Loading...
HomeMy WebLinkAbout34. Maple Valley Highway BarriersTRANSPORTATION IMPROVEMENT PROGRAM 2019 - 2024 TIP No. 34 Project Title:Maple Valley Highway Barriers Community Planning Area:Cedar River Fund: Functional Classification:Principal Arterial Project: Project Length:N/A Contact: Project Description: Justification: Status: Changes: Funded:Unfunded: Pre-2018 2018 Total 2019 2020 2021 2022 2023 2024 Expenditures: Planning - - - - - - - - - - Preliminary Engineering 522,970 - - 522,970 - - 274,035 248,935 - - R-O-W (includes Admin)156,300 - - 156,300 - - 25,000 131,300 - - Construction 1,804,160 - - 1,804,160 - - - 1,804,160 - - Construction Services 654,470 - - 654,470 - - - 654,470 - - Post Construction Services - - - - - - - - - - Other - - - - - - - - - - Total Expenses 3,137,900 - - 3,137,900 - - 299,035 2,838,865 - - Resources: Vehicle Fuel Tax - - - - - - - - - - Business & Occupation Share - - - - - - - - - - Fund Balance - - - - - - - - - - Grants In-Hand (1)- - - - - - - - - - Grants In-Hand (2)- - - - - - - - - - Mitigation In-Hand - - - - - - - - - - Bonds / LID's Formed - - - - - - - - - - Other In-Hand (1)- - - - - - - - - - Other In-Hand (2)- - - - - - - - - - - - - - - - - - - - Undetermined 3,137,900 - - 3,137,900 - - 299,035 2,838,865 - - Total Sources 3,137,900 - - 3,137,900 - - 299,035 2,838,865 - - Maple Valley Highway Barriers 317 Chris Barnes 425-430-7220 This project includes two barriers: One is to install a concrete median barrier between east and westbound travel lanes of the SR 169 S-Curve between the Riviera Apartments and S. 5th Street including associated roadway widening to add the barrier. The second barrier improvement will remove the existing concrete barrier end treatment located eastbound (east of the Riviera Apartments) and replace with 2 new concrete barriers extending west. Maple Valley Highway (SR 169) is a principal arterial carrying 44,000 vehicles per day. This project will improve safety for traffic on Maple Valley Highway (SR 169) at this location, which has been the site to numerous collision impacts. The design report for the Cedar River half bridge is complete and was funded by the Roadway Safety and Guardrail Program (TIP # 4). Final design and construction pending funding availability. - 3,137,900 Project Expenditures & Resources Programmed Programmed Pre-2019 Six-Year Program