Loading...
HomeMy WebLinkAboutSR_HEX_Report_Bo De Monastery CUP_wExhibits_180731.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Project Location Map SR_HEX_Report_Bo De Monastery CUP_wExhibits_180731 A. REPORT TO THE HEARING EXAMINER HEARING DATE: July 31st, 2018 Project Name: Bo De Monastery CUP Owner: Nhung Huynh, 11410 SE Petrovitsky Rd, Renton, WA 98055 Applicant/Contact: Nam Dung Nguyen, 11410 SE Petrovitsky Rd, Renton, WA 98055 Project File Number: PR18-000301 Land Use File Number: LUA18-000372, CU-H Project Manager: Alex Morganroth, Associate Planner Project Summary: The subject site is located at 11410 SE Petrovitsky Rd (Parcel #2923059025). The applicant has proposed the operation of a religious institution in an existing single- family home on the site. An Accessory Dwelling Unit, approved in 2010 under LUA10-036, and a gravel surface parking lot are also located on the site. The tenant received a violation for construction without a permit on November 28, 2017 (CODE17-000679). The site totals 38,134 square feet in area and is located within the R-14 (Residential 14 du/ac) zoning classification. According to the applicant, the church serves approximately 15-20 members during regular service and up to 50 members during special events. Access to the site is proposed to remain via the two existing driveways off of SE Petrovitsky Rd. The applicant has also proposed the regrading of the existing gravel area used for parking in order to provide 10 marked spaces for members. COR maps indicates the presence of sensitive slopes on the northeast corner of the site. The applicant has proposed the removal of one tree on the project site. Project Location: 11410 SE Petrovitsky Rd, Renton, WA 98055 Site Area: 0.88 acres City of Renton Department of Community & Economic Development Hearing Examiner Recommendation BO DE MONASTERY CUP LUA18-000372 Report of July 31st, 2018 Page 2 of 11 SR_HEX_Report_Bo De Monastery CUP_wExhibits_180731 B. EXHIBITS: Exhibit 1: Staff Report to the Hearing Examiner Exhibit 2: Site Plan and Construction Drawings Exhibit 3: Parking Plan Exhibit 4: Landscape Plan C. GENERAL INFORMATION: 1. Owner(s) of Record: Nhung Huynh, 11410 SE Petrovitsky Rd Renton, WA 98055 2. Zoning Classification: Residential-14 du/ac (R-14) 3. Comprehensive Plan Land Use Designation: Residential High Density 4. Existing Site Use: A Temple Building, a Single-family Residence, Accessory Structure and Associated Surface Parking 5. Critical Areas: High Seismic Hazard 6. Neighborhood Characteristics: a. North: Vacant, Residential-14 du/ac (R-14) b. East: Medical Office, Commercial Arterial (CA) c. South: Single-family Residential, Residential-8 du/ac (R-8) d. West: Multi-family Residential, Residential-14 du/ac (R-14) 7. Site Area: 0.88 acres D. HISTORICAL/BACKGROUND: Action Land Use File No. Ordinance No. Date Comprehensive Plan N/A 5758 06/22/2015 Zoning N/A 5758 06/22/2015 Benson Hill Annexation N/A 5327 03/01/2008 Conditional Use Permit for Accessory Dwellings Unit LUA10-036 N/A 10/25/2010 E. PUBLIC SERVICES: 1. Existing Utilities a. Water: Water service is provided by Soos Creek Water and Sewer District. b. Sewer: Sewer service is by Soos Creek Water and Sewer District. City of Renton Department of Community & Economic Development Hearing Examiner Recommendation BO DE MONASTERY CUP LUA18-000372 Report of July 31st, 2018 Page 3 of 11 SR_HEX_Report_Bo De Monastery CUP_wExhibits_180731 c. Surface/Storm Water: An existing public stormwater main is located in the front of the subject property within SE Petrovitsky Rd. 2. Streets: The building on the site take access from two driveways off of SE Petrovitsky, classified as a Major Arterial street. 3. Fire Protection: Renton Fire Authority. F. APPLICABLE SECTIONS OF THE RENTON MUNICIPAL CODE: 1. Chapter 2 Land Use Districts a. Section 4-2-020: Purpose and Intent of Zoning Districts b. Section 4-2-070: Zoning Use Table c. Section 4-2-110A: Residential Development Standards 2. Chapter 3 Environmental Regulations a. Section 4-3-050: Critical Area Regulations 3. Chapter 4 Property Development Standards 4. Chapter 9 Permits - Specific a. Section 4-9-030: Conditional Use Permits 5. Chapter 11 Definitions G. APPLICABLE SECTIONS OF THE COMPREHENSIVE PLAN: 1. Land Use Element H. FINDINGS OF FACT (FOF): 1. The Planning Division of the City of Renton accepted the above master application for review on May 29th, 2018 and determined the application complete on June 20th, 2018. The project complies with the 120-day review period. 