HomeMy WebLinkAboutAttachment_D_Black_River_Pump_Station_Improvements_Plan_Set405405
900
5
0
SITE LOCATION
SITE MAP
VICINITY MAP
550 MONSTER ROAD S.W.
RENTON, WA. 98057
BLACK RIVER PUMP STATION
IMPROVEMENTS
HIGH-USE ENGINES
PUMP STATION
BLACK RIVER
MONSTER RD SW
OA
K
E
S
D
A
L
E
A
V
E
S
W
SITE
SEE
ENLARGED
MAP
RENTON
BLACK
RIVER
68T
H
A
V
E
S
DUWAMISH
RIVER
GREEN
RIVER
M
O
N
S
T
E
R
R
D
S
W
MA
R
T
I
N
L
U
T
H
E
R
K
I
N
G
J
R
.
W
A
Y
MONSTER RD
S
W
O
A
K
S
D
A
L
E
A
V
E
S
W
NA
C
H
E
S
AV
E
S
W
SW 7th ST
OF336-
1
2
3
4
5
DESIGNED/DRAWN:
PROJECT ENGINEER:
PROJECT MANAGER:
CONTRACT NO:
DRAWING NO:SCALE:
PROJECT FILE NO:
DATE:
SHT NO / TOTAL REV
NO:
1
2
3
4
5
E F G HBCDA
CHECKED:
RE
F
E
R
E
N
C
E
1"
0
NO REVISION DESCRIPTION BY APVD DATE
E F G HBCDA
DEPARTMENT OF NATURAL RESOURCES & PARKS
WATER AND LAND RESOURCES DIVISION
APPROVED BY:
58
Know what's below.
R
Call before you dig.
BLACK RIVER PUMP STATION IMPROVEMENTS
HIGH-USE ENGINES
OCTOBER 2020
T. BEAN
1129574
BO
R
D
E
R
F
I
L
E
E
D
I
T
I
O
N
:
1
1
2
9
5
7
4
-
D
s
i
z
e
-
T
B
-
B
o
r
d
e
r
C:
\
p
w
_
w
o
r
k
d
i
r
\
d
e
n
0
0
3
\
c
h
2
m
h
i
l
l
_
d
y
a
n
g
1
\
d
0
4
6
9
8
5
0
\
1
1
2
9
5
7
4
-
O
F
3
3
6
-
G
-
0
0
0
0
1
.
d
w
g
|
L
a
y
o
u
t
:
L
a
y
o
u
t
PL
O
T
T
E
D
:
O
c
t
1
6
,
2
0
2
0
-
0
1
:
4
6
:
5
2
p
m
B
y
d
y
a
n
g
1
XR
E
F
S
:
1
1
2
9
5
7
4
-
D
s
i
z
e
-
T
B
.
D
W
G
;
P
E
-
E
L
B
-
W
A
_
_
E
r
i
k
_
s
t
a
m
p
.
d
w
g
IM
A
G
E
S
:
TITLE SHEET AND
VICINITY MAP G-00001
2
R. REISER
E. BRODAHL
S. DORAN
AS NOTED
0
T. DAVIS
1000 2000 3000
ACCESS ROAD
TO N. SIDE OF
PUMP STATION
ISSUED FOR PERMIT
JUNE 2026
6/18/2026
GENERAL ABBREVIATIONS
YR
ZS
YCO
#
@
&
%
1.
Ø
2.
PERCENT
ANGLE OF DEFLECTION
GENERAL NOTES:
ABBREVIATIONS REFER TO DRAWING P-00003.
FOR EQUIPMENT PREFIXES AND PIPING SYSTEM
NATIONAL CAD STANDARD MANUAL, VOLUME 2.
ADDITIONAL ABBREVIATIONS ARE AS DEFINED IN THE
DIAMETER, PHASE
AT
AND
NUMBER, POUNDS
POSITION SWITCH
YEAR
YARD CLEANOUT
AMPERE
ASPHALTIC CONCRETE, ACOUSTIC
AIR CONDITIONING
ADMINISTRATION
ABOVE FINISHED FLOOR
AREA CONTROL CENTER
ACOUSTIC
ASBESTOS CEMENT PIPE
ADDITION(AL)
AVERAGE DESIGN FLOW (AVERAGE
DAY, PEAK MONTH)
ADAPTER
AIR FILTER
AGGREGATE
AIR HANDLING UNIT
ALUMINUM
ALTERNATE
AMBIENT
AIR MONITORING DEVICE
ANCHOR
ANODIZED
ANCHOR POINT
APPROXIMATE(LY)
AIR RETURN
ARCHITECTURAL
AIR SUPPLY
ASPHALT
ASSEMBLY
AUTOMATIC
ANGLE VALVE
AVENUE
BOTTOM
BACTERIOLOGICAL
BEVEL BOTH ENDS
BIOFILTER CIRCULATION
BARE COPPER
BEGINNING OF CURVE CENTER
BOARD
BLIND FLANGE
BOOLEAN GATE
BRAKE HORSEPOWER
BREAKER
BEVEL LARGE END
BUILDING
BLOCK
BEAM, BENCHMARK
BLOW OFF
BIOCHEMICAL OXYGEN DEMAND, 5 DAY
BOTTOM OF PIPE, BACK OF PIPE
BOTTOM
BRIDGING
BEARING
BREAK
BLACK RIVER PUMP STATION
BRONZE
BAR SCREEN
BRITISH THERMAL UNIT
BULKHEADS
BUTTERFLY VALVE
BALL VALVE
CONDUIT, CRANE
DIRECT BURIAL CABLE, CABINET
COMBUSTION AIR FAN
CAPACITY
CARBONACEOUS BIOCHEMICAL OXYGEN
DEMAND, 5 DAY
COOLING COIL
CENTER TO CENTER
CONCRETE CYLINDER PIPE
CONCRETE LINED AND COATED STEEL
PIPE CEILING DIFFUSER, CHEMICAL DRAIN
CONTROL DENSITY FILL
CONDUCTOR
CONDENSING UNIT
CEILING EXHAUST DIFFUSER
CEILING EXHAUST REGISTER
CUBIC FEET
CENTRIFUGE
CUBIC FEET PER HOUR
CUBIC FEET PER MINUTE
CODE OF FEDERAL REGULATIONS
CUBIC FEET PER SECOND
CHANNEL
CHILLIER
CAST IRON
CAST IRON PIPE, CAST IN PLACE
CONSTRUCTION JOINT
CHECKER(ED)
CHECKER PLATE
CIRCUIT
CENTERLINE
CLEAR, CLEARANCE, CONDENSATE-LOW
PRESSURE
CEILING, CHLORINE GAS
CLOCK
CLEAR
MANUAL CONTROL STATION,
CONDENSATE, MEDIUM PRESSURE
MANUAL-AUTO CONTROL STATION
CEMENT MORTAR COATED
CEMENT MORTAR LINED
CORRUGATED METAL PIPE
ASBESTOS PROTECTED CORRUGATED
METAL PIPE
CONCRETE MASONRY UNIT
CONDUIT
CONTROL
CLEANOUT
CARBON DIOXIDE
CHEMICAL OXYGEN DEMAND
COOLING AIR FAN
COLUMN, COLLECTION
COMMINUTOR, COMPACTOR
COMPARTMENT
CONVEYOR, CONNECTION
CONCRETE, CONCENTRIC
CONDUCTOR, CONDENSATE, CONDITIONING
CONFERENCE
CONNECTION
CONTINUOUS, CONTINUATION
CONTINUED
CONSTRUCTION
COMPRESSOR, CENTER POINT, CONCRETE PIPE
COUPLING
CHLORINATED POLYVINYL CHLORIDE
CONDUIT RACK
CHEMICAL FEEDER
CORRUGATED RUBBER EXPANSION JOINT
CEILING SUPPLY DIFFUSER
CERAMIC TILE
CONTROL
CONTROL UNIT, COPPER, CUBIC
CULVERT
CONTROL VALVE
COMPLETE WITH
COLD WATER (POTABLE)
CUBIC YARD
COD
COF
COL
COM
COMPT
CON
CONC
COND
CONF
CONN
CONT
CONTD
CONST
CP
CPLG
CPVC
CR
CRF
CREJ
CSD
CT
CTRL
CU
CULV
CV
C/W
CW
CY
A
AC
A/C
ADMIN
AFF
ACC
ACOU
ACP
ADD
ADF
ADPT
AF
AGGR
AHU
AL
ALT
AMB
AMD
ANC
ANOD
AP
APPX
AR
ARCH
AS
ASPH
ASSY
AUTO
AV
AVE
B
BAC
BBE
BC
BCOP
BCR
BD
BF
BGAT
BHP
BKR
BLE
BLDG
BLK
BM
BO
BOD5
BOP
BOT
BRDG
BRG
BRK
BRPS
BRZ
BSN
BTU
BULKHDS
BTV
BV
C
CAB
CAF
CAP
CBOD5
CC
C/C
CCP
CCSP
CD
CDF
CDR
CDU
CED
CER
CF
CFG
CFH
CFM
CFR
CFS
CH
CHR
CI
CIP
CJ
CK
CKPL
CKT
C/L
CL
CLG
CLK
CLR
CM
CMA
CMC
CML
CMP
CMPA
CMU
CND
CNTL
CO
CO 2
DEGREE, DRYER, DEEP, DRAIN
DUCT BANK, DOWEL BAR
DISTRIBUTED CONTROL SYSTEM
DENSITY METER
DECREASING
DEMOLISH
DETAIL
DRINKING FOUNTAIN
DUCT FIRE DAMPER
DOOR GRILLE
DUCTILE IRON
DIAGRAM
DIAMETER
DUCTILE IRON PIPE
DIRECTION
DISPENSER
DISCHARGE
DAMPER MOTOR
DOWN
DEPARTMENT OF NATURAL RESOURCES
DISSOLVED OXYGEN, DITTO
DRAIN ROCK, DRAINAGE, DOOR,DRIVE
DEGRATING
DRIP TRAP, DRY TONS
DRY WEATHER FLOW
DRAWING(S)
DOWEL(S)
D
DB
DCS
DE
DEC
DEMO
DET
DF
DFD
DG
DI
DIAG
DIA
DIP
DIR
DIS
DISCH
DM
DN
DNR
DO
DR
DRG
DT
DWF
DWG(S)
DWL(S)
EAST, EMERGENCY
EXHAUST AIR, EACH
ENTERING AIR TEMPERATURE
ENGINE ALTERNATOR UNIT
END OF CURVE
ECCENTRIC
EXTRACTOR DAMPER, EQUIPMENT DRAIN
EACH END, ENGINE EXHAUST
EACH FACE,EXHAUST FAN
EFFLUENT
EXHAUST GRILLE, EMERGENCY GENERATOR
EXPANSION JOINT
ELEVATION, EXHAUST LOUVER
ELECTRICAL
ELBOW
EMBEDDED
ELBOLET
END OF PIPE, EDGE OF PAVEMENT
ELECTRIC/PNEUMATIC
ETHYLENE PROPYLENE
DIENE MONOMER
EVAPORATOR
EXPANDED POLYSTYRENE
EQUAL
EQUIPMENT
EQUIVALENT
EXISTING SURFACE, EQUALIZED SLUDGE
EASEMENT
EACH WAY
EACH WAY EACH FACE
ENTERING WATER TEMPERATURE
EACH WAY TOP AND BOTTOM
EXTRA
EXHAUST
EXISTING
EXPANSION, EXPOSED
EXTERIOR
E
EA
EAT
EAU
EC
ECC
ED
EE
EF
EFF
EG
EJ
EL, ELEV
ELECT
ELL
EMBD
EOL
EOP
E/P
EPDM
EPR
EPS
EQ
EQUIP
EQUIV
ES
ESMT
EW
EWEF
EWT
EWT&B
EX
EXH
EXIST
EXP
EXT
FAHRENHEIT, FACE, FUSE(D), FAN, FLOAT
FOUL AIR
FABRICATE(D), FABRICATION
FRESH AIR INTAKE
FLAT BAR, FLOOR BEAM
FAIL CLOSED
FREE CHLORINE
FLOOR CLEANOUT
FINE CRUSHED ROCK
FLOOR DRAIN, FOUNDATION DRAIN
FLEXIBLE DUCT CONNECTOR
FEEDER
FLOWMETER
FLAT FACE, FINISH FLOOR
FACE TO FACE
F
FA
FAB
FAI
FB
FC
FCL
FCO
FCR
FD
FDC
FDR
FE
FF
F/F
FINISHED GRADE
FIRE HYDRANT,FLATHEAD
FLATHEAD
FINISHED
FLOOR, FLOW LINE
FLOCCULATOR
FLEXIBLE
FLANGE(D), FLAP GATE
FLUID POWER UNIT
FLOOR
FILTER, FILTRATE
FORCE MAIN
FLEXIBLE METAL HOSE
FLASH MIXER
FOUNDATION
FAIL OPEN
FLAT ON BOTTOM
FLAT ON TOP
FILTER PRESS, FIRE PROTECTION
FLEXIBLE PIPE COUPLING
FPC TO TAKE TENSION
FEET PER MINUTE
FEET PER SECOND
FRAME
FIBERGLASS REINFORCED PLASTIC
FAR SIDE, FLOW SWITCH, FIRESTAT,
FLOTATION SLUDGE
