HomeMy WebLinkAbout26. Williams Ave S and Wells Ave S Conversion ProjectTRANSPORTATION IMPROVEMENT PROGRAM
2019 - 2024
TIP No. 26
Project Title:Williams Ave S and Wells Ave S Conversion Project
Community Planning Area:City Center Fund:
Functional Classification:Principal Project:
Project Length:N/A Contact:
Project Description:
Justification:
Status:
Changes:
Funded:Unfunded:
Pre-2018 2018 Total 2019 2020 2021 2022 2023 2024
Expenditures:
Planning - - - - - - - - - -
Preliminary Engineering 1,178,030 128,030 700,000 350,000 350,000 - - - - -
R-O-W (includes Admin)150,000 - 50,000 100,000 100,000 - - - - -
Construction 7,000,000 - 2,364,931 4,635,069 635,069 4,000,000 - - - -
Construction Services 1,750,000 - - 1,750,000 150,000 1,600,000 - - - -
Post Construction Services - - - - - - - - - -
Other (BNSF CM Agreement)1,000,000 - - 1,000,000 200,000 800,000 - - - -
Total Expenses 11,078,030 128,030 3,114,931 7,835,069 1,435,069 6,400,000 - - - -
Resources:
Vehicle Fuel Tax - - - - - - - - - -
Business & Occupation Share 210,000 - - 210,000 30,000 180,000 - - - -
Fund Balance 173,626 - 173,626 - - - - - - -
Grants In-Hand (1)- - - - - - - - - -
Grants In-Hand (STP)3,850,000 - - 3,850,000 1,405,069 2,444,931 - - - -
Mitigation In-Hand 750,000 - 750,000 - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (WSDOT Mitigation)319,335 128,030 191,305 - - - - - - -
Other (WSDOT Turnback)2,000,000 - 2,000,000 - - - - - - -
Other In-Hand (Utilties Reimb)- - - - - - - - - -
- - - - - - - - - -
Undetermined 3,775,069 - - 3,775,069 - 3,775,069 - - - -
Total Sources 11,078,030 128,030 3,114,931 7,835,069 1,435,069 6,400,000 - - - -
7,302,961 3,775,069
Project Expenditures & Resources Programmed Programmed Pre-2019 Six-Year Program
Williams Ave S and Wells Ave S Conversion Project
The City was awarded a STP grant in the amount of $3,850,000 in 2016. Design starting in 2017 and construction is anticipated to start in 2018.
317
122908
Keith Woolley 425-430-7318
The project provides pedestrian and bicyclists facilities and enhancements, traffic operation and circulation improvements in Downtown. The improvements include adding
signalized raised intersections with bulb outs, lighting, street furniture, streetscape, bike racks, signage and converting Williams Ave S and Wells Ave S to two-way traffic
operations.
This project is one of the strategies identified in the City Center Community Plan. The project enhances downtown Renton as a destination area, while improving circulation,
reducing traffic speeds and enhancing pedestrian safety. A feasibility study, including a Downtown Circulation Traffic Analysis for the conversion to two-way operations was
completed.
