Loading...
HomeMy WebLinkAboutECF_SEPA_Revised_DNS_200413_v2 Water and Land Resources Division Department of Natural Resources and Parks King Street Center 201 South Jackson Street, Suite 600 Seattle, WA 98104-3855 206-296-6519 Fax 206-296-0192 TTY Relay: 711 State Environmental Policy Act Revised Determination of Non-Significance Name of Proposal: Black River Pump Station High Use Engines Replacement Project Description of Proposal: The Black River Pump Station (BRPS), located on a concrete dam that spans the Black River channel, conveys all Springbrook Creek flow to the Green River and is a critical component of the Green River flood control system. The King County Department of Natural Resources and Parks, Water and Land Resources Division, in coordination with the King County Flood Control District, is undertaking a comprehensive program to replace or refurbish major components of the BRPS. This work includes replacing the high-use engines (associated with pumps P1, P2, and P4) along with other critical systems. The new diesel engines will include emissions control equipment to meet current code requirements and exhaust pipes and silencers on the exterior of the pump house will be replaced for three of the diesel engines. All construction work will be contained within the existing fenced areas north and south of the pump house, with most work taking place within the existing structures at the pump station. Project construction is estimated to occur from fall 2020 through the end of 2021. Location of Proposal: The Black River Pump Station is located at 550 Monster Road SW, Renton, WA 98057, in the southwest quarter of Section 13, Township 23 North, Range 4 East, W.M. The Black River Pump Station is located on the Black River near its confluence with the Green River. The combined rivers form the Duwamish River, which flows into Elliott Bay and the Puget Sound. DocuSign Envelope ID: 583A89F0-D34E-48E4-9131-5221A59FB8CF Determination of Non-Significance Black River Pump Station Project Page 2 Responsible Official: Josh Baldi Position/Title: Division Director, Water and Land Resources Division Address: 201 South Jackson Street, Suite 600 Seattle, WA 98104-3855 DATE: SIGNATURE: Proponent and Lead Agency: King County Department of Natural Resources and Parks Water and Land Resources Division Contact Person(s): Tom Bean, Project Manager, 206-477-4638 King County Water and Land Resources Division (lead agency) has revised its SEPA threshold Determination of Non Significance issued on April 3, 2020 in consideration of the following changes: The Environmental Checklist issued on April 3, 2020 described the new engines to replace existing engines at the Black River Pump Station as meeting “USEPA Tier 4 emissions standards, resulting in much cleaner combustion. Tier 4 engines are as much as 5 percent more energy efficient than older engines and are designed to reduce particulate and nitrogen oxide (NOx) emissions. Urea is injected into the emissions to control NOx, which is catalyzed into nitrogen gas and water.” Instead, the engines will be replaced with modern Tier 3 diesel engines, which will still result in cleaner combustion for their entire useful life (decades), with reduced particulate matter, carbon monoxide (CO), and nitrogen oxides (NOx) compared to the existing engines due to modern exhaust emissions control systems. An Addendum to the Environmental Checklist has also been prepared and will be distributed along with this revised determination. King County Water and Land Resources has reaffirmed that this proposal will not have a probable significant adverse impact on the environment. An environmental impact statement (EIS) is not required under RCW 43.21C.030(2)(c). THIS REVISED DETERMINATION OF NON-SIGNIFICANCE (DNS) is issued under Washington Administrative Code (WAC) 197-11-340(2)(F) and does not include additional notice or comment period; the lead agency will not act on this proposal until after April 17, 2020. Comments must be submitted or postmarked by that date. DocuSign Envelope ID: 583A89F0-D34E-48E4-9131-5221A59FB8CF 4/13/2020