2. The project site is located at 11410 SE Petrovitsky Rd. 3. The project site is currently developed with an existing single-family residence, an accessory dwelling unit, and a gravel surface parking area. 4. The existing accessory dwelling unit (ADU) on the site was approved in 2010 under LUA10-036. The ADU is used exclusively by leaders of the congregation as a permanent residence and would continue to be used as such. If the subject Conditional Use Permit is approved, the residence would no longer be classified as an ADU since there would no longer be a primary residence. 5. Access to the site would be provided via the two existing driveway off of SE Petrovitsky Rd on the south side of the site. 6. The property is located within the Residential High Density Comprehensive Plan land use designation. 7. The site is located within the Residential-14 du/ac (R-14) zoning classification. 8. There are approximately 16 trees located on-site, of which the applicant is proposing to remove one (1) tree. 9. The site is mapped with sensitive slopes. City of Renton Department of Community & Economic Development Hearing Examiner Recommendation BO DE MONASTERY CUP LUA18-000372 Report of July 31st, 2018 Page 4 of 11 SR_HEX_Report_Bo De Monastery CUP_wExhibits_180731 10. The applicant has not proposed any cut or fill on the site. 11. No agency comment letters were received. 12. A public comment letter was received. 13. The proposed project is Categorically Exempt from Environmental (SEPA) Review per WAC 197-111- 800(6)(b)(i). 14. Representatives from various city departments have reviewed the application materials to identify and address issues raised by the proposed development. These comments are contained in the official file, and the essence of the comments has been incorporated into the appropriate sections of this report and the Departmental Recommendation at the end of this report. 15. Comprehensive Plan Compliance: The site is designated Residential High Density (RHD) on the City’s Comprehensive Plan Map. The purpose of the RHD designation is to provide land where conditions are in place for appropriate for a variety of housing unit types, or where there is existing multifamily development. Conditions include close access to transit service and the efficient use of urban services and infrastructure. The proposal is compliant with the following development standards if all conditions of approval are met: Compliance Comprehensive Plan Analysis  Goal L-BB: Maintain a high quality of life as Renton grows by ensuring that new development is designed to be functional and attractive. Compliant if condition of approval is met Goal L-FF: Strengthen the visual identity of Renton and its Community Planning Areas and neighborhoods through quality design and development. Staff Comment: An existing six-foot high fence is located on the along the front of the property. The fence is significantly deteriorated and very unsightly due to its poor condition. In addition, the existing fence is out of compliance with the fence standards in RMC 4-4-040, which limits fences in the front yard setback to four (4’) feet in height. In order to improve the aesthetics of the property when viewed from the sidewalk or street, and to bring the site into compliance with the fence standards, staff recommends as a condition of approval that the applicant remove the existing fence prior to building permit issuance. The applicant may then choose to either replace the old fence with a fence compliant with code, or provide no fence at all.  Policy L-56: Preserve natural landforms, vegetation, distinctive stands of trees, natural slopes, and scenic areas that contribute to the City’s identity, preserve property values, and visually define the community and neighborhoods. 16. Zoning Development Standard Compliance: The purpose of the Residential-14 Zone (R-14) is to encourage development, and redevelopment, of residential neighborhoods that provide a mix of detached and attached dwelling structures organized and designed to combine characteristics of both typical single-family and small-scale multi-family developments. Structure size is intended to be limited in terms of bulk and scale so that the various unit types allowed in the zone are compatible with one another and can be integrated together into a quality neighborhood. Project features are encouraged, such as yards for private use, common open spaces, and landscaped areas that enhance a neighborhood and foster a sense of community. Civic and limited commercial uses may