Project Title:116th Ave SE Improvements
Community Planning Area:Benson Fund:
Functional Classification:Minor Arterial Project:
Project Length:2.5 mi Contact:
Project Description:
Justification:
Status:
Changes:
Funded:Unfunded:
Pre-2018 2018 Total 2019 2020 2021 2022 2023 2024
Expenditures:
Planning - - - - - - - - - -
Preliminary Engineering 1,313,179 113,179 - 1,200,000 - - 600,000 600,000 - -
R-O-W (includes Admin)2,800,000 - - 2,800,000 - - 1,000,000 1,800,000 - -
Construction 5,315,028 615,028 - 4,700,000 - - - 1,000,000 2,000,000 1,700,000
Construction Services 1,547,102 147,102 - 1,400,000 - - - 300,000 600,000 500,000
Post Construction Services - - - - - - - - - -
Other - - - - - - - - - -
Total Expenses 10,975,309 875,309 - 10,100,000 - - 1,600,000 3,700,000 2,600,000 2,200,000
Resources:
Vehicle Fuel Tax - - - - - - - - - -
Business & Occupation Share 221,638 221,638 - - - - - - - -
Fund Balance - - - - - - - - - -
Grants In-Hand (CMAQ+SRTS)653,671 653,671 - - - - - - - -
Grants In-Hand (2)- - - - - - - - - -
Mitigation In-Hand - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other In-Hand (1)- - - - - - - - - -
Other In-Hand (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 10,100,000 - - 10,100,000 - - 1,600,000 3,700,000 2,600,000 2,200,000
Total Sources 10,975,309 875,309 - 10,100,000 - - 1,600,000 3,700,000 2,600,000 2,200,000
116th Ave SE Improvements
Transportation applied for a FY 2020 WSDOT Pedestrian-Bicycle grant for the design of a walkway and a bike lane on the west side of 116th Ave SE, between SE 168th St and SE
160th St.
317
122117
Flora Lee 425-430-7303
Widen roadway to provide a 3-lane roadway with bike lanes along 116th Ave SE and Edmonds Way SE, including new pavement, curb, gutter, sidewalk, street lights, traffic signals,
storm drainage, channelization and landscaping from Puget Drive SE to the southern City limits. Benson Hill Community Plan recommended improvements for a first phase, based
on the neighborhood needs. The priority, cost and schedule for the phased improvements will be determined based on available funding.
116th Ave SE is classified as a minor arterial. Non-continuous segments of sidewalk exist along the roadway. Improvements will enhance vehicular, bicycle and pedestrian safety
along this important north-south transportation corridor.
The corridor improvements are estimated at $33M. Phase 1 Improvements (SE Petrovitsky Rd to SE 168th St) are shown as programmed for 2020-2024. Staff will be developing
scope, cost and schedule for future phases.
875,309 10,100,000
Project Expenditures & Resources Programmed Programmed Pre-2019 Six-Year Program
City of Renton 48
Chapter 4
Multi-modal Transportation
2. Build on the existing trail system
to create a functional and beautiful
pedestrian and bicycle route network.
2.1. Establish 116th Avenue SE as the central spine,
or “jewel pathway,” of Benson Hill.
116 th Avenue SE is the central spine of Benson Hill, connecting
neighbors to Cascade Village, Cascade and Benson Hill
Elementary Schools, trails, and King County. Improving this
central connection will tie Benson Hill together, especially
across SE Petrovitsky Road. The following strategies
suggest ways to make 116th Avenue SE a truly multi-modal
VWUHHWZLWKQLFHVLGHZDONVVWUHHWOLJKWVODQGVFDSLQJ³JUHHQ
infrastructure,” public art, and improved transit.
2.1.1. Improve 116th Avenue SE to provide a walkable,
bikable, and environmentally-friendly way to
connect to destinations.
Additional details: Complete 116th Avenue SE with the
following:
Within existing right-of-way, explore the feasibility
of establishing bike lanes and sidewalks to support
walking and biking on this central spine. A central
median may be used as a pedestrian refuge where
a turn lane is not needed. Work with Council
Transportation Committee to prioritize any proposed
street improvements with other projects throughout
WKHFLW\3URMHFWLVDOUHDG\LQWKHDGRSWHG\HDU7,3
,QFOXGHDPSOHVSDFHDQGDPHQLWLHVHJVHDWLQJ
ELNHUDFNVDQGSXEOLFDUWIRUSHGHVWULDQVDQGF\FOLVWV
so that 116th becomes appropriate and comfortable
for all users.
