Loading...
HomeMy WebLinkAbout27. Carr Road ImprovementsTRANSPORTATION IMPROVEMENT PROGRAM 2019 - 2024 TIP No. 27 Project Title:Carr Road Improvements Community Planning Area:Talbot & Benson Fund: Functional Classification:Major Arterial Project: Project Length:N/A Contact: Project Description: Justification: Status: Changes: Funded:Unfunded: Pre-2018 2018 Total 2019 2020 2021 2022 2023 2024 Expenditures: Planning 50,000 - - 50,000 50,000 - - - - - Preliminary Engineering 784,421 666,866 117,555 - - - - - - - R-O-W (includes Admin)- - - - - - - - - - Construction - - - - - - - - - - Construction Services - - - - - - - - - - Post Construction Services - - - - - - - - - - Other - - - - - - - - - - Total Expenses 834,421 666,866 117,555 50,000 50,000 - - - - - Resources: Vehicle Fuel Tax - - - - - - - - - - Business & Occupation Share - - - - - - - - - - Fund Balance 78,424 78,424 - - - - - - - - Grants In-Hand (Fed Safety)660,000 542,445 117,555 - - - - - - - Grants In-Hand (2)- - - - - - - - - - Mitigation In-Hand 95,997 45,997 - 50,000 50,000 - - - - - Bonds / LID's Formed - - - - - - - - - - Other In-Hand (1)- - - - - - - - - - Other In-Hand (2)- - - - - - - - - - - - - - - - - - - - Undetermined - - - - - - - - - - Total Sources 834,421 666,866 117,555 50,000 50,000 - - - - - 834,421 - Project Expenditures & Resources Programmed Programmed Pre-2019 Six-Year Program Carr Road Improvements 317 122920 Vangie Garcia 425-430-7319 A corridor study prepared by King County in 2003 identified the need for roadway improvements from Lind Ave SW and SW 43rd St intersection and extend east crossing SR 167 and ending at 116th Ave SE. Potential improvements vary from roadway realignment/widening at several locations to address geometric deficiencies, widening to 5-lane roadway (2 lanes westbound, 3 lanes eastbound), including bicycle lanes on new alignment. The total project cost is estimated as $80M. Carr Road is classified as a principal arterial. It has four lanes of traffic with left-turn lanes at intersections. Improvements are necessary to enhance vehicle traffic capacity and safety for vehicles, bicycles, and pedestrians on this major east-west transportation corridor. Future roadway improvement options include spot safety improvements, bicycle and pedestrian improvements, roadway widening and roadway on new alignment. Staff will be developing scope, cost and schedule for the intersection of Talbot Rd near Valley Medical Center.