FLASH TANK, FEET
FOOTING
FURRING
FUTURE
FREEZESTAT
ACTUATED GATE, GUTTER ELEVATION
GAGE, GAUGE
GALLON
GALVANIZED
GRADE BREAK, GRADE BEAM
GLOBE VALVE
GUARD
GRINDER
GENERAL
GROUND FAULT INTERRUPTER
GALVANIZED IRON
GLASS
GROUND
GALLONS PER DAY
GALLONS PER MINUTE
GRADE
GROUT
GRATING
GASKET
GALVANIZED STEEL PIPE
GATE VALVE
GROUND WATER TABLE
GYPSUM
HIGH, HORIZONTAL, HOIST
HAND AUTO
HARDBOARD
HEATING COIL, HANDICAP
HEAVY DUTY
HEAVY DUTY OILTIGHT
HIGH DENSITY POLYETHYLENE
HEADER
HARDWARE
HEXAGONAL, HEAT EXCHANGER
MERCURY, HAND GRADE
HANDHOLE
HEAT HOSE VALVE
HOLLOW METAL
HAND-OFF-AUTO
HORIZONTAL
HIGH PRESSURE, HIGH POINT,
HORSEPOWER
HIGHPOINT ELEVATION
HANDRAIL, HEAT RESERVOIR, HOUR
HEAT RESERVOIR FLOW
HOURS, HEAT RESERVOIR SUPPLY
HEAT RESERVOIR FLOW
HIGH SIGNAL SELECT
HEIGHT, HEAT TRACER TAPE
HALF TIDE LEVEL
HEATER
HIGH TEMPERATURE VENT
HAND VALVE
HEATING AND VENTILATING
HEATING, VENTILATING, AND AIR
CONDITIONING
HIGH WATER
HYDRAULIC
HYDRANT
G
GA
GAL
GALV
GB
GBV
GD
GDR
GEN,GEN'L
GFI
GI
GL
GND
GPD
GPM
GRD
GRT
GRTG
GSKT
GSP
GV
GWT
GYP
H
H/A
HARDBD
HC
HD
HDOT
HDPE
HDR
HDWR
HEX
HG
HH
HHV
HM
HOA
HOR,HORIZ
HP
HPEL
HR
HRB
HRS
HRF
HSS
HT
HTL
HTR
HTV
HV
H/V
HVAC
HWTR
HYD
HYDT
INTERNATIONAL BUILDING CODE
INCINERATOR
INSIDE DIAMETER
INVERT ELEVATION
INSIDE FACE
INDICATING LAMP, INSTRUMENT LOOP
INFLUENT
INSULATE(D), INSULATION
INSTANTANEOUS
INTERIOR, INTERSECTION
INTERMEDIATE
INTERLOCK
INVERT, INVERT ELEVATION
INVERT ELEVATION
INPUT/OUTPUT
IRRIGATION
INSTRUMENT TAP
IBC
ICN
ID
IE
IF
IL
INF
INSUL
INST
INT
INTER
INTLK
INV
INV EL
I/O
IRRIG
IT
KIP (1,000 POUNDS)
KNOCK OUT
KILOVOLT
KILOVOLT AMPERE
KILOVAR
KILOWATT
K
KD
KV
KVA
KVAR
KW
LEAVING AIR TEMPERATURE
LATERAL, LATITUDE
POUND(S)
LOWER EXPLOSIVE LIMIT
LEVEL
LINEAL FEET
LINEAR FEET BASEBOARD
LONG
LEFT HAND
LAP JOINT
LONG LEG VERTICAL
LUBRICATING OIL
LOCKOUT STOP
LOW PRESSURE
LOW POINT ELEVATION
LIMIT SWITCH
LOW VOLTAGE, LOUVER, LABORATORY-
VACUUM
LAT
LB(S)
LEL
LEV
LF
LFBR
LG
LH
LJ
LLV
LO
LOS
LP
LPEL
LS
LV
MENS, MOTOR, METER
MILLIAMPERE
MAINTENANCE
MALLEABLE
MANUAL
MATERIAL
MAXIMUM
THOUSAND BTUs PER HOUR
MOTOR CONTROL CENTER
THOUSAND CIRCULAR MILLS
MASTER CONTROL UNIT
MOTORIZED DAMPER
MECHANICAL
MISCELLANEOUS ELECTRICAL
EQUIPMENT
MANUFACTURER
MILLION GALLONS
MILLION GALLONS PER DAY
MILLIGRAMS PER LITER
MANAGER
MANHOLE
MEAN HIGH HIGH WATER
MALLEABLE IRON
MISCELLANEOUS INSTRUMENTATION
EQUIPMENT
MILITARY SPECIFICATION
MINIMUM, MINUTE
MISCELLANEOUS
MECHANICAL JOINT
MILLILITER, MIXED LIQUOR
MEAN LOWER LOW WATER
MEAN LOW WATER
MISCELLANEOUS MECHANICAL
EQUIPMENT
MOTOR OPERATOR, MASONRY OPENING
MODULUS
MONUMENT
MILES PER HOUR
METAL
MOTOR
MULTIPLY/DIVIDE
MUD VALVE, MILLIVOLT
MIXER
M
MA
MAL,
MALL
MAN
MAT'L
MAX
MBH
MCC
MCM
MCU
MD
MECH
MEE
MFR
MG
MGD
MG/L
MGR
MH
MHHW
MI
MIE
MILSPC
MIN
MISC
MJ
ML
MLLW
MLW
MME
MO
MOD
MON
MPH
MTL
MTR
MUL/DIV
MV
MXR
NEUTRAL, NORTH
NONAUTOMATIC, NOT APPLICABLE
SODIUM HYDROXIDE
NORMALLY CLOSED
NORTHEAST
NEGATIVE
NONFUSED
NOT IN CONTRACT
NORMALLY OPEN, NUMBER
NOMINAL
NAMEPLATE
NET POSITIVE SUCTION HEAD
NATIONAL PIPE THREAD
NONRISING STEM
NEAR SIDE
NOT USED
NORTHWEST
N
NA
NaOH
NC
NE
NEG
NF
NIC
NO
NOM
NP
NPSH
NPT
NRS
NS
NU
NW
OVERALL
OUTSIDE AIR INTAKE
OPPOSED BLADE
ON CENTER
OUTSIDE FACE, OVERFLOW
OVERHEAD
OVERLOAD
OUT TO OUT
OPENING
ODOR REMOVAL FILTER
OXIDATION REDUCTION POTENTIAL
ODOR REMOVAL TOWER
OUTSIDE AIR
ODOR SCRUBBER
OXYGEN
OA
OAI
OB
OC
OF
OH
OL
O/O
OPNG
ORF
ORP
ORT
OSA
OSC
O 2
JUNCTION BOX
JUNCTION
JOIST
JOINT(S)
JB
JCT
JST
JT(S)
PUMP, PAVEMENT ELEVATION, PAINT
PARALLEL, PARAGRAPH
PLAIN BOTH ENDS
PIPE COUPLING, PRECAST, PIECE
POINT OF CURVATURE
PLAIN CONCRETE (NO REINFORCING STEEL)
PLANT CONTROL CENTER
PINCH VALVE
PLAIN CONCRETE PIPE
PIECES
PIPE COUPLING TO TAKE TENSION
PHOTOELECTRIC CONTROL
PLAIN END, POPULATION EQUIVALENT,
PRIMARY EFFLUENT
PNEUMATIC/ELECTRIC
PENETRATION
PERFORATED
POWER FACTOR, PRESSURIZATION FLOW
PRESSURE GAGE
PHASE
PREMOLDED JOINT
POINT ON CURVE
PROPORTIONAL PLUS INTEGRAL
CONTROL, PRESSURE INDICATOR, POINT OF
INTERSECTION (PI)
PROPORTIONAL PLUS INTEGRAL
PLUS DERIVATIVE CONTROL
PEAK
PLATE, PIPELINE, PROPERTY LINE
PLASTIC LAMINATE
PROGRAMMABLE LOGIC CONTROLLER
PLACES
PLAIN LARGE END
PLYWOOD
PLYWOOD
PHOSPHATE
PLAIN ONE END
PNEUMATIC OPERATOR
POWER POLE
POUNDS PER DAY
POUNDS PER HOUR
PRESSURE RELIEF DAMPER
PRESSURE
PREFINISHED
PRESSURE REDUCING STATION
PRESSURE REGULATING (REDUCING)
(RELIEF) VALVE
PRESSURE SWITCH, PRESSURE
SENSOR, PRIMARY SLUDGE
PLAIN SMALL END
POUNDS PER SQUARE FOOT
PRESSURE SWITCH HIGH
POUNDS PER SQUARE INCH ABSOLUTE
POUNDS PER SQUARE INCH GAGE
PIPE SLEEVE, PRESSURE SWITCH LOW
POINT, POINT OF TANGENCY
PLUG VALVE, PROCESS VARIABLE
POLYVINYL CHLORIDE
POINT OF VERTICAL INTERSECTION
PRESSURE VESSEL
PAVEMENT
P
PAR
PBE
PC
P/C
PCC
PCHV
PCP
PCS
PC-T
PCU
PE
P/E
PEN
PERF
PF
PG
PH
PJF
POC
POI
PID
PK
PL
PLAM
PLC
PLCS
PLE
PLY
PLWD
PO4
POE
POP
PP
PPD
PPH
PRD
PRES
PREFIN
PRS
PRV
PS
PSE
PSF
PSH
PSIA
PSIG
PSL
PT
PV
PVC
PVI
PVL
PVT
RADIUS, RISER
RETURN AIR
RADIUS
ROLL TYPE AIR FILTER
REINFORCED CONCRETE
RECORDER
REINFORCED CONCRETE PIPE
RECORDER
ROOF DRAIN, ROAD
RECEIVER, RECESSED
RECEIVED
RECEPTIONIST
RECIRCULATION
RECEPTACLE
REDUCE(R)
REFERENCE
REGULATOR
REINFORCED (ING)
RELAY
REMOVABLE
REQUIRED
RESILIENT
REINFORCING STEEL
REVISED(ION)
RAISED FACE
RETURN GRILLE
RIGID GALVANIZED STEEL
RIGHT HAND
REDUCED LEVEL
ROOM
ROUND
ROUGH OPENINGS
RADIUS POINT
REVOLUTIONS PER MINUTE
RAILROAD
RIGHT
REINFORCED THERMOSET PLASTIC
REMOTE TERMINAL UNIT
RELIEF VALVE
RIGHT OF WAY
RAINWATER LEADER
RAINWATER PIPE
R
RA
RAD
RAF
R/C
RCDR
RCP
RCR
RD
REC
RECD
RECEPT
RECIRC
RECP
RED
REF
REG
REINF
REL
REM
REQ'D
RESIL
RE-STL
REV
RF
RG
RGS
RH
RL
RM
RND
RO
RP
RPM
RR
RT
RTRP
RTU
RV
R/W
RWL
RWP
RATE OF FLOW
QUICK COUPLING
Q
QCPL
SOUTH, SOLENOID VALVE, SLOPE
SILENCER
SUPPLY AIR, SERVICE AIR
SIGNAL BOX
SCRUBBER DRAIN
STANDARD CUBIC FEET PER MINUTE
SCHEDULE
SCREWED
SPLITTER DAMPER, SMOKE DETECTOR,
SANITARY DRAIN
SOUTHEAST, SECONDARY
EFFLUENT,SPOT ELEVATION
SECOND, SECTION
SEPARATOR, SEPTAGE
SQUARE FOOT, SUPPLY FILTER
SUPPLY GRILLE, SLUICE GATE
SHEET
SPEED INCREASER
SIMILAR
SLOPE
SLIDE GATE
SCREEN, SUPERNATANT
SULFUR DIOXIDE
SOCKOLET
SPACE, SET POINT, STATIC
PRESSURE, STOP, STAND PIPE
SLIP-ON
SPACES
SPEED
SPECIFICATION(S)
SPACING
SPLICE
SOUND POWERED TELEPHONE
SPEED REDUCER
SPLIT-RANGING
SOLIDS RETENTION TIME
SAFETY RELIEF VALVE
STAINLESS STEEL, SPEED SELECTOR,
SUSPENDED SOLIDS, SECONDARY
SLUDGE
SOLID STATE CONTROLLER,
SECONDARY SCUM
STAINLESS STEEL FLAT HEAD
SERVICE SINK
STAINLESS STEEL
START, STREET, STRUCTURE
STATION, STARTING AIR
STANDARD, STORM DRAIN, STUD
STARTING AIR
STEEL
STORAGE
STRONG
STRUCTURAL
SUBSTITUTE, SUBSTATION
SUPERVISOR
SUPPORT
SURFACE
SOLENOID VALVE
SLUDGE VOLUME INDEX
SOUTHWEST, SOCKETWELD, SEAL WATER
SWITCHBOARD
SWITCHGEAR, SWAGE
SYMMETRICAL
S
SA
SB
SCD
SCFM
SCH
SCR'D
SD
SE
SEC
SEP
SF
