�slZ� A SEALED BID FOR:
art of RENTON 2026 City Center CIPP Project
WWP-27-04394
AUL 08 2026
RECEIVED S FFICE
CITY CLERK
Bids Received By: City of Renton
1055 South Grady Way, 5th Floor
Renton, WA 98057
Bid Submitted By: SAK Construction, LLC
864 Hoff Road
O'Fallon, MO 63366
Contractor License No.: SAKCOCL897BK Class: General Expires: 05/09/27
Project Name: 2026 City Center CIPP Project
Bid Due Date: 07/08/26 Time: 2:00 PM PT
NTOt,
PROPOSAL & COMBINED AFFIDAVIT
AND CERTIFICATE FORM
CITY OF RENTON
2026 City Center CIPP Project
CAG-26-124
WWP-27-04394
TO THE CITY OF RENTON
RENTON,WASHINGTON
Ladies and/or Gentlemen:
The undersigned hereby certify that the bidder has examined the site of the proposed work and have
read and thoroughly understand the plans,specifications and contract governing the work embraced in
this improvement, and the method by which payment will be made for said work, and hereby propose
to undertake and complete the work embraced in this improvement, or as much thereof as can be
completed with the money available, in accordance with the said plans, specifications and contract
and the schedule of prices.
The undersigned further certifies and agrees to the following provisions:
NON-COLLUSION AFFIDAVIT
Being duly sworn, deposes and says, that he is the identical person who submitted the foregoing
proposal or bid, and that such bid is genuine and not sham or collusive or made in the interest or on
behalf of any person not therein named, and further, that the deponent has not directly induced or
solicited any other Bidder on the foregoing work or equipment to put in a sham bid,or any other person
or corporation to refrain from bidding, and that deponent has not in any manner sought by collusion to
secure to himself or to any other person any advantage over other Bidder or Bidders.
AND
CERTIFICATION RE: ASSIGNMENT OF
ANTI-TRUST CLAIMS TO PURCHASER
Vendor and purchaser recognize that in actual economic practice overcharges resulting from anti-trust
violations are in fact usually borne by the purchaser.Therefore,vendor hereby assigns to purchaser any
and all claims for such over-charges as to goods and materials purchased in connection with this order
or contract, except as to overcharges resulting from anti-trust violations commencing after the date of
the bid,quotation,or other event establishing the price under this order or contract. In addition,vendor
warrants and represents that such of his suppliers and subcontractors shall assign any and all such
claims to purchaser,subject to the aforementioned exception.
AND
Proposal&Affidavit/Certificate Page 1 of 4
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
01 Y OF
4 �
T0'
MINIMUM WAGE AFFIDAVIT FORM
I, the undersigned, having been duly sworn, deposed, say and certify that in connection with the
performance of the work of this project, I will pay each classification of laborer,workman, or mechanic
employed in the performance of such work;not less than the prevailing rate of wage or not less than the
minimum rate of wages as specified in the principal contract.
I have read the above and foregoing statements and certificate, know the contents thereof and the
substance as set forth therein is true to my knowledge and belief.
FOR: PROPOSAL, NON COLLUSION AFFIDAVIT, ASSIGNMENT OF ANTI-TRUST CLAIMS TO
PURCHASER AND MINIMUM WAGE AFFIDAVIT
SAK Construction, LLC 15F,F5N
UC
Name of Bidder's Firm MISSOURIOg
Signature of Authorized Representative of Bidd *:
Printed Name: Boyd Hirtz Title: Vice Presid t
Address: 864 Hoff Road, O'Fallon, MO 63366
Contact Name(please print): Boyd Hirtz
Phone: 636.385.1000 Email: bidcippw@sakcon.com
*The above signature must be notarized using the applicable notary language found on pages 3
and 4.
If business is a CORPORATION,please complete this section: N/A
Name of President of Corporation
Name of Secretary of Corporation
Corporation Organized under the laws of
With Main Office in State of Washington at
If business is a PARTNERSHIP or LIMITED LIABILITY COMPANY,please complete this section:
Name: Title(Partner, Member, Manager):
Jerome P. Shaw, Jr. President
Joe Feuerborn President
Boyd Hirtz Vice President
Tim Bussen Vice President
Roger Archibald CFO
Steve Stulce Controller
Proposal&Affidavit/Certificate Page 2 of 4
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
C T Y O
+ � t
,c)FNTO�
INDIVIDUAL FORM
STATE OF WASHINGTON ) N/A
: ss
County of_ )
On this day of before me personally appeared to me
known to be the individual(s) described in and who executed the foregoing instrument, and
acknowledged under oath that_ (he/she/they) signed and sealed the same as
(his, her, their) free and voluntary act and deed, for the uses and
purposes therein mentioned.
GIVEN under my hand and official seal the day and year last above written.
(SEAL)
Notary Public in and for the State of
Washington, residing at
Print Name:
My commission expires:
CORPORATION FORM
STATE OF WASHINGTON ) N/A
: ss
County of
On this day of before me personally appeared to me
known to be the (President, Secretary, Treasurer) of the corporation that
executed the foregoing instrument, and acknowledged said instrument to be the free and
voluntary act and deed of said corporation,for the uses and purposes therein mentioned, and
on oath stated that (he/she/they) are authorized to execute said instrument.
