HomeMy WebLinkAboutQ&A No. 2 - CAG-26-132Page 1 of 1
RENTON SCHOOL & PEDESTRIAN CROSSING NO. 2
June 22, 2026
The responses to bidder inquiries, unless incorporated into a formal addendum to the contract, are not
part of the contract and are provided for the bidders’ convenience only. The responses may be
considered along with all other information furnished to prospective bidders for the purpose of bidding
on the project. The use of information provided in the responses to bidder inquiries is not to be
construed in any way as a waiver of the provisions nor excuse the contractor from full compliance with
the contract requirements. Bidders are cautioned that subsequent responses or contract addenda may
affect or vary a response previously given and any such subsequent response or addenda should be
taken into consideration when submitting a bid for the project.
Questions and Answers No. 2
1. Question: Can you confirm if the lighting pole is supposed to be alum per Renton std. 117.1 or
steel per Renton std 117.1A? Both standards were noted in the addendum.
Answer: The luminaire pole should be aluminum in accordance with the standard requirements.
While the standard includes details for installing a foundation designed for a steel pole, the
luminaire pole itself is specified to be aluminum.
End of Questions and Answers No. 2