Loading...
HomeMy WebLinkAboutC_Defoor_City’s_Reconsideration_of_Unmapped_Stream_Determination_051207.pdf.• ~ ... + ... ... ---. . I<..athy Keolker·Wbeeler, Mayor December 7, 2005 Jason Walker, RLA, ASLA Talasea Consultants, Inc. 15020 Bear Creek Road NE Woodinville, WA 98077 CITY <jF RENTON PlanninglBuildinglPublicWorks DePartment Gregg Zimmerman P.E., Administrator Subject: Reconsideration Request of Administrative Determination of Un-mapped StreamlWetland Classification for Defoor Properties (parcel Nos. 0007200196,0007200194, and 2023059085) Dear Mr. Walker: . This letter is in response to your letter dated November 17, 2005 requesting reconsideration of the classification of 3 un.;.mapped streams (Stream B, Stream C, and Drainage 1) as identified in the Wetland Study, Stream Assessment, Habitat Study, Watershed Rest-oration, and Mitigation Plan llr'Cpared by Talasea Consultarits, Inc. dated. June 28, 2005 (revised October 3, 20(5)~ In yOUT letter you indicate that the creation of the 3 un-mapped streams was·the result of erosion due to point-discharge of st()rmwater and sQould be considered artificial and reJUlatedaSClass 5 streams. RMC 4,.3- 050L.l.a.v defines a Class 5 stream as non~regulated waters that "flow within an artificially constructed channel where no naturally defined channel had previously existed." The point discharge of stormwater onto the subject site does not constitute an . artificially constructed channel that would be clasSified as a Class 5 stream. In your letter you also cite a previous project within the City, Sunnybrook Preliminary Plat (LUA05-127, SA-H, PP, ECF), where the modification of7 drainage channels was pennitted. You indicat~ that the previous approval should serve as a precedent for the streams located on the subject property. Since "the review and approval of the Sunnybrook Preliminary Plat, subsequent critical area regulations have been adopted, which include a new stream definition and stream claSsification system. Therefore, as the current project was submitted under the subsequent regulations, the previous approval of the alteration of 7 drainages would not be a precedent. The previous determination of the classification of the streams dated November 3, 2005 stands. . -------------IO-S-S-S-ou-fu--G-ra-dy--W.-ay-.-R-e-n-ro-n-,W.--as-h-in-gt-o-n-9-80-S~S------------~ (!) This paper contains 50% recycled material, 30% post consumer AHEAD OF THE CURVE ,Oefoor Reconsideration Oecember 7, 2005 Page 2 of2 ' The reconsideration request letter also requested ~ appeal. The appeal of the determination will continue. You will be notified of the date of the appeal-bearing when' the Office of the Hearing Examiner has scheduled it. Please feel free.to contact Jill Ding at (425) 430-7219 if you h~e any questions. - Sincerely, Neil Watts Development ,Services Director Cc: ProjecfFiIe Jennifer Hehning ',,<_,~_, ,Jill Ding' , '_'i;:'iiij'<"~'jJx'(C~ "y' 'vC"1 Terry DefoorlAppbc~~'~ ,;' " Michael ChenlCont,tL,~ , , ""-.c"<,,,,, ,'''' Ronnie CS Teng-, ng~~~eng, Mei-Yu· te.g' """; ~'liIb -Wei KangKho, -C(l~uaDIOwners -" Parties of Reeo'" if