HomeMy WebLinkAbout21. Rainier Ave S.N Phase 4 - S 3rd Street to NW 3rd PlTRANSPORTATION IMPROVEMENT PROGRAM 2019 - 2024 TIP No. 21 Project Title:Rainier Ave S/N Phase 4 - S 3rd Street to NW 3rd Pl Community Planning Area:City Center Fund: Functional Classification:Principal Project: Project Length:0.51 mi Contact: Project Description: Justification: Status: Changes: Funded:Unfunded: Pre-2018 2018 Total 2019 2020 2021 2022 2023 2024 Expenditures: Planning - - - - - - - - - - Preliminary Engineering 3,000,000 543,395 1,505,282 951,323 500,000 451,323 - - - - R-O-W (includes Admin)3,500,000 - - 3,500,000 1,000,000 1,500,000 1,000,000 - - - Construction 10,500,000 - - 10,500,000 - - 6,000,000 4,500,000 - - Construction Services 3,300,000 - - 3,300,000 - - 1,800,000 1,350,000 150,000 - Post Construction Services - - - - - - - - - - Other - - - - - - - - - - Total Expenses 20,300,000 543,395 1,505,282 18,251,323 1,500,000 1,951,323 8,800,000 5,850,000 150,000 - Resources: Vehicle Fuel Tax - - - - - - - - - - Business & Occupation Share 709,600 56,387 103,213 550,000 - - 100,000 450,000 - - Fund Balance 239,552 39,552 100,000 100,000 - - 100,000 - - - Grants In-Hand (STP PE)2,600,000 447,456 1,302,069 850,475 750,475 100,000 - - - - Grants In-Hand (STP ROW)3,000,000 - - 3,000,000 442,000 1,258,000 1,300,000 - - - Grants In-Hand (STP CN)4,500,000 - - 4,500,000 - - 4,500,000 - - - Mitigation In-Hand 2,695,848 - - 2,695,848 307,525 593,323 700,000 945,000 150,000 - Bonds / LID's Formed - - - - - - - - - - Other In-Hand (TIB Grant)*6,555,000 - - 6,555,000 - - 2,100,000 4,455,000 - - - - - - - - - - - - Undetermined - - - - - - - - - - Total Sources 20,300,000 543,395 1,505,282 18,251,323 1,500,000 1,951,323 8,800,000 5,850,000 150,000 - 20,300,000 - Project Expenditures & Resources Programmed Programmed Pre-2019 Six-Year Program Rainier Ave S/N Phase 4 - S 3rd Street to NW 3rd Pl Phase 4 of the Rainier Ave S Corridor Improvements has been separated into two phases due to cost and feasibility. Currently, there is a Renton Airport Master Plan process that may affect the alignment of Airport Way, which is at the northern end of Phase 4. This grant request is to fund the construction of Phase 4A from S 3rd St to S Tobin St. The City of Renton will construct Phase 4B after the Airport Master Plan is final and approved. Transportation plans to also apply for a TIB grant for the construction of Phase 4A. Previous phases of Rainier were constructed with TIB funds but if this phase does not receive TIB funding, the City will use local funds to construct the project. 317 122195 Michelle Faltaous 425-430-7301 This is Phase 4 of the Rainier Ave Corridor Improvements, and will extend the improvements from S 3rd St to NW 3rd Pl. Project elements include sidewalk widening with streetscaping, adding pedestrian-scale illumination, adding a pedestrian actuated traffic signal, upgrading existing traffic signals, transit facility improvements, planted buffer strips and landscaped medians. Also includes a ped/bike path on the east side of Rainier Ave N, between Airport Way and NW 3rd Pl. Rainier Ave is a critical corridor in central Renton with existing operational problems and in need of infrastructure enhancements to provide greater ease of non-motorized and transit-based travel. It also provides improved access to the Renton Airport and Boeing's Renton Plant. Improvements will enhance traffic flow and reduce accidents. A STP grant in the amount of $2,600,000 was awarded (2014) for design of Phase 4 and design is currently underway. Additional STP grants were awarded for Right-of-Way for $3,000,000 and for construction of Phase 4A for $4,500,000. RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4A EXTENSION OF PAST CORRIDOR IMPROVEMENTS Phase Description Status 1 Railroad Bridge Reconstruction COMPLETE 2 Construction of a Stormwater Bypass COMPLETE 3 Construction of BAT lanes, medians, wider sidewalks, landscaping, transit amenities COMPLETE 4 Completion of Rainier Corridor up to Renton Airport DESIGN: funded and underway ROW: recently funded Construction to occur in two phases due to Airport Master Plan. RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4A CONSTRUCTION PHASING PHASE 4A PHASE 4B AIRPORT WAY S. TOBIN ST S. 2ND ST S. 3RD ST SW SUNSET BLVD RENTON AIRPORT RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4A CROSS SECTIONS BETWEEN S 3RD ST AND S 2ND ST BETWEEN S 2ND ST AND AIRPORT WAY IMPROVES TRANSIT MOBILITY Extends existing northbound and southbound BAT lanes to S 2nd St. IMPROVES TRAFFIC SAFETY Reconstructs two traffic signals and provides for signalized (protected) U-turns. IMPROVES PEDESTRIAN SAFETY Includes sidewalk widening with additional streetscape, ped-scale illumination, HAWK Signal, transit facility improvements, landscaped buffers and medians. SUPPORTS ADOPTED ECONOMIC STRATEGY Accommodates future conversion of S 2nd St and S 3rd St to two-way operation.