Loading...
HomeMy WebLinkAboutR-436002GENERAL NOTES FOR I 0 Lu W CD 0 rr z 0 75 Q n, Q Ln N O N \ N 0) E \ 0 Wel 00 N N N / 00 N N N / O CD CD N N !Z H Q) a i-I GENERAL SITE DEVELOPMENT NOTES: 1. THE GENERAL CONTRACTOR SHALL OBTAIN AND HAVE AVAILABLE COPIES OF THE APPLICABLE GOVERNING AGENCY STANDARDS AT THE JOB SITE DURING THE RELATED CONSTRUCTION OPERATIONS. 2. GENERAL CONTRACTOR SHALL ASSURE THAT ALL NECESSARY PERMITS HAVE BEEN OBTAINED PRIOR TO COMMENCING WORK. 3. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION AND DEPTH OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION WHETHER SHOWN ON THESE PLANS OR NOT. UTILITIES OTHER THAN THOSE SHOWN MAY EXIST ON THIS SITE. ONLY THOSE UTILITIES WITH EVIDENCE OF THEIR INSTALLATION VISIBLE AT GROUND SURFACE OR SHOWN ON RECORD DRAWING PROVIDED BY OTHERS ARE SHOWN HEREON. EXISTING UNDERGROUND UTILITY LOCATIONS SHOWN ARE APPROXIMATE ONLY AND ARE SUBJECT TO A DEGREE OF UNKNOWN VARIATION. SOME UNDERGROUND LOCATIONS SHOWN HEREON MAY HAVE BEEN TAKEN FROM PUBLIC RECORDS. BARGHAUSEN CONSULTING ENGINEERS, INC. ASSUMES NO LIABILITY FOR THE ACCURACY OF PUBLIC RECORDS OR RECORDS OF OTHERS. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL CONSULT THE CITY AND BARGHAUSEN CONSULTING ENGINEERS, INC., TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. 4. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THE PROJECT WORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE TO THE SPECIFICATIONS OR THE RELATIVE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF WORK AS DEFINED BY THE DRAWINGS AND IN FULL COMPLIANCE WITH LOCAL REGULATIONS AND CODES. 5. IT SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE APPROPRIATE UTILITIES INVOLVED PRIOR TO CONSTRUCTION. 6. INSPECTION OF SITE WORK WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE GOVERNING JURISDICTION. INSPECTION OF PRIVATE FACILITIES WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE OWNER. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE INSPECTOR 24 HOURS IN ADVANCE OF BACKFILLING ALL CONSTRUCTION. 7. PRIOR TO ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY THE CONTRACTOR SHALL CONTACT THE AGENCY AND/OR UTILITY INSPECTION PERSONNEL AND ARRANGE ANY REQUIRED PRE -CONSTRUCTION MEETING(S). CONTRACTOR SHALL PROVIDE 72 HRS MIN. ADVANCE NOTIFICATION TO OWNER, FIELD ENGINEER AND ENGINEER OF PRE -CONSTRUCTION MEETINGS. 8. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR WORKER AND SITE SAFETY AND SHALL COMPLY WITH THE LATEST OSHA STANDARDS AND REGULATIONS, OR ANY OTHER AGENCY HAVING JURISDICTION FOR EXCAVATION AND TRENCHING PROCEDURES. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE "MEANS AND METHODS" REQUIRED TO MEET THE INTENT AND PERFORMANCE CRITERIA OF OSHA, AS WELL AS ANY OTHER ENTITY THAT HAS JURISDICTION FOR EXCAVATION AND/OR TRENCHING PROCEDURES. 9. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARDS, SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER NEEDED ACTIONS TO PROTECT THE LIFE, HEALTH, AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK COVERED BY THE CONTRACTOR. ANY WORK WITHIN THE TRAVELED RIGHT-OF-WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE AT LEAST ONE FLAGGER FOR EACH LANE OF TRAFFIC AFFECTED. 10. PROTECTIVE MEASURES SHALL BE TAKEN BY THE CONTRACTOR TO PROTECT ALL ADJACENT PUBLIC AND PRIVATE PROPERTIES AT ALL TIMES DURING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF ALL EXISTING UTILITY SERVICES THAT ARE TO REMAIN OPERATIONAL WITHIN THE CONSTRUCTION AREA WHETHER SHOWN OR NOT SHOWN ON THE PLANS. 11. TWO (2) COPIES OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. ONE (1) SET WITH RECORDS OF AS -BUILT INFORMATION SHALL BE SUBMITTED TO BARGHAUSEN CONSULTING ENGINEERS, INC. AT COMPLETION OF PROJECT. 12. GENERAL CONTRACTOR SHALL OBTAIN SERVICES OF A LICENSED LAND SURVEYOR TO STAKE HORIZONTAL CONTROL FOR ALL NEW IMPROVEMENTS. STAKING CONTROL SHALL BE TAKEN FROM ELECTRONIC PLAN FILES PROVIDED BY BCE. HARMONY RIDGE A PORTION OF SECTION 20, TOWNSHIP 23 N., RANGE 05 E., W.M. CITY OF RENTON, KING COUNTY, WASHINGTON SOILS REPORT NOTES: 1. THE FOLLOWING SOILS REPORT FOR THE SITE SHALL BE CONSIDERED PART OF THESE CONSTRUCTION DOCUMENTS: SOILS REPORT: GEOTECHNICAL ENGINEERING STUDY HARMONY RIDGE PROJECT NUMBER: ES-8888 DATE: JULY 3, 2023 PREPARED BY: EARTH SOLUTIONS NW, LLC 15365 N.E. 90TH STREET SUITE 100 REDMOND, WA 98052 (425) 449-4704 2. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT ALL PROVISIONS OF THE SOILS REPORT FOR THE SITE BE OBSERVED AND COMPLIED WITH DURING ALL PHASES OF THE SITE PREPARATION, GRADING OPERATIONS, FOUNDATION, SLAB, AND PAVING CONSTRUCTION. 3. ANY PROVISIONS OF THE SOILS REPORT WHICH CONFLICT WITH INFORMATION SHOWN ELSWHERE ON THESE DRAWINGS, OR WHICH REQUIRE FURTHER CLARIFICATION, SHALL BE BROUGHT TO THE ATTENTION OF THE CITY AND ENGINEER FOR DETERMINATION. 4. A REPRESENTATIVE OF THE SOILS ENGINEER SHALL BE AVAILABLE TO OBSERVE AND APPROVE THE EARTHWORK OPERATIONS AND TO VERIFY FIELD CONDITIONS AS WORK PROCEEDS. THE SOILS ENGINEER SHALL SUBMIT FIELD REPORTS CERTIFYING THAT THE METHODS AND MATERIALS OF THE EARTHWORK OPERATIONS WERE IN ACCORDANCE WITH THE RECOMMENDATIONS OF THE SOILS INVESTIGATION AND THAT THE WORK WAS PERFORMED TO HIS/HER SATISFACTION. 5. THE SOILS ENGINEER SHOULD BE NOTIFIED AT LEAST FIVE (5) WORKING DAYS PRIOR TO ANY SITE CLEARING OR GRADING. 