be allowed when they support the purpose of the designation. The proposal is compliant with the following development standards, as outlined in RMC 4-2-110A, if all conditions of approval are met: City of Renton Department of Community & Economic Development Hearing Examiner Recommendation BO DE MONASTERY CUP LUA18-000372 Report of July 31st, 2018 Page 5 of 11 SR_HEX_Report_Bo De Monastery CUP_wExhibits_180731 Compliance R-14 Zone Develop Standards and Analysis  Use: The applicant is proposing to operate a religious institution. Staff Comment: Religious institutions are permitted in the R-14 zoning district subject to discretionary review and approval of a Conditional Use Permit by the Hearing Examiner. If the Conditional Use Permit is approved, the proposed use would be allowed to operate in the subject location. An Administrative Conditional Use Permit was issued in 2010 (LUA10-036) for the existing Accessory Dwelling Unit (ADU) on the site. Per the applicant, the ADU is used as a permanent residence by leaders of the congregation. Per RMC 4-11-040, an ADU is defined as “an independent subordinate dwelling unit that is located on the same lot, but not within a single-family dwelling”. If the CUP for the temple is approved, the primary structure would no longer function as a single-family dwelling. Therefore, the other dwelling unit would no longer meet the definition of an ADU and the CUP under LUA10-036 would be void. N/A Density: The density range permitted in the R-14 zone is a minimum 7.0 up to a maximum of 14.0 dwelling units per net acre. Net density is calculated after the deduction of sensitive areas, areas intended for public right-of-way, and private access easements. Staff Comment: Not applicable, no new residential uses are proposed.  Lot Dimensions: The minimum lot size permitted in the R-14 zone is 3,000 sq. ft. for detached dwellings. There is no minimum lot size for attached dwellings. A minimum lot width of 30 feet is required (40 feet for corner lots) and a minimum lot depth of 60 feet is required. Staff Comment: The proposed site is an existing legal lot and meets the minimum lot size requirement.  Setbacks: The required setbacks in the R-14 zone are as follows: front yard is 15 feet except when all access is taken from an alley then 10 feet, side yard is 4 feet for detached units, for attached units the side yard is 0 feet for the attached sides and 4 feet for the unattached sides, secondary front yard (applies to corner lots) is 15 feet, and the rear yard is 10 feet. Staff Comment: The proposed temple structure has a front yard setback of approximately 45 feet, a rear yard setback of approximately 175 feet, and side yard setbacks of approximately 32 feet on the west side and 84 feet on the east side. The existing home behind the temple has a front yard setback of approximately 112 feet, a rear yard setback of approximately 87 feet, and side yard setbacks of approximately 7 feet on the west side and 134 feet on the east side. Therefore, the existing buildings are in compliance with the R-14 setback standards.  Building Standards: The R-14 zone has a maximum building coverage of 65% and a maximum impervious surface coverage of 80%. In the R-14 zone, a maximum building height of 3 stories with a wall plate height of 24 feet is permitted. Roofs with a pitch equal to or greater than 4:12 may project an additional six (6) vertical feet from the maximum wall plate height. If the height of wall plates on a building are less than the states maximum the roof may project higher to account for the difference, yet the combined height of both features shall not exceed the combined maximums. Common rooftop features, such as chimneys, may project an additional four (4) vertical feet from City of Renton Department of Community & Economic Development Hearing Examiner Recommendation BO DE MONASTERY CUP LUA18-000372 Report of July 31st, 2018 Page 6 of 11 SR_HEX_Report_Bo De Monastery CUP_wExhibits_180731 the roof surface. Non-exempt vertical projections (e.g., roofs pitched less than 4:12, decks, railings, etc.) may extend up to six (6) vertical feet above the maximum wall plate height if the projection is stepped back one-and-a-half (1.5) horizontal feet from each minimum building setback line for each one (1) vertical foot above the maximum wall plate height. Wall plates supporting a primary roof surface that has only one (1) sloping plane (e.g., shed roof) may exceed the stated maximum if the average of wall plate heights is equal or less than the maximum wall