Loading...
HomeMy WebLinkAboutR-436045O (0 co 0 w Lij 0 Z 0 G rr Q cn w 0 0 z 0 m Q z 0 z w 00 rn N N N X In m w m 0 m a U cn 00 rn N N N o, Q) c i 00 N N N i :n 0 0 0 N N IZ aL. LANDSCAPE PLANTING NOTES AND MATERIALS SCOPE OF WORK FURNISH ALL MATERIALS, LABOR, EQUIPMENT AND RELATED ITEMS NECESSARY TO ACCOMPLISH TOPSOIL, TREATMENT AND PREPARATION OF SOIL, FINISH GRADING, PLACEMENT OF SPECIFIED PLANT MATERIALS, FERTILIZER, STAKING, MULCH, CLEAN-UP, DEBRIS REMOVAL, AND 30-DAY MAINTENANCE. QUALIFICATIONS: LANDSCAPE CONTRACTOR TO BE SKILLED AND KNOWLEDGEABLE IN THE FIELD OF WORK AND HAVE A MINIMUM OF FIVE (5) YEAR'S EXPERIENCE INSTALLING SIMILAR WORK. CONTRACTOR TO BE LICENSED TO PERFORM THE WORK SPECIFIED WITHIN THE PRESIDING JURISDICTION. JOB CONDITIONS: IT IS THE CONTRACTOR'S RESPONSIBILITY TO REVIEW THE SITE AND REPORT ANY DISCREPANCIES TO THE OWNER OR THE OWNER'S REPRESENTATIVES. ALL PLANT MATERIAL AND FINISH GRADES ARE SUBJECT TO APPROVAL BY THE OWNER. PROTECTION: SAVE AND PROTECT ALL EXISTING PLANTINGS SHOWN TO REMAIN. DO NOT PLANT UNTIL OTHER CONSTRUCTION OPERATIONS WHICH CONFLICT HAVE BEEN COMPLETED. IF AN IRRIGATION SYSTEM IS TO BE INSTALLED DO NOT PLANT UNTIL THE SYSTEM HAS BEEN INSTALLED, TESTED, AND APPROVED BY THE OWNER. HANDLE PLANTS WITH CARE - DO NOT DAMAGE OR BREAK ROOT SYSTEM, BARK, OR BRANCHES. REPAIR AND/OR REPLACE ITEMS DAMAGED AS A RESULT OF WORK, OR WORK NOT IN COMPLIANCE WITH PLANS AND SPECIFICATIONS, AS DIRECTED BY OWNER AT NO ADDITIONAL COST TO THE OWNER. REPAIR OF EXISTING PLANTINGS: DURING THE COURSE OF WORK, REPAIR ALL EXISTING PLANTING AREAS BY PRUNING DEAD GROWTH, RE-ESTABLISHING FINISH GRADE AND RE -MULCHING TO SPECIFIED DEPTH. GUARANTEE: GUARANTEE ALL PLANT MATERIAL FOR A PERIOD OF ONE YEAR FROM DATE OF FINAL ACCEPTANCE OF THE JOB BY OWNER. 30-DAY MAINTENANCE: CONTRACTOR TO PROVIDE OWNER WITH A SCOPE OF WORK AT TIME OF INITIAL PROJECT BID TO PROVIDE LANDSCAPE AND IRRIGATION MAINTENANCE FOR 30 DAYS FOLLOWING STORE OPENING. WORK TO INCLUDE MAINTENANCE AS DESCRIBED BELOW, IN PLANTING AND IRRIGATION MAINTENANCE. SUBMITTALS: SUBMIT THE FOLLOWING TO THE LANDSCAPE ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO THE START OF ANY WORK: A) DOCUMENTATION THAT ALL PLANT MATERIAL HAS BEEN ORDERED. B) TOPSOIL ANALYSIS AND RECOMMENDED AMENDMENTS. C) TREE STAKING AND GUYING MATERIALS. D) ONE (1) QUART SIZE OF