Loading...
HomeMy WebLinkAboutContractAGREEMENT FOR 116TH AVE SE AND EDMONDS WAY SE ASBESTOS CEMENT (AC) WATER MAIN REPLACEMENT THIS AGREEMENT, dated for reference purposes only as June 15, 2026, is by and between the City of Renton (the "City"), a Washington municipal corporation, and Otak Inc ("Consultant"), a Washington Corporation. The City and the Consultant are referred to collectively in this Agreement as the "Parties." Once fully executed by the Parties, this Agreement is effective as of the last date signed by both parties. 1.Scope of Work: Consultant agrees to provide consulting, design, bidding and construction support services as specified in Exhibit A, which is attached and incorporated herein and may hereinafter be referred to as the "Work." 2.Changes in Scope of Work: The City, without invalidating this Agreement, may order changes to the Work consisting of additions, deletions or modifications. Any such changes to the Work shall be ordered by the City in writing and the Compensation shall be equitably adjusted consistent with the rates set forth in Exhibit B or as otherwise mutually agreed by the Parties. 3.Time of Performance: Consultant shall commence performance of the Agreement pursuant to the schedule(s) set forth in Exhibit C. All Work shall be performed by no later than June 30, 2027. 4.Compensation: A.Amount. Total compensation to Consultant for Work provided pursuant to this Agreement shall not exceed $222,267.00, plus any applicable state and local sales taxes. Compensation shall be paid based upon Work actually performed according to the rate(s) or amounts specified in Exhibit B. The Consultant agrees that any hourly or flat rate charged by it for its Work shall remain locked at the negotiated rate(s) unless otherwise agreed to in writing or provided in Exhibit B. Except as specifically provided herein, the Consultant shall be solely responsible for payment of any taxes imposed as a result of the performance and payment of this Agreement. B.Method of Payment. On a monthly or no less than quarterly basis during any quarter in which Work is performed, the Consultant shall submit a voucher or invoice in a form specified by the City, including a description of what Work has been performed, the CAG-26-193 6/22/2026 Approved by Cheryl Beyer via email 5/15/2026 Scope of Services 11241 Willows Road NE, Suite 200 | Redmond, WA 98052 | Phone 425.822.4446 | otak.com o:\project\22800\22800\09 corporate\contracts\exhibita_scope 116th ave se water line_22800.docx EXHIBIT A City of Renton 116th Avenue SE and Edmonds Way SE Asbestos Cement (AC) Water Main Replacement Project # ______ Otak Project No. 22800 May 5, 2026 The following scope of services is to provide professional services for design and construction plan preparation for the 116th Avenue SE and Edmonds Way SE AC Water Main Replacement project for the City of Renton (Client). Project Background and Description The Client has a need to replace existing older, under-sized 6-inch and 4-inch AC water mains with new Ductile Iron Pipe (DIP) within an area of 116th Avenue SE, generally bounded by Puget Drive SE to the north and SE 157th Street to the south. The anticipated schedule is to have the design completed for constructing the water line in early 2027. Project components and specific limits include: 116th Avenue SE/Puget Drive SE: Replace approximately 1,400 LF existing 6-inch AC water main with 8-inch DIP between SE 157th Street and Puget Drive SE, including an 8-inch connection at SE 157th Street; a 12-inch connection at Puget Drive SE; and replacement of two (2) existing hydrants, nine (9) residential services, and one (1) irrigation service within the water main replacement limits. Abandon 200 LF of existing 6-inch AC line from Puget Drive SE to Beacon Way S, one (1) existing irrigation service along line to be abandoned, and replacement of one (1) existing fire hydrant to be installed along existing 12-inch cast iron (CI) line along Puget Drive SE. Edmonds Way SE: Replace approximately 1,200 LF existing 6-inch AC water main (dead-end) with 8-inch DIP (dead-end) between SE 157th Street and 116th Avenue SE, including an 8-inch connection between 1816 and 1824 Edmonds Way SE, connection to the proposed new 8-inch main in 116th Avenue SE, and replacement of three (3) existing hydrants and twenty-four (24) customer services within the water main replacement limits. Also included is replacing approximately 315 LF of existing 12-inch concrete stormwater pipe (located on the east side and running northerly from an existing catch basin at SE Edmonds Court) with new 12-inch stormwater pipe to city standards. SE Edmonds Court (cul-de-sac): Replace approximately 200 LF existing 4-inch AC water main with 8-inch DIP, including connection to the proposed new 8-inch main in Edmonds Way SE, and replacement of four (4) existing