Install pedestrian-scaled street lighting to create a
safe and welcoming environment.
Incorporate natural drainage where possible to treat
rainwater in an ecologically sound way.
Choose appropriate native species to reduce the
maintenance burden, reinforce local ecology, and
encourage healthy plant establishment.
Continue seeking Complete Streets, Safe Routes to
School, and other grants that may become available
&33:/LYDEOH&RPPXQLWLHV+HDOWK\$FWLYH/LYLQJ
7UDQVSRUWDWLRQ$OWHUQDWLYHVHWF
Figure 4-7. WK$YH6(NH\PDS
IRUFURVVVHFWLRQVLQ)LJXUH
SE 168th St
117th Ave SEPrivate Rd
SE 172nd St
SE 169th St
SE 173rd St
SE 175th StSE 170th CtCascade Shopping C
C
a
s
c
a
d
e
S
h
o
p
p
i
n
g
C
e
n
t
e
r
A
c
R
d
Private Rd Cascade Shopping Center AcRd116th Ave SESE 176th St SE Petrovitsky Rd
1
2
3
Bike lane
Sidewalk
Landscaped median
Landscaping (includes natural
drainage where space is available)
Bus stop
Overhead utility pole
Benson Hill Community Plan 49
Plan Elements
Figure 4-8. WK$YH6(SURSRVHGLPSURYHPHQWV
FURVVVHFWLRQVDQGYLVXDOL]DWLRQV
4-6’
side-
walk
5’
bike
lane
5’
bike
lane
4-6’
side-
walk
2.5-4.5’
planting
strip
2.5-4.5’
planting
strip
11’
drive lane
11’
refuge median
11’
drive lane
4-6’
sidewalk
8-10’
vegetated
swale
5’
bike lane
11’
drive lane
11’
drive lane
5’
bike lane
8-10’
vegetated
swale
4-6’
sidewalk
4-6’
side-
walk
5’
bike
lane
11’
drive lane
11’
turning lane
11’
drive lane
5’
bike
lane
4-6’
side-
walk
2.5-4.5’
planting
strip
2.5-4.5’
planting
strip
1
2
3
Cross section looking north between 168th St and SE 172nd St
(Street trees may be in grates where the planting strip is less than 4’.)
Cross section looking north where there are medians
(Street trees may be in grates where the planting strip is less than 4’.)
Cross section looking north between Cascade
Village and SE Petrovitsky Rd
6RXWKRIWK6WORRNLQJVRXWK)HQFHQHDU&9$&EDVHEDOO¿HOGVLVUHSODFHGZLWK
landscaping, sidewalk is widened, bike route formalized, and street trees added.
At Cascade Village, looking north. Bike lanes and street trees continue, sidewalk is
widened with Cascade Village redevelopment, and landscaped medians alternate
with a turning lane as needed.
Near Petrovitsky, looking south. Water drains into swales on both sides of the
street, landscaping buffers the sidewalks, and bike lanes continue.
overhead power
lines remain
BEFORE
BEFORE
BEFORE
AFTER
AFTER
AFTER
overhead power
lines remain
overhead power
lines remain
City of Renton
Chapter 4
Responsible party: Transportation Systems, Utility Systems, Parks Planning and Natural Resources
Public involvement: Land owners along 116th$YHQXH6(SRVVLEOH/,'IXQGHG
Resources: $$$
Timeframe: Mid-term to Long–term dependent on grant funding or LID funding
2.1.2. Require a high-quality pedestrian realm along 116th Avenue SE through design
guidelines with any redevelopment of Cascade Village (also see Strategy 1.2.4).
Additional details5HTXLUHDPSOHVLGHZDONVSDFHZLWKDPHQLWLHVHJDZQLQJVVHDWLQJELNHUDFNV
DQGDQDFWLYHVWUHHWHGJHHQWULHVIDFLQJth$YHQXH6(ZLWKUHGHYHORSPHQW
Responsible party: Planning
Public involvement: Cascade Village property owner
Resources: $
Timeframe6KRUWWHUPDOWKRXJKGHYHORSPHQWZRXOGOLNHO\KDSSHQLQWKHORQJWHUP
2.2. Expand the trail network to build on the existing wealth of trails in the area,
increase recreational and active living opportunities, and provide safe connections
for non-motorized travel.
Benson Hill also has the start of a great trail network with the existing pedestrian paths along utility corridors
and through Tiffany and Cascade Parks, the informal mountain biking trails under the power lines near Philip
$UQROG3DUNWKHSODQQHG6RRV&UHHN7UDLO.LQJ&RXQW\DQGWKH&HGDU5LYHU7UDLO5HQWRQ$NH\PLVVLQJ
link could be provided by the power lines corridor that runs behind Cascade Village. This path connects
Soos Creek Park and Trail, Cascade Village, Nelsen Middle and Spring Glen Schools, and the existing
SHGHVWULDQZDONDORQJ6(th Street. Other linkages, described below, would bolster the trail system to
be one of the best in the region, increasing recreational and active living opportunities and providing safe
connections for non-motorized travel.
2.2.1. Complete the Soos Creek Trail and connect to existing paths.
Additional details: Coordinate with and support King County Parks’ Capital Improvements Project
for Soos Creek Trail Phase V and VI. Incorporate and prioritize any proposed projects in the next
update of the Trails and Bicycle Master Plan.
Responsible party: King County Parks, Parks Planning and Natural Resources, Transportation
Systems
Public involvement: TBD
Resources: $$$
Timeframe: On-going
Benson Hill Community Plan 51
Plan Elements
T167
T515
T515
T515
Panther Lake
Cedar River
SPRING GLEN SCHOOL
NELSEN MIDDLE SCHOOL
LINDBERGH HIGH SCHOOL
CASCADE ELEMENTARY SCHOOLTALBOT HILL ELEMENTARY SCHOOL
RENTON PARK ELEMENTARY SCHOOL
BENSON HILL ELEMENTARY SCHOOL
TIFFANY PARK ELEMENTARY SCHOOL
GLENRIDGE SCHOOL
SPRINGBROOK SCHOOL
RENTON PARK SCHOOL
LAKE YOUNGS SCHOOL
CARRIAGE CREST SCHOOL
MEEKER JR HIGH SCHOOL
CITY UNIVERSITY-RENTON
,§-405
KentKent
Soo
s
C
r
e
ek Park and
Trail
Maplewood Golf Course
Cedar River Natural Area
Renton ParkD
o
g P
a
r
k
Watershed ParkCa
s
c
a
d
e
P
a
r
k
Craig Edlund Park
Riverview Park
Panther Creek WetlandsPh
i
ll
i
p
Ar
n
o
l
d
Pa
r
k
T iffa n y P a r k
Cedar River Trl
S
oos Creek TrlSR 167Talbot Rd SSE 192nd St
Cedar River Trl
I-40 5 Fwy
116th Ave SE140th Ave SESR 515Benson Rd SEast Valley RdSE 168th St
SE Petrovitsky Rd
108th Ave SESE 196th StGrant Ave SSE 164th St
Bea
c
o
n W
ay S
Pedestrian Walk
SE 204th St Soos
Creek Trl
SE 200th St128th Ave SES Puget Dr
S 55th St
S G ra d y W aySE 184th StSE Carr RdS 200th StHardi
e
A
v
e
S
WSR 167 RampSE 186th St
S E 141 s t S t
SE 6th St
125th Ave SEPuget Dr SE140th Way SE
112th Ave SES 7th St
SE Fairwood Blvd132nd Pl SESE 172nd StRenton Ave 118th Ave SES 15th St
126th Ave SEI-405 RampSE 182nd St
129th Pl SES 1 4 th St
S E 2 0 4t h W a y
SE 144th St
113th Ave SES 19th St
133rd Ave SESE 180th StMill Ave S120th Ave SE102nd Ave SES 38th Ct
S 3 6t h P lBenson Dr SRenton Maple
V
alley Rd
136th Pl SES E 8th Pl
143rd Pl SESE 188th StHigh Ave S92nd Ave SSE 158th St
142nd Ave SEShattuck Ave S106th Ave SESE 1 5 9th Pl
S 32nd St
S
E Royal Hills Dr
S
E 1
7
1
st
W
ay
131st Ave SES
E
170t
h
Pl
SE 202nd Pl 145th Ave137th Ave SESE 160th St
SE 176th St