GIVEN under my hand and official seal the day and year last above written.
(SEAL)
Notary Public in and for the State of
Washington, residing at
Print Name:
My commission expires:
Proposal&Affidavit/Certificate Page 3 of 4
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
GY Oo
PFNTO�
PARTNERSHIP FORM
STATE OF WASHINGTON ) N/A
: ss
County of _ )
On this day of before me personally appeared to me
known to be a General Partner of the partnership known as that
executed the foregoing instrument, and acknowledged said instrument to be the free and
voluntary act and deed of said partnership, for the uses and purposes therein mentioned, and
on oath stated that (he/she/they) are authorized to execute said instrument.
GIVEN under my hand and official seal the day and year last above written.
(SEAL)
Notary Public in and for the State of
Washington, residing at
Print Name:
My commission expires:
LIMITED LIABILITY COMPANY(LLC) FORM
Missouri
STATE OF )
: ss
County of St. Charles _ )
On this 8th day of July , 20?6 . before me personally appeared
Boyd Hirtz to me known to be a Managing Member of the Limited Liability
Company known as SAK Construction, LLC and that he/she/they executed the
foregoing instrument, and acknowledged said instrument to be the free and voluntary act and
deed of said Limited Liability Company, for the uses and purposes therein mentioned, and on
oath stated that he _(he/she/they).ae authorized to execute said instrument.
GIVEN under my hand and official seal the day and year last above written.
(SEAL) 4 :MItAAL)t_
► Notary Public in and for the State of
THERESA H. MESSER Waiir°-rgton, residing 8t St. Charles County
Notary Public, Notary Seal
State of Missouri Print Name: Theresa H. Messer
St.Charles County
Commission# 15634377
My Commission Expires 03-30-2027 My commission expires: March 30, 2027
Proposal&Affidavit/Certificate Page 4 of 4
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
1
01.Y o
O
'
�FNT
Proposal Bid Bond
KNOW ALL MEN BY THESE PRESENTS,That we,[Contractor] SAK Construction, LLC
of[address]864 Hoff Road, O'Fallon, MO 63366 _as Principal,
and[Surety]Travelers Casualty and Surety Company of America
a corporation duly organized under the laws of the State of COnneCtiCUt__
and authorized to do business in the State of Washington,as Surety,are held and firmly bound unto the City of
Renton in the sum of five (5) percent of the total amount of the bid proposal of said Principal for the work
hereinafter described, for the payment of which, well and truly to be made, we bind ourselves, our heirs,
executors,administrators and assigns,and successors and assigns,jointlyand severally,firmly by these presents.
The condition of this bond is such,that whereas the Principal herein is herewith submitting his/her or
its sealed proposal for the following project,to wit:
2026 CITY CENTER CIPP PROJECT.WWP-27-04394
said bid and proposal, by reference thereto,being made a part hereof.
NOW,THEREFORE,if the said proposal bid by said Principal be accepted,and the contract be awarded
to said Principal,and if said Principal shall duly make and enter into and execute said contract and shall furnish
performance bond as required by the City of Renton within a period of ten(10)days from and after said award,
exclusive of the day of such award,then this obligation shall be null and void,otherwise it shall remain and be
in full force and effect.
IN THE EVENT the Principal,following award,fails to execute an Agreement with the City of Renton in
accordance with the terms of the Proposal and furnish a performance bond with Surety or Sureties approved
by the City of Renton within ten(10)days from and after said award,then Principal shall forfeit the Bid Bond/Bid
Proposal Deposit or Surety shall immediately pay and forfeit to the City of Renton the amount of the Proposal
Bid Bond,as set forth in RCW 35A.40.200 and RCW 35.23.352.
IN TESTIMONY WHEREOF,the Principal and Surety have caused these presents to be signed and
sealed this 8th day of July , 2026
Travelers Casualty and Surety
Se4S1Ru'"'"N., SAK Constructio , L Company of America
<E°""a ' [Pri al]'ce '
==M1pgNy;+ [S gna e fa t o Ze o I al] [ nature of au4-r d official e .7
Boyd Hirtz, Vi e Preside t y Lindsey Zeuschel
[Title] [Attorney-in-Fact]
One Tower Square
[Address]
Hartford, CT 06183
860-277-0111
[Telephone Number]
08 Proposal Bid Bond Form-05-11-2026 Approved by City Attorney
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
ACKNOWLEDGEMENT FOR CONTRACTOR
ACKNOWLEDGEMENT FOR CONTRACTOR, IF LIMITED LIABILITY COMPANY
STATE OF Missouri }
COUNTY OF St. Charles }
ON THE 8th DAY OF July , 2026 , BEFORE ME
PERSONALLY APPEARED Boyd Hirtz TO ME KNOWN AND
KNOWN TO ME TO BE THE Vice President OF SAK Construction, LLC,
A LIMITED LIABILITY COMPANY, DESCRIBED IN AND WHO EXECUTED THE
FOREGOING INSTRUMENT AND ACKNOWLEDGED TO ME THAT (S)HE
EXECUTED THE FOREGOING INSTRUMENT AND ACKNOWLEDGED TO ME THAT
(S)HE EXECUTED THE SAME AS AND FOR THE ACT AND DEED OF SAID LIMITED
LIABILITY COMPANY.
