Loading...
HomeMy WebLinkAbout43. South Grady Way - Talbot Rd South to Rainier Ave SouthTRANSPORTATION IMPROVEMENT PROGRAM 2019 - 2024 TIP No. 43 Project Title:South Grady Way - Talbot Rd South to Rainier Ave South Community Planning Area:City Center Fund: Functional Classification:N/A Project: Project Length:N/A Contact: Project Description: Justification: Status: Changes: Funded:Unfunded: Pre-2018 2018 Total 2019 2020 2021 2022 2023 2024 Expenditures: Planning - - - - - - - - - - Preliminary Engineering 750,000 - - 750,000 - - 550,000 200,000 - - R-O-W (includes Admin)- - - - - - - - - - Construction 2,500,000 - - 2,500,000 - - - 1,200,000 1,300,000 - Construction Services 750,000 - - 750,000 - - - 360,000 390,000 - Post Construction Services - - - - - - - - - - Other - - - - - - - - - - Total Expenses 4,000,000 - - 4,000,000 - - 550,000 1,760,000 1,690,000 - Resources: Vehicle Fuel Tax - - - - - - - - - - Business & Occupation Share - - - - - - - - - - Fund Balance - - - - - - - - - - Grants In-Hand (1)- - - - - - - - - - Grants In-Hand (2)- - - - - - - - - - Mitigation In-Hand - - - - - - - - - - Bonds / LID's Formed - - - - - - - - - - Other In-Hand (1)- - - - - - - - - - Other In-Hand (2)- - - - - - - - - - - - - - - - - - - - Undetermined 4,000,000 - - 4,000,000 - - 550,000 1,760,000 1,690,000 - Total Sources 4,000,000 - - 4,000,000 - - 550,000 1,760,000 1,690,000 - - 4,000,000 Project Expenditures & Resources Programmed Programmed Pre-2019 Six-Year Program South Grady Way - Talbot Rd South to Rainier Ave South 317 Vangie Garcia 425-430-7319 This project will perform a comprehensive analysis of multi-modal transportation improvements, including review of potential transit improvements along Grady Way, such as Business Access and Transit (BAT) lanes and Traffic Signal Priority (TSP). The project will remove the islands at the intersections of S Grady Way with Lake Ave S and Shattuck Ave S, to allow for a continuous eastbound lane from Rainier Ave S to Talbot Rd S. Included are modifications to the traffic signal, new pedestrian crossings and channelization. The improvements will add much needed capacity to the S Grady Way corridor. Project is pending future grant funding availability.