100th Ave SE134th Ave SESE 181st St
SW 7th St
SE 1 6 1 st St
104th Ave SESE 151st St
105th Ave SES 31st St
S E 16t h S tIndex Ave SE
B
e
a
c
on
W
ay
S
E
S 203rd St
S 27th St 121st Ave SES 2
3
r
d
StSE 204th Pl
SE 142nd St
S 202nd St
SE 179th PlLake Ave SSE 2 0 1st Pl103rd Ave SESE 19th St
Davis Ave SS E 165th St
104th Pl SE132nd Ave SESE 162nd P l
SW 43rd St
SE 161st Pl
138t
h A
v
e
S
EMorris Ave105th Pl SES 48th St
S 50th St
S C arr Rd111th Ave SELake Youngs Way SE
S E 12th St
SE 7th St
Rolling Hills Ave SESE 181st Pl110th Pl SESE 175th St
S 47th St SE 173 rd P l124th Ave SE110th Ave SE123rd Ave SE113th Pl SESE 201st StCed122nd Ave SE142nd Pl SE107th Ave SESE 21st StS 21st St
SE 170th St
SE 174th St 114th Ave SE139th Pl SESE 190th StCedar Ave S
109th Ave SESE 1 5 6 t h S t120t
h Ter
SEEagle Ridge Dr SS E 11th St
Tho
m
as Ln
SE 180th Pl
99th Pl SCedar Ridg
e D
r
S
E
133rd Pl SESE 169th St118th Pl SESE 163rd St
S 26th St
117t
h Ave SE114th Pl SES E 8 th D rS 43rd St
S 50th Pl SE 187th St
SE 183rd St
SE 16th Pl
S E 1 7 1 s t P lSE 167th S tS 45th Pl
SE 18th Pl
SE 148
t
h St
SE 22nd Pl
116th Pl SESE 157th St
113th W ay SE130th Ave SES 17th St
S W 1 2t h S t
119th Ave SE135th Ave SE98th Ave SS 37th St
SE 177th St
1
4
4
t
h Pl SESE 191st St
141st Pl SE
9
6
t
h
A
ve S 110th Ln SES 36th St
W 27th St
SE 18 5 th P l Pierce Ave SESE 188th
SE 173rd St
S 27th PlSE 160 t h P lW 19th St
S 53rd Pl
S 35th St
SE 194th St
SE 186th Pl
SE 203rd St 127th Ave SES 18th St
128th Pl SES Renton Village Pl
Main Ave S123rd Pl SES 198th S t
106th Pl SEGrant Aly SS 19 6 th P l98th Pl SS 199th St
34th St
S 28 th C tKirklan
d Ave SEW 5th 139th Way SE135th Pl SE126th Pl SES 25th St
SE 203rd Pl Shelt
on Ave SESE 198thPl
S
E 8th St
S
E 18th St
S 46th Pl
SE 166th St
SE 159th St
W 41st St 119th Ln SEMonroe Av
e
SES E 7th Ct
SE 205th St
S E 1 7 8 t h St
122nd Pl SE1SE 183rd P l
115th Pl SE122nd L
n
SESE 162nd St
S 204th Pl
S 34th Pl
SE 10th St
136th Ave SE1 3 4 t h Ln SESE 189th Pl
SE 199th StNelsen M S AcRd
SE 194th Pl
SE 1
SE 197th St
SE 17
121st Pl SESE 188t h P lS 2 2 nd Ct SE 21 s t Pl
S 51st St SE 150th St
S 28th StSmithers Ave S138th Pl SE115th Ln SES 6th St
Wood
cliff
e
Ap
a
rtments AcRd
S 29th St 111th Pl SE117th Pl SEBerkshire Apt AcRd107th Pl SE16th St
SE 190th Pl
110th Ter SEWhit
wo
rth Av
e
SLake P
l
S
S 10th St
141st Ave SES 177th St 115th Ave SESE 192nd Pl
S E 108th LnS E 199th PlSE 197th Pl
S 205th Pl
SE 198th St127th Pl SE129th Ct SEL in d b e r g h HS AcRd
S 30 th P lS 1 9 4 t h S tSE 17th Ct
Renton Villag e AcRdSE 193rd Ter
S E 1 8 4 th L n
Unnamed
S
erene Cir SE
Rolling Hills Co ndo AcRdS 198th Pl
S 33rd Pl
SE 185th CtSE 196th Ct
SE 30th Pl
143rd Ct SEBenson Condomi niums A cRd
106th Pl SESE 201st St
102nd Ave SELake Av e S
SE 172nd St
SE 185th Pl
SE 188th Pl126th Pl SESE 186th St
SE 181st St
P
e
d
e
s
t
ri
a
n
Wal
kSR 5151
3
1
st A
ve S
E
124th Ave SE132nd Pl SES 6th St
Smithers Ave S128th Pl SEPrivat
e
R
d
Private RdI-405 RampPrivate Rd1