• THERESA H. MESSER
Notary Public, Notary Seal
State of Missouri /I
St. Charles County
Commission# 15634377 Theresa H. Messer, Notary Public
My Commission Expires 03-30-2027
•
Travelers Casualty and Surety Company of America
i� Travelers Casualty and Surety Company
TRAVELERS J St. Paul Fire and Marine Insurance Company
POWER OF ATTORNEY
Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company are
corporations duly organized under the laws of the State of Connecticut(herein collectively called the"Companies"),and the Companies do hereby make,
constitute and appoint Lindsey Zeuschel of CHESTERFIELD , Missouri ,their
true and lawful Attorney(s)-in-Fact to sign,execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and other writings
obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of
contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law.
IN WITNESS WHEREOF, the Companies have caused this instrument to be signed, and their corporate seals to be hereto affixed, this 16th day of
February,2024.
lu•!f•f''
• c s JP'.Yµ?P•t: r pMARlNh
ih �'�'lll i�•�.� I'll /�P�.�.� F�N�ll
13. SEAL aq; Of SEAL ; y SEAL :s4
�i ll d•'., �• j?i ll 6'.. " '
./.,;'t�`S IIIII ':,, ll'tyf rj S
State of Connecticut
By:
City of Hartford ss. Bryce Grissom,Senior Vice President
On this the 16th day of February, 2024, before me personally appeared Bryce Grissom,who acknowledged himself to be the Senior Vice President of
each of the Companies,and that he,as such,being authorized so to do,executed the foregoing instrument for the purposes therein contained by signing on
behalf of said Companies by himself as a duly authorized officer.
IN WITNESS WHEREOF, I hereunto set my hand and official seal. �a\ ///////►►��
NQUNY t 4:70l14 U•/�1'v"��c'
My Commission expires the 30th day of June,2026 * 44. *j rWr��
vuEac
if
Anna P. Nowik, Notary Public
co
This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of each of the Companies,
which resolutions are now in full force and effect,reading as follows:
RESOLVED, that the Chairman,the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President,any
Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys-in-Fact and
Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign
with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of
a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and
revoke the power given him or her;and it is
FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice
President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such
delegation is in writing and a copy thereof is filed in the office of the Secretary;and it is
FURTHER RESOLVED, that any bond,recognizance,contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional
undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any
Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any
Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary; or(b) duly executed (under seal, if
required)by one or more Attorneys-in-Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one
or more Company officers pursuant to a written delegation of authority;and it is
FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any
Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any
Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys-in-Fact for
purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or
certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified
by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding
to which it is attached.
I, Kevin E. Hughes, the undersigned, Assistant Secretary of each of the Companies, do hereby certify that the above and foregoing is a true and
correct copy of the Power of Attorney executed by said Companies,which remains in full force and effect.
Dated this 8th day of July , 2026 .
= OSURply� -iYM'O . OMAR
f3F SEAL o 01 SEAL e' "Li :s
; d�.,. :t=f �.
\*" . h \\\:*` �= s ,...:o� Kevin E.Hughes,Assistant Secretary
To verify the authenticity of this Power of Attorney,please call us at 1-800-421-3880.
Please refer to the above-named Attorney(s)-in-Fact and the details of the bond to which this Power of Attorney is attached.
•
TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA
HARTFORD,CONNECTICUT 06183
FINANCIAL STATEMENT AS OF DECEMBER 31,2025
CAPITAL STOCK 6,480,000
ASSETS LIABILITIES&SURPLUS
BONDS S 5,600.841,056 LOSSES S 1,735,139.597
STOCKS 117.961 88/ LOSS ADJUSTMENT EXPENSES 175.170.609
CASH AND INVESTED CASH 107,398,185 COMMISSIONS 65,061,300
OTHER INVESTED ASSETS 10,607,862 OTHER EXPENSES 72.968.024
SECURITIES LENDING REINVESTED COLLATERAL ASSETS 12,318.366 TAXES.LICENSES AND FEES 15,442.211
INVESTMENT INCOME DUE AND ACCRUED 51,295 419 CURRENT FEDERAL AND FOREIGN INCOME TAXES 7,061,861
PREMIUM BALANCES 354,898,997 UNEARNED PREMIUMS 1,749,236.242
REINSURANCE RECOVERABLE 50.418.933 ADVANCE PREMIUM 4,095,228
NET DEFERRED TAX ASSET 85.064,699 POLICYHOLDER DIVIDENDS 31.470.690
UNDISTRIBUTED PAYMENTS 14,917,791 CEDED REINSURANCE NET PREMIUMS PAYABLE 44,765,710
GUARANTY FUNDS RECEIVABLE OR ON DEPOSIT 2,299,856 AMOUNTS WITHHELD I RETAINED BY COMPANY FOR OTHERS 15,640,946
OTHER ASSETS 349,353 REMITTANCES AND ITEMS NOT ALLOCATED 5,777,183
PROVISION FOR REINSURANCE 12,100,593
PAYABLE TO PARENTS,SUBSIDIARIES AND AFFILIATES 90,391.293
PAYABLE FOR SECURITIES LENDING 12,318,369
OTHER ACCRUED EXPENSES AND LIABILITIES 842,673
TOTAL LIABILITIES S 4,037.482,608
CAPITAL STOCK S 6,480,000
PAID IN SURPLUS 433 803,760
OTHER SURPLUS 1,930,606,041
TOTAL SURPLUS TO POLICYHOLDERS S 2,370,880,801
TOTAL ASSETS 5 6.408.372,409 TOTAL LIABILITIES&SURPLUS 5 6,408,372409
STATE OF CONNECTICUT
COUNTY OF HARTFORD )SS.
