Loading...
HomeMy WebLinkAbout45. Sunset Area Green ConnectionsTRANSPORTATION IMPROVEMENT PROGRAM 2019 - 2024 TIP No. 45 Project Title:Sunset Area Green Connections Community Planning Area:Highlands Fund: Functional Classification:N/A Project: Project Length:N/A Contact: Project Description: Justification: Status: Changes: Funded:Unfunded: Pre-2018 2018 Total 2019 2020 2021 2022 2023 2024 Expenditures: Planning - - - - - - - - - - Preliminary Engineering 2,600,000 - - 2,600,000 - - - 2,600,000 - - R-O-W (includes Admin)1,000,000 - - 1,000,000 - - - 1,000,000 - - Construction 16,000,000 - - 16,000,000 - - - - 9,200,000 6,800,000 Construction Services 2,600,000 - - 2,600,000 - - - - 1,500,000 1,100,000 Post Construction Services - - - - - - - - - - Other - - - - - - - - - - Total Expenses 22,200,000 - - 22,200,000 - - - 3,600,000 10,700,000 7,900,000 Resources: Vehicle Fuel Tax - - - - - - - - - - Business & Occupation Share - - - - - - - - - - Fund Balance - - - - - - - - - - Grants In-Hand (1)- - - - - - - - - - Grants In-Hand (2)- - - - - - - - - - Mitigation In-Hand - - - - - - - - - - Bonds / LID's Formed - - - - - - - - - - Other In-Hand (CED)- - - - - - - - - - Other In-Hand (2)- - - - - - - - - - - - - - - - - - - - Undetermined 22,200,000 - - 22,200,000 - - - 3,600,000 10,700,000 7,900,000 Total Sources 22,200,000 - - 22,200,000 - - - 3,600,000 10,700,000 7,900,000 - 22,200,000 Project Expenditures & Resources Programmed Programmed Pre-2019 Six-Year Program Sunset Area Green Connections 317 Vangie Garcia 425-430-7319 This project will construct multi-modal improvements identified in the Sunset Area Community Planned Action Study. Roadways will be widened/extended/realigned to provide for future traffic flows. Several residential streets will be developed as "green connections" improving pedestrian mobility and enhance the neighborhood. Roadways included are NE 10th St, NE Sunset Lane, Harrington Ave NE, NE 12th St, Edmonds Ave NE, Jefferson Ave NE, Kirkland Ave NE and Glennwood Ave NE. Improvements to these streets are key to support the redevelopment of the Sunset Area Community in the Highlands area, bounded by NE 21st St on the north, Edmonds Ave NE on the west, NE 7th St on the south, and Monroe Ave NE on the east. The City in partnership with the Renton Housing Authority aspires to redevelop the Sunset Terrace public housing community and encourage private delopment in the Planned Action Study area over a 20-year period. The total cost of the project is estimated at $22.2M. Schedule, cost and selection of streets to be improved to be determined. Significant cost participation will be required from development. Surface Water is leading this project and has completed two projects along Harrington Ave NE.