4
2
n
d
Av
e
SEPrivate Rd
Pedestrian Wal
kSE 196th St 132nd Pl SESE 180th St
112th Ave SE103rd Ave SE143rd Ave SES 50th St
Private RdSE 203rd Pl
S 27th St
SE 169th St
SE 1 8 1 st St Edmonds Ave SE104th Pl SESE 173rd S t
S E 191s t S t
SE 160th St
Pedestria n WalkPrivate Rd
S
R
1
67 Ramp117th Ave SESE 158th St
P r i v ate Rd
122nd Pl SEPrivate RdCedar Ave SPrivate RdSE 1 9 6 th St
Private Rd
S 23rd St
104th Ave SES E 176th Morris Ave S136th Ave SE110th Ave SE124th Ave SE126th Ave SE106th Ave SESE 186th St
SE 172nd St
Priv
116th Ave SES E 188 th S t
Private Rd120th Ave SESE 190th St
SE 1 5 9 t h P l139th Pl SE109th Ave SE143rd Pl SE130th A ve SE124th Ave SE122nd Ave SETal
b
ot
R
d
S
S E 18 9 t h P lS 2 6 th St
SE 1 88th Pl
SE 176th St
140th Ave SE111th Ave SE121st Ave SESE 166th St
SE 172nd St 118th Ave SESE 200th St
SE 168th StSE 169th St
SE 170th St
143rd Pl SESE 184th Pl
SE 164th St
SE 200th St 120th Ave SEPrivate Rd
1:10,000
´
0 2,5001,250 Feet
Benson
Lake Washington
L
a
k
e
Y
o
u
n
g
s
RENTONRENTON
KentKentTukwilaTukwilaSeattleSeattle Newca stleNewcastle
B elle vueBellevue
Mercer IslandMercer Island
IssaquahIssaquah
Date: 04/20/2012
Benson Community Planning Area
City Limits
Vacant Land
Parks
3 School Site
Parcels with improved value less than $10,000
Renton Trails
XYXYXYXYXYOplympic Pipelines
Parcels intersect Olympic pipeline
High Pressure Gas
Parcels intersect high pressure gas line
Public Land
Path: H:\CED\Planning\GIS\GIS_projects\community_planning_initiative\mxds\benson_planning_area\Benson vacant land open and public space_24x36_April2012.mxd
ettroviittskk
SE 164t
120t
hTTer
SE115tms A cRd
117thEagleRRRolling
SS
E
170th
Pl
11222nd
L
n
SEWWooBveSSer SE7th
Ced
SS EE 11 00 tth S tRRentoSS
entsA
St
gHills
P r i v
12LL
MMEEEEEEEE RentonParkrr132ndPlSES P l12S
SE 1 5
B
y
S
Beacon
W
aayy
S
TTTTTTTTTTTTTTT
OT HIL
TalbootRdSSSSSEEEEEE 1111999922222nd St
hh SStt
St
S
111122S 17
rd Pl
ateRSEEEEEEEEES 23
106ESoos Creek Trailp
o
w
e
r
l
i
n
e
s
c
o
r
r
i
d
o
r
power l
ines corr
idor
pipe line
s
c
o
r
ri
d
o
r
P.
A
.
P
a
r
k
r
o
a
dgas lines corridorgas lines corridorInformal
mountain
biking trails
Cascade
Village
Benson
Plaza
Existing paths
Proposed paths
Figure 4-9. ([LVWLQJDQGSURSRVHG%HQVRQ+LOOWUDLOVRQSURSHUW\RZQHUVKLSPDS
City of Renton 52
Chapter 4
2.2.2. When possible, acquire property or establish
agreements to extend pipelines, power lines, and other
utility corridor trails as consistent with the Parks,
Recreation and Natural Areas Plan and/or the Bicycles
and Trails Master Plan.
Additional details: Seek grant funding for acquisition or
easements and construction of recreational trails and/
RUVDIHZDONLQJELNLQJURXWHV:DVKLQJWRQ5HFUHDWLRQ
DQG&RQVHUYDWLRQ2I¿FH7UDLOV*UDQWV&33:/LYDEOH
Communities, Healthy/Active Living, Transportation
$OWHUQDWLYHVHWF5HTXLUHHDVHPHQWIRUWUDLOVZLWK
redevelopment. Incorporate and prioritize any proposed
projects in the next update of the Trails and Bicycle Master
Plan.
