Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
47. Talbot Road S.S 177th Street Signalization & Raodway Improvements
TRANSPORTATION IMPROVEMENT PROGRAM 2019 - 2024 TIP No. 47 Project Title:Talbot Road S / S 177th Street Signalization & Roadway Improvements Community Planning Area:Talbot Fund: Functional Classification:Major Collector Project: Project Length:N/A Contact: Project Description: Justification: Status: Changes: Funded:Unfunded: Pre-2018 2018 Total 2019 2020 2021 2022 2023 2024 Expenditures: Planning - - - - - - - - - - Preliminary Engineering - - - - - - - - - - R-O-W (includes Admin)- - - - - - - - - - Construction 1,000,000 - 1,000,000 - - - - - - - Construction Services 25,000 - 25,000 - - - - - - - Post Construction Services - - - - - - - - - - Other - - - - - - - - - - Total Expenses 1,025,000 - 1,025,000 - - - - - - - Resources: Vehicle Fuel Tax - - - - - - - - - - Business & Occupation Share - - - - - - - - - - Fund Balance - - - - - - - - - - Grants In-Hand (1)- - - - - - - - - - Grants In-Hand (2)- - - - - - - - - - Mitigation In-Hand - - - - - - - - - - Bonds / LID's Formed - - - - - - - - - - Other In-Hand (Dev. Expenditu 1,025,000 - 1,025,000 - - - - - - - Other In-Hand (Dev. Reimb)- - - - - - - - - - - - - - - - - - - - Undetermined - - - - - - - - - - Total Sources 1,025,000 - 1,025,000 - - - - - - - Talbot Road S / S 177th Street Signalization & Roadway Improvements 1,025,000 - Project Expenditures & Resources Programmed Programmed Pre-2019 Six-Year Program 317 Vangie Garcia 425-430-7319 This project involves installing a traffic signal and various roadway improvements including meeting pedestrian transit and bicycle needs. This project is proposed to meet recent traffic demand through this intersection and surrounding area as a result of the expansion of Valley Medical Center. The project is currently in design and will be starting construction in 2018 once they receive an approved permit.