plate height allowed. Staff Comment: The applicant is only proposing tenant improvements for the temple structure and is not proposing any changes to the exterior of the buildings on the site. The structures are both two stories in height and have a wall plate height of approximately 22 feet. The total building coverage is 8.4% and the total impervious surface is approximately 63%. Therefore, the structures are compliant with the building standards for the R-14 zone. N/A Maximum Number of Units per Building: In the R-14 zone, no more than 6 units per building are permitted. Staff Comment: Not applicable, no residential uses are proposed. Compliant if condition of approval is met Landscaping: The City’s landscape regulations (RMC 4-4-070) require a 10-foot landscape strip along all public street frontages. Additional minimum planting strip widths between the curb and sidewalk are established according to the street development standards of RMC 4-6-060. Street trees and, at a minimum, groundcover, are to be located in this area when present. Spacing standards shall be as stipulated by the Department of Community and Economic Development, provided there shall be a minimum of one street tree planted per address. Any additional undeveloped right-of- way areas shall be landscaped unless otherwise determined by the Administrator. Where there is insufficient right-of-way space or no public frontage, street trees are required in the front yard subject to approval of the Administrator. A minimum of two trees are to be located in the front yard prior to final inspection for the new Single- Family Residence. Surface parking lots with more than fourteen (14) stalls shall be landscaped as follows: Surface parking lots with between 15 and 50 spaces shall provide 15 sf of landscaping per parking space, 51 and 99 spaces shall provide 25 sf of landscaping per parking space, and 100 or more spaces shall provide 35 sf of landscaping per parking space. Perimeter parking lot landscaping shall be at least 10 feet in width, interior parking lot landscaped areas shall have a minimum width of 5 feet. Staff Comment: The landscape standards in RMC 4-6-060 are applicable for projects involving the conversion of a residential use to a non-residential use. The existing landscaping shown on the landscape plan submitted by the applicant (Exhibit 4) does not meet the requirements of the landscaping code due to a lack of ground cover across a large portion of the site. In order to ensure compliance with RMC 4-6-060, staff recommends as a condition of approval that the applicant submit a revised landscape plan to the Current Planning Project Manager for approval prior to building permit issuance.  Tree Retention: The City’s adopted Tree Retention and Land Clearing Regulations (4-4- 130) require the retention of 20 percent of trees in a residential development. City of Renton Department of Community & Economic Development Hearing Examiner Recommendation BO DE MONASTERY CUP LUA18-000372 Report of July 31st, 2018 Page 7 of 11 SR_HEX_Report_Bo De Monastery CUP_wExhibits_180731 Significant trees shall be retained in the following priority order: Priority One: Landmark trees; significant trees that form a continuous canopy; significant trees on slopes greater than twenty percent (20%); significant trees adjacent to critical areas and their associated buffers; and significant trees over sixty feet (60') in height or greater than eighteen inches ( 18") caliper. Priority Two: Healthy tree groupings whose associated undergrowth can be preserved; other significant native evergreen or deciduous trees; and other significant non- native trees. Priority Three: Alders and cottonwoods shall be retained when all other trees have been evaluated for retention and are not able to be retained, unless the alders and/ or cottonwoods are used as part of an approved enhancement project within a critical area or its buffer. A minimum tree density shall be maintained on each residentially zoned lot. Lots developed with detached single-family dwelling units in the R-14 zone are exempt from the minimum tree density requirements. For multi-family development, the minimum tree density is four (4) significant trees for every five thousand (5,000) square feet. The tree density may consist of existing trees, replacement trees, trees required pursuant to RMC 4-4-070F.1, Street Frontage Landscaping Required, or a combination. Staff Comment: The applicant has proposed the removal of one (1) of the approximately 16 trees located on the