Responsible party: Parks Planning and Natural Resources,
Planning, Community and Economic Development
Public involvement: Property owners on or adjacent to
pipelines and power lines corridors
Resources: $$$
Timeframe: On-going
2.2.3. Work with the utility companies who own Beacon
Way S between Puget Drive S and Philip Arnold Park
to explore the feasibility of paving and landscaping
a path to the park from Benson Hill to amply
accommodate bicycles, pedestrians, and motorists.
Additional details: Clarify ownership of the property.
Incorporate and prioritize any proposed project in the next
update of the Trails and Bicycle Master Plan, prioritize this
project in the Capital Improvements Plan, and seek funding
for multi-modal connections.
Responsible party: Transportation Systems, Parks Planning
and Natural Resources
Public involvement: TBD
Resources: $$
Timeframe: Short-term
2.2.4. Connect paths to the existing trails on Puget Sound
Energy Property under the power lines near Phillip
Arnold Park.
Additional details: Sign existing trail heads in the natural zone
with the local trail names. In the long-term as other trails
GHYHORS6WUDWHJLHVFRQQHFWIRUPDODQGLQIRUPDO
Figure 4-10. %HDFRQ:D\6WR3KLOOLS$UQROG
3DUN
Benson Hill Community Plan 53
Plan Elements
trails. Incorporate and prioritize any proposed projects
in the next update of the Trails and Bicycle Master Plan.
Responsible party: Seattle Public Utilities, Parks
Planning and Natural Resources
Public involvement: TBD
Resources: $
Timeframe: Mid-term
2.2.5. Study the feasibility for a topographically level
bicycle and pedestrian connection between the
Grant Avenue S/S Puget Dr area to the Benson
Shopping Center.
Additional details: If feasible, incorporate into the next
update of the City’s Trails and Bicycle Master Plan and
prioritize for funding.
Responsible party: Transportation Systems, Parks
Planning and Natural Resources
Public involvement: Affected property owners, bicycle
JURXSVHJ&DVFDGH%LF\FOH$OOLDQFH
Resources: $$$
Timeframe: Long-term
2.2.6. Add and improve existing pedestrian crossings
over Interstate 405 and Highway 167.
Additional details: Explore ways to better connect
Benson Hill with Downtown Renton for pedestrians
and cyclists by providing shortcuts where possible
DQGFRQQHFWLQJZLWKQHZWUDLOV6WUDWHJLHV
Consider lighting, artwork, path width, buffers, and
so on to make the crossings feel safe and inviting.
Incorporate and prioritize any proposed projects into the
City’s Trails and Bicycle Master Plan.
Responsible party: Transportation Systems, Planning,
Parks Planning and Natural Resources
Public involvement: TBD
Resources: $$$
Timeframe: Long-term
City of Renton 54
Chapter 4
2.3. Improve neighborhood streets to complete a network
of walking routes that connect destinations and
neighborhoods and are safe and inviting for all users.
Although Benson Hill has the beginnings of a great trail network,
many streets lack adequate and safe space for people to walk to
their destinations. The following strategies recommend completing
the sidewalk network and adding low-level, pedestrian-scale lighting
on major connections to schools, parks, and commercial amenities.
$ORQJZLWKWKHSK\VLFDOVSDFHWRZDONDQGF\FOHVSHHGLQJWUDI¿FDQG
unsafe intersections must also be addressed to make streets usable
for all modes of travel.
2.3.1. Complete missing links in sidewalks and add
SHGHVWULDQVFDOHGVWUHHWOLJKWLQJDQGFDOPWUDI¿FRQ
routes to schools, parks, and commercial areas.
Additional details: See Walking and Bicycling Improvements
PDS)LJXUHIRUORFDWLRQVSHFL¿FLPSURYHPHQWV
requested by community members. Incorporate and prioritize
any proposed projects in the next update of the Trails and
Bicycle Master Plan.
Responsible party: Transportation Systems
Public involvement: Affected property owners, bicycle groups
HJ&DVFDGH%LF\FOH$OOLDQFH
Resources: $$
Timeframe: Mid-term
2.3.2. Identify and prioritize high accident locations for
people walking and cycling, especially near bus stops.
