HomeMy WebLinkAboutRC 20180706000637Instrument Number: 20180706000637 Document:COV Rec: $103.00 Page -1 of 5
Record Date:7/6/2018 12:23 PM
Electronically Recorded King County, WA
City Clerk's Office
City of Renton
FOR INSPECTION AND MAINTENANCE OF DRAINAGE FACILITIES AND
ON-SITE BM.;
Grantee: City of Renton, a Washington municipal corporation
Legal Description. LOT10, WILDWOOD VIEW, ACCORDING TO THE PLAT THEREOF RECORDED IN VOL. 282
OF PLATS, PAGES 33 TOHROUGH 37, UNDER RECORDING NUMBER 20180426000102, RECORDS OF KING CO., WA
Assessor's Tax Parcel ID#: 9415400100
Residential Building Permit F� Commercial Building Permit
clearing and Grading Permit E] Civil Construction or Utility Permit
forPermit(s)
- (ConstructionlftildinTlUtilitn Permit LA relati n to the real Xm�wrq
("Property") described above, the Grantor(s), the owner(s) in fee of that Property, hereby
covenants (covenant) with the City of Renton ("City of Renton" or "City"), a municipal corporation
of the state of Wash
and obligations set forth and described in Paragraphs 1 through 9 below with regard to the
Property, and hereby grants (grant) an easement as described in Paragraphs 2 and 3. Grantor(s)
hereby grants (grant), covenants (covenant), and agrees (agree) as follows:
1. The Grantor(s) or his/her (their) successors in interest and assigns ("Owners ") shall at their own
cost, operate, maintain, and keep in good repair, the Property's drainage facilities constructed
as required in the approved construction plans and specifications (Project
Pion #) on file with the City of Renton and submitted to the City of Renton for the review and
approval of permit(s) B1ill 2430 (ConstructionlBuildinglUtifity Permit#). The
Property's drainage facilities are shown and/or listed on Exhibit A – Site Plan. The Property's
drainage facilities shall be maintained in compliance with the operation and maintenance
schedule included and attached herein as Exhibit B – Operations and Maintenance. Drainage
facilities include pipes, channels, flow control facilities, water quality facilities, on-site best
management practices (BMPs) and other engineered structures designed to manage and/or
Instrument Number: 20180706000637 Document:COV Rec: $103.00 Page -2 of 5
Record Date:7/6/2018 12:23 PM King County, WA
1 If City of Renton determines from its inspection, or from an engineer's report provided in
accordance with Paragraph 2, that maintenance, repair, restoration, and/or mitigation work is
required to be done to any of the drainage facilities, City of Renton shall notify the Owners of
the specific maintenance, repair, restoration, and/or mitigation work ("Work") required
pursuant to the Renton Municipal Code. The City shall also set a reasonable deadline for the
Owners to complete the Work, or to provide an engineer's report that verifies completion of
the Work. After the deadline has passed, the Owners shall allow the City access to re -inspect
the drainage facilities unless an engineer's report has been provided verifying completion of
the Work. If the Work is not completed within the time frame set by the City, the City may
initiate an enforcement action and/or perform the Work and hereby is given access to the
Property for such purposes. Written notice will be sent to the Owners stating the City's
intention to perform such Work. This Work will not commence until at least seven (7) days after
such notice is mailed, If, within the sole discretion of the City, there exists an imminent or
present danger, the seven (7) day notice period will be waived and Work will begin
immediately,
4The Owners shall assume all responsibility for the cost of any Work, or any measures taken by
the City to address conditions as described in Paragraph 3. Such responsibility shall Include
reimbursement to the City within thirty (30) days of the receipt of the invoice for any such Work
performed. Overdue payments will require payment of interest at the maximum legal rate
allowed by RCW 19 .52.020 (currently twelve percent (12%)), If the City initiates legal action to
enforce this agreement, the prevailing party in such action is entitled to recover reasonable
litigation costs and attorney's fees,
5. The Owners are required to obtain written approval from City of Renton prior to filling, piping,
cutting, or removing vegetation (except in routine landscape maintenance) in open vegetated
stormwater facilities (such as swales, channels, ditches, ponds, etc.), or performing any
alterations or modifications to the drainage facilities referenced in this Declaration of Covenait.