site, resulting in a tree retention rate of 94%. The site, developed with a single-family dwelling, is exempt from the minimum tree density requirements. Therefore, the proposal is in compliance with the Tree Retention and Land Clearing Regulations. Compliant if condition of approval is met Parking: Parking regulations require that a minimum of one for every 5 seats in the main auditorium is provided, and in no case shall there be less than 10 spaces in total. For detached single-family residential uses, a minimum of two on-site spaces is required. Driveway cuts are required to be a minimum of 5 feet from property lines and new driveways may be a maximum of 16 feet in width at the property line. Maximum driveway slopes shall not exceed fifteen percent (15%); provided, that driveways exceeding eight percent (8%) shall provide slotted drains at the lower end with positive drainage discharge to restrict runoff from entering the garage/residence or crossing any public sidewalk. Staff Comment: An existing gravel parking lot on the north side of the site is currently utilized for parking by members of the temple. An analysis of the parking based on the religious institution parking requirements also finds that adequate parking exists. According to the applicant, the proposed church has a total of 50 members. According to the parking standards in RMC 4-4-080, religious institutions are required to have a minimum and maximum of one parking space per five seats. The proposed use would therefore be required to have ten (10) parking spaces in order to satisfy the parking requirement. Therefore, the 10 spaces proposed by the applicant is in compliance with parking requirements per RMC 4-4-080. The applicant did not indicate on the application the type of material proposed for the parking lot. According to the parking standards in RMC 4-4-080, all off-street parking areas are required to be paved with asphaltic concrete, cement, or equivalent alternative material of a permanent nature. In order to ensure compliance with the City of Renton Department of Community & Economic Development Hearing Examiner Recommendation BO DE MONASTERY CUP LUA18-000372 Report of July 31st, 2018 Page 8 of 11 SR_HEX_Report_Bo De Monastery CUP_wExhibits_180731 parking standards, staff recommends as a condition of approval that the applicant pave of the parking area indicated on the parking plan (Exhibit 3) by August 1st, 2019. The existing driveway cuts are located approximately five (5’) feet from the each property line. Compliant if condition of approval is met under FOF 15 Fences and Retaining Walls: In any residential district, the maximum height of any fence, hedge or retaining wall shall be seventy two inches (72"). Except in the front yard and side yard along a street setback where the fence shall not exceed forty eight inches (48") in height. There shall be a minimum three-foot (3') landscaped setback at the base of retaining walls abutting public rights-of-way. Staff Comment: See FOF 15 under “Goal L-FF”. 17. Design Standards: Residential Design and Open Space Standards (RMC 4-2-115) are applicable in the R- 14 zone for new dwelling units. No new dwelling units are being created and therefore the design standards are not applicable to the project. 18. Conditional Use Analysis: The applicant is requesting a Conditional Use Permit to operate a religious institution in the Residential-14 du/ac (R-14) zoning district. The proposal is compliant with the following conditional use criteria, pursuant to RMC 4-9-030. Therefore, staff recommends approval of the requested Conditional Use Permit. Compliance Conditional Use Criteria and Analysis  a. Consistency with Plans and Regulations: The proposed use shall be compatible with the general goals, objectives, policies and standards of the Comprehensive Plan, the zoning regulations and any other plans, programs, maps or ordinances of the City of Renton. Staff Comment: See FOF 15 and FOF 16 for Comprehensive Plan and zoning regulation compliance, respectively.  