6. SOILS PLACED IN STRUCTURAL AREAS SHOULD BE PLACED IN LOOSE LIFTS OF 12 INCHES OR LESS AND COMPACTED TO A RELATIVE COMPACTION OF 90 PERCENT, BASED ON THE LABORATORY MAXIMUM DRY DENSITY AS DETERMINED BY THE MODIFIED PROCTOR METHOD (ASTM D-1557). FOR SOIL PLACED IN UTILITY TRENCHES UNDERLYING STRUCTURAL AREAS, COMPACTION REQUIREMENTS ARE DICTATED BY THE LOCAL CITY, COUNTY, OR UTILITY DISTRICT, AND IN GENERAL ARE SPECIFIED AS 95 PERCENT RELATIVE COMPACTION. STRUCTURAL FILL PLACED WITHIN THE UPPER 12 INCHES OF SLAB -ON -GRADE AND PAVEMENT SUBGRADE AREAS SHOULD BE COMPACTED TO A RELATIVE COMPACTION OF AT LEAST 95 PERCENT. GEOTECHNICAL NOTE A QUALIFIED GEOTECHNICAL ENGINEER SHALL OBSERVE THE FOLLOWING ITEMS DURING CONSTRUCTION: • SITE STRIPPING • STRUCTRUAL FILL PLACEMENT • ROCKERY EXCAVATION, DRAINAGE INSTALLATION • LOCK AND LOAD RETAINING WALL CONSTRUCTION, GRID PLACEMENT, BACKFILL, DRAINAGE INSTALLATION • DETENTION VAULT EXCAVATION, SUBGRADE, BACKFILL, DRAINAGE INSTALLATION • UTILITY TRENCH BACKFILL • ROADWAY, CURB, SIDEWALK SUBGRADE. THE GEOTECHNICAL ENGINEER SHALL SEAL AND CERTIFY ALL ROCKERIES AND RETAINING WALLS REGARDLESS OF HEIGHT ON THE CONSTRUCTION PLANS AND PROVIDE LONG TERM MAINTENANCE RECOMMENDATIONS FOR FUTURE HOMEOWNER FIRE SPRINKLER NOTE AN APPROVED RESIDENTIAL FIRE SPRINKLER SYSTEM WILL BE REQUIRED FOR ALL NEW SINGLE-FAMILY RESIDENCES THAT WILL HAVE OVER 3,600 SQUARE -FEET OF GROSS BUILDING AREA (THIS APPLIES TO LOTS 12-17 ONLY. ALL OTHER LOTS WILL HAVE A GROSS AREA LESS THAN 3,600 SQUARE -FEET.) BENCHMARK DATUM TOP OF 3/8" BRASS PLUG SET IN CONCRETE FOUND BRASS PIN 0.76' BELOW GRADE IN 4X4 MONUMENT AT INTERSECTION OF PUGET DRIVE CONC. MONUMENT IN MONUMENT CASE AT INTX 116TH HORIZONTAL DATUM: VERTICAL DATUM: SE AND SE 19TH ST (NAD 83/11) AVE SE & 157TH ST (JUNE 2022) (NAD 83/11) NAD '83/' 11 NAVD '88 N: 172240.27, E: 1304612.10 N: 171833.64, E: 1305874.10 1 I CITY REVIEW COMMENTS DATED 2 CITY REVIEW COMMENTS DATED \►81 REVISION HEARING EXAMINER CONDITIONS: 1. THE APPLICANT SHALL SUBMIT A DETAILED LANDSCAPE PLAN WITH THE CIVIL CONSTRUCTION PERMIT APPLICATION THAT CLEARLY IDENTIFIES THE UTILITIES AND LIGHTING IN THE PLANTER STRIPS WITH STREET TREE SPECIES SELECTED FROM THE CITY APPROVED STREET TREE LIST. THE DETAILED LANDSCAPE PLAN SHALL BE REVIEWED AND APPROVED BY THE CURRENT PLANNING PROJECT MANAGER PRIOR TO PERMIT ISSUANCE. 2. THE APPLICANT SHALL PROVIDE A MINIMUM FIFTEEN FEET (15') OF PERIMETER LANDSCAPING IF ANY PART OF THE VAULT IS ABOVE GROUND, OR IF ANY OPEN DETENTION SYSTEM IS UTILIZED. IF REQUIRED, THE LANDSCAPING SHOULD CONSIST OF NATIVE LARGE SPECIES EVERGREEN TREES AND COMPLEMENTARY UNDERSTORY. IF NEEDED, THE APPLICANT SHALL SUBMIT A DETAILED LANDSCAPE PLAN WITH THE CIVIL CONSTRUCTION PERMIT APPLICATION THAT PROVIDES A PLANT SCHEDULE FOR THE STORMWATER TRACT SCREENING OUTSIDE OF THE FENCING AREA CONSISTING OF DOUGLAS FIR, WESTERN RED CEDAR, AND WESTERN HEMLOCK WITH ASSOCIATED SHRUBS AND GROUNDCOVER AS DETERMINED BY THE CURRENT PLANNING PROJECT MANAGER. THE DETAILED LANDSCAPE PLAN SHALL BE REVIEWED AND APPROVED BY THE CURRENT PLANNING PROJECT MANAGER PRIOR TO PERMIT ISSUANCE. 