Loading...
HomeMy WebLinkAboutMFP26002653.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Major Franchise Permit: MFP26002653 IVR Number: 26002653 Permit Information Permit Name: JB0002447467 OSP DE Address/Location:05/22/2026Application Date:2823059010Parcel Number: 17170 116TH AVE SE Permit Type:06/23/2026Issue Date:Franchise Permit Work Class:06/23/2027Expiration Date:Major Utility Job Number: JB0002447467 OSP DEFranchise Type:Cable Description: JB0002447467 OSP DE Comcast proposes delash/relash 36ct fiber to existing strand ~514'. Contacts Name Address PhoneTypeBilling Ashley Kiehn Mastec Communications 4610 Tacoma Avenue Sumner, WA 98390 ApplicantX Rhiana Wedgeworth-Stanford Comcast Cable B: (720) 990-0929 H: (720) 990-0929 C: (720) 990-0929 Contact Mastec North America Inc 800 S Douglas Road, 1200 Coral Gables, FL 33134 Contractor Business License Number: 51687Construction Contractor: MASTENA991KJ MBA CASCADE PLAZA L L C 7420 SE 24TH ST #4 MERCER ISLAND , WA 98040 Owner General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton codes and ordinances. Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES JB0002447467 OSP DE 17198 116th Ave SE Renton, WA 98058 6/22/26 6/26/26 8:00am 5:00pm MASTEC North America, LLC Dominic Minniti Dominic.Minniti@mastec.com 4610 Tacoma Ave Sumner, WA 98390 JB0002447467 OSP DE- Comcast proposes delash/relash 36ct fiber to existing strand ~514'. Rhiana Wedgeworth_Stanford 720-990-0929 5/22/26 Jason Foster Jason Foster MFP26002653 Monday Friday 3:00pm8:00am Scott Warlick CED 6/22/2026 EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL R/W R/WR/WR/W R/W R/W R/WR/WR/W R/W R/W R/WR/WR/W R/W R/WR/WR/WR/WR/WR/W R/W R/W R/W R/W R/WR/WR/W R/W R/W R/W R/W R/W R/WR/W R/W R/W R/W R/W R/WR/W R/W R/W R/W R/WR/W R/W R/W R/W R/W R/W R/W R/W R/WR/WR/W 17245 117TH AVE SE 11552 SE 173RD ST 17239 117TH AVE SE 17301 117TH AVE SE 17314 116TH AVE SE 17223 116TH AVE SE 17234 117TH AVE SE 17248 116TH AVE SE 11546 SE 173RD ST 11547 SE 173RD ST 11542 SE 173RD ST 11553 SE 173RD ST 17241 117TH AVE SE 17228 117TH AVE SE 11535 SE 173RD ST 17254 117TH AVE SE 11540 SE 173RD ST 11549 SE 173RD ST 11551 SE 173RD ST 17236 116TH AVE SE 17232 116TH AVE SE 11550 SE 173RD ST 17235 117TH AVE SE 17240 116TH AVE SE 11531 SE 173RD ST 17224 116TH AVE SE 11523 SE 173RD ST 17243 117TH AVE SE 11548 SE 173RD ST 17255 117TH AVE SE 11544 SE 173RD ST 11527 SE 173RD ST 17220 117TH AVE SE 11554 SE 173RD ST R/W R/WR/WR/W R/W R/W R/WR/WR/W R/W R/W R/W R/W R/WR/WR/WR/WR/W R/W R/W R/WR/W R/W R/W R/ W R/ W R/W R/W R/W R/W R/W R/W R/W EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW ←DRIVEWAY→ ←DRIVEWAY→ ←DRIVEWAY→ ←DRIVEWAY→ ←DRIVEWAY→ ←DRIVEWAY→ ←DRIVEWAY→ 11 6 T H A V E S E 11 6 T H A V E S E 11 6 T H A V E S E 11 7 T H A V E S E 11 7 T H A V E S E SE 173RD ST A A A A A POLE-3 POLE-4 15 1 ' REVISIONS DATE DESCRIPTION INITIAL TEMPORARY TRAFFIC CONTROL PLAN TR A F F I C CO N T R O L PL A N - 1 1 ADVANCED WARNING SIGN SPACING ROAD TYPE SPEED DISTANCE BETWEEN ADVANCED WARNING SIGNS X X X X FREEWAYS & EXPRESSWAYS 55/75 MPH 1500 ±1500 ±1500 ±1500 ± RURAL HIGHWAYS 60/65 MPH 800 ±800 ±800 ±800 ± RURAL ROADS 45/55 MPH 500 ±500 ±500 ±500 ± RURAL ROADS & URBAN ARTERIAL 35/40 MPH 350 ±350 ±350 ±N/A RURAL ROADS, RESIDENTIAL & BUSINESS DISTRICTS 25/30 MPH 200 ± (2)200 ± (2)200 ± (2)N/A URBAN STREETS 25 MPH OR LESS 100 ± (2)100 ± (2)100 ± (2)N/A (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT-GRADE INTERSECTIONS, AND DRIVEWAYS. (2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. LONGITUDINAL BUFFER SPACE =LBS SPEED (MPH)20 25 30 35 40 45 50 55 60 65 70 DISTANCE (FT)115 155 200 250 305 360 425 495 570 645 730 TAPER LENGTH IN FEET=L (FEET) LANE WIDTH (FEET) POSTED SPEED LIMIT (MPH) 25 30 35 40 45 50 55 60 65 70 10 105 150 205 270 450 500 550 --- 11 115 160 225 295 495 550 605 660 -- 12 125 180 245 320 540 600 660 720 780 840 Know what's below.Call R 811 48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT CALL TOLL