TOPSOIL AND MULCH. E) PLANTING SCHEDULE INCLUDING DATES AND TIMES. F) MAINTENANCE INSTRUCTIONS FOR ONE (1) FULL YEAR. MATERIALS: PLANT MATERIALS: PLANT MATERIALS TO BE GRADE NO. 1, SIZED IN ACCORDANCE WITH (AAN) AMERICAN STANDARDS FOR NURSERY STOCK (ANSI Z60.1-2004). PRUNE PLANTS RECEIVED FROM THE NURSERY ONLY UPON AUTHORIZATION BY THE LANDSCAPE ARCHITECT. "B & B" INDICATES BALLED AND BURLAPPED; "CONT." INDICATES CONTAINER; "BR" INDICATES BARE ROOT; "CAL" INDICATES CALIPER AT 6" ABOVE SOIL LINE; "GAL" INDICATES GALLON. A) SPECIFIED PLANT CANOPY SIZE OR CALIPER IS THE MINIMUM ACCEPTABLE CONTAINER OR BALL SIZE AND ESTABLISHES MINIMUM PLANT CONDITION TO BE PROVIDED. B) QUALITY: PLANT MATERIAL TO COMPLY WITH STATE AND FEDERAL LAWS FOR DISEASE INSPECTION, PLANTS TO BE FULLY LIVE, VIGOROUS, WELL FORMED, WITH WELL DEVELOPED FIBROUS ROOT SYSTEMS. ROOT BALLS OF PLANTS TO BE SOLID AND FIRMLY HELD TOGETHER, SECURELY CONTAINED AND PROTECTED FROM INJURY AND DESICCATION. PLANTS DETERMINED BY LANDSCAPE ARCHITECT TO HAVE BEEN DAMAGED; HAVE DEFORMITIES OF STEM, BRANCHES, OR ROOTS; LACK SYMMETRY, HAVE MULTIPLE LEADERS OR "Y" CROTCHES LESS THAN 30 DEGREES IN TREES, OR DO NOT MEET SIZE OR ANSI STANDARDS WILL BE REJECTED. PLANT MATERIAL TO BE FROM A SINGLE NURSERY SOURCE FOR EACH SPECIFIED SPECIES/HYBRID. NURSERY SOURCES TO BE THOSE LOCATED IN THE SAME REGION AS THE JOB SITE. C) SUBSTITUTION: NO SUBSTITUTION OF PLANT MATERIAL, SPECIES OR VARIETY, WILL BE PERMITTED UNLESS WRITTEN EVIDENCE IS SUBMITTED TO THE OWNER FROM TWO QUALIFIED PLANT BROKERAGE OFFICES. SUBSTITUTIONS WHICH ARE PERMITTED TO BE IN WRITING FROM THE OWNER AND LANDSCAPE ARCHITECT. THE SPECIFIED SIZE, SPECIES AND NEAREST VARIETY, AS APPROVED, TO BE FURNISHED. SUBSTITUTIONS MAY REQUIRE SUBMITTAL TO REVISED LANDSCAPE PLAN TO CITY FOR APPROVAL. D) LABEL AT LEAST ONE (1) TREE, SHRUB, AND GROUNDCOVER OF EACH VARIETY WITH A SECURELY ATTACHED WATERPROOF TAG BEARING LEGIBLE DESIGNATION OF BOTANICAL AND COMMON NAMES. E) DELIVER PLANT MATERIAL AFTER PREPARATION OF PLANTING AREAS HAVE BEEN COMPLETED AND PLANT IMMEDIATELY. IF PLANTING IS DELAYED MORE THAN SIX (6) HOURS AFTER DELIVERY, SET MATERIAL IN SHADE, PROTECT FOR WEATHER AND MECHANICAL DAMAGE, AND KEEP ROOT BALLS MOIST BY COVERING WITH MULCH, BURLAP OR OTHER ACCEPTABLE MEANS OF RETAINING MOISTURE. SOIL PREPARATION: TOPSOIL, AMENDMENT, AND BACKFILL, ARE