customer services within the water main replacement limits. Beacon Way SE/Royal Hills Drive SE intersection: Replace approximately 100 LF existing 8-inch steel water main within the intersection with new 12-inch DIP and relocate its connection to the existing 12-inch line on the north side of Royal Hills Drive SE. Abandon an existing 4-inch CI line connected to the 6-inch AC water main in 116th Avenue SE that terminates on the north side of the intersection, including re-connecting an existing irrigation service (currently on the existing 4-inch) with a new service line and connection to the Beacon Way SE 8-inch main. Scope of Services continued City of Renton Page 2 of 11 116th Avenue SE and Edmonds Way SE Water Main Replacement Otak Figure 1. Preliminary Water Main and Storm Sewer Replacement Exhibit Scope of Services continued City of Renton Page 3 of 11 116th Avenue SE and Edmonds Way SE Water Main Replacement Otak The scope of proposed services includes tasks for site investigation and data collection; preliminary and final design of water main and storm sewer line replacement, and preparation of construction plans; construction bid solicitation support; and project management/administration. Services by Consultant are not included or anticipated for geotechnical; structural engineering; sanitary sewer main replacement/improvements; gas, power, and other dry utility relocations; wall or rockery design; flow control design; capacity analysis of existing stormwater conveyance system; environmental documentation/permits (beyond what the Client is obtaining); and right of access and easement acquisition/support. Services during construction are not included and will be performed under a separately approved scope and budget as an amendment to the contract. Scope of services are described in more detail as follows: SCOPE OF SERVICES 1. Site Investigation and Data Collection 1.1. Obtain existing available record documentation Consultant will obtain and review available data on the project, including existing utility records and reports or other relevant Client data regarding previous determinations or decisions about proposed project. Client shall provide Consultant with copies of any available previous studies, reports, or other pertinent information related to the project. 1.2. Establish project limits and project requirements Consultant will meet with Client staff to review and discuss the scope and schedule milestones for the project. Consultant design team will conduct a comprehensive site visit to the project area to understand field conditions and design challenges. Consultant will coordinate with the Client prior to conducting any site visits to participate, if desired, and to share project knowledge and concerns. Challenging conditions will be noted and photographs taken. Consultant will develop a Design-Plan Exhibit of proposed project elements, observed potential challenges and project requirements, and meet with Client staff to review/discuss. Consultant will revise/edit the exhibit to reflect any Client comments and include with a summary memorandum establishing the project limits, design elements and project aspects, and design criteria and standards. 1.3. Topographic surveying and base mapping Consultant will research to resolve the street right-of-way, establish project control based on Client data, and have the existing utilities field-marked by a utility locating service within the project limits. Consultant will perform survey and mapping along the streets of proposed water line and storm drainage improvements. The topographic survey base mapping area and limits are defined as follows: 116th Avenue SE: From SE 157th Street to Puget Drive SE/Royal Hills Drive SE, including the intersections. Edmonds Way SE: From SE 157th Street to 116th Avenue SE intersection, including the intersections. SE Edmonds Court: From Edmonds Way SE to the end of this street’s cul-de-sac. Scope of Services continued City of Renton Page 4 of 11 116th Avenue SE and Edmonds Way SE Water Main Replacement Otak Puget Drive SE: From the Puget Drive SE/Royal Hills Drive SE intersection westerly for approximately 300 feet. Royal Hills Drive SE: From the Puget Drive SE/116th Avenue SE intersection northerly for approximately 150 feet. Beacon Way SE: From Royal Hills Drive SE southerly for approximately 150 feet, including the existing 6-inch AC water main (proposed to be abandoned) to the north of Puget Drive SE, up to the existing hydrant proposed for relocation. The survey and mapping limits will include up to 5 feet beyond the full street right-of-way and include existing surface features, ditches, and other topography breaks; pavement and other hardscape areas; hydrants, water valves, water meters, and other utility valves; paint marks from utility locating services; storm drainage and