Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout32. Lind Ave SW - SW 16th St to SW 43rd StTRANSPORTATION IMPROVEMENT PROGRAM
2019 - 2024
TIP No. 32
Project Title:Lind Ave SW - SW 16th St to SW 43rd St
Community Planning Area:Valley Fund:
Functional Classification:Minor Arterial Project:
Project Length:1.69 mi Contact:
Project Description:
Justification:
Status:
Changes:
Funded:Unfunded:
Pre-2018 2018 Total 2019 2020 2021 2022 2023 2024
Expenditures:
Planning - - - - - - - - - -
Preliminary Engineering 650,000 - - 650,000 - - - 400,000 250,000 -
R-O-W (includes Admin)- - - - - - - - - -
Construction 3,200,000 - - 3,200,000 - - - - 1,200,000 2,000,000
Construction Services 550,000 - - 550,000 - - - - 200,000 350,000
Post Construction Services - - - - - - - - - -
Other - - - - - - - - - -
Total Expenses 4,400,000 - - 4,400,000 - - - 400,000 1,650,000 2,350,000
Resources:
Vehicle Fuel Tax - - - - - - - - - -
Business & Occupation Share - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants In-Hand (1)- - - - - - - - - -
Grants In-Hand (2)- - - - - - - - - -
Mitigation In-Hand - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other In-Hand (1)- - - - - - - - - -
Other In-Hand (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 4,400,000 - - 4,400,000 - - - 400,000 1,650,000 2,350,000
Total Sources 4,400,000 - - 4,400,000 - - - 400,000 1,650,000 2,350,000
- 4,400,000
Project Expenditures & Resources Programmed Programmed Pre-2019 Six-Year Program
Lind Ave SW - SW 16th St to SW 43rd St
317
120024
Bob Mahn 425-430-7322
Widen existing roadway to five lanes where required. Includes new roadway, curbs, sidewalks, drainage, signals, lighting, signing and channelization.
Increasing traffic demands in the Valley due in part to development will create the need to increase the capacity of this major north/south arterial. A potential project is a signal
installation at the intersection at Lind Ave SW and SW 34th St (currently unsignalized). Additionally, improvements may result from future WSDOT I-405 plans which include an
interchange at Lind Ave SW (currently unfunded).
The needs, priorities and schedules for improvements on Lind Ave SW will be determined through Arterial Circulation studies.