Loading...
HomeMy WebLinkAboutT-393418PTN. OF SW 114 OF NW 114 OF SEC. 32, TWP 24N, R5E W. M. rn a LU LU LU i a J a N z LU VTENW Transportation Engineering NorthWest Transportation Planning I Design I Traffic Impact & Operations 11400 SE 8th Street, Suite 200, Bellevue, WA 98004 Office (425) 889-6747 Project Contact: Glen DuBreuil Phone: 425-250-0582 Copyright© 2019 CPH Consultants, LLC. All Rights Reserved. ILLUMINATION CONSTRUCTION NOTES FOUNDATION, POLE, LUMINAIRE, AND JUNCTION BOX PER ILLUMINATION POLE DINSTALL SCHEDULE, SHEET IL-02, AND PER CITY OF RENTON STANDARD PLANS 116.1, 119, 120, 121, 125 & J013 ON SHEETS IL-03 AND IL-04. OCONSTRUCT STREET LIGHT CONTACTOR FOUNDATION PER CITY OF RENTON STANDARD PLAN 126.1, SHEET IL-04. FOUNDATION SHALL BE ADJACENT TO AND FLUSH WITH SIDEWALK. FURNISH AND INSTALL SERVICE CABINET PER CITY OF RENTON STANDARD PLAN 122.1, SHEET IL-04. LOCATION AND ORIENTATION OF FOUNDATION AND CABINET SHALL BE VERIFIED BY CITY OF RENTON INSPECTOR PRIOR TO INSTALLATION OF CONDUITS. OAPPROXIMATE LOCATION OF 1201240V SINGLE PHASE POWER SOURCE, AS PROVIDED BY PSE ON 0110812018. THE CONTRACTOR SHALL INSTALL CONDUIT AND CONDUCTORS TO THE POWER SOURCE. CONTRACTOR SHALL COORDINATE WITH PSE FOR SPECIFIC REQUIREMENTS. PSE SHALL MAKE FINAL CONNECTION TO THE POWER SOURCE AFTER REVIEW AND APPROVAL OF LIGHTING SYSTEM BY ERIC CUTSHALL, CITY OF RENTON TRANSPORTATION MAINTENANCE MANAGER, PHONE NUMBER 425-430-7423. O EXISTING UTILITY POLE MOUNTED LUMINAIRE TO REMAIN. AS-BUILTS CERTIFICATION: KR I HEREBY CERTIFY THAT THE AS MEASUREMENTS SHOWN T : B HEREON ARE TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE �\� OF WgS�S' AND BELIEF AS SURVEYED IN THE FIELD IN JANUARY 2018 ' 2 0,w.., 35 03-06 2019 NAME DATE S�01VAL�� LICENSE # 03-06 2019 CALL BEFORE YOU DIG 1-800-424-5555 ILLUMINATION WIRING SCHEDULE RACEWAY CONDUIT SIZE ILLUM. #8 SERVICE #2 EQUIP. GRND. PULL WIRE NO. 1 2" SCH40 PVC 2 1 2 2" SCH40 PVC 2 1 2" SCH40 PVC SPARE 1 3 2" SCH80 PVC 4 1 2" SCH80 PVC SPARE 1 2" SCH40 PVC 4 1 4 2" SCH40 PVC SPARE 1 5 2" SCH80 PVC 2 1 6 3" SCH80 PVC 3 2" SCH40 PVC SPARE 1 7 2" SCH40 PVC SPARE 1 * EQUIPMENT GROUND SIZE SHALL BE EQUAL TO OR LARGER THAN THE LARGEST WIRE SIZE IN THE CONDUIT. RECORD DRAWING 1 1 2/28/19 NO. I REVISION I BY I DATE I APPR SURVEYED: DESIGNED: TREVIN ROLETTO, PE DRAWN: TREVIN ROLETTO, PE CHECKED: GLEN DUBREUIL APPROVED: CHRIS BICKET, PE SCALE: 15 60 0 30 90 SCALE IN FEET ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY VERTICAL: NAVD 1988 HORIZONTAL: NAD 1983/1991 DATU M LLGLNU EX NEW/RELOCATE DESCRIPTION B 0 JUNCTION BOX TYPE 1,2 )8( PEDESTRIAN LUMINAIRE POLE -0- UTILITY POLE UTILITY POLE MOUNTED LUMINAIRE — — — CONDUIT/CONDUCTOR ® ELECTRICAL SERVICE CABINET 91 PSE POWER SOURCE OCONSTRUCTION NOTE O LUMINAIRE POLE NO./LETTER AWIRE NOTE 000 �of WJ '` 0 OK �s .......... A... 0%i7--2018 CITY OF RENTON 1*"R Nb%V Planning/Building/Public Works Dept. RECORD DRAWINGS T-393418 IN COMPLIANCE WITH CITY OF RENTON STANDARDS SENZA LAKEVIEW ILLUMINATION PLAN DATE: 01/17/2018 FIELDBOOK: PAGE: DRAWING NO: L-01 SHEET: OF: 1 4 Ln co T Q C) �1J J H `H LU LU J Q N z LU