TO: Greg Frost, Stride BRT | BT105 Resident Engineer
FROM: Tim Stott, Environmental Engineer
DATE: June 25, 2026
PROJECT: BT105 Renton Transit Center
PROJ. #: 104059-012
SUBJECT: Reuse of Crushed Asphalt as Fill
INTRODUCTION
Shimmick Construction Company, the construction contractor for the Renton Transit Center
project, has prepared and submitted a Reclaimed Asphalt Pavement (RAP) Blending
Program via their subconsultant, Atlas Technical Consultants (Atlas). The purpose of the
RAP program is to establish a controlled and documented process for incorporating RAP
millings into imported and native aggregate materials. Shannon & Wilson has been
requested to review the use of RAP as backfill at the site from an environmental standpoint.
RAP – NOT SOLID OR DANGEROUS WASTE
The use of RAP as fill is exempt from being considered Solid and Dangerous Waste as per
Washington Administrative Code (WAC) 173-303-017(2)(a)(ii) because it substitutes for
what would otherwise be imported fill and thereby constitutes recycling. Nevertheless, in
consultation with the Washington State Department of Ecology (Ecology), Atlas had the
material tested for metals and for acute fish toxicity.1 In summary, although the material is
otherwise exempt from being Dangerous Waste, even if non-exempt, testing confirmed the
material does not meet these criteria for being Dangerous Waste.
USE IN AQUIFER PROTECTION ZONE AND RENTON
MUNICIPAL CODE
Development regulations in Renton Municipal Code (RMC), Title IV, Development
Regulations, Chapter 4, City-Wide Property Development Standards, were reviewed.
1 Washington State Department of Ecology. (2024, March). Biological testing methods 80-12 for the
designation of dangerous waste (Publication 80-12). Hazardous Waste and Toxics Reduction Program.
MEMORANDUM Reuse of Crushed Asphalt as Fill
BT105 Renton Transit Center
104059-012 2 June 25, 2026
Standards for fill material are addressed in Section 4-4-060, Grading, Excavation and Mining
Regulations. Relevant portions from Subsection N.4 of include the following:
(a) General – fill materials are not allowed to have more than minor amounts of organic
decomposable substances, which RAP does not.
(b) Construction, Demolition, and Land Clearing Waste is Prohibited. RAP is not a
waste; it is a recycled material substituting for imported fill, considered a commercial
product.
(c) Cleanliness of Fill. The fill is not allowed to constitute a solid or dangerous waste,
which RAP is not because it is a recycled material substituting for commercial import
fill. Furthermore, the asphalt has been tested for metals content and fish bioassay to
ensure it does not exhibit these characteristics of dangerous waste.
(f) Imported fill for projects located in Zone 2 of the Aquifer Protection Area, such as the
project site, are required to have a fill source statement; however, this is for the source of
imported fill, not for reuse of RAP.
The use of recycled asphalt in blended fill material was presented to Mr. Mike Sippo,
Civil Engineer with the City of Renton, and he raised no objections, provided that the
use of RAP was in accordance with RMC as just outlined.
CONTEXT AND RECOMMENDATIONS FOR USE IN
AQUIFER RECHARGE AREAS
Asphalt (and coal tar seal coat in particular) is known to contain polycyclic aromatic
hydrocarbons (PAHs) at low concentrations2 as well as other petroleum constituents.
Although RAP is not a waste or contaminated soil, because the material can contain low
concentrations of substances deleterious to groundwater quality and the project site is
located in an area designated as an aquifer protection zone, it is recommended that the RAP
fill be used in a manner consistent with fill soils containing low levels of petroleum
contamination, such as Category 2 and 3 soils as designated in Ecology’s Guidance for
Remediation of Petroleum Contaminated Sites.3 As such, RAP should only be placed above
elevation 24 feet, North American Vertical Datum of 1988 (NAVD88), which is
2 United States Environmental Protection Agency (EPA). (2018, January). Stormwater best
management practice, polycyclic aromatic hydrocarbons, coal-tar sealcoat, and stormwater pollution
(Fact Sheet Document No. 833-F-12-004).
3 Washington State Department of Ecology. (2016, June). Guidance for remediation of petroleum
contaminated sites (Publication No. 10-09-057). Toxics Cleanup Program.