b. Appropriate Location: The proposed location shall not result in the detrimental overconcentration of a particular use within the City or within the immediate area of the proposed use. The proposed location shall be suited for the proposed use. Staff Comment: The proposed site for the religious institution is located along SE Petrovitsky – an auto-oriented major arterial with a variety of commercial, residential, and institutional uses located along the road. No other religious institutions are present in the immediate vicinity of the proposed use and therefore the location of the proposed use would not result in an overconcentration of the religious institutions in the area.  c. Effect on Adjacent Properties: The proposed use at the proposed location shall not result in substantial or undue adverse effects on adjacent property. Staff Comment: The surrounding uses include multi-family and single-family residential. The proposed use would be located on a large lot with the closest residential use located approximately 100 feet from the temple, where service would be held indoors. With primarily weekend services and events, the proposed use is not expected to create traffic, noise, or other negative impacts on the surrounding properties. Therefore, the proposed use would not result in significant adverse effects on adjacent properties.  d. Compatibility: The proposed use shall be compatible with the scale and character of the neighborhood. City of Renton Department of Community & Economic Development Hearing Examiner Recommendation BO DE MONASTERY CUP LUA18-000372 Report of July 31st, 2018 Page 9 of 11 SR_HEX_Report_Bo De Monastery CUP_wExhibits_180731 Staff Comment: The small church would be located in a structure originally designed as a single-family home, a similar type of building as many of the neighboring properties. Religious institutions can be found in a wide variety of neighborhoods and zoning districts in Renton, including low intensity residential areas. Therefore, the proposed use would not be out of place in a primarily residential neighborhood.  e. Parking: Adequate parking is, or will be made, available. Staff Comment: See FOF 14 under “Parking”  f. Traffic: The use shall ensure safe movement for vehicles and pedestrians and shall mitigate potential effects on the surrounding area. Staff Comment: Pedestrians can take access via existing sidewalks on SE Petrovitsky. The applicant has proposed allowing ingress into the site via the eastern entrance and egress from the site via the western entrance in order to decrease potential vehicular/pedestrian conflicts. Due to the fact that access to the site would be via a busy major arterial and that the services would primarily be held on Sunday, the increased traffic from the temple is not expected to have a significant impact on neighboring properties.  g. Noise, Light and Glare: Potential noise, light and glare impacts from the proposed use shall be evaluated and mitigated. Staff Comment: Services would be held indoors and are not expected to generate any noise, light, or glare impacts outside of those typical along a large, major arterial street.  h. Landscaping: Landscaping shall be provided in all areas not occupied by buildings, paving, or critical areas. Additional landscaping may be required to buffer adjacent properties from potentially adverse effects of the proposed use. Staff Comment: See FOF 16 under “Landscaping”. The existing landscaping along the perimeter of the site is anticipated to be sufficient to screen any adverse effects create by the proposed use. 19. Critical Areas: Project sites which contain critical areas are required to comply with the Critical Areas Regulations (RMC 4-3-050). The proposal is consistent with the Critical Areas Regulations, if all conditions of approval are complied with:  Geologically Hazardous Areas: Based upon the results of a geotechnical report and/or independent review, conditions of approval for developments may include buffers and/or setbacks from buffers. A standard 15-foot building setback is required for all structures from Protected Slope areas. A 50-foot buffer and 15-foot building setback are required from Very High Landslide Hazard Areas. Staff Comment: A Sensitive Slope Area was mapped near the northeast corner of the project site. No work is proposed within 100 feet of the sensitive slope. 20. Availability and Impact on Public Services: Compliance Availability and Impact on Public Services Analysis  Police and Fire: Police and Fire Prevention staff indicates that sufficient resources exist to furnish services to the proposed development; subject to the condition that the applicant provides Code required improvements and fees. Fire impact fees are City of Renton Department of Community & Economic Development Hearing Examiner Recommendation BO DE MONASTERY CUP LUA18-000372 Report of July 31st, 2018 Page 10 of 11 SR_HEX_Report_Bo De Monastery CUP_wExhibits_180731 applicable at the rate of $0.56 per square foot. This fee is paid at time of building permit issuance.  