HomeMy WebLinkAboutChange Order - 1            CAG-25-278, CO #1-26 Approved by Cheryl Beyer via email 6/11/2026 6/22/2026 Attest:______________________________ Jason Seth, City Clerk Change Order No. 01 Contract Title: Oakesdale Ave SW Pavement Preservation Contract No. CAG-25-278 Page 2 of 3 Change Order Form – Revised 12/23/2025 Bid Item: A 1. Description of Change: This change order adds pay item CO1A52 “Intersection Revision” to the contract and authorizes additional work required to meet PROWAG requirements at the SW 20th St Intersection with Oakesdale Avenue. a. Proposal Schedule of Prices: Item No. Spec. Section Description Qty Unit Unit Price Amount CO1A52 8-14, 8-20 Intersection Revision 1 LS $64,777.86 $64,777.86 æϟ Specification and/or Special Provision: Ėϟ Description: The contractor shall demo 2 existing curb ramps and 6ft of sidewalk(WSDOT Spec 8-14) indicated on the attached plans and construct 2 parallelϙ ramps (WSDOT Spec 8-14) and install a new TA 25 vault to house an existingϙfiber optic line(WSDOT Spec 9-29.3). The contractor shall also remove and salvage 2ϙexisting pedestrian signal heads and 2 push button devices as called out in the plansϙand install 1 new pedestrian signal heads and 1 new pedestrian push button devices (WSDOT Spec 9-29). The work described herein and all ancillary supporting activitiesϙ shall be completed in accordance with the revised design details provided in theϙ accompanying CCD. ĖĖϟ Construction Requirements: The contractor shall adhere the specs outlined aboveϙin the description as well as the scope in Construction Change Directive CCD 001 (Seeϙattached). ĖĖĖϟ Materials: 1 PS Pole and curb base foundation, 1 pedestrian signal head, 2 APSϙ PPBs (right arrow), 1 PPB Extender, Conductors between new and existing equipment, 1ϙ iCCU to install inside the existing cabinet, 1 TA-25 Vault. ĖŽϟ Measurement: Lump Sum for all work not covered by unit items. Žϟ Payment: The payment for “Intersection Revision” includes all labor, materials,ϙ tools, mobilization(s) and equipment required for performing the above listed activitiesϙ that are not already described by unit items. èϟ Plans: revised plan sheets 1, 11, 23, 27A, 34, 37, 39, 40, 41, 41A, 41B 2. Reason for Change: The contract plans called out for paving over an existing crosswalk who’s adjacent ramps were not in conformance with the latest PROWAG requirements.             Change Order No. 01 Contract Title: Oakesdale Ave SW Pavement Preservation Contract No. CAG-25-278 Page 3 of 3 Change Order Form – Revised 12/23/2025 3. Equitable Adjustment: This Change Order does include an equitable adjustment per Section 1-09.4 of the 2025 WSDOT/APWA Standard Specifications. See attached. Estimated Cost, Pay Item: $64,777.86 Extended Overhead: $ Original Bid Item Amount: $ Total $64,777.86 * Type dollar amounts in right-hand column for each of the 1st 3 rows, then right click dollar amount on fourth row and select “update Field”. 4. Critical Path Extension of Time e: The Time for Completion is not extended any Working Days. 5. Sections 1-04.4 and 1-04.5 of the 2025 WSDOT/APWA Standard Specifications shall govern this Change Order. The Work of the referenced Contract is modified to include the changes detailed herein. The payment provided for herein shall constitute the complete and final settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all other claims that may be made by the Contractor as a result of this change. 6. To be attached to Change Order: ܈܈ a. Estimated Change Order Cost From Contractor & Breakdown ܈ b. Revised Plan Sheets ܈ c. Construction Change Directive CCD001 ܈ d. Independent Cost Estimate & Breakdown             Construction Change Directive CCD 001 Project Name:Oakesdale Avenue SW Pavement Preservation PW Project Number:CAG 25-278 Contractor:ICON Materials Federal Aid Number:STBGUL-1277(002)) Subject:SW 20th St Curb Ramp Improvements Date:3/4/2026 Make the following revision to the contract documents: Description: x This directive makes minor revisions to pedestrian management at the intersection of SW 20 St Materials: x 1 PS pole and curb base foundation x 1 pedestrian signal head x 2 APS PPB’s (right arrow) x 1 PPB extender x Conductors between the new equipment and the