GENERAL REQUIREMENTS FOR ALL LANDSCAPE AREAS, UNLESS NOTED OTHERWISE ON THE PLANS. SOIL AMENDMENTS AND FERTILIZER NOTED BELOW ARE TO BE USED FOR BID PRICE BASIS ONLY. SPECIFIC AMENDMENTS AND FERTILIZERS WILL BE MADE AFTER SOIL SAMPLES ARE LABORATORY TESTED BY THE CONTRACTOR. PROVIDE CHANGE ORDER FOR ADDITIONAL OR REDUCTION OF MATERIALS REQUIRED OR NOT REQUIRED BY THE SOILS REPORT. SOIL FERTILITY AND AGRICULTURAL SUITABILITY ANALYSIS: AFTER ROUGH GRADING AND PRIOR TO SOIL PREPARATION, CONTRACTOR TO OBTAIN TWO REPRESENTATIVE SOIL SAMPLES, FROM LOCATIONS AS DIRECTED BY THE LANDSCAPE ARCHITECT, TO A SOIL TESTING LABORATORY. SUBMIT RESULTS TO LANDSCAPE ARCHITECT FOR REVIEW. TESTS TO INCLUDE FERTILITY AND SUITABILITY ANALYSIS WITH WRITTEN RECOMMENDATIONS FOR SOIL AMENDMENT, FERTILIZER, CONDITIONERS, APPLICATION RATES, AND POST -CONSTRUCTION MAINTENANCE PROGRAM. TESTS TO BE CONTRACTED WITH AND PAID FOR BY THE CONTRACTOR. A) TOPSOIL: CONTRACTOR IS RESPONSIBLE FOR SUPPLYING ALL TOPSOIL AND FOR DETERMINING THE VOLUME OF TOPSOIL REQUIRED PER THE INFORMATION ON PLANS AND NOTED HERE -IN. CONTRACTOR IS RESPONSIBLE FOR ANY NECESSARY WEED CONTROL RESULTING FROM CONTAMINATED OFF SITE SOURCES. B) TOPSOIL TO CONSIST OF 1/3 BY VOLUME SANDY LOAM, 1/3 BY VOLUME COMPOSTED GARDEN MULCH, AND 1/3 BY VOLUME COARSE WASHED SAND OR EQUIVALENT. LANDSCAPE NOTES AND DETAILS FOR HARMONY RIDGE A PORTION OF SECTION 20, TOWNSHIP 23 N., RANGE 05 E., W.M. CITY OF RENTON, KING COUNTY, WASHINGTON C) TOPSOIL PREPARATION AND INSTALLATION: 1. VERIFY SUBGRADES TO -9 INCHES IN LANDSCAPE AREAS OR AS INDICATED ON PLANS. THIS ACCOMMODATES, TOPSOIL, AMENDMENTS, AND MULCH. 6" IMPORTED TOPSOIL FOR LANDSCAPE BEDS. PRUNE DAMAGED TWIGS AFTER PLANTING 2. ERADICATE ANY SURFACE VEGETATION ROOTED IN THE SUB -GRADE PRIOR TO SUB -GRADE PREPARATION. PLACE IN VERT. POSITION: DOUBLE LEADERS WILL BE REJECTED 3. REMOVE SOIL LUMPS, ROCK, VEGETATION AND/OR DEBRIS LARGER THAN 2 INCHES FROM ALL SUB -GRADE PRIOR TO PLACEMENT OF SPECIFIED TOPSOIL. NOTE: 4. REMOVE ANY ASPHALT EXTENDING BEYOND 6 INCHES FROM CURBS INTO ADJACENT KEEP ROOTBALL MOIST AND PROTECTED AT ALL TIMES. LANDSCAPE AREAS. HOLD CROWN OF ROOTBALL AT OR JUST ABOVE FINISH D) TOPSOIL PLACEMENT: 1. PROVIDE A TOTAL FINISH COURSE OF 4 INCHES OF TOPSOIL FOR LANDSCAPE AREAS. 