3. THE PROJECT SHALL COMPLY WITH THE 30% TREE RETENTION RATE AS REQUIRE PER RMC 4-4-130.H.1.A. ALTERNATIVELY, THE APPLICANT SHALL SUBMIT A DETAILED JUSTIFICATION LETTER DOCUMENTING CONFORMANCE WITH AT LEAST ONE ( 1) OF THE FOUR ( 4) CRITERIA OUTLINED IN RMC 4-4-130.H.1.E. THE DETAILED JUSTIFICATION LETTER SHALL BE SUBMITTED TO THE CURRENT PLANNING PROJECT MANAGER FOR REVIEW AND APPROVAL PRIOR TO ISSUANCE OF THE CIVIL CONSTRUCTION PERMIT. 4. THE APPLICANT SHALL SUBMIT A PARKING ANALYSIS FOR THE EXISTING CHURCH AND SCHOOL ON PROPOSED LOT 22 THAT DEMONSTRATES COMPLIANCE WITH THE PARKING STANDARDS IN RMC 4-4-140. THE ANALYSIS SHALL BE SUBMITTED TO THE CURRENT PLANNING PROJECT MANAGER FOR REVIEW AND APPROVAL PRIOR TO ISSUANCE OF THE CIVIL CONSTRUCTION PERMIT. 5. THE APPLICANT SHALL SUBMIT AN INADVERTENT DISCOVERIES PLAN ( IDP) PREPARED BY A QUALIFIED PROFESSIONAL WITH THE CIVIL CONSTRUCTION PERMIT FOR REVIEW AND APPROVAL BY THE CURRENT PLANNING PROJECT MANAGER PRIOR TO PERMIT ISSUANCE. 6. THE APPLICANT SHALL SUBMIT A NARRATIVE DESCRIBING HOW THE FUTURE LOTS WILL COMPLY WITH THE LOT CONFIGURATION REQUIREMENT AS OUTLINED IN RMC 4-2-115.E.1. THE NARRATIVE SHALL BE SUBMITTED TO THE CURRENT PLANNING PROJECT MANAGER FOR REVIEW AND APPROVAL PRIOR TO ISSUANCE OF THE CIVIL CONSTRUCTION PERMIT. 7. LOTS 1 THROUGH 12 SHALL UTILIZE A PUBLIC ALLEY FOR ALL VEHICULAR ACCESS. NO CURB CUTS FOR LOTS 1 THROUGH 12 SHALL BE ESTABLISHED ON 116TH AVE SE OR FUTURE ROADS A OR B. 8. THE SECONDARY ENTRANCE TO FUTURE LOT 22, LOCATED ON FUTURE ROAD A, SHALL MEET ONE (1) OF THE FOLLOWING: A) RELOCATE THE ENTRANCE WESTWARD TO ALIGN WITH FUTURE ALLEY Z; OR B) CONVERT THE ENTRANCE AT THE CURRENT PROPOSED LOCATION TO A GATED SECONDARY FIRE EMERGENCY ACCESS AS DETERMINED BY THE RENTON REGIONAL FIRE AUTHORITY ( RRFA); OR C) ELIMINATE THE ENTRANCE IF DETERMINED TO BE UNNECESSARY FOR VEHICULAR CIRCULATION AND ACCESS BY THE PUBLIC WORKS PLAN REVIEWER. RK 9/26/25 TJS SURVEYED: ANG 1 /5/25 TJS DESIGNED: RK DRAWN: RK CHECKED: BJT BY DATE APPR APPROVED: TJS SCALE: N/A ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY VERnCAL: NAVD 19w HORIZONTAL: NAD 1983/2011 DATU M 9. THE APPLICANT SHALL SUBMIT A PHOTOMETRIC STUDY AND STREET LIGHTING PLAN PER CITY STANDARD AT THE TIME OF CONSTRUCTION PERMIT REVIEW. 10. IF THE APPLICANT CONVERTS THE STORMWATER VAULT WITHIN TRACT A TO A STORMWATER DETENTION POND, IT SHALL BE CONSIDERED A MAJOR PLAT AMENDMENT SUBJECT TO THE REQUIREMENTS OUTLINED UNDER RMC 4-7-080M.2. IF UTILIZED, THE STORMWATER VAULT BE LOCATED ENTIRELY BELOW GROUND. ENGINEERED CONSTRUCTION PLANS SHOWING THE VAULT ENTIRELY BELOW GROUND SHALL BE SUBMITTED TO THE PUBLIC WORKS PLAN REVIEWER AT THE TIME OF CONSTRUCTION PERMIT REVIEW FOR REVIEW AND APPROVAL. 