SG
SHT
SI
SIM
SL
SLG
SN
S02
SOL
SP
SO
SPCS
SPD
SPEC(S)
SPG
SPL
SPT
SR
SRG
SRT
SRV
SS
SSC
SSFH
SSK
SST
ST
STA
STD
STGA
STL
STOR
STR
STRUCT
SUB
SUPERV
SUPT
SURF
SV
SVI
SW
SWBD
SWGR
SYM
TRAP, TOP, TANGENT, TREAD, TANK,
TELEPHONE
TERMINAL BOX, TOP AND BOTTOM
TOP OF BANK
TURBINE
TOP OF CURB
TOTALLY CLOSED
TEMPERATURE CONTROL PANEL
TIME DELAY RELAY, TANK DRAIN
TOTALLY ENCLOSED,THICKENER EFFLUENT
TEMPERED, TEMPORARY
TERRAZZO
TEMPORARY EROSION AND
SEDIMENTATION CONTROL PLAN
TRANSFORMER
THERMOMETER
THREADED
THRESHOLD
THROUGH
THREAD LARGE END
TOTAL KJEHDAHL NITROGEN
TEST-OFF-AUTO
TOP OF CONCRETE (CURB)
THREADED ONE END
TOP OF GRATING
THREDOLET
TOP OF PIPE
TOP OF STEEL
TOP OF WALL
TANGENT POINT, TRAP PRIMER
TONS PER DAY
TOPPING
TRIPLEXED
TIMING RELAY, STAIR TREAD
TRANSFORMER,TRANSFER
TRANSMITTER
TRANSDUCER
TRANSFER SWITCH
TEMPERATURE SWITCH, TUBE STEEL,
TRANSFER SLUDGE, TOTAL SOLIDS
THREADED SMALL END
TOTAL SUSPENDED SOLIDS
THERMOSTATIC VALVE
THERMOWELL
TYPICAL
T
TB
T/B
TBN
T/C
TCL
TCP
TD
TE
TEMP
TERR
TESCP
TFR
TH
THD'D
THRESH
THRU
TLE
TKN
TOA
TOC
TOE
TOG
TOL
TOP
TOS
TOW
TP
TPD
TPG
TPLX
TR
TRANS
TRM
TRN
TRS
TS
TSE
TSS
TV
TW
TYP
UNIFORM BUILDING CODE
UNDERGROUND
UNIT HEATER
ULTIMATE LOAD
UNLESS OTHERWISE NOTED
UTILITY POLE
UNINTERRUPTIBLE POWER SUPPLY
UTILITY STATION
UNDERSIDE
UNIT SUBSTATION
UTILITIES
ULTRAVIOLET LAMP BANK
UBC
UG
UH
UL
UON
U/P
UPS
US
U/S
USS
UTIL
UVB
VALVE, VENT, VOLTS, VERTICAL, VAULT
VACUUM, VOLTS ALTERNATING
CURRENT
VARIES, VARIABLE
VALVE BOX
VERTICAL CURVE, CHEMICAL VENT
VITRIFIED CLAY PIPE
VOLUME DAMPER
VOLTS DIRECT CURRENT
VERTICAL(S)
VACUUM FILTER
VAPOR PRESSURE, VACUUM PUMP,
PETROLEUM VENT
VERTICAL POINT OF INTERSECTION
VARIABLE SPEED COUPLING
VENT THROUGH ROOF
VARIABLE VOLUME BOX
V
VAC
VAR
VB
VC
VCP
VD
VDC
VERT(S)
VFT
VP
VPI
VSC
VTR
VV
WEST, WIDE, WOOD, WOMENS,
WASHER, WEST, WATER,WASTE
WITH
WASTE ACTIVATED SLUDGE
WATER COLUMN
WALL CLEANOUT
WALL EXHAUST GRILLE
WALL EXHAUST REGISTER
WIDE FLANGE
WASTE GAS, WATER GAGE
WROUGHT IRON
WATER LINE
WATER AND LAND RESOURCES
DIVISION (KING COUNTY)
WATER METER, WATER MAIN
WELD NECK
WASHINGTON NATURAL GAS
WITHOUT
WELDOLET
WORKING POINT
WEAKENED PLANE JOINT
WASHROOM
WATER SURFACE, WATER STOP
WELDED STEEL PIPE
WALL SUPPLY REGISTER, WASHER
WATERSTOP
WATERTIGHT, WEIGHT
WASTEWATER TREATMENT
DIVISION (KING COUNTY)
WELDED WIRE FABRIC,
WET WEATHER FLOW
W
W/
WAS
WC
WCO
WEG
WER
WF
WG
WI
WL
WLRD
WM
WN
WNG
W/O
WOL
WP
WPJ
WR
WS
WSP
WSR
WSTP
WT
WTD
WWF
SPARE CONDUIT (SUFFIX LETTER), TIMES
TRANSDUCER
POWER TRANSFORMER
TRANSMITTER
CROSS LINKED POLYETHYLENE
EXPLOSION PROOF
X
XDCR
XFMR
XMTR
XLP
XP
FG
FH
FHD
FIN
FL
FLC
FLEX
FLG('D)
FLP
FLR
FLT
FM
FMH
FMX
FND
FO
FOB
FOT
FP
FPC
FPC-T
FPM
FPS
FR
FRP
FS
FT
FTG
FURRG
FUT
FZS
MISCELLANEOUS:
OF336-
1
2
3
4
5
DESIGNED/DRAWN:
PROJECT ENGINEER:
PROJECT MANAGER:
CONTRACT NO:
DRAWING NO:SCALE:
PROJECT FILE NO:
DATE:
SHT NO / TOTAL REV
NO:
1
2
3
4
5
E F G HBCDA
CHECKED:
RE
F
E
R
E
N
C
E
1"
0
NO REVISION DESCRIPTION BY APVD DATE
E F G HBCDA
DEPARTMENT OF NATURAL RESOURCES & PARKS
WATER AND LAND RESOURCES DIVISION
APPROVED BY:
58
Know what's below.
R
Call before you dig.
BLACK RIVER PUMP STATION IMPROVEMENTS
HIGH-USE ENGINES
OCTOBER 2020
T. BEAN
1129574
BO
R
D
E
R
F
I
L
E
E
D
I
T
I
O
N
:
1
1
2
9
5
7
4
-
D
s
i
z
e
-
T
B
-
B
o
r
d
e
r
C:
\
p
w
_
w
o
r
k
d
i
r
\
d
e
n
0
0
3
\
c
h
2
m
h
i
l
l
_
d
y
a
n
g
1
\
d
0
4
6
9
8
5
0
\
1
1
2
9
5
7
4
-
O
F
3
3
6
-
G
-
0
0
0
0
3
.
d
w
g
|
L
a
y
o
u
t
:
L
a
y
o
u
t
PL
O
T
T
E
D
:
O
c
t
1
6
,
2
0
2
0
-
0
1
:
4
7
:
1
2
p
m
B
y
d
y
a
n
g
1
XR
E
F
S
:
1
1
2
9
5
7
4
-
D
s
i
z
e
-
T
B
.
D
W
G
;
P
E
-
E
L
B
-
W
A
_
_
E
r
i
k
_
s
t
a
m
p
.
d
w
g
IM
A
G
E
S
:
GENERAL
ABBREVIATIONS G-00003
4
R. REISER
E. BRODAHL
S. DORAN
NONE
0
T. DAVIS
ISSUED FOR PERMIT
JUNE 2026
6/18/2026
NOTES, SPECIAL INSPECTIONS
AND SYMBOLS S-00001
31
R. ROBERTS
E. BRODAHL
S. DORAN
AS NOTED
1
C. ROBERTS
DESIGN CRITERIA
GENERAL INFORMATION
1.DESIGN DETAILS ARE INTENDED TO BE TYPICAL AND SHALL APPLY TO SIMILAR SITUATIONS OCCURRING
THROUGHOUT THE PROJECT, WHETHER OR NOT THEY ARE INDIVIDUALLY CALLED OUT.
2.VERIFY FINAL DIMENSIONS WITH OTHER DISCIPLINE DRAWINGS PRIOR TO CONSTRUCTION OF THESE
ELEMENTS.
3.DO NOT CUT OR MODIFY STRUCTURAL MEMBERS FOR PIPES, DUCTS, ETC, UNLESS SPECIFICALLY DETAILED
OR APPROVED IN WRITING BY THE PROJECT REPRESENTATIVE.
1.DESIGN CODE: 2018 INTERNATIONAL EXISTING BUILDING CODE (IEBC) AND ASCE 41-17 FOR PUMPS P2 & P4.
, ALL AS AMENDED BY THE STATE OF WASHINGTON AND THE CITY OF RENTON.
2.REFER TO THE DRAWINGS FOR ADDITIONAL AND SPECIFIC STRUCTURE LOADINGS AND REQUIREMENTS.
3.ALL LOADS SHOWN ARE ASCE 7-16 UNFACTORED LOADS UNLESS NOTED OTHERWISE. APPLY THE ASCE 7 OR
IBC 2018 LOAD FACTORS (ASD OR LRFD) AS NECESSARY.
4.DEAD LOADS:
SELF WEIGHT
5.SEISMIC LOADS:
RISK CATEGORY IV
IMPORTANCE FACTOR, Ip 1.50
SS 1.468
SITE CLASS D
SDS 0.979
6.ASCE 41-13 (TABLE 2-3) SEISMIC PERFORMANCE OBJECTIVE NON -STRUCTURAL COMPONENTS.
BSE-2N SEISMIC HAZARD LEVEL OPERATIONAL NONSTRUCTURAL PERFORMANCE (N-A)
NONSTRUCTURAL COMPONENT SUPPORTS HAVE BEEN ANALYZED USING THE EQUIVALENT LATERAL FORCE
PROCEDURES OF ASCE 7-16 AND ASCE 41-17.
7.EPOXY ADHESIVE USED FOR ANCHORING REBAR OR POST INSTALLED ANCHORS SHALL MEET THE
REQUIREMENTS OF ASTM C881 TYPE IV.
8.CONCRETE SHALL HAVE A MINIMUM f'c = 4,000 FOR ALL CONCRETE.
EXPOSURE CATEGORIES
F(0)
S(0)
W(0)
C(0)
GRATING, SPAN DIRECTION INDICATED
GROUT
EARTH OR FINISH GRADE
CONCRETE
SYMBOL LEGEND
STRUCTURAL SYMBOLS
POST
RAILINGS
RAILINGS @ SMALL SCALE
OF336-
1
2
3
4
5
DESIGNED/DRAWN:
PROJECT ENGINEER:
PROJECT MANAGER:
CONTRACT NO:
DRAWING NO:SCALE:
PROJECT FILE NO:
DATE:
SHT NO / TOTAL REV
NO:
1
2
3
4
5
E F G HBCDA
CHECKED:
RE
F
E
R
E
N
C
E
1"
0
NO REVISION DESCRIPTION BY APVD DATE
E F G HBCDA
DEPARTMENT OF NATURAL RESOURCES & PARKS
WATER AND LAND RESOURCES DIVISION
APPROVED BY:
58
Know what's below.
R
Call before you dig.
BLACK RIVER PUMP STATION IMPROVEMENTS
HIGH-USE ENGINES
OCTOBER 2020
T. BEAN KC000011
1129574
BO
R
D
E
R
F
I
L
E
E
D
I
T
I
O
N
:
1
1
2
9
5
7
4
-
D
s
i
z
e
-
T
B
-
B
o
r
d
e
r
D:
\
D
r
o
p
b
o
x
\
A
c
t
i
v
e
P
r
o
j
e
c
t
s
\
J
a
c
o
b
s
\
E
0
0
5
4
4
E
1
8
B
l
a
c
k
R
i
v
e
r
P
S
\
d
w
g
s
\
H
U
E
C
o
n
t
r
a
c
t
D
w
g
s
\
P
h
a
s
e
2
\
1
1
2
9
5
7
4
-
O
F
3
3
6
-
S
-
0
0
0
0
1
.
d
w
g
|
L
a
y
o
u
t
:
S
0
0
0
0
1
PL
O
T
T
E
D
:
S
e
p
1
0
,
2
0
2
5
-
0
6
:
2
8
:
2
9
p
m
B
y
r
o
n
XR
E
F
S
:
1
1
2
9
5
7
4
-
D
s
i
z
e
-
T
B
.
D
W
G
IM
A
G
E
S
:
REQUIRED SPECIAL INSPECTIONS
TYPE FREQUENCY REFERENCED
STANDARDS IBC REFERENCECONTINUOUSPERIODIC
CONCRETE CONSTRUCTION 1705.3
1. INSPECT REINFORCEMENT AND VERIFY PLACEMENT X ACI 318-19 CH. 26.13
2. INSPECT ANCHORS OR REINFORCING BARS
POST-INSTALLED IN HARDENED CONCRETE MEMBERS
A. ADHESIVE ANCHORS INSTALLED IN
HORIZONTALLY OR UPWARDLY INCLINED
ORIENTATIONS TO RESIST SUSTAINED
TENSION LOADS.
