HomeMy WebLinkAbout5_PN_OCED RENTON_20260505_ v 1 MEMORANDUM To: The City of Renton Date: 05/04/2026 From: Clark Kjos Architects Project: MultiCare Overlake Off-Campus Emergency Department (OCED) Renton Project # 26002 Subject: Project Narrative and Justification PROJECT NARRATIVE a) Project name, size and location of site; a. RESPONSE: The Overlake OCED Renton includes the renovation of an existing vacant single story, ~16,500SF B occupancy box store building, formerly a Rite-Aid, located at 3116 Northeast Sunset Boulevard in Renton, Washington (the “Property”). The Property is approximately 1.76 acres. b) Zoning designation of the site and adjacent properties; a. RESPONSE: The Property is zoned Center Village (“CV”). The new use will be a Type B occupancy Emergency Care facility; a local extension of the MultiCare Overlake Medical Center & Clinics. All immediately adjacent parcels are zoned CV. c) Current use of the site and any existing improvements; a. RESPONSE: The Property is improved with an existing structure, and the facility is currently unoccupied. It is a former Rite-Aid drug store and pharmacy. This existing building is ~16,500SF and will largely remain. The site is currently paved with 63 on-site parking spaces. The building is served with water, sewer, electric, and gas utilities. d) Special site features (i.e., wetlands, water bodies, steep slopes); a. RESPONSE: Preliminary review of City GIS indicates the potential presence of steep slopes and geological hazards on the Property. As evaluated and described in the Geotechnical Engineering Services Report, steep slopes are not present. No other wetlands, waterbodies, or critical areas are on or in the vicinity of the site. e) Statement addressing soil type and drainage conditions; a. RESPONSE: The soil explorations observed Recessional Outwash soils ranging in depth from 8.5 to 41.5 feet below ground surface. These soils generally consisted of loose to dense sand with variable silt and gravel contents. b. Generally speaking, Recessional Outwash soils in the upper portion of the soil profile contained a higher percentage of silt than those encountered at depth. Soils in the upper portion of the profile were loose to medium dense, and the relative consistency of their Recessional outwash tended to increase with depth. The transition between the upper Recessional Outwash soils (typically containing a higher fines content with relative constancies between loose and medium dense) and the lower Recessional Outwash soils (lower fines content and medium dense to dense) varied but typically occurred between depths of about 10 and 20 feet bgs. c. The existing site and roof drainage is collected in an onsite conveyance system to an underground concrete detention vault located in the southwest corner of the project site. The detention system outfalls to the City of Renton’s storm drainage system at a manhole in the northbound lane of Kirkland Avenue NE. d. There are no known deficiencies or problems associated with the existing drainage system. e. The project proposes to maintain the existing drainage system to the maximum extent Section 4-9-030 2/4 feasible to ensure minimal impacts to the existing project site. The storm drainage evaluation and proposed improvements will meet the 2022 City of Renton Surface Water Design Manual. Storm Drainage Narrative: The project is subject to full drainage review because greater than 2,000 square feet of new plus replaced impervious surface is proposed. The project proposes approximately 17,556 square feet of new plus replaced impervious surfaces necessary to provide a sufficient patient drop-off, staff loading area, ambulance drop-off, ADA accessible parking stalls, and an ADA accessible pathway from the building to the right-of-way (does not include replaced roof areas). Nearly all new/replaced hard surfaces are in locations of existing hard surfaces. Approximately 250 square feet of parking lot will be removed and replaced with a landscape island. i. Core Requirement #3 – Flow Control FacilitiesThe project site is located within the East Lake Washington Drainage Basin and is subject to the Peak Rate Flow Control Standard (Existing Conditions), therefore the proposed runoff peak flow rates will match the peak flow rates of the current site conditions. The project proposes equal to or less impervious surfaces than the existing condition, therefore it is anticipated the peak flow rates of the project will meet the requirement of Basin Control Standard.Core ii. Requirement #8 – Water Quality Facilities: On-site stormwater runoff will be collected and conveyed to the existing on-site storm drainage system. The project proposes to utilize the “Cost Exemption for Parcel Redevelopment Projects” to be exempt from this Minimum Requirement #8 – Water Quality because the existing drainage system is currently properly functioning and the project only proposes 399 SF of NEW impervious surfaces.If the exception cannot be obtained, the project can install water quality treatment structures to satisfy the project’s drainage requirements. The new structures would treat the required stormwater runoff before entering the existing underground detention vault. Based on preliminary review, we anticipate these vaults to be 6’(w) x 6’(l) in size or less. iii. Core Requirement #9 – On-Site BMPs On-site BMPs will be evaluated and implemented to the maximum extent feasible, however, given the constraints of the existing stormwater system and surface grading, and that a new flow control facility is not required under Core Requirement #3, the BMPs listed in this Core Requirement will likely all be deemed infeasible to implement on the project site. f) Proposed use of the property and scope of the proposed development (i.e., height, square footage, lot coverage, parking, access, etc.); a. RESPONSE: The Overlake OCED Renton involves the conversion of an existing ~16,500 square foot commercial facility located on the Property (formerly a Rite-Aid store) to a medical services use. The primary proposed use within the new facility is an OCED, which provides emergency medical care in a freestanding location instead of being an accessory use to a larger hospital. The facility is open 24 hours per day and 365 days per year. The OCED is staffed with doctors, nurses, and other medical support staff capable of handling serious illness and injuries at acuity levels that are greater than an urgent care, but not as acute as a traditional hospital emergency department. There would be 8 - 12 staff members on site at any one time, although more staff could be on site for short intervals during shift changes. The OCED has ten outpatient emergency treatment rooms, a diagnostic lab, radiology services, and a point-of-care (i.e., not retail) pharmacy. Common conditions that are treated at OCEDs include allergic reactions, basic broken bones, burns, dehydration, head / abdominal pain, lacerations, infections, and respiratory illnesses. The facility does not offer surgical, trauma, birthing, behavioral health, or inpatient services — this is a medical facility licensed by the Washington State Department of Health (“DOH”) and is not licensed to keep patients for 24 hours or longer. Patients are treated and discharged or seriously ill patients whose needs cannot be met at the OCED are transferred to a hospital for higher levels of care; such conditions that an OCED is not equipped to serve include heart attacks, strokes, conditions with a likelihood of requiring ventilation or intubation, or Section 4-9-030 3/4 open fractures. The project is generally an interior renovation to convert the existing ~16,500SF facility into an OCED, and the proposed scope of work includes: • Planned façade alterations on the East and South sides of the existing building. • New canopies on the South and East façades. • Updates to the exterior envelope include a complete reskin, with removal of the existing EIFS exterior treatment and insulation upgrades to meet current energy codes. • New windows and storefronts, with exterior finishes to meet the City codes. • A new vestibule and entries into the building. • New signage and branding on the building as well as wayfinding signage on the Property. • Replacement of some mechanical rooftop units. Screening will be provided at units around the perimeter or within the line of site to surrounding grade level. • A backup generator and mechanical units serving the building will be provided at ground level within the existing 4 corners of the building structure in an open air, non-conditioned, covered courtyard, and will be screened from view. • Parking and site improvements will be minimal with some potential restriping, minor parking area reconfiguration, asphalt repair, landscaping, and ADA improvements (including addressing compliance issues, if any, with the ADA ramp in the Southeast corner of the Property). The existing curb cuts / site accesses will be maintained in their current configuration. • On-site fire department access roads providing access within 150’ of all portions of the building meet the minimum width and turning radius requirements. The application includes vehicle tracking modeling confirmation. While final design documents are in development, the building will not exceed the maximum height in the CV district of 50’. Existing lot coverage of ~22% is not expected to be changed. It is expected that the remainder of the building (~4,000 SF) will be converted to a medical office (i.e., primary care or medical imaging) use. The existing project site has an impervious surface coverage of approximately 86.5%. The project does not propose significant reductions in impervious surface coverage in order to maximize the use/parking on site. The improvement of the new building will not encroach into the site setbacks. There are 63 existing parking stalls on-site with 4 of them striped as ADA although surface grades may not meet the ADA stall and loading zone requirements. 