2. PLACE ADDITIONAL TOPSOIL AND SOIL MIX AS REQUIRED TO MEET FINISH ELEVATIONS. MULCH (TOPDRESSING): ONE -HALF -INCH (1/2") SIZE, TO ONE -QUARTER (1/4"), HEMLOCK/FIR BARK. FINE TEXTURED AND DARK BROWN IN COLOR. STAKES: 2-INCH DIAMETER BY 8-FOOT MINIMUM LODGEPOLE PINE STAKES. GUY MATERIAL: 1-INCH WIDE POLYETHYLENE CHAIN LOCK TYPE TIES; OR, 3/8" DIAMETER RUBBER. NO WIRE. EXECUTION: CONTAMINANTS: VERIFY THAT ALL SOIL CONTAMINANTS (E.G., PAINT, SEALANTS, SOLVENTS, OILS, GREASES, CONCRETE/ASPHALT SPOILS, ETC.) HAVE BEEN SATISFACTORY REMOVED FROM ALL PLANTING AREAS. DO NOT BEGIN WORK UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED. FINISH GRADES: FINE GRADE AND REMOVE ROCKS, DEBRIS, AND FOREIGN OBJECTS OVER 2 INCHES DIAMETER FROM TOP SURFACE OF PREPARED LANDSCAPE AREAS. FINISH ELEVATIONS TO BE DEFINED AS 3 INCHES BELOW CURBS, WALKS AND/OR OTHER ADJACENT HARDSCAPE FOR ALL PLANTING BED AREAS AND 1-INCH BELOW CURBS, WALKS AND/OR OTHER ADJACENT HARDSCAPE FOR ALL LAWN AREAS. FINISH GRADE REFER TO GRADES PRIOR TO INSTALLATION OF MULCH OR LAWN. ALL FINISH GRADES TO BE SMOOTH EVEN GRADES, LIGHTLY COMPACTED, AS SHOWN ON THE PLAN AND DETAILED. PROVIDE POSITIVE DRAINAGE AWAY FROM BUILDINGS AND STRUCTURES. SITE CIVIL DRAWINGS IDENTIFY FINAL ELEVATIONS. MOISTEN PREPARED AREAS BEFORE PLANTING IF SOIL IS DRY. WATER THOROUGHLY AND ALLOW SURFACE TO DRY BEFORE PLANTING. DO NOT CREATE MUDDY SOIL. TREES AND SHRUBS: ARRANGE TREES AND SHRUBS ON SITE IN PROPOSED LOCATIONS PER DRAWINGS. EXCAVATE PIT, PLANT AND STAKE OR GUY, AS CALLED OUT AND DETAILED. ALL TREES, SHRUBS, AND SUPPORTS TO STAND VERTICAL. BACKFILL SHALL BE PIT SPOILS. SETTLE BACKFILL USING WATER ONLY. NO MECHANICAL COMPACTION. GROUNDCOVERS: EXCAVATE PITS TO A MINIMUM OF 3 INCHES BELOW, AND TWICE THE ROOT BALL DIAMETER. WATER THOROUGHLY AND TAKE CARE TO ENSURE THAT ROOT CROWN IS AT PROPER GRADE, AS DETAILED. MULCH: MULCH ALL LANDSCAPE AREAS. MATCH DEPTH OF EXISTING MULCH. AT A MINIMUM, APPLY SUFFICIENT QUANTITY TO PROVIDE A 4-INCH DEPTH. UTILITY CLEARANCES: FIELD ADJUST PLANT LOCATIONS FOR 8-FOOT SEPARATION OF TREES/SHRUBS AND 2-FOOT SEPARATION FOR GROUNDCOVER FROM FIRE HYDRANTS AND UTILITY VAULTS. CLEANUP AND PROTECTION: DURING LANDSCAPE WORK, KEEP ALL PAVEMENT CLEAN AND WORK AREAS IN AN ORDERLY CONDITION. PROTECT LANDSCAPE WORK AND MATERIALS FROM DAMAGE DUE TO LANDSCAPE OPERATIONS AND TRESPASSERS. MAINTAIN PROTECTION DURING INSTALLATION AND MAINTENANCE