X
ACI 318-19: CH. 26.13 AND
QUALIFYING REPORT OF
EVALUATION SERVICE
(ICC-ES)
B. MECHANICAL ANCHORS AND ADHESIVE
ANCHORS AND REINFORCING BARS NOT
DEFINED IN 2.A.
X
ACI 318-19: CH. 26.13 AND
QUALIFYING REPORT OF
EVALUATION SERVICE
(ICC-ES)
3. VERIFY USE OF REQUIRED DESIGN MIX.X ACI 318: CH. 26.13 1705.3
4. PRIOR TO CONCRETE PLACEMENT, FABRICATE
SPECIMENS FOR STRENGTH TESTS, PERFORM SLUMP
AND AIR CONTENT TESTS, AND DETERMINE THE
TEMPERATURE OF THE CONCRETE.
X
ASTM C172
ASTM C31
ACI 318: CH 26.13
1705.3
5. VERIFY MAINTENANCE OF SPECIFIED CURING X ACI 318: CH. 26.13 1705.3
6. INSPECT FORMWORK FOR SHAPE, LOCATION AND
DIMENSIONS OF THE CONCRETE MEMBER BEING
FORMED.
X ACI 318: CH. 26.13
-----------------------------------------------------------------------------------
STRUCTURAL STEEL
1. SPECIAL INSPECTIONS AND NONDESTRUCTIVE
TESTING OF STRUCTURAL STEEL FABRICATION SHALL
BE IN ACCORDANCE WITH THE QUALITY ASSURANCE
INSPECTION REQUIREMENTS OF AISC 360-16
AS REQ'D BY AISC
360-16
AS REQ'D BY
AISC 360-16 AISC 360-16 CHAPTER N 1705.2
2. SPECIAL INSPECTIONS AND NONDESTRUCTIVE
TESTING OF STRUCTURAL STEEL ERECTION SHALL BE
IN ACCORDANCE WITH THE QUALITY ASSURANCE
INSPECTION REQUIREMENTS OF AISC 360-16
AS REQ'D BY AISC
360-16
AS REQ'D BY
AISC 360-16 AISC 360-16 CHAPTER N 1705.2
3. SPECIAL INSPECTIONS AND NONDESTRUCTIVE
TESTING OF STRUCTURAL STEEL WELDING SHALL BE IN
ACCORDANCE WITH THE QUALITY ASSURANCE
INSPECTION REQUIREMENTS OF AISC 360-16
AS REQ'D BY AISC
360-16
AS REQ'D BY
AISC 360-16
AISC 360-16 CHAPTER N,4
TABLES N5.4-1 THRU N5.4-3 1705.2
4. NONDESTRUCTIVE TESTING OF CJP GROOVE WELDS
SHALL BE IN ACCORDANCE WITH THE QUALITY
ASSURANCE INSPECTION REQUIREMENTS OF AISC
360-16
AS REQ'D BY AISC
360-16
AS REQ'D BY
AISC 360-16 AISC 360-16 CHAPTER N,5b 1705.2
5. SPECIAL INSPECTIONS AND NONDESTRUCTIVE
TESTING OF PREFABRICATED STEEL STRUCTURES
FABRICATION AND INSTALLATION SHALL BE IN
ACCORDANCE WITH THE QUALITY ASSURANCE
INSPECTION REQUIREMENTS OF AISC 360-16
AS REQ'D BY AISC
360-16
AS REQ'D BY
AISC 360-16 AISC 360-16 CHAPTER N 1705.2
THE STEEL FABRICATOR AND ERECTOR SHALL SUBMIT CERTIFICATES OF COMPLIANCE WITH THE AISC 360-16 QA/QC REQUIREMENTS.
1.THE ENGINEER OF RECORD SHALL PROVIDE VISUAL OBSERVATION OF THE STRUCTURAL SYSTEM, FOR GENERAL CONFORMANCE TO THE APPROVED
PLANS AND SPECIFICATIONS, AT SIGNIFICANT CONSTRUCTION STAGES AND AT THE COMPLETION OF THE STRUCTURAL SYSTEM.
2.STRUCTURAL OBSERVATION DOES NOT INCLUDE OR WAIVE THE RESPONSIBILITY FOR THE INSPECTIONS REQUIRED BY WSBC SECTIONS 1705 OR
OTHER SECTIONS OF THE WASHINGTON STATE BUILDING CODE.
3.STRUCTURAL OBSERVATION REPORTS SHALL BE ISSUED TO THE PROJECT REPRESENTATIVE AND THE BUILDING OFFICIAL AT THE COMPLETION OF
CONSTRUCTION.
STRUCTURAL OBSERVATION
1.PRIOR TO THE START OF CONSTRUCTION, THE SPECIAL INSPECTION AGENCY SHALL PROVIDE WRITTEN DOCUMENTATION TO THE BUILDING OFFICIAL
DEMONSTRATING COMPETENCE AND RELEVANT EXPERIENCE OR TRAINING OF THE SPECIAL INSPECTORS WHO WILL PERFORM THE SPECIAL
INSPECTIONS AND TESTS.
2.THE APPROVED SPECIAL INSPECTION AGENCY SHALL SUBMIT REPORTS OF ALL SPECIAL INSPECTIONS AND TESTING TO THE BUILDING OFFICIAL AND
THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE. THE REPORT SHALL INDICATE THAT WORK INSPECTED WAS OR WAS NOT
COMPLETED IN CONFORMANCE TO THE APPROVED CONSTRUCTION DOCUMENTS.
3.A FINAL REPORT SHALL DOCUMENT THE REQUIRED SPECIAL INSPECTIONS AND TESTS, AND CORRECTION OF ANY DISCREPANCIES NOTED
PREVIOUSLY.
SPECIAL INSPECTION AGENCY AND INSPECTOR
DEFERRED SUBMITTALS
1.THE FOLLOWING DEFERRED SUBMITTALS SHALL BE MADE BY THE
CONTRACTOR FOR APPROVAL BY THE CITY OF RENTON BUILDING
DEPARTMENT.
1.1.CONCRETE MIX DESIGNS
1.2.DESIGN OF SILENCER SUPPORT FRAMES AND THEIR ANCHORAGE.
STRUCTURAL SUBMITTALS
1.REPORTS, CERTIFICATES AND OTHER DOCUMENTS RELATED TO
STRUCTURAL SPECIAL INSPECTIONS AND TESTS SHOULD BE SUBMITTED
BY THE CONTRACTOR TO THE CITY OF RENTON. THE CERTIFICATES OF
COMPLIANCE ARE REQUIRED TO STATE THAT THE WORK WAS
PERFORMED IN ACCORDANCE WITH THE APPROVED CONSTRUCTION
DOCUMENTS. SEE IBC SECTIONS 107.1, 107.3.4 AND 107.3.4.1. THE
FOLLOWING IS A SUMMARY:
a.SUBMITTAL OF WELDING PROCEDURE SPECIFICATIONS FOR THE
WELDING OF CONCRETE REINFORCEMENT, OTHER THAN BY FILLET
WELDS.
b.SUBMITTAL OF CERTIFICATES OF COMPLIANCE FROM THE
FABRICATORS OF PREFABRICATED STRUCTURAL STEEL MEMBERS AT
THE COMPLETION OF FABRICATION. SEE ALSO IBC SECTIONS 1704.5.
c.SUBMITTAL OF CERTIFICATES OF COMPLIANCE FROM THE
FABRICATORS OF THE PREFABRICATED STEEL STRUCTURES AT THE
COMPLETION OF FABRICATION. SEE ALSO IBC SECTIONS 1704.5.
d.SUBMITTAL OF WELDING PROCEDURE SPECIFICATIONS FOR THE
WELDING OF STRUCTURAL STEEL, OTHER THAN BY PRE-QUALIFIED
WELDING PROCEDURE SPECIFICATIONS. SEE ALSO IBC SECTION 1704.5.
2.THE CONTRACTOR SHALL SUBMIT CERTIFICATES OF COMPLIANCE FROM
THE FABRICATORS OF THE STRUCTURAL STEEL TO THE BUILDING
OFFICIAL AT THE COMPLETION OF FABRICATION. SEE IBC SECTIONS 1704.5.
1 CODE UPDATE REVISIONS FOR P3 INSTALLATION RMR 7/25
1
1
1
1
2021 INTERNATIONAL EXISTING BUILDING CODE (IEBC) AND 2021 INTERNATIONAL BUILDING CODE (IBC) FOR
PUMP P3 IN RCP 22
OR IBC 2021 (FOR RCP 22)
12/12/2025
ISSUED FOR PERMIT
JUNE 2026
X X X X X X X
X
X
X
X
X
X
X
X
X
X
X
X X X X
X
X
X
X
X
X
X
X
X
5001
9.19
111
5003
8.88
142
5048
9.14
142
50909.09
142
1.ALL PARKING AND STAGING SHALL BE SITUATED TO FACILITATE CONTINUOUS KING COUNTY
ACCESS TO ALL GATES, DOORS AND EQUIPMENT.
2.GRAVEL ACCESS ROAD FOR NORTH SIDE OF STATION CAN BE ACCESSED FROM MONSTER
ROAD SW, FURTHER WEST OF VIEW SHOWN IN THIS DRAWING. PROVIDE NOTICE
TWO-WEEKS PRIOR TO CONSTRUCTION TO PROJECT REPRESENTATIVE (TO NOTIFY KING
COUNTY PARKS DEPARTMENT) FOR ACCESS OR USE OF LAKE TO SOUND TRAIL, PER
SPECIFICATION 01 14 30. ACCESS TO TRAIL IS LIMITED TO VEHICLES WITH A MAXIMUM OF
TYPE H20 LOADING AND TRAIL OBSTRUCTION SHALL BE MINIMIZED. CONTRACTOR SHALL
PREPARE AND SUBMIT A TRAFFIC CONTROL PLAN, WHICH SHALL BE IMPLEMENTED DURING
USE OF THE LAKE TO SOUND TRAIL, PER SPECIFICATION 01 55 26.
3.REFER TO G-00001 FOR NORTH SIDE GRAVEL ACCESS ROAD CONNECTION TO MONSTER
ROAD.
4.PROVIDE SPECIFIC PROPOSAL AND OBTAIN WRITTEN APPROVAL FROM PROJECT
REPRESENTATIVE PRIOR TO LEAVING A TRAILER OR ANYTHING ELSE OUTSIDE TO REMAIN
OVERNIGHT (OR LONGER).
5.THIS DRAWING DEPICTS GENERAL ACCESS FOR THE PUMP STATION SITE. AERIAL PHOTO
AND SURVEY FEATURES ARE NOT ACCURATELY ALIGNED, AND ARE NOT SUITABLE FOR
DIMENSIONING. CONTRACTOR SHALL DETERMINE DIMENSIONS AND CLEARANCES FOR
ACCESS AS NEEDED.
NOTES:
PRIMARY SITE
ACCESS
PRIMARY BUILDING ACCESS
15'H x 12'W ROLLUP DOOR
APPROXIMATE LOCATION
OF EXISTING PUMPS
1 THROUGH 4
MONSTER ROAD SW
OF336-
1
2
3
4
5
DESIGNED/DRAWN:
PROJECT ENGINEER:
PROJECT MANAGER:
CONTRACT NO:
DRAWING NO:SCALE:
PROJECT FILE NO:
DATE:
SHT NO / TOTAL REV
NO:
1
2
3
4
5
E F G HBCDA
CHECKED:
RE
F
E
R
E
N
C
E
1"
0
NO REVISION DESCRIPTION BY APVD DATE
E F G HBCDA
DEPARTMENT OF NATURAL RESOURCES & PARKS
WATER AND LAND RESOURCES DIVISION
APPROVED BY:
58
Know what's below.
R
Call before you dig.
BLACK RIVER PUMP STATION IMPROVEMENTS
HIGH-USE ENGINES
OCTOBER 2020
T. BEAN
1129574
BO
R
D
E
R
F
I
L
E
E
D
I
T
I
O
N
:
1
1
2
9
5
7
4
-
D
s
i
z
e
-
T
B
-
B
o
r
d
e
r
C:
\
p
w
_
w
o
r
k
d
i
r
\
d
e
n
0
0
3
\
c
h
2
m
h
i
l
l
_
d
y
a
n
g
1
\
d
0
4
6
9
8
5
0
\
1
1
2
9
5
7
4
-
O
F
3
3
6
-
G
-
1
0
0
0
1
.
d
w
g
|
L
a
y
o
u
t
:
L
a
y
o
u
t
PL
O
T
T
E
D
:
O
c
t
1
6
,
2
0
2
0
-
0
1
:
4
7
:
3
4
p
m
B
y
d
y
a
n
g
1
XR
E
F
S
:
1
0
4
4
8
8
5
x
B
A
S
E
M
A
P
2
.
d
w
g
;
w
e
t
l
a
n
d
s
_
H
E
C
_
d
e
l
i
n
e
a
t
e
d
.
d
w
g
;
x
_
H
C
_
P
u
m
p
-
P
l
a
n
t
P
M
X
R
E
V
.
d
w
g
;
x
_
O
H
M
.
d
w
g
;
1
1
2
9
5
7
4
-
D
s
i
z
e
-
T
B
.