FREEDIGALERT before you dig. 17 1 9 8 1 1 6 T H A V E S E RE N T O N , W A JB 0 0 0 2 4 4 7 4 6 7 REVISIONS DATE DESCRIPTION INITIAL COMCAST SHEET OF DATE: EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THE PROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BE REPRODUCED, COPIED, OR USED FOR ANY PURPOSE WITHOUT SPECIFIC WRITTEN PERMISSION. SI T E N A M E : SCALE LO C A T I O N A D D R E S S : CO M C A S T J O B N U M B E R : STAMP DRAWN BY:MCF 5/20/2026 2A D I G I T A L ( F D X ) - W A K V D 0 E S 0 0 1 X 2 - WA K V D 0 6 3 0 0 1 X 2 ( W A K V D 0 6 3 0 0 1 X 2 ) - R F WARNING SIGN REGULATORY SIGN TRAFFIC CONE FLAGGER STATION PATROL CAR POLICEOFFICER POLICE OFFICER WORK VEHICLE LIT INTERSECTION UNLIT INTERSECTION SPOTTER STATION KEEP RIGHT TCP DEVICE LEGEND FAS FLASHING ARROW FLASHING DOUBLE ARROW (MERGE LEFT OR RIGHT) FLASHING CAUTION FAS FAS FAS TRAFFIC CONTROL PLAN GENERAL NOTES 1.AN ARROWBOARD SHALL MEET THE MINIMUM SIZE, LEGIBILITY DISTANCE, NUMBER OF ELEMENTS AND OTHER SPECIFICATIONS SHOWN. 2.LENGTH OF ARROW EQUALS 48", WIDTH OF ARROWHEAD EQUALS 24". 3.TYPE A, B AND C ARROW BOARDS SHALL HAVE SOLID RECTANGULAR APPEARANCES. A TYPE D ARROW BOARD SHALL CONFORM TO THE SHAPE OF THE ARROW. 4.MAINTAIN DRIVEWAY ACCESS AT ALL TIMES 5.SIDEWALK ARE EITHER OPEN OR NOT OPEN. A SIDEWALK IS CLOSED IF A MINIMUM 5' PATH CANNOT BE MAINTAINED MEASURED FROM PROPERTY LINE, OR 5.5' IF CREATED FROM FACE OF CURB. (PEDESTRIAN PATH PROVIDED WHERE REQUIRED) AND WILL BE MONITORED BY A SPOTTER TO ENSURE FLOW AND SAFETY DURING WORK UNLESS OTHERWISE NOTED. A SPOTTER SHALL NOT DIRECT TRAFFIC. 6.NO EXCEPTION TAKEN- CONTRACTOR IS RESPONSIBLE FOR ADA COMPLIANCE. 7.ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES. WILL CONFORM TO SPECIFICATIONS STATED IN THE FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL DEVICES (M.U.T.C.D). 8.CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO ADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROL WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF THE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND ANY SPECIAL CONDITIONS EXIST. 9.FLAGGERS SHALL BE USED IN ACCORDANCE WITH WAC 468-95-302. 10.IF ONLY ONE LANE IS OPEN IN A DIRECTION,THAT LANE SHALL BE A MINIMUM OF 11' WIDE, UNLESS SPOTTER/FLAGGERS ARE USED, IN WHICH CASE THE LANE CAN BE A MINIMUM OF 10'. 11.ALL ROW WORK MUST YIELD TO SCHOOL TRANSIT, EMPLOYEES AND CHILDREN. WHILE PASSENGER LOADING/UNLOADING, STOPPED OR SLOWING: CEASE WORK, YIELD. WHEN SCHOOL TRANSIT, AND/OR PEDESTRIANS, DEPART COMMENCE WORK. N 1 TRAFFIC CONTROL PLAN NOTES 1.TRAFFIC CONTROL WILL CONSIST OF SINGLE LANE CLOSURE WITH 2 WAY ALTERNATING TRAFFIC (FLAGGER CONTROLLED). 2.THIS TCP LAYOUT IS TYPICAL FOR AERIAL WORK ON 116TH AVE SE. SIGNS AND FLAGGERS TO MOVE AS NEEDED WITH SLOW ROLLING WORK ZONE. X X X ROADWORKAHEAD ONELANEROADAHEAD LIMIT SPEED R2-1 30 X X X ROADWORKAHEAD ONELANEROADAHEAD FLAGGER FLAGGER WORK ZONE DI R E C T I O N O F A E R I A L W O R K SL O W R O L L I N G W O R K Z O N E MFP26002653 PROPOSED AERIAL FIBER INSTALLATION COMCAST 2A DIGITAL (FDX) - WAKVD0ES00 1X2 - WAKVD06300 1X2 (WAKVD06300 1X2) - RF 17198 116TH AVE SE, RENTON, WA, 98058 JB0002447467 MFP26002653 © 2026 Microsoft Corporation © 2026 TomTom © 2026 Zenrin POLE-1 POLE-2 POLE-3 POLE-4 Know what's below.Call R 811 48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT CALL TOLL FREEDIGALERTbefore you dig. 17 1 9 8 1 1 6 T H A V E S E RE N T O N , W A JB 0 0 0 2 4 4 7 4 6 7 REVISIONS DATE DESCRIPTION INITIAL COMCAST SHEET OF DATE: EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THE PROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BE REPRODUCED, COPIED, OR USED FOR ANY PURPOSE WITHOUT SPECIFIC WRITTEN PERMISSION. SI T E N A M E : SCALE LO C A T I O N A D D R E S S : CO M C A S T J O B N U M B E R : STAMP DRAWN BY:MCF 5/20/2026 2A D I G I T A L ( F D X ) - W A K V D 0 E S 0 0 1 X 2 - WA K V D 0 6 3 0 0 1 X 2 ( W A K V D 0 6 3 0 0 1 X 2 ) - R F VICINITY MAP 17198 