Loading...
HomeMy WebLinkAbout23. 116th Ave SE ImprovementsTRANSPORTATION IMPROVEMENT PROGRAM 2019 - 2024 TIP No. 23 Project Title:116th Ave SE Improvements Community Planning Area:Benson Fund: Functional Classification:Minor Arterial Project: Project Length:2.5 mi Contact: Project Description: Justification: Status: Changes: Funded:Unfunded: Pre-2018 2018 Total 2019 2020 2021 2022 2023 2024 Expenditures: Planning - - - - - - - - - - Preliminary Engineering 1,313,179 113,179 - 1,200,000 - - 600,000 600,000 - - R-O-W (includes Admin)2,800,000 - - 2,800,000 - - 1,000,000 1,800,000 - - Construction 5,315,028 615,028 - 4,700,000 - - - 1,000,000 2,000,000 1,700,000 Construction Services 1,547,102 147,102 - 1,400,000 - - - 300,000 600,000 500,000 Post Construction Services - - - - - - - - - - Other - - - - - - - - - - Total Expenses 10,975,309 875,309 - 10,100,000 - - 1,600,000 3,700,000 2,600,000 2,200,000 Resources: Vehicle Fuel Tax - - - - - - - - - - Business & Occupation Share 221,638 221,638 - - - - - - - - Fund Balance - - - - - - - - - - Grants In-Hand (CMAQ+SRTS)653,671 653,671 - - - - - - - - Grants In-Hand (2)- - - - - - - - - - Mitigation In-Hand - - - - - - - - - - Bonds / LID's Formed - - - - - - - - - - Other In-Hand (1)- - - - - - - - - - Other In-Hand (2)- - - - - - - - - - - - - - - - - - - - Undetermined 10,100,000 - - 10,100,000 - - 1,600,000 3,700,000 2,600,000 2,200,000 Total Sources 10,975,309 875,309 - 10,100,000 - - 1,600,000 3,700,000 2,600,000 2,200,000 116th Ave SE Improvements Transportation applied for a FY 2020 WSDOT Pedestrian-Bicycle grant for the design of a walkway and a bike lane on the west side of 116th Ave SE, between SE 168th St and SE 160th St. 317 122117 Flora Lee 425-430-7303 Widen roadway to provide a 3-lane roadway with bike lanes along 116th Ave SE and Edmonds Way SE, including new pavement, curb, gutter, sidewalk, street lights, traffic signals, storm drainage, channelization and landscaping from Puget Drive SE to the southern City limits. Benson Hill Community Plan recommended improvements for a first phase, based on the neighborhood needs. The priority, cost and schedule for the phased improvements will be determined based on available funding. 116th Ave SE is classified as a minor arterial. Non-continuous segments of sidewalk exist along the roadway. Improvements will enhance vehicular, bicycle and pedestrian safety along this important north-south transportation corridor. The corridor improvements are estimated at $33M. Phase 1 Improvements (SE Petrovitsky Rd to SE 168th St) are shown as programmed for 2020-2024. Staff will be developing scope, cost and schedule for future phases. 875,309 10,100,000 Project Expenditures & Resources Programmed Programmed Pre-2019 Six-Year Program City of Renton 48 Chapter 4 Multi-modal Transportation 2. Build on the existing trail system to create a functional and beautiful pedestrian and bicycle route network. 2.1. Establish 116th Avenue SE as the central spine, or “jewel pathway,” of Benson Hill. 116 th Avenue SE is the central spine of Benson Hill, connecting neighbors to Cascade Village, Cascade and Benson Hill Elementary Schools, trails, and King County. Improving this central connection will tie Benson Hill together, especially across SE Petrovitsky Road. The following strategies suggest ways to make 116th Avenue SE a truly multi-modal VWUHHWZLWKQLFHVLGHZDONVVWUHHWOLJKWVODQGVFDSLQJ³JUHHQ infrastructure,” public art, and improved transit. 