existing cabinet x 1 iCCU to install inside the existing cabinet x 1TA-25Vault Construction Requirements: x See attached plan sheets Measurement and Payment: x Through contract items introduced in Change Order 1 Attachment(s): x Revision 2, with revised plan sheets 1, 11, 23, 27A, 34, 37, 39, 40, 41, 41A, 41B, Contractor Acknowledgement: By: ____________________________ Date: ____________________ Tyler Townsend, Project Manager Owner Approval: By: ____________________________ Date: ____________________ Wayne Rollins, KBA Inc. By: ____________________________ Date: ____________________ Keith Woolůey, City of Renton THIS CONSTUCTION CHANGE DIRECTIVE DOES NOT PROVIDE FOR EITHER A TIME EXTENSION OR A CHANGE IN THE CONTRACT PRICE. LABOR, EQUIPMENT, AND/OR MATERIAL OUTLINED IN THIS FIELD WORK DIRECTIVE SHALL BE PAID BY BID ITEM(S) OR A CHANGE ORDER SHALL BE DEVELOPED FOR TIME EXTENSION OR CONTRACT PRICE INCREASES. ANY PROTEST TO THE FIELD WORK DIRECTIVE SHALL FOLLOW 1-04.5 OF THE WSDOT STANDARD SPECIFICATIONS. ctor Acknowledgement: ______________________________________________________ Tl T d P j 04/09/2026  4/9/2026 Page 4 of 26             © 2 0 2 5 M i c r o s o f t C o r p o r a t i o n © 2 0 2 5 M a x a r © C N E S ( 2 0 2 5 ) D i s t r i b u t i o n A i r b u s D S 12 1 3 1 1 1 3 T H A V E N U E N E , S U I T E 2 0 3 ( T E L ) 4 2 5 8 2 1 - 3 6 6 5 KI R K L A N D , W A S H I N G T O N 9 8 0 3 4 ( F A X ) 4 2 5 8 2 5 - 8 4 3 4 Kn o w w h a t ' s be l o w . Ca l l be f o r e y o u d i g . 20 1 1 9 2 1 9 Pu b l i c W o r k s D e p t . CI T Y O F R E N T O N AP P R O V E D F O R C O N S T R U C T I O N BY _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ D A T E _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ SW 7 T H S T S W G R A D Y W A Y SW 2 7 T H S T MO N S T E R R D S W OA K E S D A L E A V E N U E S W P A V E M E N T P R E S E R V A T I O N CI T Y P R O J E C T # C A G - 2 5 - 2 7 8 FE D E R A L A I D # _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ OAKESDALE AVE SW SW 1 6 T H S T SW 3 4 T H S T STATE ROUT E 1 6 7 GREEN RI V E R MILITA R Y R D S S 1 8 0 T H S T S 1 7 8 T H S T INT E R U R B A N A V E S STA T E R O U T E 5 1 8 BENSON DR S X X X Ă Pu b l i c W o r k s D e p t . CI T Y O F R E N T O N AP P R O V E D F O R B I D BY _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ D A T E _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 2/ 2 7 / 2 6 Pa g e 5 o f 2 6                                              © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © © 2024 M 2024 Mic 2024 M202 rosoft Crosoftosoft CCorCoporation ©o tion ion ©on ©©2024 M2024 Ma2024 Max024 Maxa024 Maxaxxxaxxaaaaaar ©CNr ©Cr ©C©©CNCCCCNNNNEES (2S (200202020224) Dist224) Dist)D)DDistDistttrrribbution Aibubution Aion Aion Aion Airbus DS rbus DS rbus DS us DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 M© 2024 MMicMicrosoft Corrosoft Cort Co porationporaporation ©oraoorororotio ©© 2024 Maxa 2024 Max 2024 Maxa 2024 Maxar ©CNES (2r ©Cr ©CNNES (2NNES (2NENENEEES (2S (2024) Distr024)24) Dist24) Dis Distrrributioibutibution Abun Ain Ain AiAirrrbrrbrbus rbubus DS bus DSbus D 12 1 3 1 1 1 3 T H A V E N U E N E , S U I T E 2 0 3 ( T E L ) 4 2 5 8 2 1 - 3 6 6 5 KI R K L A N D , W A S H I N G T O N 9 8 0 3 4 ( F A X ) 4 2 5 8 2 5 - 8 4 3 4 Kn o w w h a t ' s be l o w . Ca l l be f o r e y o u d i g . 20 1 1 9 2 1 9 Pu b l i c W o r k s D e p t . CI T Y O F R E N T O N AP P R O V E D F O R C O N S T R U C T I O N BY _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ D A T E _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 2/ 2 7 / 2 6 Pa g e 6 o f 2 6                                              © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © © 2024 M 2024 Mic 2024 M202 rosoft Crosoftosoft CCorCoporation ©o tion ion ©on ©©2024 M2024 Ma2024 Max024 Maxa024 Maxaxxxaxxaaaaaar ©CNr ©Cr ©C©©CNCCCCNNNNEES (2S (200202020224) Dist224) Dist)D)DDistDistttrrribbution Aibubution Aion Aion Aion Airbus DS rbus DS rbus DS us DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 M© 2024 MMicMicrosoft Corrosoft Cort Co porationporaporation ©oraoorororotio ©© 2024 Maxa 2024 Max 2024 Maxa 2024 Maxar ©CNES (2r ©Cr ©CNNES (2NNES (2NENENEEES (2S (2024) Distr024)24) Dist24) Dis Distrrributioibutibution Abun Ain Ain AiAirrrbrrbrbus rbubus DS bus DSbus D 12 1 3 1 1 1 3 T H A V E N U E N E , S U I T E 2 0 3 ( T E L ) 4 2 5 8 2 1 - 3 6 6 5 KI R K L A N D , W A S H I N G T O N 9 8 0 3 4 ( F A X ) 4 2 5 8 2 5 - 8 4 3 4 Kn o w w h a t ' s be l o w . Ca l l be f o r e y o u d i g . 