HomeMy WebLinkAbout06-17-2026 - SOPCITY OF RENTON PUBLIC WORKS DEPARTMENT
2026 CITY CENTER CIPP PROJECT
SCHEDULE OF PRICES
*Note: Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.
SEE SECTION 10-01.2 OF THE SPECIAL PROVISIONS FOR INFORMATION ON BID ITEMS.
APPROX.UNIT PRICE TOTAL AMOUNT
QUANTITY Dollars Cents Dollars Cents
1
Lump Sum
_________________
Per Lump Sum
__________________
1
Lump Sum
_________________
Per Lump Sum
__________________
1
Calc
_________________
Per Calc
__________________
Subtotal
Sales Tax (10.5%)
Total Sched. A
BID SCHEDULE A -GENERAL
ITEM WITH UNIT PRICED BID
A1
A2
Mobilization & Demobilization
BID ITEM
NO.
Temporary Traffic Control
A3 Apprentice Utilization Incentive/Penalty
CITY OF RENTON PUBLIC WORKS DEPARTMENT
2026 CITY CENTER CIPP PROJECT
SCHEDULE OF PRICES
*Note: Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.
SEE SECTION 10-01.2 OF THE SPECIAL PROVISIONS FOR INFORMATION ON BID ITEMS.
APPROX.UNIT PRICE TOTAL AMOUNT
QUANTITY Dollars Cents Dollars Cents
13185
Linear Foot
_________________
Per Linear Foot
____________________
1
Each
_________________
Per Each
____________________
1
Each
_________________
Per Each
____________________
1581
Linear Foot
_________________
Per Linear Foot
____________________
1581
Linear Foot
_________________
Per Linear Foot
____________________
8872
Linear Foot
_________________
Per Linear Foot
____________________
1012
Linear Foot
_________________
Per Linear Foot
____________________
1720
Linear Foot
_________________
Per Linear Foot
____________________
200
Each
_________________
Per Each
____________________
9
Each
_________________
Per Each
____________________
13185
Linear Foot
_________________
Per Linear Foot
____________________
13
Each
_________________
Per Each
____________________
1 Per
Estimate
_________________
Per Estimate
____________________
Subtotal Sched. B
Sales Tax (10.5%)
Total Sched. B
Minor Change
Post Installation Inspection
B10
B13
B9 Trim Intruding Laterals
B11
Not Used
B4
B5
BID SCHEDULE B - SEWER
CIPP Pre-installation Cleaning and Inspection
ITEM WITH UNIT PRICED BID
Furnish and Install 6" Cured-in-Place Pipe
B1
Furnish and Install 8" Cured-in-Place Pipe
BID ITEM
NO.
B6
B8
B2 Deep Clean of Lateral
B3 Furnish and Install Short-Range Lateral Seal
Furnish and Install 10" Cured-in-Place Pipe
B4 Furnish and Install 6" Cured-in-Place Pipe
B12 CIPP Performance Testing And Analysis
B7 Furnish and Install 15" Cured-in-Place Pipe
Lateral Reinstatement
CITY OF RENTON PUBLIC WORKS DEPARTMENT
2026 CITY CENTER CIPP PROJECT
SCHEDULE OF PRICES
*Note: Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.
SEE SECTION 10-01.2 OF THE SPECIAL PROVISIONS FOR INFORMATION ON BID ITEMS.
APPROX.UNIT PRICE TOTAL AMOUNT
QUANTITY Dollars Cents Dollars Cents
4149
Linear Foot
_________________
Per Linear Foot
__________________
1720
Linear Foot
_________________
Per Linear Foot
__________________
1685
Linear Foot
_________________
Per Linear Foot
__________________
744
Linear Foot
_________________
Per Linear Foot
__________________
28
Each
_________________
Per Each
__________________
22
Each
_________________
Per Each
__________________
4149
Linear Foot
_________________
Per Linear Foot
__________________
4
Each
_________________
Per Each
__________________
1 Per
Estimate
_________________
Per Estimate
__________________
Total Sched. C
Total All Schedules
Total Schedule C (no tax)
Not Used
Total Schedule A (Incl. tax)
Total Schedule B (Incl. tax)
Furnish and Install 12" Cured-in-Place Pipe
Furnish and Install 15" Cured-in-Place PipeC3
Furnish and Install 24" Cured-in-Place Pipe
Post Installation Inspection
Minor ChangeC10
C4
C1
C8
C6 Trim Intruding Laterals
C7
C9 CIPP Performance Testing And Analysis
C5 Lateral Reinstatement
C2
CIPP Pre-installation Cleaning and Inspection
BID SCHEDULE C - STORMWATER
BID ITEM
NO.ITEM WITH UNIT PRICED BID