E 116TH AVE SE, RENTON, WA CONTACTS PG#SHEET INDEX 1 COVER SHEET 2 VICINITY MAP, CONTACTS & SHEET INDEX 3 GENERAL NOTES 4 LEGEND 5-6 SITE-PLAN 7 TYPICAL DETAILS 7 N/A N/A DESCRIPTION OF WORK TOTAL DELASH / RELASH 36 CT FIBER TO EXISTING STRAND (4 POLES)514LF 0LF 0LF TOTAL:514LF VI C I N I T Y MA P BEGIN 17236 E 116TH AVE SE, RENTON, WA END PERMITTING ASHLEY KIEHN 4610 TACOMA AVE SUMNER, WA 98390 PHONE: (253) 999-2271 EMAIL: ASHLEY.KIEHN@MASTEC.COM COMCAST MASTEC OPE DOMINIC MINNITI 4610 TACOMA AVE SUMNER, WA 98390 PHONE: N/A EMAIL: DOMINIC.MINNITI@MASTEC.COM JOSH ASHLEY 11308 SW 68TH PKWY PHONE: 503-939-7931 EMAIL: JOSHUA_ASHLEY@COMCAST.COM TIGARD, OR, 97223 2 MFP26002653 Know what's below.Call R 811 48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT CALL TOLL FREEDIGALERTbefore you dig. 17 1 9 8 1 1 6 T H A V E S E RE N T O N , W A JB 0 0 0 2 4 4 7 4 6 7 REVISIONS DATE DESCRIPTION INITIAL COMCAST SHEET OF DATE: EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT, THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THE PROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BE REPRODUCED, COPIED, OR USED FOR ANY PURPOSE WITHOUT SPECIFIC WRITTEN PERMISSION. SI T E N A M E : SCALE LO C A T I O N A D D R E S S : CO M C A S T J O B N U M B E R : STAMP DRAWN BY:MCF 5/20/2026 2A D I G I T A L ( F D X ) - W A K V D 0 E S 0 0 1 X 2 - WA K V D 0 6 3 0 0 1 X 2 ( W A K V D 0 6 3 0 0 1 X 2 ) - R F 7 N/A N/A GE N E R A L NO T E S RENTON 1.ALL METHODS AND MATERIALS SPECIFICATION SHALL MEET ALL CITY OF RENTON STANDARDS. 2.ALL RENTON STANDARD DETAIL DRAWINGS CAN BE FOUND AT THE FOLLOWING WEBSITE: https://edocs.rentonwa.gov/Documents/Browse.aspx?startid=1363703 3.ALL ASPHALT REPAIR TO BE DONE IN ACCORDANCE WITH RENTON STANDARDS. SEE RENTON STANDARD DETAIL - SECTION F 110.0-110.2. 4.ALL SIDEWALK REPAIR TO BE DONE IN ACCORDANCE WITH RENTON STANDARDS. SEE RENTON STANDARD DETAIL - SECTION F 102.0. 5.ALL CURB AND GUTTER REPAIR TO BE DONE IN ACCORDANCE WITH RENTON STANDARDS. SEE RENTON STANDARD DETAIL - SECTION F 103.0. 6.UTILITY LOCATIONS SHOWN ON THIS PLAN ARE BASED ON DOCUMENT RESEARCH AND FIELD EVALUATION. THE INFORMATION MAY NOT BE ACCURATE OR COMPLETE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PHYSICALLY LOCATE AND VERIFY LOCATION AND DEPTH OF ALL UTILITIES WITHIN THE CONSTRUCTION PATH. ALL INSTALLATIONS MUST COMPLY WITH MINIMUM HORIZONTAL AND VERTICAL CLEARANCES FROM UTILITIES. THE LOCATIONS OF UTILITIES SHOWN ON THESE DRAWING ARE ONLY APPROXIMATE. SEFNCO HEREBY DISCLAIMS ANY RESPONSIBILITY TO THIRD PARTIES FOR THE ACCURACY OF THIS INFORMATION. PERSONS WORKING IN THE AREA COVERED BY THIS DRAWING MUST CONTACT THE STATEWIDE CALL-BEFORE-YOU-DIG SYSTEM TO ASCERTAIN THE LOCATION OF UNDERGROUND UTILITIES PRIOR TO PERFORMING ANY EXCAVATION. 1.ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF UTILITY IMPROVEMENTS SHALL MEET OR EXCEED SITE WORK STANDARDS AND THE STANDARDS AND SPECIFICATIONS SET FORTH IN THE LOCAL JURISDICTION REGULATIONS AND APPLICABLE STATE AND FEDERAL REGULATIONS. WHERE THERE IS CONFLICT BETWEEN THESE PLANS AND THE SPECIFICATIONS, OR ANY APPLICABLE STANDARDS, THE HIGHER QUALITY STANDARD SHALL APPLY. ALL WORK WITHIN PUBLIC R.O.W. OR EASEMENTS MAY REQUIRE INSPECTED AND APPROVED BY THE LOCAL JURISDICTION INSPECTOR. INSPECTION SERVICES AND CONSTRUCTION CERTIFICATION TO BE PROVIDED BY DESIGNEE OF PROJECT SPONSOR/OWNER. 2.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES, AS SHOWN ON THESE PLANS, IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND, WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED UPON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE LOCAL UTILITY LOCATION CENTER AT LEAST 48 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATIONS OF EXISTING UTILITIES. THE CONTRACTOR SHALL VERIFY PERTINENT LOCATIONS AND ELEVATIONS, ESPECIALLY AT THE CONNECTION POINTS AND AT POTENTIAL UTILITY CONFLICTS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES THAT CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THESE PLANS. 