Storm Water: An adequate drainage system shall be provided for the proper drainage of all surface water. Staff Comment: The applicant has not proposed any increases in building coverage or impervious on the site. Therefore Development Engineering staff have determined that the existing drainage system is adequate for existing conditions. When the permit application for the parking lot paving is submitted, drainage on the site would be reviewed again by staff.  Water: Water to the site is provided by the City of Renton. Staff Comment: The Renton Fire Authority and Development Engineering staff have indicated that the water service available on the site is adequate for the proposed use.  Sanitary Sewer: Sanitary Sewer Service is provided to the site by the Soos Creek Water and Sewer District. I. CONCLUSIONS: 1. The subject site is located in the Residential High Density Comprehensive Plan designation and complies with the goals and policies established with this designation provided the applicant complies with City Code and conditions of approval see FOF 15. 2. The subject site is located in the Residential-14 du/ac (R-14) zoning designation and complies with the zoning and development standards established with this designation provided the applicant complies with City Code and conditions of approval, see FOF 16. 3. The existing ADU on-site approved in 2010 would no longer be classified as an ADU once a conversion of the primary residence to a temple is complete. The dwelling unit would continue to be used as a residence for leaders of the congregation. 4. The proposed change-of-use is exempt from the Residential Design and Open Space standards as it does not create any new units, see FOF 17. 5. The proposed Conditional Use complies with the Conditional Use Permit criteria as established by City Code provided the applicant complies with all advisory notes and City Code, see FOF 18. 6. The proposed Conditional Use Permit complies with the Critical Areas Regulations provided the applicant complies with City Code, see FOF 19. 7. There are adequate public services and facilities to accommodate the proposed religious institution, see FOF 20. J. RECOMMENDATION: Staff recommends approval of the Bo De Monastery Conditional Use Permit, File No. LUA18-000372, as depicted in Exhibit 2, subject to the following condition: 1. The applicant shall submit a revised landscape plan to be reviewed and approved by the Current Planning Project Manager prior to building permit issuance. The revised landscape plan shall be provided at the time of building permit submittal. 2. The applicant shall remove or replace the existing fence along the street prior to building permit issuance. City of Renton Department of Community & Economic Development Hearing Examiner Recommendation BO DE MONASTERY CUP LUA18-000372 Report of July 31st, 2018 Page 11 of 11 SR_HEX_Report_Bo De Monastery CUP_wExhibits_180731 3. The applicant shall pave the parking area indicated on the parking plan (Exhibit 3) by August 1st, 2019. CITY OF RENTON DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT HEARING EXAMINER DECISION EXHIBITS Project Name: Bo De Monastery CUP Project Number: PR18-000301 Date of Hearing July 30, 2018 Staff Contact Alex Morganroth Associate Planner Project Contact/Applicant Nam Dung Nguyen 11410 SE Petrovitsky Rd Renton, WA 98055 Project Location 11410 SE Petrovitsky Rd Renton, WA 98055 The following exhibits were admitted during the Hearing Examiner hearing: Exhibit 1: Hearing Examiner Staff Report Exhibit 2: Site Plan and Construction Drawings Exhibit 3: Parking Plan Exhibit 4: Landscape Plan RENOVATION %Ð'Ç TEMPLE PROJECT NO 18001 DATE DESIGN DRAWN BY CHECKED SHEET TITLE ISSUE/REVISIONS NO DATE REV 14410 SE PETROVITSKY ROAD SUITE 206 RENTON, WA 98058 T 206.282.8245 F 206.283.0895 WWW.FREEMANCONNECTS.COM 12 APRIL 2018 FF FF OWNER: PERMIT SET 11410 SE PETROVITSKY ROAD RENTON, WA 98055 NAM DUNG NGUYEN 11410 SE PETROVITSKY ROAD RENTON, WA 98055 T 206.349.5104 EMAIL THICHTHANHTRI@YAHOO.COM FF CONSULTANTS 9220 ROOSEVELT WAY SEATTLE, WA 98115 NIC ROUSSOUW T 206.621.0060 EMAIL GIRAFDESIGN@GMAIL.COM WWW.GIRAFDESIGN.NET structural engineering giraf design GENERAL INFORMATION PROJECT:RENOVATION %Ð'Ç7(03/( 11410 SE PETROVITSKY ROAD RENTON, WA 98055 PROJECT DESCRIPTION:ESTABLISH PROPERTY TO INCLUDE A RELIGIOUS INSTITUTION. OBTAIN CONDITIONAL USE PERMIT (HEARING EXAMINER). PROVIDE NEW ENTRY, HANDICAP RAMP AND SHED. DEMOLISH EXISTING STRUCTURE ON NORTH SIDE OF BUILDING. OWNER:NAM DUNG NGUYEN 11410 