D
W
G
;
b
l
a
c
k
r
i
v
e
r
_
a
e
r
i
a
l
_
r
_
w
_
j
p
g
.
d
w
g
;
P
E
-
E
L
B
-
W
A
_
_
E
r
i
k
_
s
t
a
m
p
.
d
w
g
IM
A
G
E
S
:
B
R
P
S
.
j
p
g
;
SITE ACCESS PLAN G-10001
6
R. REISER
E. BRODAHL
S. DORAN
AS NOTED
0
T. DAVIS
SECONDARY BUILDING
ACCESS, 15'H x 12'W
ROLLUP DOOR
GRAVEL ACCESS ROAD TO
NORTH SIDE OF STATION
0 30 60 90
SCALE: 1"= 30'
TEMPORARY CONSTRUCTION STAGING AREA AND WORK LIMITS, MAINTAIN ACCESS FOR
KING COUNTY STAFF AT ALL TIMES, OR COORDINATE TO OBTAIN WRITTEN APPROVAL
FROM PROJECT REPRESENTATIVE FOR SPECIFIC TIMES WHEN ACCESS WILL BE
OBSTRUCTED OR MUST BE LIMITED.
DEDICATED CONSTRUCTION STAGING AREA. COORDINATE FINAL DIMENSIONS IN THE
FIELD WITH THE PROJECT REPRESENTATIVE.
WORK AREA LIMITS SHALL BE WITHIN FENCED AREAS NORTH AND SOUTH OF PUMP
STATION BUILDING, EXTERNAL WALKWAYS OUTSIDE OF PUMP HOUSE BUILDING AND
WITHIN BUILDING.
MAINTAIN 20-FT CLEARANCE BETWEEN SITE TRAILER AND BOLLARDS AROUND FUEL
STORAGE TANK TO ALLOW FUEL TRUCK CLEARANCE THROUGH THE SITE.
SEE DRAWING M-40001 FOR REMOVAL OF EXISTING CONCRETE STOP LOGS AND
STORAGE OF NEW FRP STOP LOGS IN EXISTING STOP LOG STORAGE AREA.
KEY NOTES:
1
1
2
2
3
3
PERSONNEL
ACCESS DOOR
1
CONSTRUCTION
ACCESS FROM
MONSTER ROAD
SEE
FOR PUMP FLOOR
ACCESS PLAN
X
X X X
X X X X X X X X X
X X X X
EXISTING CHAIN
LINK FENCE
BULK DIESEL FUEL
STORAGE TANKS
AND PANEL
VEHICLE
ACCESS GATE VEHICLE
ACCESS GATE
EXISTING
TRANSFORMER
STAGING AREA
FOR TRAILER
STAGING AREA FOR
ADDITIONAL PARKING
2
2 4
4
TABLE OF EXISTING CONTROL POINTS:
TABLE NOTES:
1.NORTHINGS AND EASTINGS PROVIDED IN TABLE ARE ACCURATE
AND PROVIDED FOR REFERENCE, BUT LOCATIONS ON PLAN VIEW
ARE INACCURATE AND APPROXIMATE COMPARED TO AERIAL
PHOTO. (SEE NOTE #5 ABOVE)
2.POINTS NOT SHOWN ON THIS DRAWING ARE OUTSIDE OF VIEW.
(AS INDICATED WITH "ɸ")
5
5
G-10002
1
EXISTING CHAIN
LINK FENCE
VEHICULAR
ACCESS GATE
PERSONNEL
ACCESS GATE
1
1
[5001]
[5003]
[5090]
[5048]
ɸ
ɸ
2
G-40001
2
1
G-40001
SITE AND ACCESS PLAN
1"=30'SCALE:
ISSUED FOR PERMIT
JUNE 2026
6/18/2026
1/8"=1'-0"
FLOOR ACCESS PLAN
OF336-
1
2
3
4
5
DESIGNED/DRAWN:
PROJECT ENGINEER:
PROJECT MANAGER:
CONTRACT NO:
DRAWING NO:SCALE:
PROJECT FILE NO:
DATE:
SHT NO / TOTAL REV
NO:
1
2
3
4
5
E F G HBCDA
CHECKED:
RE
F
E
R
E
N
C
E
1"
0
NO REVISION DESCRIPTION BY APVD DATE
E F G HBCDA
DEPARTMENT OF NATURAL RESOURCES & PARKS
WATER AND LAND RESOURCES DIVISION
APPROVED BY:
58
Know what's below.
R
Call before you dig.
BLACK RIVER PUMP STATION IMPROVEMENTS
HIGH-USE ENGINES
OCTOBER 2020
T. BEAN
1129574
BO
R
D
E
R
F
I
L
E
E
D
I
T
I
O
N
:
1
1
2
9
5
7
4
-
D
s
i
z
e
-
T
B
-
B
o
r
d
e
r
C:
\
p
w
_
w
o
r
k
d
i
r
\
d
e
n
0
0
3
\
j
e
g
_
r
e
i
s
e
r
r
w
\
d
0
4
6
9
8
5
0
\
1
1
2
9
5
7
4
-
O
F
3
3
6
-
G
-
1
0
0
0
2
.
d
w
g
|
L
a
y
o
u
t
:
L
a
y
o
u
t
PL
O
T
T
E
D
:
O
c
t
2
1
,
2
0
2
0
-
1
0
:
1
4
:
1
7
a
m
B
y
R
e
i
s
e
r
R
W
XR
E
F
S
:
1
1
2
9
5
7
4
-
D
s
i
z
e
-
T
B
.
D
W
G
;
1
0
-
D
-
x
P
P
e
0
1
_
D
3
1
6
4
9
0
0
.
d
w
g
;
P
E
-
E
L
B
-
W
A
_
_
E
r
i
k
_
s
t
a
m
p
.
d
w
g
;
1
0
-
D
-
x
P
P
n
0
1
_
G
R
A
T
I
N
G
_
D
3
1
6
4
9
0
0
.
d
w
g
;
1
0
-
D
-
x
P
P
n
0
1
_
G
R
A
T
I
N
G
_
2
_
D
3
1
6
4
9
0
0
.
d
w
g
IM
A
G
E
S
:
PUMP FLOOR ACCESS PLAN G-10002
7
R. REISER
E. BRODAHL
S. DORAN
AS NOTED
0
T. DAVIS
KEY NOTES:
ACCESS LOWER PUMP BAYS FROM ACCESS HATCHES, RAILS AND
LADDERS LOCATED EAST OF GEAR DRIVES AND PUMPS.
WOODEN PANEL FOR ACCESS HATCH. FOR P2 ONLY, ALL OTHERS
HAVE METAL COVERS.
P9 IS A 25 HP VERTICAL TURBINE PUMP (3,600 GPM @ 19 FEET
TDH) PROVIDING WATER TO THE FISH LADDER, FISH CHUTE, AND
OVERFLOW FROM THE FALSE WEIR (RETURNED TO P1 FOREBAY).
STOP LOG SLOT COVER PLATE.
P12 IS A 1/2 HP VERTICAL TURBINE COOLING WATER PUMP FOR
THE P1, P2 AND P4 GEAR DRIVES. THIS COOLING SYSTEM IS
CURRENTLY BEING SUPPLIED WITH POTABLE WATER, SO P12 IS
NOT PRESENTLY IN USE. PROTECT P12 AND LEAVE IN PLACE.
P10 IS A 15 HP VERTICAL TURBINE PUMP (122 GPM @ 252 FEET
TDH) PROVIDING SPRAY WATER TO CLEAN THE P1-P4 FISH
SCREENS.
P11 IS A 20 HP VERTICAL TURBINE PUMP (1,240 GPM @ 51 FEET
TDH) PROVIDING COOLING WATER TO THE HEAT EXCHANGERS
FOR THE WAUKESHA ENGINES FOR P3, P5, P7 AND P8 AND
CORRESPONDING GEAR DRIVES.
ROLL-UP DOOR
15'H x 12'W
P8 P7 P6 P5 P4 P3 P2
P1 REMOVABLE
DIAMOND PLATE
ROLL-UP DOOR
15'H x 12'W
WORK BENCH
APPROX. LOCKER AND
SHELVING LOCATIONSC1 AIR
COMPRESSOR
SYSTEM
GRATING (TYP.)DIESEL FUEL DAY TANK
AND CONTROL PANEL
(TYP. OF 5)
P9P10P12
GEAR DRIVE LUBE OIL
SYSTEM (TYP. OF 8)
17'-0"22'-0"22'-0"24'-2"22'-0"22'-0"22'-0"
8'-7 3/8"8'-8 3/8"8'-8 3/8"
P11
EXISTING PERSONNEL
ACCESS DOOR
CONCRETE
MOTOR BASE
DIAMOND
PLATE
9'
-
1
1
3
/
4
"
9'
-
1
1
3
/
4
"
10
'
-
3
1
/
4
"
15
'
-
2
"
9'
-
1
1
1
/
2
"
10
'
-
3
"
9'
-
1
1
3
/
4
"
0 8 16 24
SCALE: 1/8"= 1'-0"
A B C D E F G H J K L M N P
Q R
3
2
1
EXISTING PERSONNEL
ACCESS DOOR
EXPANSION JOINT
WITH COVER PLATE
EXISTING PERSONNEL
ACCESS DOOR
A
G-30001
EXISTING
STORAGE SHED
NOTES:
1.ALL EQUIPMENT NOT SPECIFICALLY IDENTIFIED FOR REFURBISHMENT
OR REPLACEMENT SHALL BE PROTECTED AND REMAIN OPERATIONAL
WITHOUT DISTURBANCE DURING CONSTRUCTION.
2.DIMENSIONS SHOWN EAST OF MAIN PUMPS ARE APPROXIMATE FROM
PUMPS TO BUILDING ONLY. THERE ARE OTHER OBSTRUCTIONS ALONG
EAST WALL, INCLUDING PIPING AND OTHER EQUIPMENT, AND
AVAILABLE ACCESS IS LESS IN SOME LOCATIONS. CONTRACTOR
SHALL VERIFY AVAILABLE CLEARANCE AND TEMPORARILY MOVE
PORTABLE EQUIPMENT AS NEEDED FOR ACCESS AND MOVE BACK TO
EXISTING LOCATIONS UPON COMPLETION OF ACCESS NEEDS. OBTAIN
WRITTEN APPROVAL FROM PROJECT REPRESENTATIVE FOR ANY
SIGNIFICANT OR OVERNIGHT (OR LONGER) EQUIPMENT RELOCATIONS.
3.P9 AND P12 ARE PUMPS THAT EXTEND DOWN INTO THE INTAKE BAYS
FOR P2 AND P4 RESPECTIVELY. PROTECT EXISTING PUMPS AND PIPING
DURING REMOVAL AND REINSTALLATION OF P2 AND P4. P9 SUPPLIES
THE FISH LADDER ON THE SOUTH SIDE OF THE STATION AND MUST
REMAIN IN SERVICE AT ALL TIMES, EXCEPT WHERE OTHERWISE NOTED
IN DRAWINGS OR SPECIFICATIONS. IF CONTRACTOR NEEDS TO DRAIN
THE P2 PUMP BAY, THE UPSTREAM FISH MIGRATION BACKUP PUMP P9A
SHALL BE INSTALLED IN THE P3 PUMP BAY AND BE FULLY OPERATIONAL
(SEE DWG M-10002). SEE SECTION 01 14 00 FOR FURTHER DETAILS.
2
X
1
2
3
3
4
4 4 4
5
5
6
6
7
7
8
8 888 8 8 811 1 1
DECK EL:
28.55
STOP LOG SLOT BELOW
GRATING (TYP. EA BAY)
PUMP 4 DIESEL FUEL
DAY TANK AND
CONTROL PANEL
PUMP 2 DIESEL FUEL
DAY TANK AND
CONTROL PANEL
1
G-10001
SEE PUMP HATCH ACCESS PLAN ON DWG G-10003
AND PUMP BAY ACCESS WALKWAY PLAN ON DWG G-10004
9
9 9
9
E336007
GBX336008 GBX336007 GBX336006
GBX336005
GBX336004
E336004E336005E336006E336008
GBX336003 GBX336002
GBX336001
MTR336001
E336002E336003
DESICCANT DRYER
FOR EQUIPMENT AIR
SEE DEMOLITION DRAWING
D-10002 FOR REMOVAL OF A
PORTION OF THE P11
DISCHARGE PIPING AND
DRAWING M-30005 FOR
INSTALLATION OF A NEW P11
STRAINER
10
10
6
M-90002
5
M-90002
7
M-90002
KEY NOTES CONT'D:
REMOVABLE DIAMOND PLATE (TYP).
REMOVABLE DIAMOND PLATE AROUND PUMP MOUNTING PLATES
(TYP).
NEW INFLATABLE SEAL AIR SUPPLY PANEL IN THIS AREA. SEE
DWG M-40003.
APPROXIMATE LOCATION (NOT SURVEYED) OF EXISTING FISH
SCREEN CONTROL PANEL LCP336102.