MEMORANDUM Reuse of Crushed Asphalt as Fill
BT105 Renton Transit Center
104059-012 3 June 25, 2026
approximately a minimum of 1 foot above the highest anticipated ground water elevation
(approximately 23 feet NAVD88 based on several years of monitoring events) and below
surface paving to limit infiltration and potential migration to groundwater.
Enc. Table 1 – Groundwater Elevation Data
Figure 1 – Site Plan
BT105 Renton Transit Center
5/30/2019 7/22/2021 12/9/2022 7/11/2023 8/10/2023 6/13/2024
09/25/2024-
09/26/2024
12/18/2024-
12/19/2024
3/18/2025-
3/19/2025
08/12/2025-
08/13/2025 11/3/2025
MW-1 20.2 19.65 22.49 -- 20.27 21.12 20.35 21.92 23.62 20 21.76
MW-2 18.49 18.37 19.15 -- 18.7 19.67 18.58 19.92 21.2 18.77 18.59
MW-3 19.57 19.37 20.67 -- 19.25 20.82 19.06 21.12 22 15.73 19.74
MW-4 19.09 -- -- -- -- -- -- -- -- -- --
MW-5 18.72 -- 19.71 -- 18.83 20.02 18.55 20.45 21.51 18.78 18.94
MW-6 19.35 19.18 20.43 -- 19.23 20.48 18.62 20.96 21.9 18.38 19.82
MW-7 19.87 17.51 21.49 -- 19.81 20.85 19.84 21.28 22.49 19.82 21.18
MW-8 -- -- -- 19.72 19 21.27 19.44 22 23.27 19.38 21.49
MW-9 -- -- -- 19.56 19.09 20.29 18.99 21.02 21.98 19.08 20.28
MW-10 -- -- -- 19.12 18.58 19.83 18.34 20.53 21.86 18.55 18.89
MW-11 -- -- -- 18.88 18.38 19.57 18.08 19.88 21.19 18.35 18.34
MW-12 -- -- -- 17.78 17.65 18.45 17.05 18.43 20.4 17.25 17.36
MW-13 -- -- -- 18.48 18.44 19.66 17.88 19.65 21.09 17.84 18.82
MW-14 -- -- -- 20.55 20.03 21.25 20.16 21.65 21.93 19.88 20.84
NOTES:
1 Monitoring well MW-4 was decommissioned in September 2022.
Table 1: Groundwater Elevation Data
Groundwater Elevation
2 MW-8 through MW-14 were installed in July 2023.
Monitoring
Well ID
104059-021 104059-021-M1-T1.xlsx - 6/23/2026/wp/tvv
RTN002RTN001
RTN003
RTN004
S Grady W
a
y
Ra
i
n
i
e
r
A
v
e
S
La
k
e
A
v
e
S
Lake Ave S & S Grady
Way - Bay 4
South Renton Park &
Ride - Bay 1
Ha
r
d
i
e
A
v
e
S
MW-11MW-13
MW-12 MW-14
MW-6
MW-10
RTN001-12 RTN001-13
RTN002-06
MW-8
MW-7
MW-9
MW-1
RTN002-05
MW-2
MW-5
MW-3
Fil
e
n
a
m
e
:
D:
\
_
P
r
o
j
e
c
t
s
\
S
W
\
1
0
4
0
5
9
.
0
2
1
S
T
R
e
n
t
o
n
\
1
0
4
0
5
9
.
0
2
1
S
T
R
e
n
t
o
n
T
C
.
d
w
g
L
a
y
o
u
t
:
s&
e
p
l
a
n
(
1
)
D
a
t
e
:
06
-
2
5
-
2
0
2
6
L
o
g
i
n
:
ca
b
r
y
104059-212
Renton Transit Center (Sound Transit ROW Nos. RTN001-RTN004)
Sound Transit
Renton, WA
Feet
0 75
N
Notes:
1.Site features are approximate.
June 2026
Site Plan
Figure 1
LEGEND
Active Monitoring Well
Installed July 2023
Decommissioned Monitoring Well
Site Boundary
ST Parcels
Former Buildings
RTN001