Loading...
HomeMy WebLinkAbout40_D_Hazardous materials_20260506_v1 MEMORANDUM CLARK/KJOS ARCHITECTS, LLC | 421 SW SIXTH AV, SUITE 1300 | PORTLAND, OR 97204 | 503.224.4848 | WWW.CKARCH.COM 1 / 2 To: City of Renton Date: 5/06/2026 From: Clark Kjos Architects Project: MultiCare Overlake Off-Campus Emergency Department (OCED) Renton Project # 16002 Subject: Hazardous Waste procedures PURPOSE This memorandum outlines the mandatory construction activity standards applicable to this project, which is located within the City of Renton's Aquifer Protection Area (APA). Because construction vehicles will be refueled on site and/or hazardous materials exceeding twenty (20) gallons will be stored, dispensed, used, or handled, all provisions of Renton Municipal Code (RMC) Section 4-3-050 apply to all site activities. REQUIRED COMPLIANCE MEASURES All personnel shall adhere to the following standards throughout the duration of construction: 1. Designated Site Person A designated person shall be present on site during all operating hours. This individual is responsible for supervising hazardous material use, storage, and handling, and shall take immediate mitigating action in the event of a fire or spill. 2. Secondary Containment All hazardous material storage, dispensing, and refueling areas shall be equipped with secondary containment per RMC 4-3-050H2d(i). Use and handling areas shall also be contained to the greatest extent practicable. 3. Securing Hazardous Materials When the site is unsupervised, all hazardous materials must be secured against unauthorized public access. Acceptable methods include locked storage sheds, locked fencing, or locked fuel tanks on construction vehicles. 4. Leaking Vehicles and Equipment Any construction vehicle or equipment found to be leaking fuel, hydraulic fluid, or other hazardous materials shall be removed from the site and the APA, or repaired in place, as soon as possible. Equipment may remain on-site only if leakage is fully contained. 5. Flammable and Combustible Liquids Storage and dispensing of flammable and combustible liquids shall comply with RMC 4-3-050 and Uniform Fire Code Section 7904.2, as adopted or amended by the City of Renton. 6. Clean-Up Equipment Adequate spill response equipment and supplies for a worst-case release shall be maintained on site and stored in close proximity to hazardous materials at all times. 7. Unauthorized Releases Any unauthorized release (as defined in RMC 4-11-210) shall be immediately contained, reported, and cleaned up per RMC 4-9-015G. All contaminated soil, water, and materials shall be disposed of in accordance with applicable state and local requirements. 8. Pesticide and Fertilizer Application Application of pesticides and fertilizers shall comply with RMC 4-3-050H3, governing use within APA Zones 1 and 2. 9. Hazardous Materials Management Statement (HMMS) MEMORANDUM CLARK/KJOS ARCHITECTS, LLC | 421 SW SIXTH AV, SUITE 1300 | PORTLAND, OR 97204 | 503.224.4848 | WWW.CKARCH.COM 2 / 2 A Hazardous Materials Management Statement (as described in RMC 4-8-120D8) must be submitted to and approved by the City of Renton prior to issuance of any permit governing construction activity within the APA. ACTION REQUIRED All subcontractors and site personnel are responsible for understanding and complying with these requirements. Questions regarding this memorandum or applicable RMC provisions should be directed to the Project Manager. Non-compliance may result in stop-work orders, regulatory penalties, or permit revocation. End of Memo