CITY OF HARTFORD
PETER GAMER,BEING DULY SWORN,SAYS THAT HE IS VICE PRESIDENT-CORPORATE FINANCE.OF TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA,
AND THAT TO THE BEST OF HIS KNOWLEDGE AND BELIEF,THE FOREGOING IS A TRUE AND CORRECT STATEMENT OF THE FINANCIAL CONDITION OF SAID
COMPANY AS OF THE 31ST DAY OF DECEMBER.2025
VICE PRESIDENT-CORPORAT FINANCE
SUBSCRIBED AND SWORN TO BEFORE ME THIS NOTA Y PUBLIC
16TH DAY OF MARCH.2026
SUSAN M.WEISSLEDER
Notary Public
Sly Commission Espires Nolcmber 3(1,2027
1111111111/��
?(ZrOT �
GetY o .
+
3 i
'PFN1"w
CERTIFICATE OF REGISTRATION
DEPARTMENT OF LABOR & INDUSTRIES
2026 CITY CENTER CIPP PROJECT
CAG-26-124
WWP-27-04394
Name on Registration: SAK Construction, LLC
Registration Number: SAKCOCL897BK
Expiration Date: 05/09/27
Note:A copy of the certificate will be requested as part of contract execution when project
is awarded.
09 DOLI Certificate of Registration 05-11-2026 Page 1 of 1
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
ADDENDUM 1
CITY OF RENTON PUBLIC WORKS DEPARTMENT 6/22/2026
2026 CITY CENTER CIPP PROJECT A ADDENDUM 2
SCHEDULE OF PRICES \ 6/29/2026
'Note: Show price per unit in figures only. Figures written to the right of the dot(decimal)in the price per unit column shall be interpreted as cents.
SEE SECTION 10-01.2 OF THE SPECIAL PROVISIONS FOR INFORMATION ON BID ITEMS.
BID SCHEDULE A-GENERAL
APPROX. UNIT PRICE TOTAL AMOUNT
BID ITEM
ITEM WITH UNIT PRICED BID
NO.
QUANTITY Dollars Cents Dollars Cents
Al Mobilization&Demobilization 1 $ 50,000.00 $ 50,000.00
Lump Sum Per Lump Sum
A2 Temporary Traffic Control 1 $ 500,000.00 $ 500,000.00
Lump Sum Per Lum Sum
A3 Apprentice Utilization Incentive/Penalty b $2,000.00 $2,000.00
Calc Per Calc
Subtotal $ 552,000.00
Sales Tax(10.5%) $ 57,960.00
$ 609,960.00
Total Sched.A
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
CITY OF RENTON PUBLIC WORKS DEPARTMENT
2026 CITY CENTER CIPP PROJECT
SCHEDULE OF PRICES
'Note: Show price per unit in figures only. Figures written to the right of the dot(decimal)in the price per unit column shall be interpreted as cents.
SEE SECTION 10-01.2 OF THE SPECIAL PROVISIONS FOR INFORMATION ON BID ITEMS.
BID SCHEDULE B-SEWER
BID ITEM ITEM WITH UNIT PRICED BID APPROX. UNIT PRICE TOTAL AMOUNT
NO.