11
11
Work Area Associated with P3 engine replacement
ISSUED FOR PERMIT
JUNE 2026
6/18/2026
17'-0"8'-7 3/8"13'-4 5/8"8'-8 3/8"13'-3 5/8"8'-8 3/8"15'-5 5/8"
MAIN LEVEL FLOOR PLAN
1/4"=1'-0"
P3P4 P2
P1
REMOVE AND
RECYCLE PUMP 4
CONTROL PANEL
REMOVE AND RECYCLE
PUMP 2 ENGINE, SILENCER
AND EXHAUST PIPE
(8-INCH DIAMETER)REMOVE AND RECYCLE
PUMP 1 MOTOR
NOTES:
1. ALL EQUIPMENT NOT SPECIFICALLY IDENTIFIED FOR REFURBISHMENT
OR REPLACEMENT SHALL BE PROTECTED AND REMAIN OPERATIONAL
WITHOUT DISTURBANCE DURING CONSTRUCTION.
2. BRIDGE CRANE CAN ALSO TRAVEL TO THE NORTH PORTION OF THE
BUILDING WITH SIMILAR REACH EXTENTS AS SHOWN THIS SHEET FOR
SOUTH PORTION OF BUILDING.
3.SEE DEMOLITION PHOTO DRAWINGS D-90001 AND D-90002.
4.DIAMOND PLATE SHOWN IS MADE UP OF SMALLER INDIVIDUAL
PANELS FOR REMOVAL (NOT SHOWN), CONTRACTOR SHALL VERIFY
LIMITS AS NEEDED.
15' HIGH x 12' WIDE
ROLL-UP ACCESS
DOOR
DEMOLITION
MAIN FLOOR PLAN D-10001
13
R. REISER
B. GRAVETTE
S. NELLIGAN
AS NOTED
3
T. DAVIS
OF336-
1
2
3
4
5
DESIGNED/DRAWN:
PROJECT ENGINEER:
PROJECT MANAGER:
CONTRACT NO:
DRAWING NO:SCALE:
PROJECT FILE NO:
DATE:
SHT NO / TOTAL REV
NO:
1
2
3
4
5
E F G HBCDA
CHECKED:
RE
F
E
R
E
N
C
E
1"
0
NO REVISION DESCRIPTION BY APVD DATE
E F G HBCDA
DEPARTMENT OF NATURAL RESOURCES & PARKS
WATER AND LAND RESOURCES DIVISION
APPROVED BY:
58
Know what's below.
R
Call before you dig.
BLACK RIVER PUMP STATION IMPROVEMENTS
HIGH-USE ENGINES
OCTOBER 2020
T. BEAN KC000011
1129574
BO
R
D
E
R
F
I
L
E
E
D
I
T
I
O
N
:
1
1
2
9
5
7
4
-
D
s
i
z
e
-
T
B
-
B
o
r
d
e
r
C:
\
p
w
_
w
o
r
k
d
i
r
\
d
e
n
0
0
3
\
j
a
c
o
b
.
g
i
l
l
i
a
m
@
j
a
c
o
b
s
.
c
o
m
\
d
0
4
6
9
8
7
4
\
1
1
2
9
5
7
4
-
O
F
3
3
6
-
D
-
1
0
0
0
1
.
d
w
g
|
L
a
y
o
u
t
:
L
a
y
o
u
t
PL
O
T
T
E
D
:
F
e
b
2
3
,
2
0
2
6
-
1
0
:
1
3
:
5
1
a
m
B
y
G
I
L
L
I
A
J
2
XR
E
F
S
:
1
1
2
9
5
7
4
-
D
s
i
z
e
-
T
B
.
d
w
g
;
1
0
-
D
-
x
P
P
e
0
1
_
D
3
1
6
4
9
0
0
.
d
w
g
;
P
E
-
E
L
B
-
W
A
_
_
E
r
i
k
_
s
t
a
m
p
.
d
w
g
;
1
0
-
D
-
x
P
P
n
0
1
_
G
R
A
T
I
N
G
_
D
3
1
6
4
9
0
0
.
d
w
g
;
1
0
-
D
-
x
P
P
n
0
1
_
G
R
A
T
I
N
G
_
2
_
D
3
1
6
4
9
0
0
.
d
w
g
IM
A
G
E
S
:
D-30001
A
D-30002
B
P5
APPROX. LOCKER AND
SHELVING LOCATIONS
WORK
BENCH
P9
P10P12
REMOVE AND RECYCLE
PUMP 4 ENGINE, SILENCER
AND EXHAUST PIPE
(8-INCH DIAMETER)
DESICCANT
DRYER FOR
EQUIPMENT AIR
C1 AIR
COMPRESSOR
SYSTEM
PERSONNEL
ACCESS DOOR
ALL EXISTING DIESEL
FUEL DAY TANKS TO
REMAIN (TYP.)
1
D-90001
9'
-
1
1
1
/
2
"
10
'
-
3
"
9'
-
1
1
3
/
4
"
10
'
-
3
"
15
'
-
2
"
APPROXIMATE HORIZONTAL
REACH OF BRIDGE CRANE
HOOK 3 FEET FROM BRIDGE
CRANE SUPPORTS ON EAST
AND WEST WALLS
2
D-90001
3
D-90001
4
D-90001
5
D-90002
6
D-90002
7
D-90002
8
D-90002
D-30003
C
REMOVE AND RECYCLE EXISTING
EQUIPMENT PAD AS SHOWN ON
DETAIL 1
S-40002
1
S-40002
RQNPLJMK
2
1
PERSONNEL
ACCESS DOOR
KEY NOTES:
REMOVE AND RECYCLE DRIVE SHAFT AND GUARD.
REMOVE AND RECYCLE STARTER BATTERIES.
DEMOLISH EXISTING 1/2" FUEL LINE FROM THE ISOLATION VALVE
ON THE BRANCH LINE OFF THE HEADER TO THE ISOLATION
VALVE AT THE ENGINE (FUEL HEADER SHALL REMAIN IN SERVICE)
THE EXISTING ENGINE EXHAUST PIPING HAS FLANGED
CONNECTIONS WITH ASBESTOS GASKETS, SEE SECTION 02 26 00.
FOR CONTRACTOR'S RESPONSIBILITIES FOR ASBESTOS
ABATEMENT QUALITY CONTROL, SEE SECTION 01 45 40.
REMOVE AND RECYCLE EXISTING 2" P12 DISCHARGE PIPING,
INCLUDING ELBOW AND PIPING TERMINATING AT TRENCH (JUST
BELOW GRATING).
REMOVE AND RECYCLE PUMP P12, MOTOR, DISCHARGE PIPING
AND ASSOCIATED APPURTANANCES.
22
ACCESS HATCH
FOR PUMP 1
1
ACCESS HATCH
FOR PUMP BAY
(TYP.)
1
X
1
2
3
33
1
REMOVE AND RECYCLE
EXISTING EQUIPMENT PAD AS
SHOWN ON DETAIL 1
S-40002
REMOVE AND RECYCLE EXISTING
EQUIPMENT PAD AS SHOWN ON
DETAIL
4
4
6
5
5
6
3'
-
0
"
PUMPS P6, P7 AND
P8 NOT SHOWN IN
THIS VIEW
3'
-
0
"
4
87 87
8
7
KEY NOTES (CONT'D):
REMOVE EXISTING LUBE OIL PUMP SYSTEM AND STORE IN APPROVED
MANNER FOR REINSTALLATION FOLLOWING PUMP AND GEAR DRIVE
REFURBISHMENT.
REMOVE EXISTING COOLING WATER SOLENOID VALVE, THERMOSTATIC
CONTROL OF SOLENOID VALVE, AND ASSOCIATED CONDUIT AND WIRE ON
GEAR DRIVE (3 PLC'S). STORE SOLENOID VALVES IN APPROVED MANNER
FOR REINSTALLATION FOLLOWING GEAR DRIVE REFURBISHMENT.
RECYCLE THE REMOVED THERMOSTATIC CONTROLS.
SAVE WIRE FROM EXISTING CONTROL PANELS WHEN DEMOLISHED AND
REUSE WITH NEW CONTROL PANELS, AS INDICATED ON DRAWING I-40001.
REMOVE AND RECYCLE 36"x30"x12" SQUARE CUTOUT OPENING IN
CONCRETE DECK BETWEEN WALL AND BEAM TO
ACCOMMODATE INSTALLATION OF PUMP 9A. DO NOT CUT INTO
BEAM OR WALL, CENTER OPENING WITH PUMP COLUMN. SEE DETAIL
REMOVE AND RECYCLE EXTERIOR PORTION OF ENGINE EXHAUST
PIPING AND SILENCER. SEE DEMO PHOTO ON DWG D-90003.
X
7
8
GBX336001
MTR336001
E336002
GBX336002
E336004
GBX336004
9 9
9
P336009
10
10 1
M-10002
11
11
11
4
D-90003
REMOVE EXISTING
DRINKING FOUNTAIN.
SEE D-90004
1
D-90004
OCTOBER 2020
2
D-90005
1
D-90005
9
REMOVE AND RECYCLE
PUMP 3 CONTROL PANEL
1
12
REMOVE AND RECYCLE ENGINE HEAT EXCHANGER AND ALL ASSOCIATED
PIPING. DEMOLISH 3" ECW SUPPLY AND DRAIN PIPING BACK TO ELBOWS
ABOVE UTILITY TRENCH.
REMOVE AND SALVAGE PUMP 3 ENGINE TO COUNTY AND RECYCLE
CONCRETE PEDESTAL. EXHAUST SUPPORT FRAME SHALL BE PROTECTED
AND REUSED. EXISTING SILENCER SADDLES SHALL BE DEMOLISHED AND
REPLACED AS SHOWN IN DETAIL 3/S-40001
REMOVE AND RECYCLE INTERIOR AND EXTERIOR PORTION OF EXHAUST
PIPING. SALVAGE SILENCER TO COUNTY. SEE DEMO PHOTO ON DWG
D-90007.
ENLARGE PENETRATION FOR PUMP TO ACCOMMODATE INSTALLATION OF
PUMP 16, AS SHOWN ON M-30013.
12
13
13
3
D-90007
2
D-90007
4
D-90007
1
D-90007
5
D-90007
GBX336003
14
14
3
3
3
3
3
3
3
1
2
3
RCP 08 - PUMP P1 BAY BUBBLER ADDITION
RCP 12 - P2 AND P4 ENGINE CONTROL PANEL MODS FOR GEAR DRIVE TEMP CONTROL
RCP 22 - INSTALL P3 ENGINE AND ECW SUPPLY
JM EB 01/20/22
CF EB 07/18/22
CF EB 02/19/26
15
15
ISSUED FOR PERMIT
JUNE 2026
6/18/2026
DEMOLITION - PUMP P3 ENGINE
PHOTO DETAILS D-90007
C. FRODE
E. BRODAHL
S. NELLIGAN
AS NOTED
0
N. EBBS
SCALE:NTS
PHOTO
D-10001
1
OF336-
1
2
3
4
5
DESIGNED/DRAWN:
PROJECT ENGINEER:
PROJECT MANAGER:
CONTRACT NO:
DRAWING NO:SCALE:
PROJECT FILE NO:
DATE:
SHT NO / TOTAL REV
NO:
1
2
3
4
5
E F G HBCDA
CHECKED:
RE
F
E
R
E
N
C
E
1"
0
NO REVISION DESCRIPTION BY APVD DATE
E F G HBCDA
DEPARTMENT OF NATURAL RESOURCES & PARKS
WATER AND LAND RESOURCES DIVISION
APPROVED BY:
58
Know what's below.
R
Call before you dig.
BLACK RIVER PUMP STATION IMPROVEMENTS
HIGH-USE ENGINES
OCTOBER 2020
T. BEAN KC000011
1129574
BO
R
D
E
R
F
I
L
E
E
D
I
T
I
O
N
:
1
1
2
9
5
7
4
-
D
s
i
z
e
-
T
B
-
B
o
r
d
e
r
KEY NOTES:X
1
2
MARCH 2026
3
4
5
6
SCALE:NTS
PHOTO
D-10001
2
SCALE:NTS
PHOTO
D-10001
3
7
8
9
SCALE:NTS
PHOTO
D-10001
4
10
11
SCALE:NTS
PHOTO
D-10001
5
DRAIN AND PROPERLY DISPOSE OF ALL FLUIDS. REMOVE AND
SALVAGE DIESEL ENGINE
REMOVE AND RECYCLE DRIVE SHAFT AND GUARD.
REMOVE AND RECYCLE EXTERIOR PORTION OF ENGINE EXHAUST
PIPING.
REMOVE AND RECYCLE PUMP 3 CONTROL PANEL.
DRAIN AND PROPERLY DISPOSE OF ALL FLUIDS. REMOVE AND
RECYCLE ENGINE HEAT EXCHANGER AND ASSOCIATED SUPPLY
AND RETURN PIPING FROM HEX TO ENGINE.
REMOVE AND RECYCLE 1-1/2" ECW DRAIN FROM ENGINE OIL
COOLER TO 3"x1-1/2" SERVICE SADDLE INSTALLED ON 3" ECW
DRAIN.
REMOVE AND RECYCLE 2" STARTING AIR FROM ENGINE TO MAIN
IN TRENCH.