20 1 1 9 2 1 9 Pu b l i c W o r k s D e p t . CI T Y O F R E N T O N AP P R O V E D F O R C O N S T R U C T I O N BY _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ D A T E _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 2/ 2 7 / 2 6 Pa g e 7 o f 2 6                                              12 1 3 1 1 1 3 T H A V E N U E N E , S U I T E 2 0 3 ( T E L ) 4 2 5 8 2 1 - 3 6 6 5 KI R K L A N D , W A S H I N G T O N 9 8 0 3 4 ( F A X ) 4 2 5 8 2 5 - 8 4 3 4 Kn o w w h a t ' s be l o w . Ca l l be f o r e y o u d i g . 20 1 1 9 2 1 9 Pu b l i c W o r k s D e p t . CI T Y O F R E N T O N AP P R O V E D F O R C O N S T R U C T I O N BY _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ D A T E _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 2/ 2 7 / 2 6 Pa g e 8 o f 2 6                                              © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © © 2024 M 2024 Mic 2024 M202 rosoft Crosoftosoft CCorCoporation ©o tion ion ©on ©©2024 M2024 Ma2024 Max024 Maxa024 Maxaxxxaxxaaaaaar ©CNr ©Cr ©C©©CNCCCCNNNNEES (2S (200202020224) Dist224) Dist)D)DDistDistttrrribbution Aibubution Aion Aion Aion Airbus DS rbus DS rbus DS us DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 M© 2024 MMicMicrosoft Corrosoft Cort Co porationporaporation ©oraoorororotio ©© 2024 Maxa 2024 Max 2024 Maxa 2024 Maxar ©CNES (2r ©Cr ©CNNES (2NNES (2NENENEEES (2S (2024) Distr024)24) Dist24) Dis Distrrributioibutibution Abun Ain Ain AiAirrrbrrbrbus rbubus DS bus DSbus D ONLY BUS 12 1 3 1 1 1 3 T H A V E N U E N E , S U I T E 2 0 3 ( T E L ) 4 2 5 8 2 1 - 3 6 6 5 KI R K L A N D , W A S H I N G T O N 9 8 0 3 4 ( F A X ) 4 2 5 8 2 5 - 8 4 3 4 Kn o w w h a t ' s be l o w . Ca l l be f o r e y o u d i g . 20 1 1 9 2 1 9 Pu b l i c W o r k s D e p t . CI T Y O F R E N T O N AP P R O V E D F O R C O N S T R U C T I O N BY _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ D A T E _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 2/ 2 7 / 2 6 Pa g e 9 o f 2 6                                              12 1 3 1 1 1 3 T H A V E N U E N E , S U I T E 2 0 3 ( T E L ) 4 2 5 8 2 1 - 3 6 6 5 KI R K L A N D , W A S H I N G T O N 9 8 0 3 4 ( F A X ) 4 2 5 8 2 5 - 8 4 3 4 Kn o w w h a t ' s be l o w . Ca l l be f o r e y o u d i g . 20 1 1 9 2 1 9 Pu b l i c W o r k s D e p t . CI T Y O F R E N T O N AP P R O V E D F O R C O N S T R U C T I O N BY _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ D A T E _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 2/ 2 7 / 2 6 Pa g e 1 0 o f 2 6                                              © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS ©© 202© 20224 Mic4Mi4Microsossofsofoft Cort Cort C porporararatraiooon ©on ©n ©20220024 MMMMaaxaxaxaxar ©r ©©CN©©C©©CN©CCNCCNCNCNNNNNNES (2ES (2ES (2ES (2ES (2S2024)0240024)024)24)))DistDistrDistrDistrDistrDiDisDiDiDiribibiibibbb 12 1 3 1 1 1 3 T H A V E N U E N E , S U I T E 2 0 3 ( T E L ) 4 2 5 8 2 1 - 3 6 6 5 KI R K L A N D , W A S H I N G T O N 9 8 0 3 4 ( F A X ) 4 2 5 8 2 5 - 8 4 3 4 Kn o w w h a t ' s be l o w . Ca l l be f o r e y o u d i g . Pu b l i c W o r k s D e p t . CI T Y O F R E N T O N AP P R O V E D F O R C O N S T R U C T I O N BY _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ D A T E _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 20 1 1 1 1 8 3 02 / 2 7 / 2 0 2 6 Pa g e 1 1 o f 2 6                                              ONLY BUS NLY BUS 12 1 3 1 1 1 3 T H A V E N U E N E , S U I T E 2 0 3 ( T E L ) 4 2 5 8 2 1 - 3 6 6 5 KI R K L A N D , W A S H I N G T O N 9 8 0 3 4 ( F A X ) 4 2 5 8 2 5 - 8 4 3 4 Kn o w w h a t ' s be l o w . Ca l l be f o r e y o u d i g . Pu b l i c W o r k s D e p t . CI T Y O F R E N T O N AP P R O V E D F O R C O N S T R U C T I O N BY _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ D A T E _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 20 1 1 1 1 8 3 02 / 2 7 / 2 0 2 6 Pa g e 1 2 o f 2 6                                              