sanitary sewer structures; power pole and above ground utilities; street channelization and signing; and significant trees (greater than 6 inches in diameter) and other landscaping, fences, structures, or features within the existing right-of-way. Consultant will create a topographic and planimetric base map in AutoCAD format from field survey data and utility records. Base mapping will be provided at a horizontal scale of 1 inch = 20 feet showing the features outlined above. A digital surface will be prepared, and contour lines will be shown at one-foot intervals. Parcel lines of properties adjoining street right-of-way will be depicted from available assessor records. The survey data will be referenced to the Client’s horizontal and vertical data. TASK 1 DELIVERABLES (Unless otherwise noted all deliverables shall be PDFs, submitted electronically.) 1. Design-Plan Exhibit identifying project improvement aspects and requirements 2. Memorandum summarizing the design criteria and standards 3. Topographic survey of project area 4. AutoCAD drawing file with point database and DTM files TASK 1 ASSUMPTIONS A. Client will provide Consultant copies of available reports, technical memorandums, and other data relevant to the project. B. Client will secure any rights-of-entry permits on any private property, as may be necessary, for Consultant to perform field work under this scope of services. C. Client will prepare notice and notify homeowners in advance of survey. D. Survey control will be on Washington State Plane North Zone and NAVD88. E. Parcel side lot lines will not be resolved. F. Existing utility field-locate will be horizontal location only. No potholing underground utilities will be performed under Task 1. G. Scope of services does not include permit submittal to Department of Natural Resources to permit removal or destruction of any survey monuments that may be required for the project. H. Labor and expense task level-of-effort budgets are estimates and Consultant reserves the right to request approval by the Client to transfer unused task budget amounts to accomplish other service task scope activities. Scope of Services continued City of Renton Page 5 of 11 116th Avenue SE and Edmonds Way SE Water Main Replacement Otak 2. Preliminary Design and Construction Documents 2.1. Design and prepare 30% construction plans Consultant will design and prepare 30% design plans in accordance with Client design and construction standards and requirements, and formatted to Client’s standard title and border. The following design elements and plan-set components will be included in the 30% preliminary plans: Cover and General Information Plans (5 Drawings) Consultant will prepare drawings indicating the project title, project number, vicinity map, and drawing index; project layout map; general notes; project legend, symbols, and abbreviations; horizontal alignment and survey control; and existing right-of-way and site survey map. Water Line Replacement Plans (9 Drawings) Consultant will prepare design drawings for proposed replacement of the water lines and services. Drawings will be prepared at a horizontal scale of 1 inch = 20 feet and formatted to Client standards. Storm Sewer Replacement Plans (1 Drawing) Consultant will prepare design drawings for the proposed storm sewer pipe replacement along Edmonds Way SE. Drawings will be prepared at a horizontal scale of 1 inch = 20 feet and formatted to Client standards. 2.2. Submit documents and respond to Client 30% comments Consultant will assemble and submit the design plans for review and comment. Consultant will conduct a “plans-in-hand” site walk-through with Client to discuss the project and design issues. Client shall review and provide Consultant a consolidated set of written review comments from all reviewers. Consultant will subsequently evaluate the comments and provide the Client with written responses to each comment, including meeting with the Client to review/discuss comments for clarification and concurrence. 2.3. Design and prepare 60% construction plans Consultant will design and advance the previously prepared drawings to a higher level of completion, including design of proposed water line and storm sewer profiles, incorporating Client comments from previous design submittal, and the following additional drawings: Design Details Drawings (4 Drawings) Drawings and details to support proposed water line, main line connection details, water services, and storm sewer pipe replacements. Site Restoration Plans (7 Drawings) Drawings will be prepared using double-plate plan formatted at a horizontal scale of 1 inch = 20 feet. Plans to depict paved and non-paved restoration area types, limits, and design details required for proposed utility replacements, including where necessary, restoration and/or replacement of shrubs or other landscaping