2.1.1. Improve 116th Avenue SE to provide a walkable, bikable, and environmentally-friendly way to connect to destinations. Additional details: Complete 116th Avenue SE with the following: ‡Within existing right-of-way, explore the feasibility of establishing bike lanes and sidewalks to support walking and biking on this central spine. A central median may be used as a pedestrian refuge where a turn lane is not needed. Work with Council Transportation Committee to prioritize any proposed street improvements with other projects throughout WKHFLW\ 3URMHFWLVDOUHDG\LQWKHDGRSWHG\HDU7,3  ‡ ,QFOXGHDPSOHVSDFHDQGDPHQLWLHV HJVHDWLQJ ELNHUDFNVDQGSXEOLFDUW IRUSHGHVWULDQVDQGF\FOLVWV so that 116th becomes appropriate and comfortable for all users. ‡Install pedestrian-scaled street lighting to create a safe and welcoming environment. ‡Incorporate natural drainage where possible to treat rainwater in an ecologically sound way. ‡Choose appropriate native species to reduce the maintenance burden, reinforce local ecology, and encourage healthy plant establishment. ‡Continue seeking Complete Streets, Safe Routes to School, and other grants that may become available &33:/LYDEOH&RPPXQLWLHV+HDOWK\$FWLYH/LYLQJ 7UDQVSRUWDWLRQ$OWHUQDWLYHVHWF  Figure 4-7. WK$YH6(NH\PDS IRUFURVVVHFWLRQVLQ)LJXUH SE 168th St 117th Ave SEPrivate Rd SE 172nd St SE 169th St SE 173rd St SE 175th StSE 170th CtCascade Shopping C C a s c a d e S h o p p i n g C e n t e r A c R d Private Rd Cascade Shopping Center AcRd116th Ave SESE 176th St SE Petrovitsky Rd 1 2 3 Bike lane Sidewalk Landscaped median Landscaping (includes natural drainage where space is available) Bus stop Overhead utility pole Benson Hill Community Plan 49 Plan Elements Figure 4-8. WK$YH6(SURSRVHGLPSURYHPHQWV FURVVVHFWLRQVDQGYLVXDOL]DWLRQV 4-6’ side- walk 5’ bike lane 5’ bike lane 4-6’ side- walk 2.5-4.5’ planting strip 2.5-4.5’ planting strip 11’ drive lane 11’ refuge median 11’ drive lane 4-6’ sidewalk 8-10’ vegetated swale 5’ bike lane 11’ drive lane 11’ drive lane 5’ bike lane 8-10’ vegetated swale 4-6’ sidewalk 4-6’ side- walk 5’ bike lane 11’ drive lane 11’ turning lane 11’ drive lane 5’ bike lane 4-6’ side- walk 2.5-4.5’ planting strip 2.5-4.5’ planting strip 1 2 3 Cross section looking north between 168th St and SE 172nd St (Street trees may be in grates where the planting strip is less than 4’.) Cross section looking north where there are medians (Street trees may be in grates where the planting strip is less than 4’.) Cross section looking north between Cascade Village and SE Petrovitsky Rd 6RXWKRIWK6WORRNLQJVRXWK)HQFHQHDU&9$&EDVHEDOO¿HOGVLVUHSODFHGZLWK landscaping, sidewalk is widened, bike route formalized, and street trees added. At Cascade Village, looking north. Bike lanes and street trees continue, sidewalk is widened with Cascade Village redevelopment, and landscaped medians alternate with a turning lane as needed. Near Petrovitsky, looking south. Water drains into swales on both sides of the street, landscaping buffers the sidewalks, and