REMOVE AND RECYCLE ECW SUPPLY AND RETURN PIPING FROM
HEAT EXCHANGER TO GROOVED ELBOWS AT TRENCH. REMOVE
AND RECYCLE HEAT EXCHANGER ISOLATION VALVE.
REMOVE AND RECYCLE HEAT EXCHANGER PIPING SUPPORTS.
REMOVE AND RECYCLE 2" ECW FROM ENGINE OIL COOLER TO
2-1/2" X 2" TEE. INSTALL 2" THREADED PLUG.
REMOVE AND SALVAGE ENGINE EXHAUST SILENCER AND 10"
EXHAUST PIPE.
RETAIN AND PROTECT EXISTING EXHAUST PIPE SUPPORT.
MODIFY AND REUSE EXISTING SUPPORT.
RCP 22 - INSTALL P3 ENGINE AND ECW SUPPLY CF EB 03/02/260
1
2
11
8
7
6
5
9
1
10
4
1
2
3
5
12
12
5
11
ISSUED FOR PERMIT
JUNE 2026
6/18/2026
2'-2"
HSS 5x5x5/16, TYP
HSS 3x3x1/4,
TYP ALL DIAG
HSS 6x6x3/8,
TYP (4) @ P2 & P4
8'-2" MAX
4'
-
1
0
"
M
A
X
TYP
3'-5"
AS
R
E
Q
'
D
F
O
R
SI
L
E
N
C
E
R
L
A
Y
O
U
T
2'-0",
TYP
HSS
5x5x1/2,
TYP
HSS 3x3x1/4,
TYP ALL DIAG
HSS 6x6x1/2,
TYP (4) @ P3
18'-0" MAX
4'
-
8
"
M
A
X
AS REQ'D FOR
SILENCER LAYOUT
AS REQ'D FOR
SILENCER
2'
-
0
"
,
TY
P
2'
-
6
"
AS REQ'D FOR
EXHAUST PIPE LAYOUT
CAP ENDS SIMILAR
TO POSTS
PL 1
2" x AS REQ'D
FOR AFTER
COOLER
EXPANSION TANK
MOUNTING
2'
-
0
"
,
TY
P
2'-0",
TYP
HSS 3x3x1/4,
TYP
ELEV 28.55
HSS 6x6x3/8,
TYP (4) @ P2 &
P4
HSS 5x5x5/16, TYP
SEE MECHANICAL FOR
CENTERLINE OF
SILENCER ELEVATION
ELEV 28.55
HSS 6x6x1/2,
TYP (4) @ P3
HSS 5x5x5/16, TYP
MSS SP-58 (TYPE 41)
ADJUSTABLE PIPE
ROLL SUPPORT
HSS 3x3x1/4,
(BEYOND) TYP
8"
1 1/2" NONSHRINK
GROUT
HSS 6x6x3/8,
TYP (4) @ P2 &
P4
PL 1/2" x 8" x
12", TYP
HSS 5x5x5/16,
TYP
HSS 3x3x1/4,
TYP ALL DIAG
SEE MECHANICAL FOR CENTERLINE
OF SILENCER ELEVATION
ELEV 28.55
8"
1 1/2" NONSHRINK
GROUT
2'
-
0
"
,
T
Y
P
HSS 6x6x1/2,
TYP (4) @ P3
PL 1/2" x 8" x
12", TYP
HSS 5x5x1/2,
TYP
HSS 3x3x1/4,
TYP ALL DIAG
2'-0", TYP
SEE MECHANICAL
FOR CENTERLINE OF
SILENCER ELEVATION
ELEV 28.55
1/4TYP
HSS
6x6xVARIES
1/4" CAP PL,
TYP TOP OF
ALL HSS 6x6
1/4TYP
TYP HSS 5x5
TO HSS 6x6
TYP
CAP PL TO
HSS 6x6 (1/8)
HSS 3x3x1/4,
TYP ALL DIAG
HSS 3x3x1/4,
TYP ALL DIAG
HSS 6x6xVARIES,
TYP
HSS 5x5x5/16, TYP
SILENCER, SEE MECH
AS REQ'D FOR
SILENCER AND
INSULATION
5/8" DIA U-BOLTINSULATION, PER MECH.
PROVIDE INSULATION
SHIELD @ U-BOLT
FABRICATE SADDLE
FROM 3/8" PL. REMOVE
EXISTING SADDLE AND
REPLACE AS SHOWN.
AS REQ'D FOR
SILENCER AND
INSULATION
AS REQ'D FOR
SILENCER AND
INSULATION
PL 3/8" x 4" x BENT PL
LENGTH. FIT TIGHT TO
SILENCER BODY AS
SHOWN.
1/4
1/4 TYP
SEE MECHANICAL FOR
CENTERLINE OF SILENCER
ELEVATION
2"
HSS 5x5x5/16, TYP
90°
1/4TYP
HSS 6x6x3/8
PL 1/2" x 8" x 1'-0"
ALIGN AS SHOWN
IN PLAN VIEWS
(3) 3/4" DIA SST POST
INSTALLED ANCHOR, SEE
DETAIL 4/S40002,TYP
9"
,
T
Y
P
SCALE:
SILENCER SUPPORT FRAME P2 & P4
3/8" = 1'-0"
PLAN
M-10001
1
B
--
OF336-
1
2
3
4
5
DESIGNED/DRAWN:
PROJECT ENGINEER:
PROJECT MANAGER:
CONTRACT NO:
DRAWING NO:SCALE:
PROJECT FILE NO:
DATE:
SHT NO / TOTAL REV
NO:
1
2
3
4
5
E F G HBCDA
CHECKED:
RE
F
E
R
E
N
C
E
1"
0
NO REVISION DESCRIPTION BY APVD DATE
E F G HBCDA
DEPARTMENT OF NATURAL RESOURCES & PARKS
WATER AND LAND RESOURCES DIVISION
APPROVED BY:
58
Know what's below.
R
Call before you dig.
BLACK RIVER PUMP STATION IMPROVEMENTS
HIGH-USE ENGINES
OCTOBER 2020
T. BEAN KC000011
1129574
BO
R
D
E
R
F
I
L
E
E
D
I
T
I
O
N
:
1
1
2
9
5
7
4
-
D
s
i
z
e
-
T
B
-
B
o
r
d
e
r
D:
\
D
r
o
p
b
o
x
\
A
c
t
i
v
e
P
r
o
j
e
c
t
s
\
J
a
c
o
b
s
\
E
0
0
5
4
4
E
1
8
B
l
a
c
k
R
i
v
e
r
P
S
\
d
w
g
s
\
H
U
E
C
o
n
t
r
a
c
t
D
w
g
s
\
P
h
a
s
e
2
\
D
l
v
(
M
a
r
0
4
2
0
2
6
)
\
1
1
2
9
5
7
4
-
O
F
3
3
6
-
S
-
4
0
0
0
1
.
d
w
g
|
L
a
y
o
u
t
:
S
4
0
0
0
1
PL
O
T
T
E
D
:
J
u
n
1
6
,
2
0
2
6
-
0
3
:
3
1
:
4
0
p
m
B
y
r
o
n
XR
E
F
S
:
R
O
B
E
R
T
S
S
T
R
U
C
T
U
R
A
L
S
T
A
M
P
.
d
w
g
;
1
1
2
9
5
7
4
-
D
s
i
z
e
-
T
B
.
D
W
G
IM
A
G
E
S
:
R
o
n
R
o
b
e
r
t
s
S
i
g
n
a
t
u
r
e
T
r
a
n
s
p
a
r
e
n
t
.
p
n
g
;
A
--
SCALE:
SILENCER SUPPORT FRAME P3
3/8" = 1'-0"
PLAN
M-10001
2
D
--
C
--
SCALE:
SILENCER FRAME P2 & P4
3/8"=1'-0"
SECTION
--
A
SCALE:
SILENCER FRAME P2 & P4
3/8"=1'-0"
SECTION
--
B
SCALE:
SILENCER FRAME P3
3/8"=1'-0"
SECTION
--
C
SCALE:
SILENCER FRAME P3
3/8"=1'-0"
SECTION
--
D
SCALE:
SILENCER FRAME BRACE
3/8"=1'-0"
DETAIL
--
1
SCALE:
SILENCER FRAME BRACE
3/8"=1'-0"
DETAIL
--
2
SCALE:
SILENCER SADDLE AND U-BOLT
3/4"=1'-0"
DETAIL
--
3
SCALE:
SILENCER FRAME BASE PL
3/8"=1'-0"
SECTION
--
E
1
--
2
--
2
--
2
--
1
--
2
--
3
--
E
--
E
--
E
--
E
--
TYPICAL SILENCER SUPPORT
DETAILS S-40001
32
R. ROBERTS
E. BRODAHL
S. DORAN
AS NOTED
1
C. ROBERTS
NOTE:
1.ALL DIMENSIONS, MEMBER SIZES, CONNECTIONS, ANCHORS
AND OTHER DETAILS ARE PRESENTED FOR BIDDING PURPOSES
ONLY. THE CONTRACTOR SHALL DESIGN THE SUPPORT
FRAMES AS FOR THE ACTUAL SILENCER SIZES, DETAILS AND
LAYOUT AS REQUIRED IN SPECIFICATION SECTION 01 73 00 AND
SUBMIT THE DESIGN TO THE CITY OF RENTON AS A DEFERRED
BUILDING PERMIT ITEM.
Roberts Engineering
NOTE: REFER TO RECORD PIPE SUPPORT SHOP
DRAWINGS FOR FURTHER DETAILS.
1 RCP22 - INSTALL P3 ENGINE AND ECW SUPPLY RR 7/25
1
1
1
1
6/16/2026
ISSUED FOR PERMIT
JUNE 2026
FILL ALL OVERCUT AT
CORNERS WITH MORTAR
PREPARE AND PRIME SUBSTRATE
PER GROUT MANUFACTURER'S
RECOMMENDATIONS
POLYMER MODIFIED,
CEMENTITIOUS MORTAR. FINISH
TO MATCH SURROUNDING SLAB
SLOPE, SURFACE AND TEXTURE.
NOTE: THIS DETAIL IS INTENDED FOR
USE AT LOCATIONS WHERE AN
EXISTING EQUIPMENT PAD IS
REMOVED AND THE FLOOR IS BEING
RESTORED TO A FLAT SURFACE.
VA
R
I
E
S
SAWCUT 3/4" DEEP
AROUND (4) SIDES
CUT FLUSH
CH
I
P
A
N
D
RE
M
O
V
E
3
/
4
"
M
I
N
REMOVE EXISTING
EQUIPMENT PAD AS
INDICATED ON THE
MECHANICAL DRAWINGS
#4 @ 6" O.C.
ALL SIDES
4"
M
I
N
,
U
N
L
E
S
S
OT
H
E
R
W
I
S
E
R
E
Q
'
D
F
O
R
PR
O
P
E
R
E
Q
U
I
P
M
E
N
T
AL
I
G
N
M
E
N
T
O
F
EQ
U
I
P
M
E
N
T
DR
I
V
E
S
H
A
F
T
.
ROUGHENED SURFACE
6" MIN, TYP EDGE
DISTANCE
8"
NEW CONCRETE EQUIPMENT PAD.
SIZE AS REQ'D FOR EQUIPMENT
EXISTING
CONCRETE SLAB
12"
#4 @ 6" O.C. EW
SST POST INSTALLED ANCHORS AS
REQ'D BY EQUIPMENT
MANUFACTURER.
#4 @ 6" TYP
POST INSTALLED ANCHOR NOTES:
1.LOCATE EXISTING REINFORCING PRIOR TO DRILLING. ADJUST THE LOCATION OF THE ANCHOR TO MISS ALL EXISTING REINFORCING.
2.NUT, WASHER AND METAL SLEEVE MATERIAL TO MATCH BOLT MATERIAL.
3.ALL ANCHOR BOLTS, POST INSTALLED CONCRETE ANCHORS, THREADED-ROD ANCHORS SHALL BE TYPE 316 SST PER SPECIFICATION
SECTION 05 05 19 UNLESS OTHERWISE NOTED.
4.SEE SPECIFICATION SECTION 05 05 19 FOR THE ACCEPTABLE USE FOR ADHESIVE ANCHORS .
5.THESE TYPICAL POST INSTALLED CONCRETE ANCHOR DETAILS ARE FOR ANCHORING ALL MECHANICAL AND ELECTRICAL PIPING,
CONDUITS AND/OR EQUIPMENT.
SST THREADED ROD
ANCHOR, SIZE AS SHOWN
OR AS REQ'D BY EQUIP
MANUFACTURER.
PR
O
J
E
C
T
I
O
N
A
S
RE
Q
'
D
B
Y
E
Q
U
I
P
MA
N
U
F
A
C
T
U
R
E
R
AS
R
E
Q
'
D
B
Y
E
Q
U
I
P
MA
N
U
F
A
C
T
U
R
E
R
O
R
SH
O
W
N
I
N
T
H
E
D
W
G
S
EPOXY ADHESIVE
SST MECHANICAL
ANCHOR, SIZE AS SHOWN
OR AS REQ'D BY EQUIP
MANUFACTURER.