disturbed within the street right-of-way. 2.4. Assist with 60% specifications and cost estimate preparation Client will prepare the bid and construction specifications and the construction cost estimate. Consultant will coordinate with Client staff to confirm standard Client bid items (and establish non-standard bid items, if needed), units of measure, and measure and payment conditions. Scope of Services continued City of Renton Page 6 of 11 116th Avenue SE and Edmonds Way SE Water Main Replacement Otak Client will provide Consultant electronic copy of the cost estimate and specifications for review and comment. Consultant will provide review comments within the electronic documents and re-submit them to Client for review. 2.5. Submit documents and respond to Client 60% comments Consultant will assemble and submit the design plans for review and comment. Client shall review and provide Consultant a consolidated set of written review comments from all reviewers. Consultant will subsequently evaluate the comments and provide Client with written responses to each comment, including resolution-comments on Client’s responses to Consultant’s specifications (project manual) and cost estimate review comments. Consultant will meet with Client to review/discuss comments for clarification and concurrence. 2.6. Preliminary design utility agency coordination Consultant will coordinate with the relevant power, gas, telecommunications franchise utility companies, including Olympic and Cedar River pipeline authorities having facilities within the project limits, to verify existing facility locations and initially discuss the project, requirements, and timelines. Consultant will prepare a comprehensive Utility Coordination Exhibit during 30% design. The exhibit will depict all existing and proposed utilities within the project area, and include a matrix spreadsheet summarizing potential conflict locations and viable options for avoiding conflicts or, if necessary, guidance on utility adjustments. Consultant will identify any existing utility locations deemed critical to the design where utility “potholing” is recommended, and submit the exhibit to Client for review and comment. Consultant will address Client’s review comments and based on Client approval, commission to have utility “potholing” performed to locate existing utility locations more accurately for either confirming current design or adjusting the 60% design based upon the findings. Following Client review, Consultant will submit 60% design plans and coordinate with the utility agencies to review the project related to their facilities. 2.7. Preliminary design meetings (Client) Consultant will prepare for and attend regular coordination meetings with the Client during preliminary design. Consultant will schedule, prepare for, and attend a 30-minute virtual coordination meeting every two weeks throughout the preliminary design to review and discuss project status/progress and design issues or considerations. Additionally, Consultant will prepare for and attend a 1-hour in-person meeting at Client’s office at design submittal milestones to discuss Client’s document review comments. Consultant will document design decisions, determinations and conclusions, and prepare/submit meeting summaries to the Client. 2.8. Preliminary design quality control Consultant will implement measures to control quality and effectively communicate with the Client during design. Consultant will establish and maintain effective communications for keeping the Client apprised of progress, unanticipated design issues that may arise, and issues requiring Client decision and direction. Consultant will perform specific quality control reviews of design elements and proposed deliverables prior to submittals. Scope of Services continued City of Renton Page 7 of 11 116th Avenue SE and Edmonds Way SE Water Main Replacement Otak TASK 2 DELIVERABLES (Unless otherwise noted all deliverables shall be PDFs, submitted electronically.) 1. Construction plans (at 30% and 60% design) 2. Responses to Client’s review comments on construction plans (at 30% and 60% design) 3. Review comments on Client-prepared specifications (project manual) and construction cost estimate (at 60% design) 4. Utility Coordination Exhibit (at 30% and 60% design) 5. Potholing results 6. Meeting summaries TASK 2 ASSUMPTIONS A. Client will obtain local project permits, anticipated as Civil Construction, Utility, and Right-of-Way. B. Client will provide Consultant with electronic standard plan title and border. C. Client will review and provide Consultant with a consolidated set of written review comments from all reviewers. D. Client will prepare the bid and construction specifications and lead the preparation of the construction cost estimate. E. Client’s review/comment duration on construction plans shall