SE PETROVITSKY ROAD RENTON, WA 98055 TEL: 206.349.5104 EMAIL: THICHTHANTRI@YAHOO.COM ASSESSOR'S PARCEL NO.:292305-9025 LEGAL DESCRIPTION:S 280 FT OF W 12 OF E 12 OF SE 14 LESS CO RD - AKA LOT C OF KC LOT LN ADJ NO 8808010 APPROVED NOVEMBER 2, 1988 LESS PER DEED 20060126000927. CODES:CITY OF RENTON MUNICIPAL CODE 2015 INTERNATIONAL BUILDING CODE 2015 WASHINGTON STATE ENERGY CODE CODES:R-14 LOT AREA:38,134 SF AREA: MAIN HALL, PRAYER, SOCIAL HALL 1,981 SF OFFICES 284 SF BATHS, STORAGE, STAIRS 419 SF +247 SF (NEW SHED) = 666 SF TOTAL 2,931 SF OCCUPANT LOAD: TYPE SF RATE LOAD MAIN HALL, PRAYER, SOCIAL HALL 1,981 SF 15 132 OFFICES 284 SF 100 3 BATHS, STORAGE, STAIRS 666 SF 300 3 TOTAL OCCUPANT LOAD 138 OCCUPANCY TYPE:I BUILDING HEIGHT / STORIES:2 CONSTRUCTION TYPE:V-B VICINITY MAP NO SCALE1 N SITE PLAN SCALE: 1" = 20'-0" 2 N SHEET INDEX A1.0 GENERAL INFO, VICINITY MAP, SITE PLAN & SHEET INDEX A2.0 FOUNDATION, BASEMENT & MAIN FLOOR FRAMING PLAN A2.1 MAIN FLOOR & ROOF FRAMING PLAN A3.0 EXTERIOR ELEVATIONS S1.0 STRUCTURAL NOTES, ROOF FRAMING & FOUNDATION PLAN, DETAIL FREEMAN FONG ARCHITECT REGISTERED3547 STATE OF WASHINGTON RENOVATION %Ð'Ç TEMPLE PROJECT NO 18001 DATE DESIGN DRAWN BY CHECKED SHEET TITLE ISSUE/REVISIONS NO DATE REV 14410 SE PETROVITSKY ROAD SUITE 206 RENTON, WA 98058 T 206.282.8245 F 206.283.0895 WWW.FREEMANCONNECTS.COM 12 APRIL 2018 FF FF OWNER: PERMIT SET 11410 SE PETROVITSKY ROAD RENTON, WA 98055 NAM DUNG NGUYEN 11410 SE PETROVITSKY ROAD RENTON, WA 98055 T 206.349.5104 EMAIL THICHTHANHTRI@YAHOO.COM FF CONSULTANTS 9220 ROOSEVELT WAY SEATTLE, WA 98115 NIC ROUSSOUW T 206.621.0060 EMAIL GIRAFDESIGN@GMAIL.COM WWW.GIRAFDESIGN.NET structural engineering giraf design FOUNDATION, BASEMENT & MAIN FLOOR FRAMING PLAN SCALE: 1/4" = 1'-0" 1 N RECEIVED 06/25/2018 amorganroth PLANNING DIVISION 06/01/2018 RENOVATION %Ð'Ç TEMPLE PROJECT NO 18001 DATE DESIGN DRAWN BY CHECKED SHEET TITLE ISSUE/REVISIONS NO DATE REV 14410 SE PETROVITSKY ROAD SUITE 206 RENTON, WA 98058 T 206.282.8245 F 206.283.0895 WWW.FREEMANCONNECTS.COM 12 APRIL 2018 FF FF OWNER: PERMIT SET 11410 SE PETROVITSKY ROAD RENTON, WA 98055 NAM DUNG NGUYEN 11410 SE PETROVITSKY ROAD RENTON, WA 98055 T 206.349.5104 EMAIL THICHTHANHTRI@YAHOO.COM FF CONSULTANTS 9220 ROOSEVELT WAY SEATTLE, WA 98115 NIC ROUSSOUW T 206.621.0060 EMAIL GIRAFDESIGN@GMAIL.COM WWW.GIRAFDESIGN.NET structural engineering giraf design MAIN FLOOR & ROOF FRAMING PLAN SCALE: 1/4" = 1'-0"1 N RENOVATION %Ð'Ç TEMPLE PROJECT NO 18001 DATE DESIGN DRAWN BY CHECKED SHEET TITLE ISSUE/REVISIONS NO DATE REV 14410 SE PETROVITSKY ROAD SUITE 206 RENTON, WA 98058 T 206.282.8245 F 206.283.0895 WWW.FREEMANCONNECTS.COM 12 APRIL 2018 FF FF OWNER: PERMIT SET 11410 SE PETROVITSKY ROAD RENTON, WA 98055 NAM DUNG NGUYEN 11410 SE PETROVITSKY ROAD RENTON, WA 98055 T 206.349.5104 EMAIL THICHTHANHTRI@YAHOO.COM FF CONSULTANTS 9220 ROOSEVELT WAY SEATTLE, WA 98115 NIC ROUSSOUW T 206.621.0060 EMAIL GIRAFDESIGN@GMAIL.COM WWW.GIRAFDESIGN.NET structural engineering giraf design FREEMAN FONG ARCHITECT REGISTERED3547 STATE OF WASHINGTON EAST ELEVATION SCALE: 1/4" = 1'-0" 1 SOUTH ELEVATION SCALE: 1/4" = 1'-0"2 RENOVATION %Ð'Ç TEMPLE PROJECT NO 18001 DATE DESIGN DRAWN BY CHECKED SHEET TITLE ISSUE/REVISIONS NO DATE REV 14410 SE PETROVITSKY ROAD SUITE 206 RENTON, WA 98058 T 206.282.8245 F 206.283.0895 WWW.FREEMANCONNECTS.COM 12 APRIL 2018 FF FF OWNER: PERMIT SET 11410 SE PETROVITSKY ROAD RENTON, WA 98055 NAM DUNG NGUYEN 11410 SE PETROVITSKY ROAD RENTON, WA 98055 T 206.349.5104 EMAIL THICHTHANHTRI@YAHOO.COM FF CONSULTANTS 9220 ROOSEVELT WAY SEATTLE, WA 98115 NIC ROUSSOUW T 206.621.0060 EMAIL GIRAFDESIGN@GMAIL.COM WWW.GIRAFDESIGN.NET structural engineering giraf design FREEMAN FONG ARCHITECT REGISTERED3547 STATE OF WASHINGTON WEST ELEVATION SCALE: 1/4" = 1'-0" 1 NORTH ELEVATION SCALE: 1/4" = 1'-0" 2 RENOVATION %Ð'Ç TEMPLE PROJECT NO 2018-040 DATE DESIGN DRAWN BY CHECKED SHEET TITLE ISSUE/REVISIONS NO DATE REV 14410 SE PETROVITSKY ROAD SUITE 206 RENTON, WA 98058 T 206.282.8245 F 206.283.0895 WWW.FREEMANCONNECTS.COM 12 APRIL 2018 NR NR OWNER: PERMIT SET 11410 SE PETROVITSKY ROAD RENTON, WA 98055 NAM DUNG NGUYEN 11410 SE PETROVITSKY ROAD RENTON, WA 98055 T 206.349.5104 EMAIL THICHTHANHTRI@YAHOO.COM NR CONSULTANTS 9220 ROOSEVELT WAY SEATTLE, WA 98115 NIC ROUSSOUW T 206.621.0060 EMAIL GIRAFDESIGN@GMAIL.COM WWW.GIRAFDESIGN.NET structural engineering giraf design DETAIL SCALE: 3/4" = 1'-0"1 RECEIVED06/25/2018amorganrothPLANNING DIVISION06/01/2018 RECEIVED06/25/2018amorganrothPLANNING DIVISION06/01/2018