LANDSCAPE NOTES
1.THIS LINEWORK AND DIMENSIONS FOUND ON LANDSCAPE ARCHITECT'S PLANS
WITHIN THE FRONT ENTRYWAY AND CROSSWALK TO THE RAMP TAKE
PRECEDENCE OVER CIVIL ENGINEER'S LINEWORK WITHIN THESE AREAS.
INSTALL FRONT ENTRYWAY PLAZA AND CROSSWALK PER LANDSCAPE
ARCHITECT'S PLANS.
2.FOR TRASH ENCLOSURE DETAIL, SEE ARCH PLANS.
3.FOR SITE SIGNAGE SEE ARCH PLANS.
4.FOR GRADING, UTILITIES AND DRAINAGE, AND PARKING LOT SEE CIVIL PLANS.
5.FOR RAMP RAILINGS SEE CIVIL PLANS.
6.FOR SITE LIGHTING SEE MEP PLANS.
7.ALL EXISTING SHRUBS AND GROUNDCOVER WILL BE REMOVED TO MAKE WAY
FOR NEW PLANTINGS PER PLANTING PLAN.
8.PLANTINGS WILL BE PROVIDED PER THE CITY OF RENTON'S LANDSCAPE CODE
FOR ALL ON SITE PLANTINGS.
9.PLANTINGS IN THE RIGHT OF WAY WILL CONFORM TO THE STANDARDS OF
WSDOT.
10.A PERMANENT IRRIGATION SYSTEM WILL BE PROVIDED FOR ALL ON SITE
PLANTINGS AND TREES. FOR THE RIGHT OF WAY TREES, WE WILL IRRIGATE OUT
TOWARDS THE PLANTINGS FROM PRIVATE PROPERTY PER WSDOT STANDARDS.
MATERIALS LEGEND
PROPERTY LINE
PLAZA PEDESTRIAN CONCRETE PAVING - 778 S.F.
CONCRETE PAVERS - 462 S.F.
SITE BENCH - 2
BIKE RACK - 3
VERTICAL BASALT COLUMN CLUSTERS - 9
EXISTING BROADLEAF EVERGREEN TREES
EXISTING CONIFEROUS TREES
PERIMETER PLANTINGS - 7,350 S.F.
INTERIOR PARKING LOT PLANTINGS - 3,110 S.F.
RIGHT OF WAY PLANTINGS - 3,711 S.F.
SEEDED LAWN MIX - 0 S.F.
SITE DETAIL KEYNOTES
PAVING
DETAIL/ SHEET QUANTITY
1.1 CONCRETE PAVING 4+5 / L5.02 778 S.F.
1.2 LARGE FORMAT CONCRETE PAVERS 6 / L5.02 462 S.F.
FENCE / SITE FURNITURE
2.1 BENCH 2 / L5.02 2
2.2 BIKE RACK 1 / L5.02 3
2.3 BOLLARDS 3 / L5.02 11
2.4 VERTICAL STONE COLUMNS 2 / L5.01 9
2.5 WOOD FENCE MOUNTED ON
EXISTING CONCRETE WALL 1 / L5.01 140 L.F.
1.0
2.0
NORTH
01 CONCEPTUAL LANDSCAPE PLAN
1" = 20'-0"
0'10'20'40'
EXISTING
FULLY SITE
OBSCURING
HEDGE
EXISTING
FULLY SITE
OBSCURING
HEDGE
EXISTING CONCRETE
PAVING TO BE REFINISHED
AND RESCORED
1.2
2.21.1 2.4
PLANTING REQUIREMENT CALCULATIONS
INTERIOR PARKING LOT REQUIREMENTS
·NUMBER OF PARKING SPACES - 63
·AMOUNT OF INTERIOR PARKING LOT PLANTING REQUIRED - 63 X 25 S.F. = 1,575 S.F.
·AMOUNT OF INTERIOR PARKING LOT PLANTING PROVIDED - 3,110 S.F.
·(1) 2" CALIPER TREES PER 6 PARKING STALLS ON THE INTERIOR OF THE PARKING
LOT ARE PROVIDED. THERE ARE (12) TOTAL PROVIDED ON THE INTERIOR OF THE
PARKING LOT.
