Loading...
HomeMy WebLinkAbout32. Lind Ave SW - SW 16th St to SW 43rd StTRANSPORTATION IMPROVEMENT PROGRAM 2019 - 2024 TIP No. 32 Project Title:Lind Ave SW - SW 16th St to SW 43rd St Community Planning Area:Valley Fund: Functional Classification:Minor Arterial Project: Project Length:1.69 mi Contact: Project Description: Justification: Status: Changes: Funded:Unfunded: Pre-2018 2018 Total 2019 2020 2021 2022 2023 2024 Expenditures: Planning - - - - - - - - - - Preliminary Engineering 650,000 - - 650,000 - - - 400,000 250,000 - R-O-W (includes Admin)- - - - - - - - - - Construction 3,200,000 - - 3,200,000 - - - - 1,200,000 2,000,000 Construction Services 550,000 - - 550,000 - - - - 200,000 350,000 Post Construction Services - - - - - - - - - - Other - - - - - - - - - - Total Expenses 4,400,000 - - 4,400,000 - - - 400,000 1,650,000 2,350,000 Resources: Vehicle Fuel Tax - - - - - - - - - - Business & Occupation Share - - - - - - - - - - Fund Balance - - - - - - - - - - Grants In-Hand (1)- - - - - - - - - - Grants In-Hand (2)- - - - - - - - - - Mitigation In-Hand - - - - - - - - - - Bonds / LID's Formed - - - - - - - - - - Other In-Hand (1)- - - - - - - - - - Other In-Hand (2)- - - - - - - - - - - - - - - - - - - - Undetermined 4,400,000 - - 4,400,000 - - - 400,000 1,650,000 2,350,000 Total Sources 4,400,000 - - 4,400,000 - - - 400,000 1,650,000 2,350,000 - 4,400,000 Project Expenditures & Resources Programmed Programmed Pre-2019 Six-Year Program Lind Ave SW - SW 16th St to SW 43rd St 317 120024 Bob Mahn 425-430-7322 Widen existing roadway to five lanes where required. Includes new roadway, curbs, sidewalks, drainage, signals, lighting, signing and channelization. Increasing traffic demands in the Valley due in part to development will create the need to increase the capacity of this major north/south arterial. A potential project is a signal installation at the intersection at Lind Ave SW and SW 34th St (currently unsignalized). Additionally, improvements may result from future WSDOT I-405 plans which include an interchange at Lind Ave SW (currently unfunded). The needs, priorities and schedules for improvements on Lind Ave SW will be determined through Arterial Circulation studies.