be two weeks for 30% design and three weeks for 60% design. F. The project does not require SEPA. G. No proposed profiles will be shown for water lines and storm sewer lines at 30% design. H. No water line or storm sewer details will be prepared for the 30% design submittal. I. Site restoration types and limits will not be depicted in the 30% submittal. J. No temporary traffic control will be designed by Consultant or included in the construction plans. K. Potholing allowance based on performing a maximum of six (6) potholes, locations identified at 30% and performed during 60% design. L. Pavement restoration based on pavement patch and half-street overlay. M. For budgeting purposes, level-of-effort for preliminary design meetings with Client based on Consultant preparing for and attending a maximum of eight (8) meetings (six [6] 30-minute virtual meetings occurring every two weeks and two [2] 1-hour in-person meetings at 30% and 60% design submittal milestones) to discuss Client’s document review comments. N. Labor and expense task level-of-effort budgets are estimates and Consultant reserves the right to request approval by the Client to transfer unused task budget amounts to accomplish other service task scope activities. 3. Final Design and Construction Documents 3.1. Design and prepare 90% construction plans Consultant will design and advance the previously prepared drawings to a higher level of completion, including design plan edits to incorporate Client comments from previous design submittal. Scope of Services continued City of Renton Page 8 of 11 116th Avenue SE and Edmonds Way SE Water Main Replacement Otak 3.2. Assist with 90% specifications and cost estimate preparation Client will prepare the bid and construction specifications and the construction cost estimate. Consultant will coordinate with Client staff to re-confirm bid items, units of measure, and measure and payment conditions. Client will provide Consultant electronic copy of the cost estimate and specifications for review and comment. Consultant will provide review comments within the electronic documents and re-submit them to Client for review. 3.3. Submit documents and respond to Client 90% comments Consultant will assemble and submit the design plans for review and comment. Client shall review and provide Consultant a consolidated set of written review comments from all reviewers. Consultant will subsequently evaluate the comments and provide Client with written responses to each comment, including resolution-comments on Client’s responses to Consultant’s specifications (project manual) and cost estimate review comments. Consultant will meet with Client to review/discuss comments for clarification and concurrence. 3.4. Design and prepare 100% construction plans Consultant will design and advance the previously prepared drawings to a higher level of completion, including design plan edits to incorporate Client comments from previous design submittal. 3.5. Assist with 100% specifications and cost estimate preparation Client will prepare the bid and construction specifications and the construction cost estimate. Consultant will coordinate with Client staff to re-confirm bid items, units of measure, and measure and payment conditions. Client will provide Consultant electronic copy of the cost estimate for review and comment. Consultant will provide review comments within the electronic documents and re-submit them to Client for review. 3.6. Submit documents and respond to Client 100% comments Consultant will assemble and submit the design plans for review and comment. Client shall review and provide Consultant a consolidated set of written review comments from all reviewers. Consultant will subsequently evaluate the comments and provide Client with written responses to each comment, including resolution-comments on Client’s responses to Consultant’s specifications (project manual) and cost estimate review comments. Consultant will meet with Client to review/discuss comments for clarification and concurrence. 3.7. Final design utility agency coordination Consultant will maintain contact with utility agencies throughout final design and update the utility coordination exhibit and spreadsheet to track utility coordination activities, and any current information that may become available. Consultant will submit design plans to utility agencies at each design milestone to review the proposed project and gather specific comments from utility agencies. 