Additional details: Review Walking and Bicycling
,PSURYHPHQWVPDS)LJXUHIRUORFDWLRQVSHFL¿F
improvements requested by community members. Place
pertinent projects on Transportation Improvements Plan and
continue or increase Police enforcement where needed.
Incorporate and prioritize any proposed projects in the next
update of the Trails and Bicycle Master Plan.
Responsible party: Transportation Systems, Police
Public involvement: TBD
Resources: $$
Timeframe: Short- to Long-term dependent upon scope and
funding of projects
Benson Hill Community Plan 55
Plan Elements
3
3
3
3
3
3
3
3
Nelsen Middle School
Lindbergh
High School
Cascade
Elementary
School
Renton Park
Elementary School
Benson Hill
Elementary School
Tiffany Park
Elementary School
Spring Glen
School
SE 168th St
128th Ave SESE 164th St
SE 31st St
SE 164th StGrant Ave SPedestrian
W
a
l
k
Ce
d
a
r
R
i
v
e
r
T
r
l
B
e
a
c
o
n
W
a
y
S
112th Ave SESE 186th St 134th Ave SE125th Ave SESE 184th St
102nd Ave SESE 172nd St
118th Ave SE126th Ave SESE 192nd St
SE 182nd St
129th Pl SE113th Ave SEMi
l
l
Ave
S120th Ave SES 36th Pl
SE
8
t
h
P
l
SE 188th St
SE 158th S
t
S 7th St
106th Ave SEHigh Ave SSE Royal Hills D
r
131st Ave SES
E
1
7
0
t
h
P
l
SE 160th St
SE 16th Pl
SE 181st St
SE 165th St
104th Ave SE105th Ave SEIn
d
e
x
A
v
e
S
E
S
E
1
5
1
s
t
S
t
SE 16th StB
e
a
c
o
n
W
a
y
S
E
121st Ave SES 27th St
SE
6
t
h
S
t
129th Ave SES 23rd S
t
S 9th St
106th Pl SE103rd Ave SESE 161st StRenton Ave SS
E
1
9
t
h
S
t
132nd Pl SE105th Pl SESE 159th Pl
F
e
r
n
d
a
l
e
A
v
e
S
E
SE 180th St111th Ave SES 36th St
Lake Yo
u
n
g
s
W
a
y
S
E
110th Pl SESE 12th St
SE 7t
h
S
t
S 47th St 124th Ave SESE 175th St 123rd Ave SEJones Ave S122nd Ave SE114th Ave SES 32nd StTalbot Rd S127th Pl SESE 21st St
110th Ave SECedar Ave SSE 170th St
SE 174th S
t 120th
Te
r
SE109th Ave SESE 11t
h
St
Eagle Ridge Dr SSE 180th Pl
T
h
o
m
a
s
L
n
118th Pl SECe
d
a
r
R
i
d
g
e
D
r
SE
133rd Pl SE114th Pl SESE 169th St
SE 163rd St
SE 22nd Pl
Private RdSE 8th Dr
G
l
e
n
w
o
o
d
A
v
e
S
E
117th Ave SEMain Ave SSE 18th
P
l
121st
Ln
SE133rd Ave SE113th Way SE
SE 187th St
130th
Av
e
S
E
S
E
1
6
9
t
h
P
l
112th Pl SESE 157th St
119th Ave SEBenson Plaza AcRd128th Ave SES 38th Ct
SE 191st St
SE 167th St 135th Ave SESE
1
4
8
t
h
S
t
Aberdeen Ave SES 37th Pl
SE 185th Pl
SE 173rd St
SE 160th Pl
SE
1
4
9
t
h
S
t
127th Ave SES 35th St
Mill Ave SE128th Pl SEGrant Aly SS 31st St
S 28th
Ct Eagle Ln S135th Pl SE126th Pl SESE 178th St
SE 179th St
S
E
1
8
t
h
S
t
SE 166th St
SE 159th St
SE 8th St
SE 183rd Pl 119th Pl SE
SE 186th Pl
1
2
2
n
d
L
n
S
E
SE 162nd St
S 34th Pl
123rd P
l SE
SE 10th
S
t
122nd Pl SESE 5t
h
P
l
UnnamedSE 11th
Pl
Olympia Ave SE107th Ave SESE 189th Pl
Nelsen MS AcRd
113th Pl SESE 184th Pl
121st Pl SESE 188th Pl