bike lanes continue. overhead power lines remain BEFORE BEFORE BEFORE AFTER AFTER AFTER overhead power lines remain overhead power lines remain City of Renton  Chapter 4 Responsible party: Transportation Systems, Utility Systems, Parks Planning and Natural Resources Public involvement: Land owners along 116th$YHQXH6( SRVVLEOH/,'IXQGHG Resources: $$$ Timeframe: Mid-term to Long–term dependent on grant funding or LID funding 2.1.2. Require a high-quality pedestrian realm along 116th Avenue SE through design guidelines with any redevelopment of Cascade Village (also see Strategy 1.2.4). Additional details5HTXLUHDPSOHVLGHZDONVSDFHZLWKDPHQLWLHV HJDZQLQJVVHDWLQJELNHUDFNV  DQGDQDFWLYHVWUHHWHGJH HQWULHVIDFLQJth$YHQXH6( ZLWKUHGHYHORSPHQW Responsible party: Planning Public involvement: Cascade Village property owner Resources: $ Timeframe6KRUWWHUP DOWKRXJKGHYHORSPHQWZRXOGOLNHO\KDSSHQLQWKHORQJWHUP 2.2. Expand the trail network to build on the existing wealth of trails in the area, increase recreational and active living opportunities, and provide safe connections for non-motorized travel. Benson Hill also has the start of a great trail network with the existing pedestrian paths along utility corridors and through Tiffany and Cascade Parks, the informal mountain biking trails under the power lines near Philip $UQROG3DUNWKHSODQQHG6RRV&UHHN7UDLO .LQJ&RXQW\ DQGWKH&HGDU5LYHU7UDLO 5HQWRQ $NH\PLVVLQJ link could be provided by the power lines corridor that runs behind Cascade Village. This path connects Soos Creek Park and Trail, Cascade Village, Nelsen Middle and Spring Glen Schools, and the existing SHGHVWULDQZDONDORQJ6(th Street. Other linkages, described below, would bolster the trail system to be one of the best in the region, increasing recreational and active living opportunities and providing safe connections for non-motorized travel. 2.2.1. Complete the Soos Creek Trail and connect to existing paths. Additional details: Coordinate with and support King County Parks’ Capital Improvements Project for Soos Creek Trail Phase V and VI. Incorporate and prioritize any proposed projects in the next update of the Trails and Bicycle Master Plan. Responsible party: King County Parks, Parks Planning and Natural Resources, Transportation Systems Public involvement: TBD Resources: $$$ Timeframe: On-going Benson Hill Community Plan 51 Plan Elements T167 T515 T515 T515 Panther Lake Cedar River SPRING GLEN SCHOOL NELSEN MIDDLE SCHOOL LINDBERGH HIGH SCHOOL CASCADE ELEMENTARY SCHOOLTALBOT HILL ELEMENTARY SCHOOL RENTON PARK ELEMENTARY SCHOOL BENSON HILL ELEMENTARY SCHOOL TIFFANY PARK ELEMENTARY SCHOOL GLENRIDGE SCHOOL SPRINGBROOK SCHOOL RENTON PARK SCHOOL LAKE YOUNGS SCHOOL CARRIAGE CREST SCHOOL MEEKER JR HIGH SCHOOL CITY UNIVERSITY-RENTON ,§-405 KentKent Soo s C r e ek Park and Trail Maplewood Golf Course Cedar River Natural Area Renton ParkD o g P a r k Watershed ParkCa s c a d e P a r k Craig Edlund Park Riverview Park Panther Creek WetlandsPh i ll i p Ar n o l d Pa r k T iffa n y P a r k Cedar River Trl S oos Creek TrlSR 167Talbot Rd SSE 192nd St Cedar River Trl I-40 5 Fwy 116th Ave SE140th Ave SESR 515Benson Rd SEast Valley RdSE 168th St SE Petrovitsky Rd 108th Ave SESE 196th StGrant Ave SSE 164th St Bea c o