QUANTITY Dollars Cents Dollars Cents
B1 CIPP Pre-installation Cleaning and Inspection 13185 $ 5.25 $ 69,221.25
Linear Foot Per Linear Foot
B2 Deep Clean of Lateral 1 $ 368.00 $ 368.00
Each Per Each
B3 Furnish and Install Short-Range Lateral Seal 1 $ 2,632.00 $ 2,632.00
Each Per Each
j 2, B4 Furnish and Install 6"Cured-in-Place Pipe 1581 $ 85.00 $ 134,385.00
Linear Foot Per Linear Foot
B5 Furnish and Install 8"Cured-in-Place Pipe 8872 $ 65.00 $ 576,680.00
Linear Foot Per Linear Foot
B6 Furnish and Install 10"Cured-in-Place Pipe 1012 $ 75.00 $ 75,900.00
Linear Foot Per Linear Foot
B7 Furnish and Install 15"Cured-in-Place Pipe 1720 $ 129.00 $ 221,880.00
Linear Foot Per Linear Foot
B8 Lateral Reinstatement 200 $ 200.00 $ 40,000.00
Each Per Each
B9 Trim Intruding Laterals 9 $ 789.00 $ 7,101.00
Each Per Each
B10 Not Used
811 Post Installation Inspection 13185 $ 1.00 $ 13,185.00
Linear Foot Per Linear Foot
B12 CIPP Performance Testing And Analysis 13 $ 500.00 $6,500.00
Each Per Each
B13 Minor Change 1 Per $30,000.00 $30,000.00
Estimate Per Estimate
Subtotal Sched.B $ 1,177,852.25
$ 123,674.49
Sales Tax(10.5%)
$ 1,301,526.74
Total Sched.B
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
CITY OF RENTON PUBLIC WORKS DEPARTMENT
2026 CITY CENTER CIPP PROJECT
SCHEDULE OF PRICES
'Note: Show price per unit in figures only. Figures written to the right of the dot(decimal)in the price per unit column shall be interpreted as cents.
SEE SECTION 10-01.2 OF THE SPECIAL PROVISIONS FOR INFORMATION ON BID ITEMS.
BID SCHEDULE C-STORMWATER
BID ITEM APPROX. UNIT PRICE TOTAL AMOUNT
NO. ITEM WITH UNIT PRICED BID
QUANTITY Dollars Cents Dollars Cents
Cl CIPP Pre-installation Cleaning and Inspection 4149 $ 5.25 $ 21,782.25
Linear Foot Per Linear Foot
C2 Furnish and Install 12"Cured-in-Place Pipe 1720 $ 88.00 $ 151,360.00
Linear Foot Per Linear Foot
C3 Furnish and Install 15"Cured-in-Place Pipe 1685 $ 119.00 $ 200,515.00
Linear Foot Per Linear Foot
C4 Furnish and Install 24"Cured-in-Place Pipe 744 $ 260.00 $ 193,440.00
Linear Foot Per Linear Foot
C5 Lateral Reinstatement 28 $ 200.00 $ 5,600.00
Each Per Each
C6 Trim Intruding Laterals 22 $ 789.00 $ 17,358.00
Each Per Each
C7 Not Used
C8 Post Installation Inspection 4149 $ 1.00 $ 4,149.00
Linear Foot Per Linear Foot
C9 CIPP Performance Testing And Analysis 4 $ 500.00 $ 2,000.00
Each Per Each
C10 Minor Change 1 Per $15,000.00 $15,000.00
Estimate Per Estimate
$ 611,204.25
Total Sched.C
Total Schedule A(Incl.tax) $ 609,960.00
Total Schedule B(Incl.tax) $ 1,301,526.74
$ 611,204.25
Total Schedule C(no tax)
Total All Schedules $ 2,522,690.99
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
GAT Y OAs
PFNTOt�
ACKNOWLEDGEMENT OF RECEIPT OF ADDENDA
2026 CITY CENTER CIPP PROJECT
CAG-26-124
W W P-27-04394
ACKNOWLEDGEMENT OF RECEIPT OF ADDENDA
NO. 1 DATE: June 22, 2026
NO. 2 DATE: June 29, 2026
NO. DATE:
NO. DATE:
NO. DATE:
SIGNED:
TITLE: Boyd Hirtz, Vice Pres ent
NAME OF COMPANY: SAK Constructi6n, LLC
ADDRESS: 864 Hoff Road
CITY/STATE/ZIP: O'Fallon/MO/63366
TELEPHONE: 636.385.1000
11 Acknowledge Receipt of Addenda-05-11-2026 Page 1 of 1
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
This form must be submitted with the Bid Proposal.
Certification of Compliance with Wage Payment Statutes and Minor
Work Permit Status
The bidder hereby certifies that, within the three-year period immediately preceding the bid
solicitation date, the bidder is not a "willful" violator, as defined in RCW 49.48.082,of any provision
of chapters 49.46, 49.48, or 49.52 RCW, as determined by a final and binding citation and notice of
assessment issued by the Department of Labor and Industries or through a civil judgment entered by
a court of limited or general jurisdiction.
Additionally, the bidder herby certifies that at the time of bid submittal, the bidder is not subject to
a revocation of a minor work permit under RCW 49.12.390(4).
I certify under penalty of perjury under the laws of the State of Washington that the foregoing is true
and correct.
SAK Construction, LLC
Bidder's Business Name
Sign re of Aut orized ffic *
Boyd Hirtz
Printed Name
Vice President
Title
July 8, 2026 O'Fallon MO
Date City State
Check One:
Sole Proprietorship E Partnership E Joint Venture ❑ Corporation ❑ LLC
State of Incorporation, or if not a corporation,State where business entity was formed:
Organized in Missouri
If a co-partnership,give firm name under which business is transacted:
N/A
*If a corporation,proposal must be executed in the corporate name by the president or vice-president(or any other corporate
officer accompanied by evidence of authority to sign).If a co-partnership,proposal must be executed by a partner.