PERIOD. TREAT, REPAIR, OR REPLACE DAMAGE LANDSCAPE WORK AS DIRECTED BY THE OWNER. PLANTING MAINTENANCE: PROVIDE FULL MAINTENANCE BY SKILLED EMPLOYEES OF LANDSCAPE INSTALLERS. CONTRACTOR TO MAINTAIN PLANTINGS THROUGH COMPLETED INSTALLATION, AND UNTIL ACCEPTANCE OF LANDSCAPE INSTALLATION. PLANTING MAINTENANCE TO INCLUDE WATERING, WEEDING, CULTIVATING, TIGHTENING AND REPAIRING OF TREE GUYS, RESETTING PLANTS TO PROPER GRADES OR POSITION, RE-ESTABLISHING SETTLED GRADES; AND MOWING LAWNS WEEKLY AFTER LAWN ESTABLISHMENT. HERBICIDE IS NOT RECOMMENDED FOR ONE YEAR FOLLOWING LANDSCAPE INSTALLATION. INCLUDED IS REPLACEMENT OF DEAD PLANTS AND PLANTS SHOWING LOSS OF 40 PERCENT OR MORE OF CANOPY. HOLD PLANTS FROM EDGE OF PLANT AS NOTED ON F BED LINE EDGE CURB/WALK - PLANT MATERIAL SPACING DETAIL NOT TO SCALE SPACING AS CALLED OUT ON PLAN/PLANT LIST HOLD PLANTS FROM EDGE OF PLANTER AS NOTED ON PLANT LIST NOTE: THIS SPACING APPLIES TO GROUNDCOVER AND FORMAL SHRUB ROW PLACEMENT. GRADE. PROTECT TRUNK AND LIMBS FROM INJURY. BACKFILL TO BE SETTLED USING WATER ONLY - NO MECHANICAL COMPACTION. REMOVE ALL WRAP, TIES & CONTAINERS, REGARDLESS OF MATERIAL. (2) LODGEPOLE STAKES, PLUMB WITH ELASTIC CHAIN -LOCK TYPE OR RUBBER GUYS TIED IN FIGURE EIGHT; REMOVE AFTER ONE GROWING SEASON PROTECTIVE WRAPPING DURING SHIPMENT TO SITE AND INSTALLATION REMOVE AT COMPLETION OF PLANTING LAWN PLANTING; PROVIDE 3' D "NO GRASS" TREE RING AND 2" DEEP MULCH LAYER IN WELL. HOLD BACK FROM TRUNK 8" TO 10" FINISH GRADE PREPARE PLANTING BED PER SPEC'S; AT MIN., LOOSEN AND MIX SOIL TO 18" OR DEPTH OF ROOTBALL AND 2 TIMES BALL DIAMETER REMOVE ALL WRAP, TIES, AND CONTAINERS SCORE ROOTBALL AND WORK NURSERY SOIL AWAY FROM PERIMETER ROOTS SET BALL ON UNDISTURBED BASE OR COMPACTED MOUND UNDER BALL PENETRATION TO SUBBASE (+) 24" DECIDUOUS TREE PLANTING/STAKING DETAIL NOT TO SCALE MULCH LAYER FEATHER EXCESS SOIL UNDER MULCH 1 " MULCH AT CROWN 1/2" ABOVE GRADE 1" ABOVE GRADE t ° @REPARED PLANTING BED NOTE: < REMOVE CONTAINER & WORK ROOTS ° FREE OF SOIL. BACKFILL TO BE SETTLED USING WATER ONLY SEE PLANT LIST FOR PLANT SPACING SHRUB - PRUNE AS DIRECTED BY LANDSCAPE ARCHITECT HOLD MULCH FROM STEM MULCH LAYER 4" SAUCER FOR WATERING BACKFILL TO BE A MIX OF TOPSOIL, FERTILIZER, AND PEAT MOSS SCARIFY ROOTBALL ON CONTAINER MATERIAL. REMOVE TOP 1/3 OF BURLAP ON B&B MATERIAL DUST ROOT BALL WITH ROOT GROWTH HORMONE 3x THE ROOTBALL DIAMETER NOTE: z APPLY ADDITIONAL 4 OZ. 8-32-16 FERTILIZER INTO TOP 2" OF PLANTING MIX. CO PLANT SHRUB HIGH ENOUGH TO ALLOW POSITIVE DRAINAGE AWAY FROM ROOTBALL. ROUGHEN ALL SURFACES OF PIT. CUT AND REMOVE BURLAP FROM ROOT BALL SHRUB PLANTING DETAIL NOT TO SCALE (2) LODGEPOLE STAKES; TIE AT APPROX. 