MEMORANDUM
DATE: May 27, 2026
TO: City of Renton
FROM: Curtis Chin, P.E.
TENW
SUBJECT: Trip Generation Memo
WareSpace Tenant Improvement at 700 Powell Ave SW (Renton, WA)
TENW Project No. 2026-128
This memorandum documents the trip generation estimate for the WareSpace Tenant Improvement (TI)
to occupy the existing building located at 700 Powell Ave SW in Renton, WA.
Project Description
The proposed tenant improvement project includes converting 96,543 SF of former manufacturing space
into an 88,464 SF WareSpace facility in the existing building located at 700 Powell Ave SW. A WareSpace
concept converts/subdivides large underused industrial buildings into smaller warehouse bays for
entrepreneurs and growing businesses. The Renton WareSpace facility would include 79,467 SF of
warehouse space and 8,997 SF of office space. As part of the proposed TI project 8,079 SF of existing
mezzanine space would be removed. A preliminary site plan is included in Attachment A. A summary of
the building land uses is shown in Table 1. It should be noted that based on information provided by the
applicant at other similar WareSpace facilities, it is anticipated that on a typical weekday only 35 to 40
percent of the building would be actively used.
Table 1
Land Use Summary
Land Use Former Use Proposed WareSpace TI1
Manufacturing 96,543 SF --
Warehousing -- 79,467 SF
Office -- 8,997 SF
Total = 96,543 SF 88,464 SF
Note:
1. As part of the proposed WareSpace TI project, 8,079 SF of existing mezzanine area
would be removed.
Trip Generation Memo
WareSpace TI (Renton, WA)
May 27, 2026
Page 2
Trip Generation
The trip generation estimates for the proposed and former uses for the WareSpace TI project were based
on methodology documented in the Institute of Transportation Engineers (ITE) Trip Generation Manual,
12th Edition for Land Use Code (LUC) 150 (Warehousing), LUC 712 (Small Office), and LUC 140
(Manufacturing).
The resulting net new weekday daily, AM peak hour, and PM peak hour trip generation estimates for the
proposed project are summarized in Table 1. The detailed trip generation estimates are included in
Attachment B.
Table 1
Trip Generation Summary
Weekday Time Period
Net New Trips Generated
In Out Total
Daily Trips
Proposed Use (LUC 150 & 712) 77 77 154
Less Prior Use (LUC 140) -186 -186 -372
-109 -109 -218
AM Peak Hour Trips
Proposed Use (LUC 150 & 712) 28 8 36
Less Prior Use (LUC 140) -37 -12 -49
-9 -4 -13
PM Peak Hour Trips
Proposed Use (LUC 150 & 712) 14 33 47
Less Prior Use (LUC 140) -15 -36 -51
-1 -3 -4
As shown in Table 1, the proposed WareSpace TI project is estimated to generate fewer trips than the
prior manufacturing use.
Next Steps
Per the City of Renton’s Policy Guidelines for Traffic Impact Analysis for New Development, a traffic impact
analysis (TIA) is required when estimated vehicular traffic generated from a proposed development
exceeds 20 vehicles per hour in either the AM (6:00 ‐ 9:00) or PM (3:00–6:00) peak periods. Since the
proposed WareSpace TI project is estimated to generate less than 20 net new weekday AM or PM peak
hour trips, a TIA would not be required for the project.
Please contact me at (425) 250-5003 or chin@tenw.com with any questions.
cc: Jason Thorburg & JR Gleason – WareSpace
Jeff Schramm, Principal – TENW
ATTACHMENT A
Preliminary Site Plan
909 sf 465 sf 357 sf 357 sf 357 sf 357 sf 357 sf 369 sf 345 sf 357 sf 357 sf 357 sf 357 sf 357 sf 357 sf 369 sf 345 sf 357 sf 357 sf 357 sf 358 sf
770 sf
550 sf
660 sf
660 sf
660 sf
660 sf
825 sf
1,121 sf
835 sf835 sf828 sf601 sf
752 sf 738 sf 738 sf 738 sf 738 sf 738 sf 738 sf 727 sf 748 sf
735 sf
734 sf
748 sf727 sf738 sf738 sf738 sf738 sf738 sf738 sf752 sf
950 sf
951 sf
924 sf
924 sf985 sf
985 sf
954 sf
952 sf
573 sf
976 sf
1,015 sf
1,099 sf
601 sf
601 sf
593 sf
593 sf 593 sf
593 sf 593 sf
593 sf 593 sf
593 sf 593 sf
593 sf 593 sf
593 sf 593 sf
593 sf 593 sf
593 sf
589 sf
588 sf
214 sf
136 sf
101 sf 99 sf
122 sf 99 sf
99 sf 145 sf
145 sf
145 sf
165 sf
155 sf
140 sf
140 sf
191 sf
97 sf
210 sf
175 sf
175 sf
97 sf97 sf
101 sf 101 sf
161 sf
161 sf
212 sf
77 sf 77 sf
129 sf
129 sf
CONF
GM
DID
LD
(PRIVATE)
ELEC
BREAK
STORAGE
OUTBOUND
LOGISTICS
INBOUND
LOGISTICS
LD
(PRIVATE)
IT
LDLDLDLD
LD
HUDDLE
84,000 sf
4,533 sf
4,464 sf
215 sf
LD
(PRIVATE)
LD
(PRIVATE)
606 sf
606 sf
593 sf
593 sf 593 sf
593 sf 593 sf
593 sf 593 sf
593 sf 640 sf
640 sf
ATTACHMENT A
Trip Generation Calculations
ITE
Land Use Size/Units 1 LUC 2 In Out In Out Total
DAILY
Proposed Use:
Warehouse 79,467 GFA 150 T = 1.56(X) -97.97 50%50%13 12 25
Small Office Building 8,997 GFA 712 14.39 50%50%64 65 129
77 77 154
Existing Use:
Manufacturing 96,543 GFA 140 Ln(T) = 0.68 L n(X) + 2.81 50%50%-186 -186 -372
Net New Daily Trips =-109 -109 -218
AM PEAK HOUR
Proposed Use:
Warehouse 79,467 GFA 150 T = 0.10(X) + 13.43 77%23%16 5 21
Small Office Building 8,997 GFA 712 1.64 83%17%12 3 15
28 8 36
Existing Use:
Manufacturing 96,543 GFA 140 0.51 75%25%-37 -12 -49
Net New AM Peak Hour Trips =-9 -4 -13
PM PEAK HOUR
Proposed Use:
Warehouse 79,467 GFA 150 T = 0.11(X) + 19.62 28%72%8 20 28
Small Office Building 8,997 GFA 712 2.16 34%66%6 13 19
14 33 47
Existing Use:
Manufacturing 96,543 GFA 140 T = 0.84(X) - 29.93 29%71%-15 -36 -51
Net New PM Peak Hour Trips =-1 -3 -4
Notes:
1 GFA = Gross Floor Area, DU = Dwelling Units.
2 Based on Institute of Transportation Engineers (ITE) Trip Generation Manual, 12th Edition, 2025.
WareSpace (Renton)
Weekday Trip Generation Summary
Trip Rate or
Equation 2
Directional Distribution Trips Generated