Template updated 5-07-2026
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
SUBCONTRACTOR LIST
To Be Submitted with the Bid Proposal
In accordance with RCW 39.30-060 as amended:
For all public works contracts exceeding$1,000,000 the bidder shall submit with the bid the names of the
licensed subcontractors and proof of license by providing subcontractors license number with whom the
bidder, if awarded the contract,will subcontract for the following work or to name itself for the work,if it is
licensed to perform the work for which it has named itself.
• All structural steel installation, rebar installation, heating, ventilation and air conditioning, and
plumbing work as described in chapter 18.106 RCW,and electrical work as described in chapter 19.28
RCW (this also includes the control system integrator subcontractor as well as other electrical
subcontractors)shall be submitted as part of the bid.
If the work does not apply to this contract, check the box "Not Applicable". If the work will be self-
performed by the bidder,check the box"Self-Performed".
If the subcontractors' names are not submitted with the bid OR if two or more subcontractors are
named to perform the same work,the bid shall be considered nonresponsive and,therefore,void.
If subcontractors vary with bid alternates, please complete a separate form indicating which
subcontractors will be used for which bid alternate.
Complete the following:
SAK Construction, LLC
If awarded the contract, will contract with the following
subcontractors for the performance of heating,ventilation and air conditioning, plumbing,
electrical(including automatic controls)work,structural steel installation,and rebar installation:
The following list of subcontracts is due with the bid. Errors identified by the contracting agency in the
proof of license information must be corrected by the bidder within 48 hours of bid submission.
Category of Work Heating,Ventilation&Air Conditioning(HVAC) Not Applicable 1
Subcontractors Name Self-Performed t]
Address
Subcontractor's WA License
Phone No. No.
Bid Item Numbers
Description of Work
Approved CLB 4-2-26
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
SUBCONTRACTOR LIST
To Be Submitted with the Bid Proposal
Category of Work Plumbing(per RCW 18.106) Not Applicable 1
Subcontractors Name Self-Performed ❑
Address
Phone No. Subcontractor's WA License
No.
Bid Item Numbers
Description of Work
Category of Work Electrical(per RCW 19.28) Not Applicable
Subcontractors Name Self-Performed ❑
Address
Phone No. Subcontractor's WA License
No.
Bid Item Numbers
Description of Work
Category of Work Structural Steel Not Applicable I�
Subcontractors Name Self-Performed ❑
Address
Subcontractor's WA License
Phone No. No.
Bid Item Numbers
Description of Work
Category of Work Rebar Installation Not Applicable 1�
Subcontractors Name Self-Performed ❑
Address
Subcontractor's WA License
Phone No. No.
Bid Item Numbers
Description of Work
2 Approved CLB 4-2-26
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
G\t Y O�
'PFNtO�
2026 City Center CIPP
PROJECT NO.WWP-27-4394
CAG-26-124
ADDENDUM NO. 1
Date of Addendum Issue: June 22,2026
Due Date for Bids: 2:00 pm on July 8,2026
Date of Bid Opening: 3:00 pm on July 8,2026
To: ALL PLAN HOLDERS AND/OR PROSPECTIVE BIDDERS
The following changes,additions, and/or deletions are hereby made a part of the project bid documents for
the 2026 City Center CIPP project and shall have the same effect as if set forth therein. Bidders shall
acknowledge receipt and acceptance of this Addendum No. 1 by signing in the space provided below and
submitting the signed addendum with the bid package. Failure to acknowledge receipt of this Addendum may
result in your bid proposal being disqualified.
SCHEDULE OF PRICES
1. DELETE Schedule of prices REPLACE with attached Schedule of Prices:
Items changed in attached Schedule of Prices:
• Added Unit Price to Bid Item No.A3,Apprentice Utilization/Penalty,$2,000.00.
• Deleted Item No. B10 and C7, Point Repairs, in Schedule of Prices and replaced with "NOT
USED"
• Deleted Subtotal Row from Final Page and revised per the following:
Total Schedule A (Incl. tax)
Total Schedule B(Incl.tax)
Total Schedule C (no tax)
Total All Schedules
2026 City Center CIPP June 22,2026
Page 1 of 3 Addendum No. 1
•
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scale
SPECIAL PROVISIONS
2. DELETE Bid Item B10&C7 from Section 10-01.2 Bid Items—Point Repair
3. DELETE Section 7-21.1(3)and REPLACE(Revisions in RED)with the following:
Manufacturer Qualifications:
• The Manufacturer's CIPP liner shalt have successfully installed a minimum of 200,000 linear feet in
accordance with these specifications.
• Manufacturers using standards other than those listed in these specifications shall demonstrate,to
the satisfaction of the Contracting Agency,that their standards produce a product that is,at a
minimum,equal to the quality of a product produced using these specifications.