3.8. Final design meetings (Client) Consultant will prepare for and attend regular coordination meetings with the Client during final design. Consultant will schedule, prepare for, and attend a 30-minute virtual coordination meeting with the Client every two weeks throughout the final design to review and discuss project status/progress and design issues or considerations. Additionally, Consultant will prepare for and attend a 1-hour in-person meeting Scope of Services continued City of Renton Page 9 of 11 116th Avenue SE and Edmonds Way SE Water Main Replacement Otak at Client’s office at design submittal milestones to discuss Client’s document review comments. Consultant will document design decisions, determinations and conclusions, and prepare/submit meeting summaries to the Client. 3.9. Final design quality control Consultant will implement measures to control quality and effectively communicate with the Client during final design. Consultant will establish and maintain effective communications for keeping the Client apprised of progress, unanticipated design issues that may arise, and issues requiring Client decision and direction. Consultant will perform specific quality control reviews of design elements and proposed deliverables prior to submittals. TASK 3 DELIVERABLES (Unless otherwise noted all deliverables shall be PDFs, submitted electronically.) 1. Construction plans (at 90% and 100% design) 2. Responses to Client’s review comments on construction plans (at 90% and 100% design) 3. Review comments on Client-prepared specifications (project manual) and construction cost estimate (at 90% and 100% design) 4. Updated utility coordination exhibit (at 90% and 100% design) 5. Meeting summaries TASK 3 ASSUMPTIONS A. Client shall review and provide Consultant with a consolidated set of written review comments from all reviewers. B. Client will prepare the bid and construction specifications and the construction cost estimate. C. Client’s review/comment duration on construction plans shall be 3-weeks for 90% design and 2-weeks for 100% design. D. For budgeting purposes, level-of-effort for final design meetings with Client based on Consultant preparing for and attending a maximum of eight (8) meetings (six [6] 30-minute virtual meetings occurring every two weeks and two [2] 1-hour in-person meetings at 90% and 100% design submittal milestones) to discuss Client’s document review comments. E. Labor and expense task level-of-effort budgets are estimates and Consultant reserves the right to request approval by the Client to transfer unused task budget amounts to accomplish other service task scope activities. 4. Bid Solicitation Assistance Consultant will assist Client in soliciting, responding to questions, and evaluating received bids from construction contractors. Consultant will incorporate any Client 100% comments; assemble, sign/seal the construction plans; and submit to Client for their bid documents submittal/coordination with online plan center. Consultant will respond to questions during contractor bid solicitation period, prepare any required bid addenda, review submitted bids to identify irregularities and/or verify contractor references, and if requested, attend a pre-bid meeting, and prepare conformed construction plans. Scope of Services continued City of Renton Page 10 of 11 116th Avenue SE and Edmonds Way SE Water Main Replacement Otak TASK 4 DELIVERABLES (Unless otherwise noted all deliverables shall be PDFs, submitted electronically.) 1. Signed/sealed construction plans (22" x 34" and 11" x 17" formats) 2. AutoCAD drawings of design plans 3. Written response clarifications to questions during bidding 4. Preparation of bid addenda, when requested 5. Bid review and contractor reference checks, when requested 6. “Conformed” construction plans TASK 4 ASSUMPTIONS A. Client shall be responsible for leading the construction bid solicitation process, submittal of documents to electronic bid services, issuing bid advertisement, scheduling meeting facilities, and conducting and leading the pre-bid and bid-opening meetings. B. Client will be responsible for printing and distribution of “For Construction” documents. C. Client will provide Consultant with the following “For Construction” documents: one PDF of project (specification) manual, two bound hard copies each of the project (specification) manual, and half-size set of construction plans. D. Client will prepare the “Conformed” project manual (Specifications). E. Labor and expense task level-of-effort budgets are estimates and Consultant reserves the right to request approval by the City to transfer unused task budget amounts to accomplish other service task scope activities. 5. Project Management and Administration 5.1. Design and document preparation Consultant will direct and supervise internal staff team members and their activities to successfully complete the design documents and other services provided. Consultant will prepare a work plan guiding the project to include Client’s goals and objectives; information related to project scope, schedule, budget, and deliverable milestones; design standards and project-specific QA/QC control measures; and communication and administrative protocols. 