·A MINIMUM OF (1) SHRUB PER 20 S.F. WILL BE PLANTED. UP TO 50% OF THEM CAN
BE DECIDUOUS. ALL SHRUBS PLANTED WILL BE AT LEAST A 2 GAL. SIZE.
·GROUNDCOVER WILL COVER 90% OF THE REMAINING PLANTINGS. ALL
GROUNDCOVER PLANTS WILL BE A MINIMUM OF 1 GALLON PLANTS.
PERIMETER PARKING LOT PLANTING REQUIREMENTS
·2" CALIPER SIZED TREES WILL BE PLANTED FOR ALL PROPOSED TREES. (10)
INTERIOR PARKING LOT TREES ARE PLANTED.
·A MINIMUM OF (1) SHRUB PER 20 S.F. WILL BE PLANTED. UP TO 50% OF THEM
CAN BE DECIDUOUS. ALL SHRUBS PLANTED WILL BE AT LEAST A 2 GAL. SIZE.
·GROUNDCOVER WILL COVER 90% OF THE REMAINING PLANTINGS. ALL
GROUNDCOVER PLANTS WILL BE A MINIMUM OF 1 GALLON PLANTS.
IRRIGATION SYSTEM REQUIREMENTS
1.A FULL RENOVATION OF THE EXISTING IRRIGATION SYSTEM WILL BE
INSTALLED.
2.THE IRRIGATION SYSTEM WILL USE WEATHER SMART TECHNOLOGY SUCH AS
RAIN SENSORS WHICH TURN IRRIGATION CONTROLLER OFF WHEN IT IS
RAINING.
3.THE IRRIGATION SYSTEM WILL PROVIDE FULL COVERAGE OF ALL SHOWN
PLANTING BEDS TO ASSURE PLANT HEALTH.
1.1
2.4
CONCEPTUAL
LANDSCAPE PLAN
L1.01
2.4
2.2
PROJECT NO.:
ISSUE DATE:
REVISIONS:
CL
A
R
K
K
J
O
S
A
R
C
H
I
T
E
C
T
S
,
L
L
C
C
O
P
Y
R
I
G
H
T
2
0
2
4
62
1
S
W
A
l
d
e
r
S
t
.
,
S
u
i
t
e
7
0
0
Po
r
t
l
a
n
d
,
O
R
9
7
2
0
5
Ph
o
n
e
:
5
0
3
/
2
2
4
-
4
8
4
8
FO
R
RE
F
E
R
E
N
C
E
ONL
Y
9024 N Geneva Avenue
Portland OR 97203
info@delandarchstudio.com
phone: 503-278-2536
2.1
2.1
NEW ENTRYWAY SIGN.
SEE ARCH PLANS.
OF
F
C
A
M
P
U
S
E
M
E
R
G
E
N
C
Y
D
E
P
A
R
T
M
E
N
T
31
1
6
N
E
S
U
N
S
E
T
B
L
V
D
,
R
E
N
T
O
N
,
W
A
9
8
0
5
6
EM
E
R
U
S
EXISTING CONCRETE
PAVING TO REMAIN
NEW CONCRETE
CROSSWALK WITH SCORING
TO MATCH PLAZA SCORING
1
1
1 VERTICAL STONE COLUMN ENSEMBLE
WITH RIVER ROCK MULCH
2 STACKED LARGE FORMAT
PAVERS AT ENTRYWAY
(1) BIKE RACK
(2) BIKE RACKS
(1) BACKED
BENCH
(1) BACKED
BENCH
EXISTING STAIRCASE
EXISTING RAMP
2
1
SCORED
CONCRETE
PAVING
SCORED
CONCRETE
PAVING
NORTH
02 FRONT ENTRYWAY CONCEPT PLAN
NTS
ENTRYWAY SIGNAGE. SEE
ARCH PLANS.
SEE ENTRYWAY
ENLARGEMENT
05.05.2026
CU
P
S
U
B
M
I
T
T
A
L
NEW SCORED
CONCRETE CROSSWALK
EXISTING STAIRCASE
TO REMAIN
EXISTING RAMP TO REMAIN
STRIPING ON PAVEMENT
2.5
2.3
2.3
BOLLARDS TYP.