Contractor Qualifications:
• AThe Contractor and/or Field Superintendent shall have a minimum of five(5)successful
projects totaling a minimum of 50,000 linear feet of installed CIPP utilizing the contractor's
proposed curing method meeting the rcquiremcnts of these specifications. After being
selected as the apparent low bidder.contractor shall provide a list of installation projects
includingthe project-name—owner_contact,phone numbet.andyearinstatled:
• The Contractor's FieldSsuperintendent shall have a minimum of three(3)successfully
completed projects totaling a minimum of 25,000 linear feet of installed CIPP meeting the
requirements of these specifications.Thc-A Contractor's identified projcctField
superintendent shall be on the project for the duration of the project and shall be available
at all times during the CIPP rehabilitation. If the Field Superintendent is not available during
construction,a.gualified replacement shall be rrovided. After being selected as the
apparent low bidder and/or if the Field Superintendent is replaced.contractor shall provide
e resume for the Field Superintendent showing relevant experience.
• At least one person on the Contractor's installation crew shall have a minimum of one(1)
year of CIPP installation experience,shall have installed a minimum of 25,000 lineal feet
using the proposed CIPP rehabilitation technology,and shall be on the project site at all
times. After being selected as the apparent low bidder, contractor shall provide a resume
for each operator showing relevant experience.
• The Contractor's identified Lateral Cutting Technician shall have a minimum of one (1)year
of experience reinstating laterals. After i_lekigselected as the apparent low bidder,
contractor shall provide a resume for each operator showing relevant experience,
This Addendum consists of three(3)pages plus the attached Schedule of Prices.
ALL OTHER REQUIREMENTS OF THE CONTRACT DOCUMENTS REMAIN IN EFFECT
Sincerely,
Jesse Newman,PE
Project Manager
City of Renton
2026 City Center CIPP June 22,2026
Page 2 of 3 Addendum No. 1
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scale
All Bidders must sign this Adden,y�; N•• . in t space provided below and attach the signed
AddendumN4 Ito th- • u - •,1 , ••••
Signature: 712tUt/• 1 Title: Boyd Hirtz, Vice President
Company: SAK Construction' LLC Date: July 8, 2026
2026 City Center CIPP June 22,2026
Page 3 of 3 Addendum No. 1
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scale
GAT Y Ok•
+
LENTO
2026 City Center CIPP
PROJECT NO.WWP-27-4394
CAG-26-124
ADDENDUM NO.2
Date of Addendum Issue: June 29,2026
Due Date for Bids: 2:00 pm on July 8,2026
Date of Bid Opening: 3:00 pm on July 8,2026
To: ALL PLAN HOLDERS AND/OR PROSPECTIVE BIDDERS
The following changes,additions,and/or deletions are hereby made a part of the project bid documents for
the 2026 City Center CIPP project and shall have the same effect as if set forth therein. Bidders shall
acknowledge receipt and acceptance of this Addendum No. 2 by signing in the space provided below and
submitting the signed addendum with the bid package. Failure to acknowledge receipt of this Addendum may
result in your bid proposal being disqualified.
SCHEDULE OF PRICES
1 DELETE Schedule of prices REPLACE with attached Schedule of Prices:
Items changed in attached Schedule of Prices:
• Delete duplicate Bid Item B4.
This Addendum consists of one(1)page plus the attached Schedule of Prices.
ALL OTHER REQUIREMENTS OF THE CONTRACT DOCUMENTS REMAIN IN EFFECT
Sincerely,
Jesse Newman, PE
Project Manager
City of Renton
All Bidders must sign1his Ad�.w Nils 1.- dlz• = - • •videglo _and attach �
thgned Addenshlm
No.2 to the Formal :id Pr. .
`
IF
Signature L/ _ /A Title.: Boyd Hirtz, Vice President
Company: SAK Construe ion, LLC 1Date: July 8, 2026
r
2026 City Center CIPP June 29,2026
Page 1 of 1 Addendum No. 2
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
636.385.100fel
636.385.11 fax
faz
864 Hoff Road
OTallon.MO 63366
Pipeline Infrastructure.Solved.' www.sakcon.com
January 2,2026
To Whom It May Concern:
Joe Feuerborn, President,is hereby authorized to sign bids,extend offers,submit proposals,and
execute contracts on behalf of SAK Construction, LLC.
Boyd Hirtz,Vice President,is hereby authorized to sign bids,extend offers,submit proposals,and
execute contracts on behalf of SAK Construction, LLC.
Tim Bussen,Vice President, is hereby authorized to sign bids,extend offers,submit proposals,and
execute contracts on behalf of SAK Construction, LLC.
4 g .
me P.Shaw,Jr.
Sole Manager,COO
SAK Construction, LLC
State of Missouri)
County of St. Charles)
On the 2nd day of January 2026, before me, Kathleen Ann Reed, Notary Public, personally appeared
Jerome P.Shaw,Jr.,who provided satisfactory evidence confirming his identity as the person whose
name is subscribed to this instrument,and acknowledged that he executed the same.Witness my hand
and official seal.
prommarresiroimmiresiumbosawaisgmetsarsormi
KATHLEEN ANN REED � C . 12Q.