5.2. Project documentation and reporting Consultant will develop a detailed project schedule (Microsoft Project) to reflect significant tasks and project milestones, and monitor and update schedule. Consultant will prepare and submit monthly progress reports and invoices with sufficient detail to demonstrate progress and budget status. TASK 5 DELIVERABLES (Unless otherwise noted all deliverables shall be PDFs, submitted electronically.) 1. Project schedules with periodic updates (Microsoft Project) 2. Monthly progress reports and invoices Scope of Services continued City of Renton Page 11 of 11 116th Avenue SE and Edmonds Way SE Water Main Replacement Otak TASK 5 ASSUMPTIONS A. Project Management and Administration budget is based on an anticipated design period of nine (9) months for completing the scope of services and deliverables. B. Project schedule to reflect significant design tasks and durations, updated at project milestones. C. Project progress reports and invoices will be submitted monthly. Invoice backup information (timesheets, mileage, and expense logs, etc.) will not be submitted with invoicing, except for copies of subconsultant invoice documentation. Backup information will be made available for staff auditing purposes, if requested. D. Task labor level-of-effort budgets are estimates and Consultant reserves the right to request approval by the City to transfer unused task budget amounts to accomplish other service task scope activities. 6. Management Reserve A management reserve is established for the City’s use with unanticipated project design issues or services not included. Use of this budget is at the sole discretion of the City, and Consultant will not use without separate prior written authorization. The Consultant will provide a written scope of services and budget to the City for approval prior to the beginning of any requested services. Discipline/Labor Category Maximum Billing Rate Engineering Engineering Technician 1 $89.43 Engineering Technician 2 $118.13 Engineering Technician 3 $129.21 Engineering Technician 4 $141.75 Engineering Technician 5 $154.35 Engineering Technician 6 $180.50 Engineering Designer 1 $117.37 Engineering Designer 2 $134.60 Engineering Designer 3 $142.47 Engineering Designer 4 $154.35 Engineering Designer 5 $168.53 Engineer 1 $147.14 Engineer 2 $159.08 Engineer 3 $176.40 Engineer 4 $191.36 Engineer 5 $220.50 Engineer 6 $245.01 Engineer 7 $286.65 Engineer 8 $325.55 Engineer 9 $375.01 Science Scientist 1 $110.50 Scientist 2 $131.07 Scientist 3 $141.75 Scientist 4 $157.50 Scientist 5 $190.54 Scientist 6 $223.56 Scientist 7 $242.55 Scientist 8 $262.99 Construction Management & Inspection Field Representative 1 $119.98 Field Representative 2 $133.02 Field Representative 3 $165.28 Field Representative 4 $180.02 Construction Manager 1 $131.04 Construction Manager 2 $150.00 Construction Manager 3 $178.45 Construction Manager 4 $189.00 Otak, Inc. 116th Ave SE & Edmonds Way SE Water Main Replacement Billing Rate Schedule Page 1 of 3 Discipline/Labor Category Maximum Billing Rate Construction Manager 5 $214.99 Construction Manager 6 $237.07 Survey Survey Field Technician 1 $77.99 Survey Field Technician 2 $88.01 Survey Field Technician 3 $95.00 Survey Data Analyst 1 $102.00 Survey Data Analyst 2 $116.99 Survey Data Analyst 3 $136.02 Survey Data Analyst 4 $150.92 Survey Crew Chief 1 $101.46 Survey Crew Chief 2 $132.58 Survey Crew Chief 3 $156.15 Project Surveyor 1 $158.00 Project Surveyor 2 $167.99 Project Surveyor 3 $182.48 Project Surveyor 4 $199.80 Project Surveyor 5 $236.25 Project Surveyor 6 $272.98 Project Surveyor 7 $315.00 Project Surveyor 8 $350.00 Landscape Architecture Landscape Designer 1 $88.20 Landscape Designer 2 $121.28 Landscape Designer 3 $131.51 Landscape Designer 4 $141.75 Landscape Architect 1 $124.99 Landscape Architect 2 $138.00 Landscape Architect 3 $153.85 Landscape Architect 4 $165.00 Landscape Architect 5 $186.98 Landscape Architect 6 $202.89 Landscape Architect 7 $218.77 Landscape Architect 8 $295.00 Landscape Architect 9 $350.00 Planning Planning Technician 1 $90.00 Planning Technician 2 $103.95 Planning Technician 3 $116.55 Planning Technician 4 $132.30 Planner 1 $121.21 Planner 2 $135.89 Planner 3 $166.95 Page 2 of 3 Discipline/Labor Category Maximum Billing Rate Planner 4 $189.00 Planner 5 $209.79 Planner 6 $221.29 Planner 7 $306.31 GIS Specialist $132.30 Sr. GIS Specialist $165.00 Project Support Services Administrative Assistant 1 $98.66 Administrative Assistant 2 $109.18 Administrative Assistant 3 $119.70 Administrative Assistant 4 $139.23 Project Coordinator 1 $114.06 Project Coordinator 2 $135.45 Project Coordinator 3 $154.35 Project Coordinator 4 $160.52 Graphic Designer $132.11 Sr. Graphic Designer $144.90 Billing Rates are updated annually by approximately four percent (4.00%) Page 3 of 3