SLOW SLOW 12 1 3 1 1 1 3 T H A V E N U E N E , S U I T E 2 0 3 ( T E L ) 4 2 5 8 2 1 - 3 6 6 5 KI R K L A N D , W A S H I N G T O N 9 8 0 3 4 ( F A X ) 4 2 5 8 2 5 - 8 4 3 4 Kn o w w h a t ' s be l o w . Ca l l be f o r e y o u d i g . Pu b l i c W o r k s D e p t . CI T Y O F R E N T O N AP P R O V E D F O R C O N S T R U C T I O N BY _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ D A T E _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 20 1 1 1 1 8 3 02 / 2 7 / 2 0 2 6 Pa g e 1 3 o f 2 6                                              12 1 3 1 1 1 3 T H A V E N U E N E , S U I T E 2 0 3 ( T E L ) 4 2 5 8 2 1 - 3 6 6 5 KI R K L A N D , W A S H I N G T O N 9 8 0 3 4 ( F A X ) 4 2 5 8 2 5 - 8 4 3 4 Kn o w w h a t ' s be l o w . Ca l l be f o r e y o u d i g . Pu b l i c W o r k s D e p t . CI T Y O F R E N T O N AP P R O V E D F O R C O N S T R U C T I O N BY _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ D A T E _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 20 1 1 1 1 8 3 EL E V A T I O N V I E W WI T H A P S I N S T A L L E D E X P L O D E D V I E W EL E V A T I O N V I E W 1/ 2 " ( I N ) - 1 3 N C x 2 " ( I N ) L O N G S . S HE X H E A D B O L T A N D S . S LO C K W A S H E R ( T Y P . ) AP S P U S H B U T T O N N O T I N C L U D E D (S H O W N F O R R E F E R E N C E O N L Y ) . HA R D W A R E A N D I N S T A L L A T I O N P E R MA N U F A C T U R E R S R E C O M M E N D A T I O N . OR I E N T A P S P U S H B U T T O N P E R PE D E S T R I A N P U S H B U T T O N OR I E N T A T I O N D E T A I L I N S H E E T S G 0 2 . CU R V E D B O L T - O N H U B PL A T E W I T H C A B L E GU I D E ( B R O N Z E ) ( T Y P . ) Se e St a n d a r d S p e c i f i c a t i o n S e c t i o n 9 - 2 9 . 1 7 f o r a d d i t i o n a l m a t e r i a l re q u i r e m e n t s , i n c l u d i n g p a i n t i n g o f a l l p i p e s , e l b o w s , a n d h u b p l a t e s . 1. 5 " D I A M E T E R S T E E L T U B E ~ TH R E A D E D B O T H E N D S 1. 5 " D I A M E T E R S T E E L T U B E ~ TH R E A D E D O N E E N D O N L Y ST E E L E L B O W ~ TH R E A D E D B O T H E N D S 1. 5 " D I A M E T E R S T E E L T U B E ~ T H R E A D E D B O T H E N D S ST E E L E L B O W ~ TH R E A D E D O N E E N D O N L Y ~ ST A I N L E S S S T E E L S E T S C R E W ON R E A M E D E N D DI R E C T I O N O F T H E A R R O W SH A L L B E P E R P R O P O S E D PE D E S T R I A N P U S H B U T T O N SC H E D U L E I N S H E E T S G 0 2 . 02 / 2 7 / 2 0 2 6 Pa g e 1 4 o f 2 6                                              12 1 3 1 1 1 3 T H A V E N U E N E , S U I T E 2 0 3 ( T E L ) 4 2 5 8 2 1 - 3 6 6 5 KI R K L A N D , W A S H I N G T O N 9 8 0 3 4 ( F A X ) 4 2 5 8 2 5 - 8 4 3 4 Kn o w w h a t ' s be l o w . Ca l l be f o r e y o u d i g . Pu b l i c W o r k s D e p t . CI T Y O F R E N T O N AP P R O V E D F O R C O N S T R U C T I O N BY _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ D A T E _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 20 1 1 1 1 8 3 AP P L Y S I L I C O N E C A U L K T O T H R E A D S O F H O T - D I P P E D GA L V A N I Z E D H E X S O C K E T P I P E P L U G . TI G H T E N P L U G U N T I L F L U S H W I T H S T A N D A R D . FI L E P L U G T O M A T C H C O N T O U R O F S T A N D A R D . FI L L H E X S O C K E T W I T H P A I N T A B L E S I L I C O N E C A U L K . TR E A T P L U G A N D S U R R O U N D I N G P O L E W I T H G A L V A N I Z I N G RE P A I R P A I N T M E E T I N G T H E R E Q U I R E M E N T O F ST A N D A R D SP E C I F I C A T I O N 9 - 0 8 . 1 ( 2 ) . AP P L Y T W O C O A T S . P A I N T S H A L L B E D R Y B E F O R E AP P L Y I N G S E C O N D C O A T . SU B M I T T A L P E R ST A N D A R D S P E C I F I C A T I O N 6 - 0 3 . 3 ( 2 5 ) . MA X I M U M H O L E S I Z E 3 " ( I N ) O R L E S S I N D I A M E T E R . 1/ 8 " ( I N ) S T E E L P L A T E - T Y P E A S T M A - 3 6 E L E C T R O D E T Y P E X X - 7 0 . TH E P L A T E S H A L L B E 1 / 2 " ( I N ) L A R G E R T H A N T H E D I A M E T E R O F T H E H O L E TO B E R E P A I R E D ( 1 / 4 " ( I N ) O V E R L A P A L L S I D E S ) . TA C K W E L D P L A T E T O P O L E . SH A P E P L A T E T O M A T C H T A P E R A N D C U R V E O F P O L E . 