1/3 TO 1 /2 HEIGHT OF TREE WITH FLEXIBLE RUBBER TIE IN FIGURE EIGHT PATTERN. STAKES AND TREE TO BE PLUMB 3" DEEP SAUCER FOR WATER MULCH LAYER REMOVE ALL TIES, WRAP & CONTAINERS. FREE PERIMETER ROOTS FROM NURSERY BALL EXCAVATE TREE PIT AT A MIN. OF 2 TIMES DIA. OF ROOTBALL AT BALL CENTER, TAPERING PIT GRADE TO FINISH GRADE PIT SPOILS, NURSERY BALL WASTE BACKFILL SET BALL ON UNDISTURBED SUBGRADE, OR COMPACTED SOIL. NOTE: LIGHT FERTILIZER OVER PLANTING BED AFTER BACKFILL - ° ONLY; NO FERTILIZER IN PLANTING PIT. �-, WORK PERIMETER ROOTS FREE OF NURSERY BALL. �- BALL & PIT TO BE COURSELY SCARIFIED. LESS THAN 1 GAL 1 GAL CONTAINER and LARGER ( PLANTED BEFORE MULCH) ( PLANTED BEFORE MULCH ) GROUNDCOVER PLANTING DETAIL NOT TO SCALE FINISH GRADE AT — 4:1 SLOPE MAXIMUM 2% SLOPE MINIMUM CURB PER CIVIL - DRAWINGS (WALK SIMILAR) 1" MAX. MULCH LAYER TOPSOIL AS SPECIFIED FINISH GRADE AT 3:1 SLOPE MAXIMUM 10:1 SLOPE MINIMUM PREPARED SUBGRADE 1" MAX. CLEAR SIDEWALK LAWN CONDMON MULCH CONDMON (CURB SIMILAR) PLANTER SECTION DETAIL NOT TO SCALE SURVEYED: DESIGN 3 PER CITY COMMENTS TCR 12/2/25 TCR 2 PER SITE, TREE PROTECTION PLANS TCR 9/9/25 DRAWN TCR 1 PER CITY COMMENTS TCR 8/4/25 CHECKED: NO. REVISION BY DATE APPR imv APPROVED: TCR ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY VERTICAL: NAVD 1988 HORIZONTAL NAD 1983/2011 DATU M 4WD EVERGREEN TREE PLANTING/STAKING DETAIL NOT TO SCALE MULCH AT CURB DETAIL NOT TO SCALE CITY OF PRI RENTON Planning/Building/Public Works Dept. MULCH LAYER 1 " MAX. TOP OF CURB TO TOP OF MULCH M111111-0.1 R-436045 Mill �u ��NDSCAP�P J uJ � C � � 7 Z3 t 0 0 Ln a- c Z i W c: N N M V7 C accoN is c>Q� m N 'A > j un a-,' N cv M W O V r— a) Y N IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING ti N O Ln N wk M qq r O O O N Q J O ti O CD M N HBray 02/05/202600 W N (D N CURRENT PLANNING AW& 0 N AMorganroth O 02/05/2026 Z DA12/2/2025 z 00 LANDSCAPE NOTES AND DETAILS FIELDB00K: 00 PAGE: �A�^ Na HARMONY RIDGE u.l ' ICHIJO USA, CO., LTD Q �j 1406 140TH PL SE, SUITE 104, BELLEVUE, WA 98007 S"� L6 °F 7 = pp