11. THE APPLICANT SHALL SUBMIT AN UPDATED SITE PLAN THAT INCORPORATES A MINIMUM FOUR FOOT 4') WIDE PEDESTRIAN PATHWAY IN TRACT B THAT CONNECTS THE STREET FRONTAGE IMPROVEMENTS OF FUTURE ROAD B TO 116TH AVE SE. THE DESIGN FOR THE PEDESTRIAN PATHWAY CONNECTION SHALL BE SUBMITTED TO THE CURRENT PLANNING PROJECT MANAGER FOR REVIEW AND APPROVAL PRIOR TO ISSUANCE OF THE CIVIL CONSTRUCTION PERMIT. 12. THE APPLICANT SHALL INSTALL ALL REQUIRED STREET FRONTAGE IMPROVEMENTS ON THE PORTION OF 116TH AVE SE ADJACENT TO PROPOSED LOT 22 ( CHURCH SITE) WITHIN TWO ( 2) YEARS OF PRELIMINARY PLAT APPROVAL, UNLESS AN ALTERNATIVE SCHEDULE IS APPROVED BY THE CURRENT PLANNING PROJECT MANAGER. 13. STREET NAMES SHALL BE APPROVED BY THE CITY AND STREET NAME SIGNS SHALL BE INSTALLED IF REQUIRED BY CITY STAFF. 14. SANITARY SEWERS SHALL BE PROVIDED BY THE DEVELOPER AT NO COST TO THE CITY AND DESIGNED IN ACCORDANCE WITH CITY STANDARDS. SIDE SEWER LINES SHALL BE INSTALLED EIGHT FEET (8') INTO EACH LOT IF SANITARY SEWER MAINS ARE AVAILABLE. 15. ALL UTILITIES DESIGNED TO SERVE THE SUBDIVISION SHALL BE PLACED UNDERGROUND. ANY UTILITIES INSTALLED IN THE PARKING STRIP SHALL BE PLACED IN SUCH A MANNER AND DEPTH TO PERMIT THE PLANTING OF TREES. THOSE UTILITIES TO BE LOCATED BENEATH PAVED SURFACES SHALL BE INSTALLED, INCLUDING ALL SERVICE CONNECTIONS, AS APPROVED BY THE DEPARTMENT. SUCH INSTALLATION SHALL BE COMPLETED AND APPROVED PRIOR TO THE APPLICATION OF ANY SURFACE MATERIAL. EASEMENTS MAY BE REQUIRED FOR THE MAINTENANCE AND OPERATION OF UTILITIES AS SPECIFIED BY THE DEPARTMENT. 16. ANY CABLE TV CONDUITS SHALL BE UNDERGROUNDED AT THE SAME TIME AS OTHER BASIC UTILITIES ARE INSTALLED TO SERVE EACH LOT. CONDUIT FOR SERVICE CONNECTIONS SHALL BE LAID TO EACH LOT LINE BY SUBDIVIDER AS TO OBVIATE THE NECESSITY FOR DISTURBING THE STREET AREA, INCLUDING SIDEWALKS, OR ALLEY IMPROVEMENTS WHEN SUCH SERVICE CONNECTIONS ARE EXTENDED TO SERVE ANY BUILDING. THE COST OF TRENCHING, CONDUIT, PEDESTALS AND/OR VAULTS AND LATERALS AS WELL AS EASEMENTS THEREFORE REQUIRED TO BRING SERVICE TO THE DEVELOPMENT SHALL BE BORNE BY THE DEVELOPER AND/OR LANDOWNER. THE SUBDIVIDER SHALL BE RESPONSIBLE ONLY FOR CONDUIT TO SERVE HIS DEVELOPMENT. CONDUIT ENDS SHALL BE ELBOWED TO FINAL GROUND ELEVATION AND CAPPED. THE CABLE TV COMPANY SHALL PROVIDE MAPS AND SPECIFICATIONS TO THE SUBDIVIDER AND SHALL INSPECT THE CONDUIT AND CERTIFY TO THE CITY THAT IT IS PROPERLY INSTALLED. CALL BEFORE YOU DIG: 1-800-424-5555 CITY OF RENTON Planning/Building/Public Works Dept. R-436002 ON S%r Q- OF W A S,91 o Z �'l SO 0 �24 �A LT 1/6/26 J O J v � C _ 7 t . _ 0 of m C � i W (V � M i Q 00 CA is c: < # > j i C LO a-+ fV m W 0 V N r (1) Y N "t IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING c � N N N O O N M u H • H co Q J co O O O O 1 co N Ir WE HBray 02/05/2026 IL,, AF 00 Lu �y GENERAL NOTES HARMONY RIDGE ICHIJO USA, CO., LTD 1406 140TH PL SE, SUITE 104, BELLEVUE, WA 98007 (D N N rr0 Z DATE: 1/6/2026 > z m FIELDBOOK: O O PAGE: DRAWING NO:W. au SHEET: ^ OF:66 = m