56 total parking stalls are proposed with 7 being ADA accessible (2 van accessible stalls and 5 standard ADA stalls). The ADA parking stalls are proposed with new pavement to ensure accessible grades are provided. The existing ADA ramp to the southeast of the site has non-compliant grades, therefore the project proposes to replace the ramp and on-site walkways to ensure ADA accessibility is provided from the stalls to the building and from the building to the right-of- way. Pathways within parking areas are proposed as differentiated material; concrete walkways within asphalt parking areas. Short retaining walls are proposed for the new ramp. No other retaining walls are proposed on-site. On-site fire department apparatus access roads providing access within 150’ of all portions of the building meet the minimum width and turning radius requirements (20’ wide, 25’ inside and 45’ outside turning radius). The application includes vehicle tracking modeling confirmation. Section 4-9-030 4/4 Utilities Water System: no improvements are proposed to the existing outdoor domestic or fire water systems. A new FDC is not proposed. The project team will coordinate with the Fire Authority during CUP review if any system improvements are required. Storz adapters will be provided on existing hydrants that are not already equipped. The new OCED space requires a domestic demand of 75 gallons per minute and the shell space is anticipated to require approximately 16 gallons per minute totaling the need for 91 gallon per minute which can be supplied by a 1.5” service line. Therefore the existing 1.5” water service will provide the necessary water demand and will not need to be upsized. The existing DCVA will be removed per Pre-Application Meeting comment and replaced with a new 1.5” RPBA within the building. A 4” drain outlet is provided from the mechanical room to outside the building. Coordination with the City to confirm that the RPBA can be located within the building is ongoing. The existing irrigation meter, service, and DCVA is expected to provide adequate capacity and does not require modification. Sewer system: The project proposes to maintain the existing 6” PVC sewer stub serving the property. Per the Pre-Application Meeting requirements, the existing sewer stub has been CCTV’d, appears to be in good condition, and adequate for reuse by the project site. CCTV footage is provided in the CUP submittal. Based on review of the topo and as-builts, it may be infeasible to provide a sewer service to the trash enclosure due to depth of the existing sewer stub and the site grading. Coordination with the City is forthcoming to determine if the City would accept an alternative to the required sewer stub. Alternative consist or allowing the existing drainage system to remain in place and continue to function as it is currently, or to review the feasibility of routing the trash enclosure to the proposed storm system and the ability to provide enhanced water quality treatment to the enclosure runoff before entering the existing storm drainage vault. Power/Communications/Gas: Existing utility services may be modified to enter the building at new locations based on the proposed floor plan. Coordination with the utility purveyors is forthcoming. g) Proposed off-site improvements (i.e., installation of sidewalks, fire hydrants, sewer main, etc.); a. RESPONSE: No off-site improvements are proposed or anticipated. h) Total estimated construction cost and estimated fair market value of the proposed project; a. RESPONSE: Early construction cost estimate is estimated to be $12,000,000. Estimated fair market value based on exit caps for similar projects indicate a completed value of $17- 19M. i) Estimated quantities and type of materials involved if any fill or excavation is proposed; a. RESPONSE: The project proposes only minimal earthwork associated with the new walkways and ramps, entrances, drop-off, and minor utility renovations. Large-scale grading or excavations are not proposed. j) Number, type and size of trees to be removed; a. RESPONSE: Two existing trees may be removed in the Northeast portion of the Property due to minor parking area reconfiguration. The preliminary landscaping plan proposed replacement of these trees. k) Explanation of any land to be dedicated to the City a. RESPONSE: No land is anticipated to be dedicated to the City. ************