n W ay S Pedestrian Walk SE 204th St Soos Creek Trl SE 200th St128th Ave SES Puget Dr S 55th St S G ra d y W aySE 184th StSE Carr RdS 200th StHardi e A v e S WSR 167 RampSE 186th St S E 141 s t S t SE 6th St 125th Ave SEPuget Dr SE140th Way SE 112th Ave SES 7th St SE Fairwood Blvd132nd Pl SESE 172nd StRenton Ave 118th Ave SES 15th St 126th Ave SEI-405 RampSE 182nd St 129th Pl SES 1 4 th St S E 2 0 4t h W a y SE 144th St 113th Ave SES 19th St 133rd Ave SESE 180th StMill Ave S120th Ave SE102nd Ave SES 38th Ct S 3 6t h P lBenson Dr SRenton Maple V alley Rd 136th Pl SES E 8th Pl 143rd Pl SESE 188th StHigh Ave S92nd Ave SSE 158th St 142nd Ave SEShattuck Ave S106th Ave SESE 1 5 9th Pl S 32nd St S E Royal Hills Dr S E 1 7 1 st W ay 131st Ave SES E 170t h Pl SE 202nd Pl 145th Ave137th Ave SESE 160th St SE 176th St 100th Ave SE134th Ave SESE 181st St SW 7th St SE 1 6 1 st St 104th Ave SESE 151st St 105th Ave SES 31st St S E 16t h S tIndex Ave SE B e a c on W ay S E S 203rd St S 27th St 121st Ave SES 2 3 r d StSE 204th Pl SE 142nd St S 202nd St SE 179th PlLake Ave SSE 2 0 1st Pl103rd Ave SESE 19th St Davis Ave SS E 165th St 104th Pl SE132nd Ave SESE 162nd P l SW 43rd St SE 161st Pl 138t h A v e S EMorris Ave105th Pl SES 48th St S 50th St S C arr Rd111th Ave SELake Youngs Way SE S E 12th St SE 7th St Rolling Hills Ave SESE 181st Pl110th Pl SESE 175th St S 47th St SE 173 rd P l124th Ave SE110th Ave SE123rd Ave SE113th Pl SESE 201st StCed122nd Ave SE142nd Pl SE107th Ave SESE 21st StS 21st St SE 170th St SE 174th St 114th Ave SE139th Pl SESE 190th StCedar Ave S 109th Ave SESE 1 5 6 t h S t120t h Ter SEEagle Ridge Dr SS E 11th St Tho m as Ln SE 180th Pl 99th Pl SCedar Ridg e D r S E 133rd Pl SESE 169th St118th Pl SESE 163rd St S 26th St 117t h Ave SE114th Pl SES E 8 th D rS 43rd St S 50th Pl SE 187th St SE 183rd St SE 16th Pl S E 1 7 1 s t P lSE 167th S tS 45th Pl SE 18th Pl SE 148 t h St SE 22nd Pl 116th Pl SESE 157th St 113th W ay SE130th Ave SES 17th St S W 1 2t h S t 119th Ave SE135th Ave SE98th Ave SS 37th St SE 177th St 1 4 4 t h Pl SESE 191st St 141st Pl SE 9 6 t h A ve S 110th Ln SES 36th St W 27th St SE 18 5 th P l Pierce Ave SESE 188th SE 173rd St S 27th PlSE 160 t h P lW 19th St S 53rd Pl S 35th St SE 194th St SE 186th Pl SE 203rd St 127th Ave SES 18th St 128th Pl SES Renton Village Pl Main Ave S123rd Pl SES 198th S t 106th Pl SEGrant Aly SS 19 6 th P l98th Pl SS 199th St 34th St S 28 th C tKirklan d Ave SEW 5th 139th Way SE135th Pl SE126th Pl SES 25th St SE 203rd Pl Shelt on Ave SESE 198thPl S E 8th St S E 18th St S 46th Pl SE 166th St SE 159th St W 41st St 119th Ln SEMonroe Av e SES E 7th Ct SE 205th St S E 1 7 8 t h St 122nd Pl SE1SE 183rd P l 115th Pl SE122nd L n SESE 162nd St S 204th Pl S 34th Pl SE 10th St 136th Ave SE1 3 4 t h Ln SESE 189th Pl SE 199th StNelsen M S AcRd SE 194th Pl SE 1 SE 197th St SE 17 121st Pl SESE 188t h P lS 2 2 nd Ct SE 21 s t Pl S 51st St SE 150th St S 28th StSmithers Ave S138th Pl SE115th Ln SES 6th St Wood cliff e Ap a rtments AcRd S 29th St 111th Pl SE117th Pl SEBerkshire Apt AcRd107th Pl SE16th St SE 190th Pl 110th Ter SEWhit wo rth Av e SLake P l S S 10th St 141st Ave SES 177th St 115th Ave SESE 192nd Pl S E 108th LnS E 199th PlSE 197th Pl S 205th Pl SE 198th