Instrument Number: 20180706000637 Document:COV Rec: 5103.00 Page -3 of 5
Record Date:7/6/2018 12:23 I'M King County, WA
6. Any notice or consent required to be given or otherwise provided for by the provisions of this
Agreement shall be effective upon personal delivery, or three (3) days after mailing by Certified
Mail, return receipt requested,
7. With regard to the matters addressed herein, this agreement constitutes the entire agreement
between the parties, and supersedes all prior discussions, negotiations, and all agreements
whatsoever whether oral or written,
8. This Declaration of Covenant is intended to! protect the value and desirability and promote
efficient and effective management of surface water drainage of the real property described
above, and shall inure to the benefit of all the citizens of the City of Renton and its successors
and assigns, This Declaration of Covenant shall run with the land and be binding upon
Grantor(s), and Grantor's(s') successors in interest, and assigns.
9. This Declaration of Covenant may be terminated by execution of a written agreement by the
Owners and the City that is recorded by King County in its real property records.
IN WITNESS WHEREOF, this Declaration of Covenant for the Inspection and Maintenance of
Drainage Facilities is executed this U" day of A 20_IL_.
GR NTOR, owner of the Properly GRANTOR, owner of the Property
STATE OF WASHINGTON
COUNTY OF KING
,1 V P , to me known to be the individual(s)
described in and who executed the within and foregoing instrument and acknowledged that they
signed the same as their free and voluntary act and deed, for the uses and purposes therein stated.
Given under my hand and official seai this 0 day of At,,; 1 20 13 .
ifiEiTiiil
Printed name
Notary Public in and for the State of
Washington, residing at
�eattu
Instrument Number: 20180706000637 Document:COV Rec: $103.00 Page -4 of 5
Record Date:7/6/2018 12:23 I'M King County, WA
TOTAL LOT AREA: 6,183 &F.
ADDRESS: 4786 SMI THERS AVE S, RENTON, WA 98055
PARCEL NUMBER:
PERMIT #:
EXISTING PERVIOUS AREA: 0 S.F.
PROPOSED PERVIOUS AREA: 3,731 S.F
EXISTING IMPERVIOUS AREA: 0 S,F.
PROPOSED IMPERVIOUS AREA: 2,450 &F
SS
TE
—
10' JOIN
111 UTIL I TY ESM'T
WA TER SER DICE
LINE FROM
SMI THERS AVE S
I I i
C\l
-�-
r CO ,
CONNECT ROOF
DRAINS TO STORM
STUB KITH 6 "0
PERFORATED PIPE
IN 2'xlO' TRENCH
0 WNER A DDRESS.-
HARBOUR HOMES, LLC
400 N 34TH STREET SUITE JOO
Z.
10
1PROPOSED SFR
6 PL
'12350,B PLAN
FLOW CONTROL
BMP NO TE. -
SEATTLE, WA 98103 THIS PROPERTY CONTAINS A
STORM WA TER MA NA GEMEN T FL 0 W
LEGAL DESCRIPTION.- CONTROL BMP KNOWN AS
LOT 10, WILDWOOD VIEW "RESTRICTED FOOTPRINT'"THE
ACCORDING TO THE PLAT THEREOF TOTAL IMPERVIOUS SURFACE ON
RECORDED IN 6LUME1,11OF THIS PROPERTY MAY NOT EXCEED
PLA TS, PAGES THROUGH LT 3, ..330 S: F.
NDER�dECORDING NUMBER THIS PROPERTY ALSO CONTAINS A
f0??RECOROS OF FLOW CONTROL 8MP KNOWN AS A
KING COUNTY WASHINGTON. PERFORATED PIPE CONNECTION.
Instrument Number: 20180706000637 Document:COV Rec: $103.00 Page -5 of 5
Record Date:7/6/2018 12:23 PM King County, WA
Your property contains a stormwater management flow control BMP (best management
practice) known as "restricted footprint," the practice of restricting the amount of impervious
surface that may be added to a property so as to minimize the storm water runoff impacts
caused by impervious surface. The total impervious surface on your property may not exceed
3330 square feet without written approvai from the City of Renton,
This lot contains storm water management flow control BMP (best management practice) called
a "perforated pipe connection," which was installed to reduce the stormwater runoff impacts of
some or all of the impervious surface on your property. A perforated pipe connection is a length
of drainage conveyance pipe with holes in the bottom, designed to "leak" runoff, conveyed by
the pipe, into a gravel filled trench where it can be soaked into the surrounding soH. The
connection is intended to provide opportunity for infiltration of any runoff that is being
conveyed from an impervious surface (usually a roofs to a local drainage system such as a ditch
or roadway pipe system.
The size and composition of the perforated pipe connection as depicted by the flow control BMP
site plan and design details must be maintained and may not be changed without written
approval from the City of Renton. The soil overtop of the perforated portion of the system must
not be compacted or covered with impervious materials,
/"Ipe 5 a � 5