3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FROM ALL APPLICABLE AGENCIES. THE CONTRACTOR SHALL NOTIFY THE LOCAL JURISDICTION INSPECTOR AT LEAST 48 HOURS PRIOR TO THE START OF ANY EARTH DISTURBING ACTIVITY OR CONSTRUCTION ON ANY AND ALL PUBLIC IMPROVEMENTS IF REQUIRED. 4.THE CONTRACTOR SHALL COORDINATE AND COOPERATE WITH THE LOCAL JURISDICTION AND ALL UTILITY COMPANIES WITH REGARD TO RELOCATIONS OR ADJUSTMENTS OF EXISTING UTILITIES DURING CONSTRUCTION, TO ASSURE THAT THE WORK IS ACCOMPLISHED IN A TIMELY FASHION, AND WITH A MINIMUM DISRUPTION OF SERVICE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL PARTIES AFFECTED BY ANY DISRUPTION OF ANY UTILITY SERVICE. 5.THE CONTRACTOR SHALL HAVE ONE (1) SIGNED COPY OF THE APPROVED PLANS, ONE (1) COPY OF THE APPROPRIATE STANDARDS AND SPECIFICATIONS, AND ONE (1) COPY OF ANY PERMITS AND EXTENSION AGREEMENTS NEEDED FOR THE JOB ON-SITE AT ALL TIMES. 6.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT LIMITED TO: EXCAVATION, TRENCHING, SHORING, TRAFFIC CONTROL, AND SECURITY. 7.IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED BY THE CONTRACTOR, HIS SUBCONTRACTORS, OR OTHER AFFECTED PARTIES WHICH COULD INDICATE A SITUATION THAT IS NOT IDENTIFIED IN THE PLANS OR SPECIFICATIONS, THE CONTRACTOR SHALL CONTACT THE ENGINEER IMMEDIATELY. 8.ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF SAID STANDARD, UNLESS SPECIFICALLY STATED OTHERWISE. 9.FOR WORK AFFECTING PUBLIC ROADWAYS OR IF REQUIRED BY THE LOCAL JURISDICTION, THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL AND PHASING PLAN IN ACCORDANCE WITH M.U.T.C.D. FOR APPROVAL. PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN OR AFFECTING THE RIGHT-OF-WAY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALL TRAFFIC CONTROL DEVICES AS MAY BE REQUIRED BY SAID PLANS. PRIOR TO INSTALLATION A PRECONSTRUCTION CONFERENCE SHALL BE HELD WITH LOCAL JURISDICTION. 10.THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY FOR THE COMPLETION OF THE INTENDED IMPROVEMENTS SHOWN ON THESE DRAWINGS OR DESIGNATED TO BE PROVIDED, INSTALLED, CONSTRUCTED, REMOVED OR RELOCATED UNLESS SPECIFICALLY NOTED OTHERWISE. 11.PER AGENCY STANDARDS THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ROADWAYS FREE AND CLEAR OF ALL CONSTRUCTION DEBRIS AND DIRT TRACKED FROM THE SITE. 12.THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECORDING RECORD INFORMATION ON A SET OF RECORD DRAWINGS KEPT AT THE CONSTRUCTION SITE AND AVAILABLE TO THE LOCAL JURISDICTION INSPECTOR AT ALL TIMES. 13.DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING. FOR ADDITIONAL INFORMATION CONTACT THE ENGINEER FOR CLARIFICATION AND NOTE ON THE RECORD DRAWINGS. 14.ALL EROSION AND SEDIMENT CONTROL (E.S.C.) MEASURES SHALL BE INSTALLED AT THE LIMITS OF CONSTRUCTION PRIOR TO GROUND DISTURBING ACTIVITY. ALL E.S.C. MEASURES SHALL BE MAINTAINED IN GOOD REPAIR BY THE CONTRACTOR UNTIL SUCH TIME AS THE ENTIRE DISTURBED AREAS ARE STABILIZED WITH HARD SURFACE OR LANDSCAPING. 15.ALL WORK WITHIN THE PUBLIC RIGHT-OF-WAY IS SUBJECT TO THE JURISDICTION OF THE LOCAL JURISDICTION ENGINEERING DEPARTMENT STANDARD DETAILS AND SPECIFICATIONS. 16.ALL CONSTRUCTION OPERATIONS, INCLUDING THE WARMING UP, REPAIR, ARRIVAL, DEPARTURE OR RUNNING OF TRUCKS, EARTH MOVING EQUIPMENT, CONSTRUCTION EQUIPMENT AND ANY OTHER ASSOCIATED EQUIPMENT SHALL GENERALLY BE LIMITED TO THE TIME PERIOD APPROVED BY THE LOCAL JURISDICTION. 17.CALL THE "CALL BEFORE YOU DIG" NUMBER 48HRS IN ADVANCE AT 1-800-424-5555 PRIOR TO DIGGING. 