St127th Pl SE129th Ct SEL in d b e r g h HS AcRd S 30 th P lS 1 9 4 t h S tSE 17th Ct Renton Villag e AcRdSE 193rd Ter S E 1 8 4 th L n Unnamed S erene Cir SE Rolling Hills Co ndo AcRdS 198th Pl S 33rd Pl SE 185th CtSE 196th Ct SE 30th Pl 143rd Ct SEBenson Condomi niums A cRd 106th Pl SESE 201st St 102nd Ave SELake Av e S SE 172nd St SE 185th Pl SE 188th Pl126th Pl SESE 186th St SE 181st St P e d e s t ri a n Wal kSR 5151 3 1 st A ve S E 124th Ave SE132nd Pl SES 6th St Smithers Ave S128th Pl SEPrivat e R d Private RdI-405 RampPrivate Rd1 4 2 n d Av e SEPrivate Rd Pedestrian Wal kSE 196th St 132nd Pl SESE 180th St 112th Ave SE103rd Ave SE143rd Ave SES 50th St Private RdSE 203rd Pl S 27th St SE 169th St SE 1 8 1 st St Edmonds Ave SE104th Pl SESE 173rd S t S E 191s t S t SE 160th St Pedestria n WalkPrivate Rd S R 1 67 Ramp117th Ave SESE 158th St P r i v ate Rd 122nd Pl SEPrivate RdCedar Ave SPrivate RdSE 1 9 6 th St Private Rd S 23rd St 104th Ave SES E 176th Morris Ave S136th Ave SE110th Ave SE124th Ave SE126th Ave SE106th Ave SESE 186th St SE 172nd St Priv 116th Ave SES E 188 th S t Private Rd120th Ave SESE 190th St SE 1 5 9 t h P l139th Pl SE109th Ave SE143rd Pl SE130th A ve SE124th Ave SE122nd Ave SETal b ot R d S S E 18 9 t h P lS 2 6 th St SE 1 88th Pl SE 176th St 140th Ave SE111th Ave SE121st Ave SESE 166th St SE 172nd St 118th Ave SESE 200th St SE 168th StSE 169th St SE 170th St 143rd Pl SESE 184th Pl SE 164th St SE 200th St 120th Ave SEPrivate Rd 1:10,000 ´ 0 2,5001,250 Feet Benson Lake Washington L a k e Y o u n g s RENTONRENTON KentKentTukwilaTukwilaSeattleSeattle Newca stleNewcastle B elle vueBellevue Mercer IslandMercer Island IssaquahIssaquah Date: 04/20/2012 Benson Community Planning Area City Limits Vacant Land Parks 3 School Site Parcels with improved value less than $10,000 Renton Trails XYXYXYXYXYOplympic Pipelines Parcels intersect Olympic pipeline High Pressure Gas Parcels intersect high pressure gas line Public Land Path: H:\CED\Planning\GIS\GIS_projects\community_planning_initiative\mxds\benson_planning_area\Benson vacant land open and public space_24x36_April2012.mxd ettroviittskk SE 164t 120t hTTer SE115tms A cRd 117thEagleRRRolling SS E 170th Pl 11222nd L n SEWWooBveSSer SE7th Ced SS EE 11 00 tth S tRRentoSS entsA St gHills P r i v 12LL MMEEEEEEEE RentonParkrr132ndPlSES P l12S SE 1 5 B y S Beacon W aayy S TTTTTTTTTTTTTTT OT HIL TalbootRdSSSSSEEEEEE 1111999922222nd St hh SStt St S 111122S 17 rd Pl ateRSEEEEEEEEES 23 106ESoos Creek Trailp o w e r l i n e s c o r r i d o r power l ines corr idor pipe line s c o r ri d o r P. A . P a r k r o a dgas lines corridorgas lines corridorInformal mountain biking trails Cascade Village Benson Plaza Existing paths Proposed paths Figure 4-9. ([LVWLQJDQGSURSRVHG%HQVRQ+LOOWUDLOVRQSURSHUW\RZQHUVKLSPDS City of Renton 52 Chapter 4 2.2.2. When possible, acquire property or establish agreements to extend pipelines, power lines, and other utility corridor trails as consistent with the Parks, Recreation and Natural Areas Plan and/or the Bicycles and Trails Master Plan. Additional details: Seek grant funding for acquisition or easements and construction of recreational trails and/ RUVDIHZDONLQJELNLQJURXWHV :DVKLQJWRQ5HFUHDWLRQ DQG&RQVHUYDWLRQ2I¿FH7UDLOV*UDQWV&33:/LYDEOH Communities, Healthy/Active Living, Transportation $OWHUQDWLYHVHWF 5HTXLUHHDVHPHQWIRUWUDLOVZLWK redevelopment. Incorporate and prioritize any proposed projects in the next update of the Trails and Bicycle Master Plan. Responsible party: Parks Planning and Natural Resources, Planning, Community and Economic Development Public involvement: Property owners on or adjacent to pipelines and power lines corridors Resources: $$$ Timeframe: On-going 2.2.3. Work with the utility companies who own Beacon Way S between Puget Drive S and Philip Arnold Park to explore the feasibility of paving and landscaping a path to the park from Benson Hill to amply accommodate bicycles, pedestrians, and motorists. Additional details: Clarify ownership of the property. Incorporate and prioritize any proposed project in the next update of the Trails and Bicycle Master Plan, prioritize this project in the Capital Improvements Plan, and seek funding for multi-modal connections. Responsible party: Transportation Systems, Parks Planning and Natural Resources Public involvement: TBD Resources: $$ Timeframe: Short-term 2.2.4. Connect paths to the existing trails on Puget Sound Energy Property under the power lines near Phillip Arnold Park. Additional details: Sign existing trail heads in the natural zone with the local trail names. In the long-term as other trails GHYHORS 6WUDWHJLHV FRQQHFWIRUPDODQGLQIRUPDO Figure 4-10. %HDFRQ:D\6WR3KLOOLS$UQROG 3DUN Benson Hill Community Plan 53 Plan Elements trails. Incorporate and prioritize any proposed projects in the next update of the Trails and Bicycle Master Plan. Responsible party: Seattle Public Utilities, Parks Planning and Natural Resources Public involvement: TBD Resources: $ Timeframe: Mid-term 2.2.5. Study the feasibility for a topographically level bicycle and pedestrian connection between the Grant Avenue S/S Puget Dr area to the Benson Shopping Center. Additional details: If feasible, incorporate into the next update of the City’s Trails and Bicycle Master Plan and prioritize for funding. Responsible party: Transportation Systems, Parks Planning and Natural Resources Public involvement: Affected property owners, bicycle JURXSV HJ&DVFDGH%LF\FOH$OOLDQFH Resources: $$$ Timeframe: Long-term 2.2.6. Add and improve existing pedestrian crossings over Interstate 405 and Highway 167. Additional details: Explore ways to better connect Benson Hill with Downtown Renton for pedestrians and cyclists by providing shortcuts where possible DQGFRQQHFWLQJZLWKQHZWUDLOV 6WUDWHJLHV  Consider lighting, artwork, path width, buffers, and so on to make the crossings feel safe and inviting. Incorporate and prioritize any proposed projects into the City’s Trails and Bicycle Master Plan. Responsible party: Transportation Systems, Planning, Parks Planning and Natural Resources Public involvement: TBD Resources: $$$ Timeframe: Long-term City of Renton 54 Chapter 4 2.3. Improve neighborhood streets to complete a network of walking routes that connect destinations and neighborhoods and are safe and inviting for all users. Although Benson Hill has the beginnings of a great trail network, many streets lack adequate and safe space for people to walk to their destinations. The following strategies recommend completing the sidewalk network and adding low-level, pedestrian-scale lighting on major connections to schools, parks, and commercial amenities. $ORQJZLWKWKHSK\VLFDOVSDFHWRZDONDQGF\FOHVSHHGLQJWUDI¿FDQG unsafe intersections must also be addressed to make streets usable for all modes of travel. 