1/ 8 " ( I N ) F I L L E T W E L D A L L A R O U N D . CH A M F E R ( G R I N D ) E D G E O F P L A T E S M O O T H . R E M O V E A L L B U R R S A N D SH A R P E D G E S . TR E A T P A T C H P L A T E A N D S U R R O U N D I N G P O L E W I T H G A L V A N I Z I N G R E P A I R PA I N T M E E T I N G T H E R E Q U I R E M E N T O F ST A N D A R D S P E C I F I C A T I O N 9 - 0 8 . 1 ( 2 ) . AP P L Y T W O C O A T S . P A I N T S H A L L B E D R Y P R I O R T O A P P L Y I N G S E C O N D C O A T . EX I S T I N G ST A N D A R D EX A M P L E O F R E P A I R F R O M P P B L O C A T I O N ~ 1/ 2 " ( I N ) D I A M E T E R A N D 3 / 8 " ( I N ) D I A M E T E R H O L E S S H O W N IS O M E T R I C V I E W E L E V A T I O N V I E W (T Y P E I I I S I G N A L S T A N D A R D S H O W N ) EX I S T I N G 3/ 8 " ( I N ) H O L E (R A M P M E T E R S I G N A L S T A N D A R D WI T H S L I P B A S E S H O W N ) EX A M P L E W I T H 2 " ( I N ) D I A M E T E R H O L E S H O W N EL E V A T I O N V I E W IS O M E T R I C V I E W 3/ 8 " ( I N ) S S B O L T WI T H S H A N K EX I S T I N G H O L E ~ PI P E T H R E A D S I Z E 1/ 2 " ( I N ) O R L E S S 1/ 2 " ( I N ) H O T - D I P P E D GA L V A N I Z E D H E X SO C K E T P I P E P L U G PU N C H ~ T O D E F O R M PL U G ~ ( 4 ) P L A C E S SO P L U G W I L L N O T RO T A T E EX A M P L E O F P E D E S T R I A N PU S H B U T T O N ( P P B ) H O L E ( S ) TO B E R E P A I R E D ~ S E E DE T A I L @ L E F T EX A M P L E O F H O L E TO B E R E P A I R E D ~ SE E D E T A I L @ R I G H T EX I S T I N G ST A N D A R D EX I S T I N G 2 " ( I N ) DI A M E T E R H O L E 1/ 8 " ( I N ) x 2 1 / 2 " ( I N ) x 2 1 / 2 " ( I N ) S T E E L PL A T E AP P L Y S I L I C O N E C A U L K T O T H R E A D S O F S S B O L T W I T H S H A N K . TI G H T E N S S B O L T U N T I L S H A N K I S T I G H T A G A I N S T S T A N D A R D . CU T O F F S S B O L T E V E N W I T H S T A N D A R D . FI L E S S B O L T T O M A T C H C O N T O U R O F S T A N D A R D . TR E A T S S B O L T A N D S U R R O U N D I N G P O L E W I T H G A L V A N I Z I N G R E P A I R P A I N T ME E T I N G T H E R E Q U I R E M E N T O F ST A N D A R D S P E C I F I C A T I O N 9 - 0 8 . 1 ( 2 ) . AP P L Y T W O C O A T S . P A I N T S H A L L BE D R Y B E F O R E A P P L Y I N G SE C O N D C O A T . 02 / 2 7 / 2 0 2 6 Pa g e 1 5 o f 2 6                                              ĖîώIťôıώbĺϟ èťĖŽĖťƅώbĺ †ŪÍIJťĖťƅ ˜IJĖťώ„ŘĖèô i͔͐͑͐щ͕͓Ϡ͖͖͖ϟ͕͗ ͐͐͑͐Ϡ͖͏͏ϟ͏͏щώώώώώώώ ͑͐͗Ϡ͖͒͏ϟ͏͏щώώώώώώώώώώ ͒͐͑Ϡ͐͗͏ϟ͏͏щώώώώώώώώώώ ͓͔͐Ϡ͏͏͏ϟ͏͏щώώώώώώώώώώ ͔͖͐Ϡ͔͏͏ϟ͏͏щώώώώώώώώώώ ͕͐͐͒Ϡ͖͗͑ϟ͔͏щώώώώώώώ ͐͐͏ϟ͔҇ ώ ĺIJŜťŘŪèťĖĺIJώaÍIJÍČôŘϡ ®ÍƅIJôώ‡ĺīīĖIJŜ "Íťôϡώ͓ϯ͘ϯ͑͏͕͑ ĺIJťŘÍèťĺŘϡ IibώaÍťôŘĖÍīŜϠώIIJèϟώ ĺIJťŘÍèťώbĺϡ @ϱ͔͑ϱ͖͑͗ >ôîôŘÍīώĖîώbĺϡ ‹“@˜[ϱ͖͖͐͑ϼ͏͏͑Ͻ ƅϡώ®ÍƅIJôώ‡ĺīīĖIJŜ "ôŜèŘĖŕťĖĺIJ ˜IJĖť (ŜťĖıÍťôîώĺŜť >ĺŘèôώèèĺŪIJť ‡ôŽĖŜôîώŘĺŜŜſÍīħώÍťώ‹®ώ͑͏ťēώ‹ť [‹ aÍťôŘĖÍīŜ ôÍ щ͑͐Ϡ͖͏͏ϟ͏͏ [ÍæĺŘ ôÍ щ͗Ϡ͖͒͏ϟ͏͏ (ŗŪĖŕıôIJť ôÍ щ͑Ϡ͐͗͏ϟ͏͏ >ĖæôŘώ‹ŕīĖèĖIJČ ôÍ щ͔Ϡ͏͏͏ϟ͏͏ aĺæĖīĖƏÍťĖĺIJ ôÍ щ͖Ϡ͔͏͏ϟ͏͏ aÍŘħŪŕώϼ͒͐҇Ͻ ôÍ щ͐͒Ϡ͖͗͑ϟ͔͏ ‹ÍīôŜώťÍƄ щ͏ϟ͏͏ щ͏ϟ͏͏ щ͕Ϡ͔͔͐ϟ͕͒ (ŜťĖıÍťôîώēÍIJČôώiŘîôŘώĺŜť щ͕͓Ϡ͖͖͖ϟ͕͗ щ͕͓Ϡ͖͖͖ϟ͕͗ щ͏ϟ͏͏ iŽôŘēôÍî ĖîώIťôıώēÍIJČô щ͏ϟ͏͏ щ͏ϟ͏͏ щ͏ϟ͏͏ Page 16 of 26             aÍťôŘĖÍī †ťƅ ˜IJĖťώĺŜť “ĺťÍī “ƅŕôώ„‹ώ‹ĖČIJÍīώ„ĺīôώϼVǦ͑͐ϟ͐͏Ͻ ͐ ͘Ϡ͗͏͏ϟ͏͏щώώώώώώ ͘Ϡ͗͏͏ϟ͏͏щώώώώώ ŪŘæώÍŜôώ>ĺŪIJîÍťĖĺIJώϼĖIJèīϟώŘôæÍŘϠώÍIJèēĺŘώæĺīťŜϽ ͐ ͒Ϡ͑͏͏ϟ͏͏щώώώώώώ ͒Ϡ͑͏͏ϟ͏͏щώώώώώ „ôîôŜťŘĖÍIJώ‹ĖČIJÍīώFôÍîώϼèĺŪIJťîĺſIJϠώ“ƅŕôώ"ώıĺŪIJťϽ ͐ ͐Ϡ͓͔͏ϟ͏͏щώώώώώώ ͐Ϡ͓͔͏ϟ͏͏щώώώώώ „‹ώ„ŪŜēæŪťťĺIJώŜŜôıæīƅ ͑ ͐Ϡ͔͑͏ϟ͏͏щώώώώώώ ͑Ϡ͔͏͏ϟ͏͏щώώώώώ „‹ώ„ŪŜēæŪťťĺIJώ(ƄťôIJîôŘ ͐ ͕͔͏ϟ͏͏щώώώώώώώώώώ ͕͔͏ϟ͏͏щώώώώώώώώώ Ė˜ώϯώ„‹ώīĖèħώaĺîŪīô ͐ ͐Ϡ͐͏͏ϟ͏͏щώώώώώώ ͐Ϡ͐͏͏ϟ͏͏щώώώώώ ĺIJîŪèťĺŘŜώϼ„„ώѭώ„ôîώFôÍîώѭώ@ŘĺŪIJîώѭώ“͕Ͻ [‹ ͐Ϡ͑͏͏ϟ͏͏щώώώώώώ ͐Ϡ͑͏͏ϟ͏͏щώώώώώ “Ǧ͔͑ώ«ÍŪīťώϼæĺťťĺıīôŜŜϽ ͐ ͐Ϡ͔͒͏ϟ͏͏щώώώώώώ ͐Ϡ͔͒͏ϟ͏͏щώώώώώ aĖŜèϟώēÍŘîſÍŘôϠώŜôÍīÍIJťϠώČŘĺŪIJîĖIJČϠώèĺIJIJôèťĺŘŜ [‹ ͓͔͏ϟ͏͏щώώώώώώώώώώ ͓͔͏ϟ͏͏щώώώώώώώώώ “ĺťÍī ͑͐Ϡ͖͏͏ϟ͏͏щώώώ [ÍæĺŘ FĺŪŘŜ ‡Íťô “ĺťÍī ‹ĖČIJÍīώ“ôèēIJĖèĖÍIJώϳώIIJŜťÍīīώ„‹ώŕĺīôώЭώċĺŪIJîÍťĖĺIJ ͕͐ щ͓͔͐ϯēŘ ͑Ϡ͒͑͏ϟ͏͏щώώώώώ ‹ĖČIJÍīώ“ôèēIJĖèĖÍIJώϳώ„ôîώēôÍîώѭώ„‹ώѭώôƄťôIJîôŘ ͐͑ щ͓͔͐ϯēŘ ͐Ϡ͖͓͏ϟ͏͏щώώώώώ (īôèťŘĖèĖÍIJώϳώ„ŪīīώèĺIJîŪèťĺŘŜώЭώťôŘıĖIJÍťôώĖIJώèÍæĖIJôť ͐͏ щ͔͐͏ϯēŘ ͐Ϡ͔͏͏ϟ͏͏щώώώώώ ÍæĖIJôťώſĺŘħώϳώĖ˜ώĖIJŜťÍīīϠώŕŘĺČŘÍııĖIJČϠώťôŜťĖIJČ ͕ щ͔͔͐ϯēŘ ͒͘͏ϟ͏͏щώώώώώώώώώ ĖŽĖīώīÍæĺŘώϳώ(ƄèÍŽÍťôώЭώĖIJŜťÍīīώ“Ǧ͔͑ώŽÍŪīť ͗ щ͔͐͑ϯēŘ ͐Ϡ͏͏͏ϟ͏͏щώώώώώ “ŘÍċċĖèώèĺIJťŘĺīώèŘôſ ͗ щ͐͐͏ϯēŘ ͗͗͏ϟ͏͏щώώώώώώώώώ “ĺťÍī ͗Ϡ͖͒͏ϟ͏͏щώώώώώ (ŗŪĖŕıôIJť FĺŪŘŜ ‡Íťô “ĺťÍī aĖIJĖǦôƄèÍŽÍťĺŘ ͕ щ͔͘ϯēŘ ͔͖͏ϟ͏͏щώώώώώώώώώ ŪèħôťώťŘŪèħ ͗ щ͔͐͒ϯēŘ ͐Ϡ͏͗͏ϟ͏͏щώώώώώ ĺıŕÍèťĖĺIJώôŗŪĖŕıôIJť ͓ щ͓͔ϯēŘ ͐͗͏ϟ͏͏щώώώώώώώώώ ‹ôŘŽĖèôώťŘŪèħ ͐͏ щ͔͒ϯēŘ ͔͒͏ϟ͏͏щώώώώώώώώώ “ĺťÍī ͑Ϡ͐͗͏ϟ͏͏щώώώώώ >ĖæôŘώ‹ŕīĖèĖIJČ †ťƅ ‡Íťô “ĺťÍī [‹ ͔Ϡ͏͏͏ϟ͏͏щώώώώώώ ͔Ϡ͏͏͏ϟ͏͏щώώώώώ aĺæĖīĖƏÍťĖĺIJ †ťƅ ˜IJĖťώĺŜť “ĺťÍī ‹ŪŘŽôƅĺŘ [‹ ͐Ϡ͔͏͏ϟ͏͏щώώώώώώ ͐Ϡ͔͏͏ϟ͏͏щώώώώώ ĺIJèŘôťôώŜŪæ [‹ ͒Ϡ͏͏͏ϟ͏͏щώώώώώώ ͒Ϡ͏͏͏ϟ͏͏щώώώώώ (īôèťŘĖèÍīώ‹Ūæ [‹ ͒Ϡ͏͏͏ϟ͏͏щώώώώώώ ͒Ϡ͏͏͏ϟ͏͏щώώώώώ “ĺťÍī ͖Ϡ͔͏͏ϟ͏͏щώώώώώ Page 17 of 26             ICON MATERIALS 1508 VALENTINE AVE PACIFIC, WA 98047 (206) 575-3200 Office භ (206) 575-3207 Fax Forward Priced Proposal EWO Work to be Performed EWO Work already Performed Explanation of Change(s) General Contractor ICON Materials TOTAL 51,416.57$ Signature: Signature: ICON is requesting your review, acceptance and Change Order issuance so it may apply for payment during the proper billing cycle. -$ -$ -$ -$ -$ -$ Sales Tax (10.5%)1 EST 4,885.74$ 4,885.74$ 8005 Tyee - Mobilization (Concrete Paid Under Bid Items) 1 LS 4,480.00$ 4,480.00$ 8004 Siler's Concrete Cutting - Saw Cutting 145 LF 8.96$ 1,299.20$ 8003 Northline Surveying - Survey 1 LS 2,004.80$ 2,004.80$ 8002 G&G - Electrical 1 LS 28,282.24$ 28,282.24$ 8001 ICON Materials Added Work - Demo, Prep, New CBs 1LS10,464.59$ 10,464.59$ ITEM ITEM DESCRIPTION ESTIMATED QUANTITY UNIT UNIT PRICE TOTAL PRICE ICON MATERIALS respectfully submitts this Additional Pricing Form which contains a quotation for a change in the contract sum or the contract time in response to proposed modifications to the contract documents based on: X **Please see attachments for additional information** Contractor:ICON Materials Request #:1 Attention:Wayne Rollins Date:3/26/2026 Additional Work Pricing CONFIDENTIAL INFORMATION FOR INTENDED RECIPIENT ONLY DO NOT DISCLOSE Project Name:Oakesdale Ave SW Pavement Preservation ICON Job #:526300 Page 18 of 26             To:Contact:City Of Renton Keith Woolley OAKESDALE AVE SW PAVEMENT PRESERVATIONProject Name:Bid Number: Fax:(425) 430-7426Renton, WA 98056 Address:3555 NE 2ND STREET Phone:(425) 430-7400 Project Location:Oakesdale Avenue SW, Renton, WA Bid Date:10/14/2025 Total PriceUnit PriceUnitItem DescriptionItem # Estimated Quantity 8001 1.00 LS $10,464.59 $10,464.59ICON Materials Added Work - Demo, Prep, New CBs 8002 1.00 LS $28,282.24 $28,282.24G&G - Electrical 8003 1.00 LS $2,004.80 $2,004.80Northline Surveying - Survey 8004 145.00 LF $8.96 $1,299.20Siler's Concrete Cutting - Saw Cutting 8005 1.00 LS $4,480.00 $4,480.00Tyee - Mobilization (Concrete Paid Under Bid Items) Total Bid Price:$46,530.83 Notes: •This quotation is firm for 30 days. Without written notification of the G.C./ Owner's intent to subcontract within 30 days, ICON Materials retains the option to withdraw or alter its quotation. •STANDARD EXCLUSIONS : Permits, Bonds; Builder's Risk or Railroad Protective Insurance; Weekend, Holiday, or Night work; Testing/Inspection; Survey/Layout; Traffic Control or Traffic Control Plans: Pavement Marking/Removal; Seal Coat; Saw Cutting; Soil Sterilization; Utility Adjustment and/or Patching; Prime Coat; Proof Roll; Milling/Grinding; Trench Patching (unless listed above); Subgrade Preparation; Temporary Wedges or Removal; Sweeping; As-Built Drawiings • ICON's Price includes demolition and prep of two new curb ramps, as well as procuring and installing two new catch basin vaned frame and grates. • Tyee is charging $4,000 for an extra mobilization/waste fee. Concrete paid under existing bid items. • G&G's work is a LS of $25,252. They will be subbing out the fiber splicing. Installing closed bottom box. • Survey added charges are $1,790. • Additional CSTC paid under bid item. • Traffic control paid under bid item. • All markups are based on WSDOT T&M rates. • Sales tax included in final price on next page. Payment Terms: Terms of Payment are net thirty (30) days, subject to approval or modification by ICON MATERIALS credit department according to Exhibit "B". ACCEPTED: The above prices, specifications and conditions are satisfactory and are hereby accepted. Buyer: Signature: Date of Acceptance: CONFIRMED: ICON Materials (dba Of CPM Development Corp.) Authorized Signature: Estimator:Bill Johnson 253-261-4852 bill.johnson@iconmaterials.com 3/26/2026 9:35:25 AM Page 1 of 1 Page 19 of 26             '' &'&'#&'' '  %$' '  '                                  !"' '   '      )0('+)*0*0%(0$(0*0(,)$#0*$0*0%)*(#0)/)*"0*00*0*0-!!000 !