3 MFP26002653 Know what's below.Call R 811 48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT CALL TOLL FREE DIGALERTbefore you dig. 17 1 9 8 1 1 6 T H A V E S E RE N T O N , W A JB 0 0 0 2 4 4 7 4 6 7 REVISIONS DATE DESCRIPTION INITIAL COMCAST SHEET OF DATE: EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT, THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BE REPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION. SI T E N A M E : SCALE LO C A T I O N A D D R E S S : CO M C A S T J O B N U M B E R : STAMP DRAWN BY:MCF 5/20/2026 2A D I G I T A L ( F D X ) - W A K V D 0 E S 0 0 1 X 2 - WA K V D 0 6 3 0 0 1 X 2 ( W A K V D 0 6 3 0 0 1 X 2 ) - R F 7 N/A N/A LE G E N D LEGEND TELECOMMUNICATION SANITARY SEWER GAS LINE WATER STORM DRAIN RECYCLED WATER POWER PARCEL LINE RIGHT OF WAY DITCH LINE CENTER LINE EDGE OF PAVEMENT FACE OF CURB PROPERTY LINE LIP OF GUTTER GUARDRAIL SD SD W W SS SS G G T T LIP D/L EOP FOC RW RW BUILDING OUTLINE P FLFOG LINE SIDEWALK SWSW TRENCH DIRECT BORE PROPOSED AERIAL STRAND PROOF/PULL PROPOSED OVERLASH MINOR ARTERIAL COLLECTOR ARTERIAL INTERSTATE FREEWAY ACCESS STREET PRINCIPAL ARTERIAL BUILDING R/W WARNING SIGN PLACEMENT (W/ PART #) TRAFFIC BARREL HYDRO-VAC TRENCH KEEP RIGHT REGULATORY SIGN (W/ PART #) LIMIT SPEED R2-1 25SPEED LIMIT CALLOUT SIGN PLACEMENT / DIRECTION TRAFFIC CONE FLAGGER STATION FLAGGER STATION PATROL CAR POLICEOFFICER UNIFORMED POLICE OFFICER WORK VEHICLE FENCE STREET LIGHT HANDHOLE TELECOM MANHOLE TELECOM HANDHOLE TELECOM CABINET TRAFFIC SIGNAL MANHOLE TRAFFIC CABINET TRAFFIC SIGNAL PEDESTAL STREET LIGHT POLE TRAFFIC SIGNAL HANDHOLE CATV MANHOLE CATV HANDHOLE CATV PEDESTAL TRAFFIC SIGNAL POLE STORM MANHOLE WATER VALVE WATER METER TELECOM PEDESTAL STORM INLET STORM DRAIN UNKNOWN D? SI SEWER VALVE S SEWER VAULT S S SEWER UNKNOWN S ? STORM DRAIN VAULT S D SEWER CLEANOUT SEWER MANHOLE SC SEWER CATCH BASIN SS STORM ACCESS POINT BASE LAYERS EXISTING UTILITIES ROAD HATCH CLASSIFICATION ROW WORK LINETYPE COMCAST UNDERGROUND SYMBOLS EXISTING UTILITY SYMBOLS TRAFFIC CONTROL SYMBOLS STORM CATCH BASIN SD TRAFFIC SIGNAL VAULT GAS METERTEST VALVE PEDESTAL UNK UTILITY FIRE HYDRANT GAS VALVE GAS TEST POINT GAS MANHOLE WATER PUMP G G G WATER AIR CONTROL VALVE WATER WELL WATER SAMPLING STATION POWER HANDHOLE POWER MANHOLE POWER CABINET POWER VAULT POWER PEDESTAL P POWER UNKNOWN P P P P P P ? SIGN POST CULVERT TRANSIT STOP BUS STOP DRIVEWAY (FOC OR EOP) SD SS (P) FIBER & COUNT F48 (P) .625 COAX (P) .875 COAX COMCAST AERIAL SYMBOLS (E) FIBER & COUNT F48 (E) .625 COAX (E) .875 COAX SL SL TS TS TS TS C C C T T T T T S TS ? PUMP F WELL TREE TRIM LIGHT/MEDIUM/HEAVY L M H// WRECKOUT LIT INTERSECTION FAS FLASHING ARROW SEQUENTIAL ARROW SEQUENTIAL CHEVRON FLASHING DOUBLE ARROW (MERGE LEFT OR RIGHT) FLASHING CAUTION OR FLASHING DIAMOND CAUTION ARROWBOARD PLACEMENT (SEE BELOW) CHANNELIZING DEVICES / MIN DIMENSIONS NOTE(S): 1.AN ARROWBOARD SHALL MEET THE MINIMUM SIZE, LEGIBILITY DISTANCE, NUMBER OF ELEMENTS AND OTHER SPECIFICATIONS SHOWN. 2.LENGTH OF ARROW EQUALS 48", WIDTH OF ARROWHEAD EQUALS 24". 3.TYPE A, B AND C ARROW BOARDS SHALL HAVE SOLID RECTANGULAR APPEARANCES. A TYPE D ARROW BOARD SHALL CONFORM TO THE SHAPE OF THE ARROW. ARROWBOARD TYPE MIN LEGIBILITY DISTANCE MIN SIZE MINIMUM # OF ELEMENTS A B C D 48"×24" 60"×30" 96"×48" NONE 12 MILE 1 MILE 34 MILE 12 MILE 12 13 15 12 5F T M I N 4FT MIN 8-12" 45° TYPE 3 BARRICADE 3F T M I N 45° 2FT MIN 8-12" TYPE 1 BARRICADE 3F T M I N 8-12" 2FT MIN 45° TYPE 2 BARRICADE 3-4" 6" 2" 4" 28 ' - 3 6 " M A X SPEED < 45MPH NIGHT AND/OR FREEWAY MO R E T H A N 3 6 " 4-6" TYP CONE CONE SPEED ≥ 45MPH DIRECTION INDICATOR BARRICADE 12" 8" 36 " M I N 24" MIN 45° UNLIT INTERSECTION DB TRENCH A VAC-T SPOTTER STATION ALL TRAFFIC CONTROL DEVICES / ANNOTATIONS PER MUTCD AMPLIFIER PICTURE TAP PICTURE Equipment ANCHOR SIDEWALK ANCHOR & GUY PROPOSEDEXISTING WRECKOUT POLE W/O RISER RISER ARM VERTICAL GROUND SLACK SPAN OVERHEAD GUY TANGENT ATTACHMENT DEAD-END DOUBLE DEAD-END VAULT SPLICE CASE MANHOLE PEDESTAL PP P A MINIBRIDGER T T T A A TAP AMPLIFER POTHOLE BORE PIT / EXCAVATION M M M PROPOSEDEXISTING WRECKOUT NODE STORAGE LOOP X'X' A B C D A B C D A B C D POWER SUPPLY A C B D SM A C B D SM A C B D SM 4 MFP26002653 EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL R/W R/ W R/W R/W R/W R/ W R/W R/WR/WR/W R/W R/W R/W R/W R/W R/W R/W R/W R/ W R/W R/W R/W R/W R/ W