2.3.1. Complete missing links in sidewalks and add SHGHVWULDQVFDOHGVWUHHWOLJKWLQJDQGFDOPWUDI¿FRQ routes to schools, parks, and commercial areas. Additional details: See Walking and Bicycling Improvements PDS )LJXUH IRUORFDWLRQVSHFL¿FLPSURYHPHQWV requested by community members. Incorporate and prioritize any proposed projects in the next update of the Trails and Bicycle Master Plan. Responsible party: Transportation Systems Public involvement: Affected property owners, bicycle groups HJ&DVFDGH%LF\FOH$OOLDQFH Resources: $$ Timeframe: Mid-term 2.3.2. Identify and prioritize high accident locations for people walking and cycling, especially near bus stops. Additional details: Review Walking and Bicycling ,PSURYHPHQWVPDS )LJXUH IRUORFDWLRQVSHFL¿F improvements requested by community members. Place pertinent projects on Transportation Improvements Plan and continue or increase Police enforcement where needed. Incorporate and prioritize any proposed projects in the next update of the Trails and Bicycle Master Plan. Responsible party: Transportation Systems, Police Public involvement: TBD Resources: $$ Timeframe: Short- to Long-term dependent upon scope and funding of projects Benson Hill Community Plan 55 Plan Elements 3 3 3 3 3 3 3 3 Nelsen Middle School Lindbergh High School Cascade Elementary School Renton Park Elementary School Benson Hill Elementary School Tiffany Park Elementary School Spring Glen School SE 168th St 128th Ave SESE 164th St SE 31st St SE 164th StGrant Ave SPedestrian W a l k Ce d a r R i v e r T r l B e a c o n W a y S 112th Ave SESE 186th St 134th Ave SE125th Ave SESE 184th St 102nd Ave SESE 172nd St 118th Ave SE126th Ave SESE 192nd St SE 182nd St 129th Pl SE113th Ave SEMi l l Ave S120th Ave SES 36th Pl SE 8 t h P l SE 188th St SE 158th S t S 7th St 106th Ave SEHigh Ave SSE Royal Hills D r 131st Ave SES E 1 7 0 t h P l SE 160th St SE 16th Pl SE 181st St SE 165th St 104th Ave SE105th Ave SEIn d e x A v e S E S E 1 5 1 s t S t SE 16th StB e a c o n W a y S E 121st Ave SES 27th St SE 6 t h S t 129th Ave SES 23rd S t S 9th St 106th Pl SE103rd Ave SESE 161st StRenton Ave SS E 1 9 t h S t 132nd Pl SE105th Pl SESE 159th Pl F e r n d a l e A v e S E SE 180th St111th Ave SES 36th St Lake Yo u n g s W a y S E 110th Pl SESE 12th St SE 7t h S t S 47th St 124th Ave SESE 175th St 123rd Ave SEJones Ave S122nd Ave SE114th Ave SES 32nd StTalbot Rd S127th Pl SESE 21st St 110th Ave SECedar Ave SSE 170th St SE 174th S t 120th Te r SE109th Ave SESE 11t h St Eagle Ridge Dr SSE 180th Pl T h o m a s L n 118th Pl SECe d a r R i d g e D r SE 133rd Pl SE114th Pl SESE 169th St SE 163rd St SE 22nd Pl Private RdSE 8th Dr G l e n w o o d A v e S E 117th Ave SEMain Ave SSE 18th P l 121st Ln SE133rd Ave SE113th Way SE SE 187th St 130th Av e S E S E 1 6 9 t h P l 112th Pl SESE 157th St 119th Ave SEBenson Plaza AcRd128th Ave SES 38th Ct SE 191st St SE 167th St 135th Ave SESE 1 4 8 t h S t Aberdeen Ave