Notary Public, Notary Seal Kathleen Ann Reed, Notary Public
State of Missouri
Lincoln County
Commission#20854191
My Commission Expires 08-13-2028
all=11--
UNANIMOUS WRITTEN CONSENT
OF THE SOLE MANAGER OF
SAK CONSTRUCTION, LLC
Pursuant to Section 5.3 of the Operating Agreement of SAK Construction, LLC, a Missouri
limited liability company (the "Company"), the undersigned, being the sole manager of the Company,
hereby adopts the following resolutions for the Company and consents to the taking of the actions
therein described,such consent to have the same force and effect as a unanimous vote of the managers
of the Company at a meeting duly held on the date hereof:
RESOLVED, that the following individuals are hereby elected as officers of the Company, to
hold the offices set forth opposite their respective names below for the ensuing year or until their
successors are duly elected and shall have qualified, unless sooner removed by the Manager:
Thomas Kalishman Chairman and Chief Executive Officer
Jerome P. Shaw,Jr. Chief Operating Officer
Joe Feuerborn President
Boyd Hirtz Vice President
Roger Archibald Chief Financial Officer, Secretary and Treasurer
Steve Stulce Assistant Secretary and Assistant Treasurer
RESOLVED FURTHER, that any and all action heretofore taken, and any and all things
heretofore done, by any director of the Company in connection with, or with respect to, the matters
referred to in the foregoing Resolutions be and hereby are confirmed as authorized and valid acts taken
on behalf of the Company.
RESOLVED FURTHER,that the foregoing resolutions shall replace and supersede any and all
prior resolutions appointing officers of the Company.
Dated as of January 1, 2025
Jerome . haw, Jr.
BEING THE SOLE MANAGER OF THE COMPANY
WRITTEN CONSENT
OF THE SOLE MANAGER OF
SAK CONSTRUCTION,LLC
Pursuant to Sections 347.083 of The Missouri Limited Liability Company Act and Section 5.3 of
the Second Amended and Restated Operating Agreement of SAK Construction,LLC, a Missouri limited
liability company (the "Company"), the undersigned, being the sole manager of the Company, hereby
adopts the following resolutions for the Company and consents to the taking of the actions therein described,
such consent to have the same force and effect as a unanimous vote of the managers of the Company at a
meeting duly held on the date hereof:
RESOLVED, that the Manager of the Company hereby authorizes the following
individual to act as an authorized representative of the Company ("Authorized
Representative")in connection with Bid Documents,Contracts and Bonds related to SAK
Construction, LLC pipe rehabilitation services, (collectively, the "Contract") to be
executed on behalf of the Company, and such Authorized Representative is hereby
authorized,directed and empowered to execute and deliver all documents required by law,
and take such other action as such Authorized Representative,in his or her sole discretion,
may deem necessary or advisable, in order to cause to be performed and to carry out the
intent of the Contract, including execution of the Contract, with such changes or
amendments thereto as may be required in the sole discretion of an Authorized
Representative,as evidenced by such Authorized Representative's execution thereof.
Tim Bussen
RESOLVED FURTHER, that the Authorized Representative, be and hereby is
authorized and directed to do all things and acts as may be necessary or desirable to carry
out the purpose and intent of the above resolutions, and that all of the acts and doings,
whether heretofore or hereafter done or performed, by the Authorized Representative or
other authorized representatives, officers or employees of the Corporation in furtherance
of the above resolutions are hereby in all respects ratified,approved,and confirmed.
Dated as of i a / 9 ,2025
c----)
me P. Shaw,Jr.,Sole Manager
4893-6319-1903.1
Department of Labor and Industries SAK CONSTRUCTION LLC
PO Box 44450
Olympia,WA 98504-4450 Reg: CC SAKCOCL897BK
UBI: 603-040-228
Registered as provided by Law as:
Construction Contractor
(CC01) -GENERAL
391
Effective Date: 5/9/2011
SAK CONSTRUCTION LLC Expiration Date: 5/9/2027
864 HOFF ROAD
0 FALLON MO 63366
'vv'ti STATES pF Aii� 40211111111111*
Oa e
Sl.4TF
�
-s' ^� .''
�
Tbe itate of Ja1!!!: s Araajjington
4z
...-
sgg:
secretary ofe. state
I, SAM REED,Secretary of State of the State of Washington and custodian of its seal,
hereby issue this
CERTIFICATE OF REGISTRATION
to
SAK CONSTRUCTION, LLC
a/an MO Limited Liability Company. Charter documents are effective on the date
indicated below.
Date: 7/30/2010
UBI Number: 603-040-228
APPID: 1773186
�. STA fr
C ,„: ■r` 9:: �/ • Given under my hand and the Seal of the State
•ru • r•r
•■• ''•■■ of Washington at Olympia, the State Capital
-N r::: /� /ram ::
.4. - - rj•• • ,Z Cli -
'v:
,J, '••:'J ...) Sam Reed.Secretary of State