOURS, 111.4" AND 22 12 Q BENDS PIPE CLAMP AND ANCHORROD `i50 BEND PIVE CLAPAP AND ANCHORROD MINIMUM DIMENSIONS PIPE VOLUME ,� SIZE BEND (CF) A D L 111-4* 8 2.0' 1/41P 1.5' 4" 22 45' 11 2.2' 30 311, 11#' 6" 22ly CC 11 2.2' `e 2.0" 2yy.9' �25 p 8" 11 #' 16 2.5' 2.0' 22 47 3.6' 45' 123 32 5 V 3.2' 12" 11 ?I4* " 3,120 58 &5' 6.1' 3.0' 4.5- 2:32 2.5' 11 �141 70 4.1' v 30 1 V 22 1.,20 184 517' 45• 478 7.8' 2W 111 q• 91 4.5' 11 a 3.0' Z2 tt' 225 6A, 45' 560 8,2' 11 5.01 1 L4'° 315, 24" 221 2° 320 454 820 6.8' 1 4.5' 5.4' * D y ANCHOR ROD DIAMETER NOTES., 1, CONCRETE BLOCKING SIZES BASED ON 200 P51 HYDROSTATIC PRESSURE AND 3,000 F51 CONCRETE. 2- ALL CONCRETE SHALL BE MECHANICALLY MIXED- J013 SITE MIXING, HAND-WXED CONCRETE, AND MOBILE CONCRETE MIXER5 ARE NOT ALLOWED. 3. PIPE CLAMPS AND ANCHOR RODS SHALL BE INSTALLED PER STIR PLAN 330.4. 4. FITTINGS SHALL BE POLYWRAPPED AFTER INSTALLATION OF PIPE CLAMPS AND ANCHOR R005 PRIOR TO POURING CONCRETE BLOCKING. 5. WATER MAIN SHALL NOT BE PRESSURIZED UNTIL ALL TRENCHING WFrHIN 100' OF VERTICAL BEND IS BACKFILLED AND COMPACTED TO MINIMUM T COVER. 6. CONCRETE BLOCKING SHALL BE LEFT OPEN OR SHEETED FOR MINIMUM 24 HOURS. STO. PLAN - 330.1 PUBLIC WORKS CONCRETE BLOCKING ,aaRa°�E° _ � PUBLIC WORKS CONCRETE BLOCKING DEPARTMENT FOR HORIZONTAL FITTINGS ;_;�.' W512023 DEPARTMENT FOR VERTICAL FITTINGS " "`".`� Is)DATE r.r 4Ywlu /dnNrrrte HORIZONTAL CONCRETE BLOCKING VERTICAL CONCRETE BLOCK NOT TO SCALE 1� T. O pg �VASgj��� O 417x L Know what's below. �SSIONAL ��G Call before you dig. 05/15/2026 T A C O M A S E A T T L E S P O K A N E T R I- C I T I E S 2215 North 30th Street, Suite 300 Tacoma, WA 98403 253.383.2422 TEL 253.383.2572 FAX www.ahbl.com WEB NOT TO SCALE STD. PLAN - 330.2 AP1�17t]VED: �'�'�' Ri 6i tli• DATE WIFt 4JaYu /dn4itl�ahw ING J - METERED SACKFLOW ASSEMBLY (TO BE OBTAINED FROM CITY) (1) 21�" CONTROL VALVE (1) CQN5TRUCTION METED (1) RPBAz METER SUPPORT (BY CONITRACTORI NSF 61 SUPPLY H05E I TEMPORARY BLOCKINIG - HYDRANT Ohl EXISTING WATER MAIN TEMPORARY BLOW -OFF ASSEMBLY NEW DI WAT POLYNG STATION (1) VERTICAL CROSS (MJxFQ, SIZE TO MATCH WATER MAIN (1) BLIND FLANGE WITH 2" TAP ON TOP OF CROSS (1) TEMPORARY BLOW -OFF ASSEMBLY (1) BLIND FLANGE ON BOTTOM OF CROSS (1) PLUG (IVU1 ON END OF CROSS WITH TEMPORARY THRUST BLOCKI NG NOTES, 1. THE SACKFLOW PREVE"ON ASSEMBLY AND 5UPPLY HOSE MUST BE DISCONNECTED DARING HY0905TATIC PRE55URE TESTING OF THE NEW WATER MAIN. 2. POLYPIC AND ALL DEBRIS SHALL BE REMOVED FROM SUMP OF VERTICAL CR05S VIA SANITARY METHOD PRIOR TO DISINFECTION OF NEW WATER MAIN. 3. U PON REMOVAL OF POLYPIG, REMOVE TEMPORARY BLOW -OFF ASSEMBLY AND INSTALL 2" PLUG, 4. THE NEW WATER MAIN SHALL BE CONNECTED TO THE EXISTING SYSTEM ONLY AFTER NEW WATER MAIN IS POLYPIGGED, DISINFECTED AND SATISFACTORY BACTERIOLOGICAL. SAMPLE RESULTS ARE OBTAINED. 5- THE INTERIORS OE ALL PIPES AND FITTINGS TO BE USED M FINAL CONNECTION MUST BE SWABBED OR SPRAYED WITH A 5-G% AVAILABLE CHLORINE SOLUTION, STD. PLAN - 300.7 PUBLIC WORKS APPROVED! W DEPARTMENT POLYPIGGING NEW WATER MAINS i7.ru! ..ma7i. DATE hbiciRwM/OnNMrrt� . POLYPIGGING NEW WATER MAINS 00 co co O co A, LJ W-438805