SES 37th Pl SE 185th Pl SE 173rd St SE 160th Pl SE 1 4 9 t h S t 127th Ave SES 35th St Mill Ave SE128th Pl SEGrant Aly SS 31st St S 28th Ct Eagle Ln S135th Pl SE126th Pl SESE 178th St SE 179th St S E 1 8 t h S t SE 166th St SE 159th St SE 8th St SE 183rd Pl 119th Pl SE SE 186th Pl 1 2 2 n d L n S E SE 162nd St S 34th Pl 123rd P l SE SE 10th S t 122nd Pl SESE 5t h P l UnnamedSE 11th Pl Olympia Ave SE107th Ave SESE 189th Pl Nelsen MS AcRd 113th Pl SESE 184th Pl 121st Pl SESE 188th Pl S 28th St 115th Ln SESE 190th St S 6th St SE 20th Ct 111th Pl SESmi thers Ave S117th Pl SES 29th St SE 193rd Pl SE 187th Ln S 29th Ct 108th Ave SE107th Pl SEBerkshire Apt AcRdSE 187th Pl SE 176th St SE 190th Pl SE 19th Ct SE 171st Pl SE 174th LnWells Ct SMain Ct S115th Ave SECedar Ave SES 31st Ct Palm Court Condos AcRdEdmonds Dr SESE 166th Pl SE 171st St 131st Pl SESE 21st Ct SE 185th StJones Dr SESE 1 5 7 t h P l SE 182nd Pl S 30th Pl SE 179th Pl SE 18th Ct 104th Pl SES 30th Ct SE 161st Pl SE 189th St SE 171st Ln 128th Pl SE132nd Pl SESE 182nd St 114th Ave SESE 181st St SE 161st St 126th Ave SESE 18 7 t h P lPrivate RdPrivate Rd114th Ave SESE 160th St 1 3 2 n d P l SE SE 18th CtPrivate RdSE 169th St 12 9 t h P l S E 132nd Pl SESE 159th Pl Private Rd134th Ave SE11 9 t h P l S E Pedestrian Walk 131st Ave S E 106th Pl SES 23rd St Cedar Ave SSE 180th St SE 190th St 126th Pl SEPrivate RdSE 167th St SE 175th St SE 172nd St 126th P l SE111th Ave SESE 186th St SE 173rd St 134th Ave SE106th Ave SESE 182nd St SE 179th St 130th Ave SE118th Ave SE124th Ave SESE 184th Pl 117th Ave SESE 188th P l SE 169th Pl 133rd Pl SE110th Pl SE133rd Pl SESE 181st St109th Ave SE118th Ave SEPedestrian Walk120th Ave SEPrivate RdSE 180th St SE 160th St SE 172nd St SE 185th Pl120th Ave SESE 172nd St SE 182nd St 132nd Pl SESE 166th St SE 186th Pl116th Ave SEBenson Rd S S Puget Dr Benson Dr S108th Ave SESE Petrovitsky Rd E Carr RdTalbot Rd SSE 176th St SE 192nd St SOOS CREEK PARK AND TRAIL CEDAR RIVER NATURAL ZONE RENTON PARK BOULEVARD LANE PARK CASCADE PARK PHILLIP ARNOLD PARK TIFFANY PARK CASCADE VILLAGE SHOPPING CENTER BENSON SHOPPING CENTER T515 T515 405 Needs a stop sign Needs signal & crosswalk or pedestrian refuge Needs signal & crosswalk, esp. for bus riders Unsafe intersection Collisions; pedestrian crossings not respected Crosswalk needed for bus users Visibility Visibility of school kids on street L-1 L-2 L-3 L-4 L-5 L-6 L-7 L-8 P-1 B-1 B-2 B-3 T-1 T-2 T-3T-4 T-5 T-6 T-7 T-8 T-9 P-2 P-3 P-4 P-7 P-6 P-5 P-4 S-1 S-2 S-3 S-4 S-5 S-6 S-7 S-8 S-9 I-1 I-2 I-3 I-4 I-5 I-6 I-7 I-8 I-9 Benson Hill Planning Area City of Renton Commercial areas Parks ¯0 1,200 2,400600 Feet BENSON HILL COMMUNITY PLANCOMMUNITY PLAN Walking and Bicycling Improvements SUGGESTED IMPROVEMENTS Identified by February 2012 open house, online map and surveys, and Summer 2012 neighborhood picnics participants. Add a new path Add paths along utility corridors Add/improve sidewalks Existing pedestrian paths Existing regional trail Planned regional trail Add/improve bike routes General areas identified for sidewalk improvements Calm traffic Improve intersection Add /improve human- scale street lights T-7 I-7 L-6B-3 S-6 S-4 P-2 P-3 Figure 4-11. :DONLQJDQGELF\FOLQJLPSURYHPHQWVPDS