Williams Ave S and Wells Ave S Conversion Project
MARCH 2018 KPGPRELIMINARY DESIGN
URBAN DESIGN PACKAGE
KPG
illustrative - williams avenue south and wells ave south conversion project
WELLS AVE S AND S 2ND ST
WILLIAMS AVE S AND S 2ND ST
WELLS AVE S AND S 3RD ST
WILLIAMS AVE S AND S 3RD ST
KPG
photo simulation - williams avenue south and south 2nd street (looking north)
2’X2’ SCORED
CEMENT
CONCRETE
SIDEWALK
WITH LIGHT
SANDBLAST
VEHICULAR
BOLLARD (4 PER
INTERSECTION)
4’X4’ SCORED CEMENT
CONCRETE INTERSECTION
PAVEMENT (RAISED)
2’X2’ SCORED COLORED CEMENT
CONCRETE CROSSWALK PAVEMENT
WITH MEDIUM SANDBLAST (RAISED)
LANDSCAPE
STRIP FENCING
BIKE RACK
WASTE
RECEPTACLE
BENCH
PLAN VIEW
PEDESTRIAN
LUMINAIRE &
POLE
BEFORE PHOTO
KPG
photo simulation - wells avenue south and south 3rd street (looking north)
2’X2’ SCORED
CEMENT CONCRETE
SIDEWALK WITH
LIGHT SANDBLAST
2’X2’ SCORED
CEMENT
CONCRETE
CROSSWALK
PAVEMENT
WITH MEDIUM
SANDBLAST
SCORED CEMENT CONCRETE
APPROACH PAVEMENT
VEHICULAR
BOLLARD (4 PER
INTERSECTION)
4’X4’ SCORED CEMENT
CONCRETE INTERSECTION
PAVEMENT (RAISED)
LANDSCAPE STRIP
FENCING
BENCH
BIKE RACK
NEWSPAPER STAND
BIKE BOULEVARD
WITH BIKE BOX PLAN VIEW
2’X2’ SCORED COLORED CEMENT
CONCRETE CROSSWALK PAVEMENT
WITH MEDIUM SANDBLAST (RAISED)
PEDESTRIAN
LUMINAIRE &
POLE
BEFORE PHOTO
KPG
urban design streetscape elements
BENCH
UTILITY CABINET BOX WRAP
(INSPIRATION EXAMPLE)
WASTE RECEPTACLE
VEHICULAR BOLLARD
LANDSCAPE STRIP FENCING
June 2016
LANDSCAPE STRIP FENCING
ARC MIDDLE RAIL, TYP.
ELEVATION
TOP RAIL, TYP.
BOTTOM RAIL, TYP.
VERTICAL RAIL, TYP.
POST CAP, TYP.
POST, TYP.2’-0”BIKE RACK 2’X2’ SCORED CEMENT CONCRETE
SIDEWALK W/ LIGHT SANDBLAST
2’X2’ SCORED COLORED CONCRETE
CROSSWALK W/ MEDIUM SANDBLAST
NEWSPAPER STAND
KPG
decorative illumination
PEDESTRIAN LUMINAIRE & POLE WITH
BANNER AND FLOWER BASKET ARMS
DECORATIVE SIGNAL POLE & MAST ARM
AND LUMINAIRE WITH STREET NAME SIGN
KPG
vegetation i plants
AMELANCHIER LAEVIS ‘JFS-ARB’/
SPRING FLURRY SERVICEBERRY
FOTHERGILLA GARDENII ‘BLUE MIST’ /
BLUE MIST DWARF FOTHERGILLA
SPIRAEA JAPONICA ‘YAN’/
DOUBLE PLAY ARTIST SPIREA
HEBE ANOMALA ‘PURPUREA NANA’ /
DWARF HEBE
WEIGELA FLORIDA ‘ELVERA’ /
MIDNIGHT WINE WEIGELA
SESLERIA AUTUMNALIS /
AUTUMN MOOR GRASS
PENNISETUM ORIENTALE ‘KARLEY
ROSE’/ PINK FOUNTAIN GRASS
HEMEROCALLIS ‘PURPLE
D’ORO’ / DAYLILY
ERICA CARNEA ‘MYRETOUN RUBY’/
MYRETOUN RUBY WINTER HEATH
VERONICA PEDUNCULARIS ‘GEORGIA BLUE’ /
GEORGIA BLUE SPEEDWELL
Williams Ave S and Wells Ave S Conversion ProjectPreliminary DesignMarch 16, 2018S 2nd Street
Williams Ave S and Wells Ave S Conversion ProjectPreliminary DesignMarch 16, 2018S 3rd Street
Williams Ave S and Wells Ave S Conversion ProjectPreliminary DesignMarch 16, 2018