+"&0)+"0$0  0)0#!+)0*0 0 0,+!*0-*0(0)%!#0$#+*0#0 -(#0%)*(#0)#!00#0&+)+**$#)0*0 0+#*0#00!$0%$!0-*0 )0 0&($&$)0+)#00!$0&$!0#0&!0$0*0 0/%00%$!0+0*$0*0.*#0 !0*"0('+(0*$0%($+(0*0 00&$!0 0 0 0,+!*0-!!0#$*0,0#0 $%#0$**$"0 **0 )0$+(0( $-# 0                Page 20 of 26             Page 21 of 26             NorthLine Surveying, Inc. 1580 Port Drive, Burlington, WA 98233 Phone: (360) 899-9598 1 February 25th, 2026 Serial Letter #002 Tyler Townsend Icon Materials 1508 Valentine Ave SE Pacific, WA 98047 Project Name: Oakesdale Ave SW Pavement Preservation – SW 34 th St to SW 16th St NLS Job #: 26-015 Client Job #: 526300 RE: Change Order Request #001; Additional Services Related to CCD01 Mr. Townsend, NorthLine Surveying, Inc. (NLS) hereby submits the following and officially requests a change order increase in value to NLS’ lump sum contract for compensation of work directed by Asphalt Patch Systems, Inc. and performed by NLS above and beyond the original agreement. Design Changes per CCD01 Change Order Value $1,790.00 Respectfully submitted, NorthLine Surveying, Inc. Brian Gullikson, PLS Senior Project Manager, President, DLS Page 22 of 26             TYEE CONCRETE CONSTRUCTION, INC 11403 58TH AVE E PUYALLUP, WA 98373 PH (253) 507-TYEE / FAX (253) 507-8934 CONTRACTOR: PROJECT: LOCATION: QUANTITY (APPROX)DESCRIPTION 1 EA MOBILIZATION $4,000.00 EA INFORMATION: INCLUDES: EXCLUDES: RESPECTFULLY, JUSTIN O'KEEFE MANAGER/ESTIMATOR justinokeefe@tyeeconcrete.com QUOTE IS GOOD FOR 30 DAYS. PRICING IS BASED ON US DOING ALL THE WORK LISTED ABOVE. CONCRETE IS THE REPSONSIBLITY OF THE GENERAL CONTRACTOR AFTER CURE OR PLASTIC IS APPLIED. TYEE WILL MEET PROJECT SCHEDULE PROVIDED PRIOR TO BID OTHERWISE REASONABLE EFFORT WILL BE MADE TO MEET SCHEDULE. PLEASE CONTACT DISPATCH TO SCHEDULE A MINIMUM OF 2 WEEKS PRIOR TO START DATE. YOUR CONTRACT IS TO BASED ON THIS ENTIRE QUOTE AND INCLUDED IN THE CONTRACT. CONTRACTOR CAUSED LATE CONCRETE CANCELLATION FEE WILL BE PASSED ON. ANY T&M IS 20% OVERHEAD. WINTER SURCHARGES MAY APPLY FROM NOVEMBER - MARCH. PRICING ABOVE IS BASED ON OUR MINIMUM POURS AND ANY SHORT OR ADDITIONAL POURS WILL RESULT IN A MINIMUM OF $2,500 FOR EACH. WORK TO BE COMPLETED BY 6/1/2026. RETENTION IS TO BE PAID WITHIN 90 DAYS OF COMPLETION OF OUR PORTION OF WORK. FINAL PAYMENT BASED ON FINAL FIELD MEASURE. LABOR & MATERIAL, TRUCK ACCESS, TYEE STANDARD INSURANCE, NEATLINE CONCRETE YIELD. LAYOUT, SUBGRADE, NIGHT WORK, LOCATE, PAINT, WASH PIT, WEEKEND WORK, ENGINEERING, ALL INSTANCES OF VEHICHLE & PEDESTRIAN TRAFFIC CONTROL, SURFACE WATER, WATER, WATER PH, PUMP, BOND, SLURRY CONTROL, TESTING & INSPECTIONS, FORM INSPECTION & APPROVAL, MONITORING, JOINT SEALANT, UTILITY DAMAGE FROM STAKES, CONCRETE WORK LEFT OUT DUE TO OTHERS, FUEL SURCHARGE, STREET SWEEPING, LEVELING STRIP, OVERTIME, SURVEY, HOT/COLD WEATHER PROTECTION, LUMP SUM, BOLLARDS, INSERTS, EMBEDS. UNIT PRICE ICON MATERIALS THIS IS IN ADDITION TO UNIT PRICES FOR THE ADDITIONAL QUANTITIES BEING ADDED TO THE PROJECT PER REQUEST BY CITY OF RENTON'S CCD 01 MARCH 11, 2026 OAKESDALE AVE SW ADDITIONAL MOBILIZATION FOR ADDED WORK RENTON EMAIL: TYLER.TOWNSEND@ICONMATERIALS.COM Page 23 of 26             P.O. Box 68886 Seattle, WA 98168 Phone: 206-901-9383 6438QUOTESiler's Concrete Cutting # www.silersconcretecutting.com 04/09/26 02:41pm None Tyler Townsend Tyler Townsend 526300 / Oakesdale Ave Oakesdale Ave SW & SW 34th St Renton, WA 04/09/26 $ 25 ICON Materials 1508 Valentine Ave SE Pacific, WA 98047 Ordered By: Jobsite: Foreman: Order Entered: Job Date: Arrival: Job Request #: PO #: JOB SITE INFORMATION CUSTOMER INFORMATION JOB INFORMATION 253-293-4391 LARRYSalesman: General Contractor: Cust # 001525 (Thursday) Larry Siler JrSalesman: QUANTITY DESCRIPTION UNIT PRICE PRICEUNIT 1.00 Slab Saw: Saw cut through 4-inch concrete and 8-inch asphalt at $8.00 per lineal foot. Curb Cuts: (4) curb and gutter cuts. 0.00 0.00LF $0.00$150Stand By Charge: /hr Subtotal: *** Conditions and Exclusions Attached *** Work Area from Truck!