R/WR/WR/WR/WR/WR/WR/W R/W R/ W R/W 17160 116TH AVE SE 17168 116TH AVE SE 17166 116TH AVE SE 17150 116TH AVE SE 17174 116TH AVE SE 17117 116TH AVE SE 17170 116TH AVE SE 17200 116TH AVE SE 17164 116TH AVE SE 17178 116TH AVE SE 17148 116TH AVE SE 17115 116TH AVE SE R/WR/WR/WR/WR/W R/W R/W R/ W R/W R/ W SW SW SW SW SW SW SW SW SW SW SW SW SW SWSW SW SW SW SW SW SW SW SW SW ←DRIVEWAY→ ←DRIVEWAY→ ←DRIVEWAY→ ←DRIVEWAY→ ←DRIVEWAY→←DRIVEWAY→ 11 6 T H A V E S E 11 6 T H A V E S E A A A A A A A POLE-1 POLE-2 21 9 ' 14 6 ' Know what's below.Call R 811 48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT CALL TOLL FREE DIGALERTbefore you dig. 17 1 9 8 1 1 6 T H A V E S E RE N T O N , W A JB 0 0 0 2 4 4 7 4 6 7 REVISIONS DATE DESCRIPTION INITIAL COMCAST SHEET OF DATE: EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT, THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BE REPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION. SI T E N A M E : SCALE LO C A T I O N A D D R E S S : CO M C A S T J O B N U M B E R : STAMP DRAWN BY:MCF 5/20/2026 2A D I G I T A L ( F D X ) - W A K V D 0 E S 0 0 1 X 2 - WA K V D 0 6 3 0 0 1 X 2 ( W A K V D 0 6 3 0 0 1 X 2 ) - R F 7 SI T E P L A N - 1 N EXISTING POLE. 1 2 SITE PLAN CONSTRUCTION NOTES DELASH / RELASH 36 CT FIBER TO EXISTING STRAND. 5 2 1 2 1 MATCH TO SITE PLAN - 2 MFP26002653 EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL R/W R/WR/WR/W R/ W R/ W R/WR/WR/W R/ W R/W R/WR/WR/W R/W R/WR/WR/WR/W R/W R/W R/W R/W R/W R/W R/W R/ W R/W R/W R/W R/W R/ W R/W R/W R/ W R/W R/W R/W R/W R/W R/W R/WR/WR/W 17245 117TH AVE SE 11552 SE 173RD ST 17239 117TH AVE SE 17301 117TH AVE SE 17314 116TH AVE SE 17223 116TH AVE SE 17234 117TH AVE SE 17248 116TH AVE SE 11547 SE 173RD ST 11553 SE 173RD ST 17241 117TH AVE SE 11549 SE 173RD ST 11551 SE 173RD ST 17236 116TH AVE SE 17232 116TH AVE SE 11550 SE 173RD ST 17235 117TH AVE SE 17240 116TH AVE SE 17224 116TH AVE SE 17243 117TH AVE SE 11548 SE 173RD ST 17255 117TH AVE SE 11554 SE 173RD ST R/ W R/WR/WR/W R/W R/W R/WR/WR/W R/ W R/W R/ W R/W R/W R/W R/W R/W R/W R/ W R/W R/W R/ W R/W R/W R/ W R/W R/W E O P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW ←DRIVEWAY→ ←DRIVEWAY→ ←DRIVEWAY→ ←DRIVEWAY→ ←DRIVEWAY→ ←DRIVEWAY→ ←DRIVEWAY→ 11 6 T H A V E S E 11 6 T H A V E S E 11 7 T H A V E S E 11 7 T H A V E S E SE 173RD ST A A A A POLE-3 POLE-4 15 1 ' Know what's below.Call R 811 48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT CALL TOLL FREE DIGALERTbefore you dig. 17 1 9 8 1 1 6 T H A V E S E RE N T O N , W A JB 0 0 0 2 4 4 7 4 6 7 REVISIONS DATE DESCRIPTION INITIAL COMCAST SHEET OF DATE: EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT, THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BE REPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION. SI T E N A M E : SCALE LO C A T I O N A D D R E S S : CO M C A S T J O B N U M B E R : STAMP DRAWN BY:MCF 5/20/2026 2A D I G I T A L ( F D X ) - W A K V D 0 E S 0 0 1 X 2 - WA K V D 0 6 3 0 0 1 X 2 ( W A K V D 0 6 3 0 0 1 X 2 ) - R F 7 SI T E P L A N - 2 N EXISTING POLE. 1 2 SITE PLAN CONSTRUCTION NOTES DELASH / RELASH 36 CT FIBER TO EXISTING STRAND. 6 2 1 2 MATCH TO SITE PLAN - 1 MFP26002653 7 REVISIONS DATE DESCRIPTION INITIAL Know what's below.Call R 811 48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT CALL TOLL FREEDIGALERT before you dig. 17 1 9 8 1 1 6 T H A V E S E RE N T O N , W A JB 0 0 0 2 4 4 7 4 6 7 REVISIONS DATE DESCRIPTION INITIAL COMCAST SHEET OF DATE: EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THE PROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BE REPRODUCED, COPIED, OR USED FOR ANY PURPOSE WITHOUT SPECIFIC WRITTEN PERMISSION. SI T E N A M E : SCALE LO C A T I O N A D D R E S S : CO M C A S T J O B N U M B E R : STAMP DRAWN BY:MCF 5/20/2026 2A D I G I T A L ( F D X ) - W A K V D 0 E S 0 0 1 X 2 - WA K V D 0 6 3 0 0 1 X 2 ( W A K V D 0 6 3 0 0 1 X 2 ) - R F NTS TY P I C A L DE T A I L S N 7 AERIAL TYPICALS MFP26002653 ___________________________________________________________________________________ MasTec Network Solutions 4610 Tacoma Ave Sumner, WA 98390 ____________________________________________________________________________________________________________ MasTec Washington Locations Spokane ~ Puget Sound 5/22/26 To whom it may concern: City of Renton 1055 South Grady Way Renton, WA 98057 RE: Aerial Variance Request for JB0002447467 OSP DE To whom it may concern, Mastec North America has been contracted to design and engineer this project on behalf of Comcast Cablevision. Comcast is applying for a variance request in order to upgrade their existing facilities. Comcast proposes to delash/relash 36ct fiber to existing strand ~514’. Comcast is requesting that the City of Renton approve this variance request based on the fact that the requirements for undergrounding this proposed over-lash will not cause substantial adverse impacts to other person or entities in the immediate area and will cause undue hardship. 1. Installation of undergrounding facilities will increase the total cost of construction roughly 15-25 times the amount of an aerial over-lash on the existing Comcast strand. 2. Potential damage to underground facilities will be increased. 3. Over-lash will not cause substantial adverse impact to other persons or entities in the immediate area. Over-lashing the cable will be accomplished in a few days, and the residents will not notice any impact. Comcast will clean up the over-lashed spans as necessary and identify and remove any existing dead cables along this route. 4. The variance is necessary to prevent and undue hardship due to the increased construction costs if forced to install the proposed extension underground. 5. The granting of the variance will not be materially detrimental to the public welfare because Comcast does agree to underground the cable system, but they are waiving the obligation into the future when all other utilities are underground to prevent an undue hardship against Comcast currently. Upon the granting of the Variance, Comcast will coordinate construction and traffic control as per your requirements. Comcast and their contractors want to cooperate at the highest level and agree to adhere to all provisions and requirements set forth by the City of Renton to insure safe installation and maintenance of the proposed facilities. If you have any further questions regarding this project please contact Dominic Minniti at Dominic.Minniti@mastec.com. Thank you for your consideration in this matter. ___________________________________________________________________________________ MasTec Network Solutions 4610 Tacoma Ave Sumner, WA 98390 ____________________________________________________________________________________________________________ MasTec Washington Locations Spokane ~ Puget Sound Ashley Kiehn Director of Operations Support MasTec North America Cell (253)797-8118 | Ashley.Kiehn@mastec.com Attachments: 1. Application for ROW permit 2. 11” x 17” Site plan 3. 11” x 17” Design plan 4. Traffic Control Plan June 23, 2026 Ashley Kiehn Mastec North America 4610 Tacoma Avenue, Sumner WA 98390 Via Email: Ashley.Kiehn@mastec.com SUBJECT: Request for Undergrounding Exemption (JB#2447467, MFP26002653, 17170 116th Ave SE) Dear Ms. Kiehn: The City of Renton has reviewed your request to grant Comcast an exemption from Renton Municipal Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required to be installed underground, pursuant to the standards of the section of RMC. Comcast proposes to have Mastec North America overlash new fiber for a total of approximately 516 lineal feet to existing Puget Sound Energy (PSE) poles along 116th Ave SE within the City. See the enclosed Site Plan showing the proposed overlashing limits. ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090. Ordinance 5720 grants Comcast, the right to install fiber optic cable and related appurtenances under, along, over, below, through and across the streets, avenues and alleys of City of Renton within the right-of-way of Renton. Section 3.4 of the franchise ordinance states that if all of the distribution lines all the wireline service providers, such as telecommunications service providers, as defined in RCW 35.99.010, a utility service provider or a Cable Operator (collectively “Service Providers”) in any portion of the Franchise Area are underground, Grantee shall place its Cable System’s distribution cables underground within that area; provided that such underground locations are actually capable of accommodating Grantee’s cable and other equipment without technical degradation of the Cable Systems’ signal quality. The proposal would utilize existing poles with other attached franchisee communication facilities and overlash to the existing Comcast aerial path. As minimum vertical height clearance of 15’-6” would need to be provided for, any existing obsolete cable will need to be removed; staff recommends these as conditions of approval. Therefore, the City is granting an exemption with conditions, per the Comcast franchise agreement which allows new overhead facilities to be placed overhead provided there are other similar providers overhead as well. Comcast is required to obtain all necessary private utility easements for work on private property. DECISION: The requested exemption from underground utility installation requirements RMC4-6-090 (C) as requested by the applicant is approved with conditions subject to the conditions below as the request complies with the Comcast Franchise Agreement. Comcast Job JB#2447467 Page 2 of 2 June 23, 2026 Conditions of Approval: 1. Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15’-6”. 2. Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking place. 3. A traffic control plan must be separately submitted to the City, and no construction may take place until the City has approved a traffic control plan. 4. The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at the Applicant’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case the Applicant shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial lines must be undergrounded within one year, or approved otherwise by the City of Renton Community and Economic Development Administrator or designee, from the first event triggering the requirement to underground the aerial lines. This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed with the City Clerk, along with the required appeal fee, by 5:00 pm, July 7, 2026. Appeals must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub Monday through Friday.  The appeal fee, normally due at the time an appeal is submitted, will be collected at a future date if your appeal is submitted electronically. The appeal submitted in person may be paid on the first floor in our Finance Department. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov.   Sincerely, Justin Johnson, PE Development Engineering Director cc: Nathan Janders, Development Engineering Manager Scott Warlick, Engineering Specialist III Holly Powers, Engineering Specialist III Franchise Permits Enclosures: Site Plan Justin Johnson DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Conditions for Permit MFP26002653 Engineering 1 The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at the Applicant’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case the Applicant shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial lines must be undergrounded within one year, or approved otherwise by the City of Renton Community and Economic Development Administrator or designee, from the first event triggering the requirement to underground the aerial lines. 2 A traffic control plan must be separately submitted to the City, and no construction may take place until the City has approved a traffic control plan. 3 Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking place. 4 Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15'-6". Page 1 of 1