HomeMy WebLinkAbout26. Williams Ave S and Wells Ave S Conversion ProjectTRANSPORTATION IMPROVEMENT PROGRAM 2019 - 2024 TIP No. 26 Project Title:Williams Ave S and Wells Ave S Conversion Project Community Planning Area:City Center Fund: Functional Classification:Principal Project: Project Length:N/A Contact: Project Description: Justification: Status: Changes: Funded:Unfunded: Pre-2018 2018 Total 2019 2020 2021 2022 2023 2024 Expenditures: Planning - - - - - - - - - - Preliminary Engineering 1,178,030 128,030 700,000 350,000 350,000 - - - - - R-O-W (includes Admin)150,000 - 50,000 100,000 100,000 - - - - - Construction 7,000,000 - 2,364,931 4,635,069 635,069 4,000,000 - - - - Construction Services 1,750,000 - - 1,750,000 150,000 1,600,000 - - - - Post Construction Services - - - - - - - - - - Other (BNSF CM Agreement)1,000,000 - - 1,000,000 200,000 800,000 - - - - Total Expenses 11,078,030 128,030 3,114,931 7,835,069 1,435,069 6,400,000 - - - - Resources: Vehicle Fuel Tax - - - - - - - - - - Business & Occupation Share 210,000 - - 210,000 30,000 180,000 - - - - Fund Balance 173,626 - 173,626 - - - - - - - Grants In-Hand (1)- - - - - - - - - - Grants In-Hand (STP)3,850,000 - - 3,850,000 1,405,069 2,444,931 - - - - Mitigation In-Hand 750,000 - 750,000 - - - - - - - Bonds / LID's Formed - - - - - - - - - - Other (WSDOT Mitigation)319,335 128,030 191,305 - - - - - - - Other (WSDOT Turnback)2,000,000 - 2,000,000 - - - - - - - Other In-Hand (Utilties Reimb)- - - - - - - - - - - - - - - - - - - - Undetermined 3,775,069 - - 3,775,069 - 3,775,069 - - - - Total Sources 11,078,030 128,030 3,114,931 7,835,069 1,435,069 6,400,000 - - - - 7,302,961 3,775,069 Project Expenditures & Resources Programmed Programmed Pre-2019 Six-Year Program Williams Ave S and Wells Ave S Conversion Project The City was awarded a STP grant in the amount of $3,850,000 in 2016. Design starting in 2017 and construction is anticipated to start in 2018. 317 122908 Keith Woolley 425-430-7318 The project provides pedestrian and bicyclists facilities and enhancements, traffic operation and circulation improvements in Downtown. The improvements include adding signalized raised intersections with bulb outs, lighting, street furniture, streetscape, bike racks, signage and converting Williams Ave S and Wells Ave S to two-way traffic operations. This project is one of the strategies identified in the City Center Community Plan. The project enhances downtown Renton as a destination area, while improving circulation, reducing traffic speeds and enhancing pedestrian safety. A feasibility study, including a Downtown Circulation Traffic Analysis for the conversion to two-way operations was completed. Williams Ave S and Wells Ave S Conversion Project MARCH 2018 KPGPRELIMINARY DESIGN URBAN DESIGN PACKAGE KPG illustrative - williams avenue south and wells ave south conversion project WELLS AVE S AND S 2ND ST WILLIAMS AVE S AND S 2ND ST WELLS AVE S AND S 3RD ST WILLIAMS AVE S AND S 3RD ST KPG photo simulation - williams avenue south and south 2nd street (looking north) 2’X2’ SCORED CEMENT CONCRETE SIDEWALK WITH LIGHT SANDBLAST VEHICULAR BOLLARD (4 PER INTERSECTION) 4’X4’ SCORED CEMENT CONCRETE INTERSECTION PAVEMENT (RAISED) 2’X2’ SCORED COLORED CEMENT CONCRETE CROSSWALK PAVEMENT WITH MEDIUM SANDBLAST (RAISED) LANDSCAPE STRIP FENCING BIKE RACK WASTE RECEPTACLE BENCH PLAN VIEW PEDESTRIAN LUMINAIRE & POLE BEFORE PHOTO KPG photo simulation - wells avenue south and south 3rd street (looking north) 2’X2’ SCORED CEMENT CONCRETE SIDEWALK WITH LIGHT SANDBLAST 2’X2’ SCORED CEMENT CONCRETE CROSSWALK PAVEMENT WITH MEDIUM SANDBLAST SCORED CEMENT CONCRETE APPROACH PAVEMENT VEHICULAR BOLLARD (4 PER INTERSECTION) 4’X4’ SCORED CEMENT CONCRETE INTERSECTION PAVEMENT (RAISED) LANDSCAPE STRIP FENCING BENCH BIKE RACK NEWSPAPER STAND BIKE BOULEVARD WITH BIKE BOX PLAN VIEW 2’X2’ SCORED COLORED CEMENT CONCRETE CROSSWALK PAVEMENT WITH MEDIUM SANDBLAST (RAISED) PEDESTRIAN LUMINAIRE & POLE BEFORE PHOTO KPG urban design streetscape elements BENCH UTILITY CABINET BOX WRAP (INSPIRATION EXAMPLE) WASTE RECEPTACLE VEHICULAR BOLLARD LANDSCAPE STRIP FENCING June 2016 LANDSCAPE STRIP FENCING ARC MIDDLE RAIL, TYP. ELEVATION TOP RAIL, TYP. BOTTOM RAIL, TYP. VERTICAL RAIL, TYP. POST CAP, TYP. POST, TYP.2’-0”BIKE RACK 2’X2’ SCORED CEMENT CONCRETE SIDEWALK W/ LIGHT SANDBLAST 2’X2’ SCORED COLORED CONCRETE CROSSWALK W/ MEDIUM SANDBLAST NEWSPAPER STAND KPG decorative illumination PEDESTRIAN LUMINAIRE & POLE WITH BANNER AND FLOWER BASKET ARMS DECORATIVE SIGNAL POLE & MAST ARM AND LUMINAIRE WITH STREET NAME SIGN KPG vegetation i plants AMELANCHIER LAEVIS ‘JFS-ARB’/ SPRING FLURRY SERVICEBERRY FOTHERGILLA GARDENII ‘BLUE MIST’ / BLUE MIST DWARF FOTHERGILLA SPIRAEA JAPONICA ‘YAN’/ DOUBLE PLAY ARTIST SPIREA HEBE ANOMALA ‘PURPUREA NANA’ / DWARF HEBE WEIGELA FLORIDA ‘ELVERA’ / MIDNIGHT WINE WEIGELA SESLERIA AUTUMNALIS / AUTUMN MOOR GRASS PENNISETUM ORIENTALE ‘KARLEY ROSE’/ PINK FOUNTAIN GRASS HEMEROCALLIS ‘PURPLE D’ORO’ / DAYLILY ERICA CARNEA ‘MYRETOUN RUBY’/ MYRETOUN RUBY WINTER HEATH VERONICA PEDUNCULARIS ‘GEORGIA BLUE’ / GEORGIA BLUE SPEEDWELL Williams Ave S and Wells Ave S Conversion ProjectPreliminary DesignMarch 16, 2018S 2nd Street Williams Ave S and Wells Ave S Conversion ProjectPreliminary DesignMarch 16, 2018S 3rd Street Williams Ave S and Wells Ave S Conversion ProjectPreliminary DesignMarch 16, 2018