$0.00 $0.00TOTAL: Tax (0.00%): Quoted Tax Amount is an Estimate Page 24 of 26             P.O. Box 68886 Seattle, WA 98168 Phone: 206-901-9383 6438QUOTESiler's Concrete Cutting # www.silersconcretecutting.com EXCLUSIONS & CONDITIONSAll Estimates Are Good for 30 days 2) Siler's is not responsible for up-to-date verification of drawings and specifications as all layout is to be done by others and completed prior to Siler's arrival on site Siler's Concrete Cutting, Inc. is in compliance with OSHA Regulatory Standard 1926.1153 on Respirable Crystalline Silica. For more information on how we comply on your jobsite please call our office and ask for our safety department. 3) Traffic control & lane closures 4) Covering any openings in slabs, suspended slabs, or walls. Clearing work area to provide machine access Hiring Contractor responsibilities: 1) All Layout, Permits, Engineering, Project Specific Bonds Siler's Certifications: certificates upon request Siler's Concrete Cutting, Inc. # SILERCC804RT 5) Protecting all vital areas into, out of and around cutting area from water & dust damage prior to Siler's arrival on jobsite 6) Fall protection systems for leading edge work 7) Scaffolding and or lift for work over 8 feet high 8) Provide labor to catch cores / hole watch / fire watch 9) Disposal of concrete unless otherwise quoted Accepted by:Date: Washington HUB Washington Contractors License Holder Concrete Sawing & Drilling Association ************ Quotes valid for 30 days************* Quote Exclusions: Identification, location, and disconnect of underground utilities; protection of finish surfaces; Demolition Exclusions: Excavation, grading,or compaction; removal of hazardous waste Additional Charges May Apply: 1) Minimum call out charges may apply 2) Cancellation charges may apply if work is cancelled without a 24 hour notice 3) Stand by and Training costs $150.00 per operator per hour 4) Any additional insurance requirements Notes: In Addition, Siler's Concrete Cutting is not responsible for damage caused by cutting concrete cutting, drilling, breaking, removing, and/or digging into any buried pipe, conduit, voids, wood and steel beams, or any materials that are covered by Job Conditions: Quotes based on one mobilization 7am-3pm; straight time work; mat of #4 rebar on 18 inch centers. Footings and beams are not included in pricing unless specified in quote. 5) Sales Tax 6) All prices subject to change due to site conditions Work to be done in one mobilization during normal business hours (7am-3pm), unless quoted otherwise. The above quote price excludes no over cuts, slurry control & disposal, unless quoted otherwise. Stand by time will be billed per hour per man. Siler's Concrete Cutting reserves the right to increase the bid due to work site conditions accordingly. Credit: 1) Subject to approval of Contractor's credit. 2) Unless agreed to in advance retainage shall not be withheld from Subcontractor's invoice 3) Payment shall be made to the subcontractor within 30 days of contractor's receipt of the 10) Safe access to work area for employees and parking for service trucks If COD - payment shall be made upon completion of the projectsubcontractor's invoice Printed Name: Page 25 of 26             Outlook Re: Oakesdale Ave SW BI#29 From Wayne Rollins <wrollins@kbacm.com> Date Wed 3/4/2026 4:34 PM To Townsend, Tyler (ICON Materials) <tyler.townsend@iconmaterials.com>; David, Kevin (ICON Materials) <kevin.david@iconmaterials.com> Cc Keith Woolley <kwoolley@rentonwa.gov>; Ambaye Hailu <ahailu@kbacm.com> 1 attachment (19 MB) CCD 01 SW 20th St Curb Ramp Improvements.pdf; Hi Tyler, The City of Renton is requesting a cost proposal to make the following potential change to the contract: Description:Provide a cost proposal to perform the work in the accompanying desing change which includes electrical equipment not already included in the project.. Materials:See the enclosed CCD. Measurement and Payment:Provide a LS cost proposal broken down with sufficient detail for evaluation. Activities with bid items will be paid by bid item. Let me know if you have any questions. Thank you, Wayne Rollins, NICET III 425.495.0765 |wrollins@kbacm.com KBA, Inc.|ConstrucƟon Management Professionals Teams That Build Trust Page 26 of 26