S 28th St
115th Ln SESE 190th St
S 6th St
SE 20th Ct
111th Pl SESmi
thers
Ave
S117th Pl SES 29th St
SE 193rd Pl
SE 187th Ln
S 29th
Ct
108th Ave SE107th Pl SEBerkshire Apt AcRdSE 187th Pl
SE 176th St
SE 190th Pl
SE 19th Ct
SE 171st Pl
SE 174th LnWells Ct SMain Ct S115th Ave SECedar Ave SES 31st Ct
Palm Court Condos AcRdEdmonds Dr SESE 166th Pl
SE 171st St
131st Pl SESE 21st Ct
SE 185th StJones Dr SESE
1
5
7
t
h
P
l
SE 182nd Pl
S 30th Pl
SE 179th Pl
SE 18th Ct
104th Pl SES 30th Ct
SE 161st Pl
SE 189th St
SE 171st Ln
128th Pl SE132nd Pl SESE 182nd St
114th Ave SESE 181st St
SE 161st St
126th Ave SESE 18
7
t
h
P
lPrivate RdPrivate Rd114th Ave SESE 160th St
1
3
2
n
d
P
l
SE
SE 18th CtPrivate RdSE 169th St
12
9
t
h
P
l
S
E
132nd Pl SESE 159th Pl
Private Rd134th Ave SE11
9
t
h
P
l
S
E
Pedestrian Walk 131st Ave S
E
106th Pl SES 23rd St Cedar Ave SSE 180th St
SE 190th St 126th Pl SEPrivate RdSE 167th St
SE 175th St
SE 172nd St 126th
P
l
SE111th Ave SESE 186th St
SE 173rd St 134th Ave SE106th Ave SESE 182nd St
SE 179th St 130th Ave SE118th Ave SE124th Ave SESE 184th Pl 117th Ave SESE 188th P
l
SE 169th Pl 133rd Pl SE110th Pl SE133rd Pl SESE 181st St109th Ave SE118th Ave SEPedestrian Walk120th Ave SEPrivate RdSE 180th St
SE 160th St
SE 172nd St
SE 185th Pl120th Ave SESE 172nd St
SE 182nd St
132nd Pl SESE 166th St
SE 186th Pl116th Ave SEBenson Rd S
S Puget Dr
Benson Dr
S108th Ave SESE Petrovitsky Rd
E Carr RdTalbot Rd SSE 176th St
SE 192nd St
SOOS CREEK
PARK AND TRAIL
CEDAR RIVER
NATURAL ZONE
RENTON
PARK
BOULEVARD
LANE PARK
CASCADE
PARK
PHILLIP
ARNOLD
PARK
TIFFANY
PARK
CASCADE VILLAGE
SHOPPING CENTER
BENSON
SHOPPING
CENTER
T515
T515
405
Needs a
stop sign
Needs signal
& crosswalk
or pedestrian
refuge
Needs signal
& crosswalk,
esp. for bus
riders
Unsafe
intersection
Collisions;
pedestrian
crossings not
respected
Crosswalk
needed for
bus users
Visibility
Visibility of
school kids
on street
L-1
L-2
L-3
L-4
L-5
L-6
L-7
L-8
P-1
B-1
B-2
B-3
T-1
T-2
T-3T-4
T-5
T-6
T-7
T-8
T-9
P-2
P-3 P-4
P-7
P-6
P-5
P-4
S-1
S-2
S-3
S-4
S-5
S-6
S-7
S-8
S-9
I-1
I-2 I-3
I-4
I-5
I-6
I-7
I-8
I-9
Benson Hill Planning Area
City of Renton
Commercial areas
Parks
¯0 1,200 2,400600 Feet
BENSON HILL COMMUNITY PLANCOMMUNITY PLAN
Walking and Bicycling Improvements
SUGGESTED IMPROVEMENTS
Identified by February 2012 open house, online map and surveys, and Summer 2012 neighborhood picnics participants.
Add a new path
Add paths along utility
corridors
Add/improve sidewalks
Existing pedestrian paths
Existing regional trail Planned regional trail
Add/improve bike routes
General areas identified for
sidewalk improvements
Calm traffic
Improve intersection
Add /improve human-
scale street lights
T-7
I-7
L-6B-3
S-6
S-4 P-2
P-3
Figure 4-11. :DONLQJDQGELF\FOLQJLPSURYHPHQWVPDS