PR
O
J
E
C
T
I
O
N
A
S
RE
Q
'
D
B
Y
E
Q
U
I
P
MA
N
U
F
A
C
T
U
R
E
R
ADHESIVE ANCHOR MECHANICAL ANCHOR
AS
R
E
Q
'
D
B
Y
E
Q
U
I
P
MA
N
U
F
A
C
T
U
R
E
R
O
R
SH
O
W
N
I
N
T
H
E
D
W
G
S
4'
-
0
"
8'-4"
#4 x @ 6" O.C.
ALL SIDES
1'
-
1
1
3
/
4
"
NEW ENGINE
EQUIPMENT PAD
EXISTING
CONCRETE SLAB
12"#4 @ 6" O.C. EW
5/8" DIA SST POST INSTALLED
ANCHOR, TYP (16) VERIFY SIZE
AND LOCATION WITH ISOLATOR
MANUFACTURER
8"
M
I
N
REPAIR FLOOR
AROUND NEW PAD
SIMILAR TO DETAIL 3/-
ROUGHENED SURFACE
#4 @ 6" TYP
8"
2'-10 3/4"8 1/2"2'-10 3/4"8 1/2"
10
1
/
1
6
"
7
1
/
2
"
10
1
/
1
6
"
7
1
/
2
"
2'
-
0
"
4'-2"
5'
-
2
"
8'-10 3/4"
#4 x @ 6" O.C.
ALL SIDES
1'
-
8
1 16
"
NEW ENGINE P3
EQUIPMENT PAD
EXISTING
CONCRETE SLAB
12"#4 @ 6" O.C. EW
3/4" DIA SST POST INSTALLED
ANCHOR, TYP (24) VERIFY SIZE
AND LOCATION WITH ISOLATOR
MANUFACTURER
8"
M
I
N
REPAIR FLOOR
AROUND NEW PAD
SIMILAR TO DETAIL 3/-
ROUGHENED SURFACE
#4 @ 6" TYP
8"
2'-9 1/4"3'-10 1/2"
1'
-
5
1
/
2
"
1'
-
1
1
/
2
"
1'
-
5
1
/
2
"
1'
-
1
1
/
2
"
1'-6"
NEW PUMP P16
EQUIPMENT PAD
1'
-
6
"
10
1
/
4
"
#4 @ 6" TYP
ROUGHENED
SURFACE
8"
M
I
N
EXISTING
CONCRETE SLAB
#4 x @ 6" O.C.
ALL SIDES
SST POST INSTALLED ANCHOR,
TYP VERIFY QUANTITY, SIZE AND
LOCATION WITH P16
MANUFACTURER
8"
1'-1 1/2"
1'-1 1/2"
CONCRETE EQUIPMENT PAD NOTES:
1.CONCRETE PAD SIZE SHALL BE MINIMUM INDICATED OR AS SHOWN ON THE PLANS OR AS
REQUIRED BY THE MANUFACTURER AND APPROVED BY THE PROJECT REPRESENTATIVE.
2.THE SIZE, NUMBER, TYPE, LOCATION, AND THREAD PROJECTION OF THE ANCHOR RODS
SHALL BE DETERMINED BY THE EQUIPMENT MANUFACTURER AND AS APPROVED BY THE
PROJECT REPRESENTATIVE.
3.EQUIPMENT BASES SHALL BE INSTALLED LEVEL. WEDGES, SHIMS, OR LEVELING NUTS
SHALL BE USED TO SUPPORT THE BASE WHILE GROUT IS PLACED. WEDGES AND SHIMS
SHALL BE REMOVED AFTER GROUT HAS SET. PACK RESULTING VOIDS WITH
CEMENTITIOUS NONSHRINK, NONMETALLIC AGGREGATE GROUT HAVING A MINIMUM 28 DAY
COMPRESSIVE STRENGTH OF 6,500 PSI.
4.SEE MECHANICAL AND ELECTRICAL DWGS FOR THE LOCATION AND SIZE FOR ALL
EQUIPMENT PADS. CONFIRM PAD REQUIREMENTS WITH EQUIPMENT MANUFACTURER
PRIOR TO CONSTRUCTING PADS.
SCALE:
TYPICAL EQUIP PAD REMOVAL
1"=1'-0"
DETAIL
VAR
1
SCALE:
MOTOR PAD FOR PUMP 1
NTS
DETAIL
VAR
2
SCALE:
TYPICAL EQUIP PAD REMOVAL REPAIRS
NTS
DETAIL
VAR
3
SCALE:
TYPICAL CONCRETE ANCHORS
NTS
DETAIL
VAR
4
SCALE:
ENGINE PAD FOR PUMPS P2 & P4
NTS
DETAIL
VAR
5
TYPICAL CONCRETE
PAD & ANCHOR
DETAILS
S-40002
33
R. ROBERTS
E. BRODAHL
S. DORAN
AS NOTED
1
C. ROBERTS
OF336-
1
2
3
4
5
DESIGNED/DRAWN:
PROJECT ENGINEER:
PROJECT MANAGER:
CONTRACT NO:
DRAWING NO:SCALE:
PROJECT FILE NO:
DATE:
SHT NO / TOTAL REV
NO:
1
2
3
4
5
E F G HBCDA
CHECKED:
RE
F
E
R
E
N
C
E
1"
0
NO REVISION DESCRIPTION BY APVD DATE
E F G HBCDA
DEPARTMENT OF NATURAL RESOURCES & PARKS
WATER AND LAND RESOURCES DIVISION
APPROVED BY:
58
Know what's below.
R
Call before you dig.
BLACK RIVER PUMP STATION IMPROVEMENTS
HIGH-USE ENGINES
OCTOBER 2020
T. BEAN KC000011
1129574
BO
R
D
E
R
F
I
L
E
E
D
I
T
I
O
N
:
1
1
2
9
5
7
4
-
D
s
i
z
e
-
T
B
-
B
o
r
d
e
r
D:
\
D
r
o
p
b
o
x
\
A
c
t
i
v
e
P
r
o
j
e
c
t
s
\
J
a
c
o
b
s
\
E
0
0
5
4
4
E
1
8
B
l
a
c
k
R
i
v
e
r
P
S
\
d
w
g
s
\
H
U
E
C
o
n
t
r
a
c
t
D
w
g
s
\
P
h
a
s
e
2
\
D
l
v
(
M
a
r
0
4
2
0
2
6
)
\
1
1
2
9
5
7
4
-
O
F
3
3
6
-
S
-
4
0
0
0
2
.
d
w
g
|
L
a
y
o
u
t
:
L
A
Y
O
U
T
PL
O
T
T
E
D
:
J
u
n
1
6
,
2
0
2
6
-
0
3
:
3
3
:
1
1
p
m
B
y
r
o
n
XR
E
F
S
:
1
1
2
9
5
7
4
-
D
s
i
z
e
-
T
B
.
D
W
G
IM
A
G
E
S
:
R
o
n
R
o
b
e
r
t
s
S
i
g
n
a
t
u
r
e
T
r
a
n
s
p
a
r
e
n
t
.
p
n
g
;
Roberts Engineering1RCP22 - INSTALL P3 ENGINE AND ECW SUPPLY RMR 6/26
SCALE:
ENGINE PAD FOR PUMP P3
NTS
DETAIL
VAR
6
1
SCALE:
PAD FOR P16 STRAINER
NTS
DETAIL
VAR
7
6/16/2026
ISSUED FOR PERMIT
JUNE 2026
12WF36, EXIST.
TOS 58.13
14WF68, EXIST.
(BEYOND)
12WF36, EXIST.
TOS 44.15
EXISTING GABLE FLASHING.
EXISTING METAL SIDING
REUSE EXISTING WALL PENETRATION.
PROVIDE CIRCULAR FLASHING AROUND
EXHAUST PIPE
NEW SST EXHAUST
PIPE, SEE MECH
CUSTOM FABRICATED 1
2"
SST PIPE CLAMP. SEE
DETAIL 2/-
5/8" DIA ASTM F1554
GRADE 36 BOLT OR
THREADED ROD, TYP
NEW SST EXHAUST
PIPE. CENTERLINE
ELEV SEE MECH
L6x6x3/8 ROLLED TO
FIT INSULATED
EXHAUST, TYP
TOP OF SST
EXHAUST PIPE
CAP ELEV 61.0
1" STL ROD
12WF36, EXIST.
TOS 44.15
5/8" DIA ASTM F1554
GRADE 36 BOLT OR
THREADED ROD, TYP
INSULATION,
PER MECH.
NEW SST EXHAUST PIPE.
CENTERLINE ELEV SEE MECH
PL 3
8" x 6" WIDE X CUT TO
SEMICIRCULAR SHAPE TO FIT
INSULATED EXHAUST, TYP
REMOVE EXISTING
PIPE SUPPORT, TYP
3/8 TYP
2"
L6x6x3/8 , TYP
FULL PEN BUTT WELD
L6x6x3/8 ROLLED TO
CURVED 3
8" PL, TYP
PL 3
8" x 6" WIDE X
ROLLED TO FIT
INSULATED EXHAUST
AS SHOWN, TYP
12WF36, EXIST.EXISTING GABLE FLASHING.
EXISTING METAL
SIDING
REUSE EXIST 1" DIA STL ROD, TYP.
TYPICAL EXHAUST SUPPORT
DETAILS S-40003
34
R. ROBERTS
E. BRODAHL
S. DORAN
AS NOTED
1
C. ROBERTS
CUSTOM FABRICATED 1
2"
SST PIPE CLAMP. SEE
DETAIL 2/-
SCALE:1/2"=1'-0"
DETAIL
M-30002
1
SCALE:
TYPICAL LOWER SUPPORT
1/2"=1'-0"
SECTION
--
B
SCALE:
TYPICAL SECTION AT UPPER SUPPORT
1/2"=1'-0"
SECTION
--
A
DESIGNED/DRAWN:CHECKED:
DEPARTMENT OF NATURAL RESOURCES & PARKS
WATER AND LAND RESOURCES DIVISION
A
--
B
--
OF336-
1
2
3
4
5
DESIGNED/DRAWN:
PROJECT ENGINEER:
PROJECT MANAGER:
CONTRACT NO:
DRAWING NO:SCALE:
PROJECT FILE NO:
DATE:
SHT NO / TOTAL REV
NO:
1
2
3
4
5
E F G HBCDA
CHECKED:
RE
F
E
R
E
N
C
E
1"
0
NO REVISION DESCRIPTION BY APVD DATE
E F G HBCDA
DEPARTMENT OF NATURAL RESOURCES & PARKS
WATER AND LAND RESOURCES DIVISION
APPROVED BY:
58
Know what's below.
R
Call before you dig.
BLACK RIVER PUMP STATION IMPROVEMENTS
HIGH-USE ENGINES
OCTOBER 2020
T. BEAN KC000011
1129574
BO
R
D
E
R
F
I
L
E
E
D
I
T
I
O
N
:
1
1
2
9
5
7
4
-
D
s
i
z
e
-
T
B
-
B
o
r
d
e
r
D:
\
D
r
o
p
b
o
x
\
A
c
t
i
v
e
P
r
o
j
e
c
t
s
\
J
a
c
o
b
s
\
E
0
0
5
4
4
E
1
8
B
l
a
c
k
R
i
v
e
r
P
S
\
d
w
g
s
\
H
U
E
C
o
n
t
r
a
c
t
D
w
g
s
\
P
h
a
s
e
2
\
D
l
v
(
M
a
r
0
4
2
0
2
6
)
\
1
1
2
9
5
7
4
-
O
F
3
3
6
-
S
-
4
0
0
0
3
.
d
w
g
|
L
a
y
o
u
t
:
S
4
0
0
0
3
PL
O
T
T
E
D
:
J
u
n
1
6
,
2
0
2
6
-
0
3
:
3
4
:
4
1
p
m
B
y
r
o
n
XR
E
F
S
:
1
1
2
9
5
7
4
-
D
s
i
z
e
-
T
B
.
D
W
G
IM
A
G
E
S
:
P
i
p
e
S
u
p
p
o
r
t
.
j
p
g
;
R
o
n
R
o
b
e
r
t
s
S
i
g
n
a
t
u
r
e
T
r
a
n
s
p
a
r
e
n
t
.
p
n
g
;
Roberts Engineering
NOTE: REFER TO RECORD PIPE SUPPORT SHOP DRAWING FOR
FURTHER DETAILS.
SCALE:NTS
DETAIL
--
2
ID
EXISTING 1" DIA
SUPPORT RODS
NEW SST EXHAUST
PIPING1" DIA SST HEX NUT,
(TYP)
1
2" THICK SST RISER
CLAMP. CUSTOM MADE
TO FIT EXISTING
SUPPORT RODS.
B
A
1 1
8" DIA HOLE
4" WIDE SST PL, (TYP)
PIPE SUPPORT BRACKET DETAIL 2
PIPE DIA A B ID
0'-8"1'-9"1'-5"0'-8 5/8"
0'-10"1'-11"1'-7"0'-10 3/4"
1'-0"1'-11"1'-7"1'-0 3/4"
FIELD VERIFY DIMENSION "B". ADJUST
DIMENSION "A" ACCORDINGLY.
THIS DRAWING INCLUDES UPDATES TO
REFLECT CONSTRUCTION RECORDS FOR
THE EXHAUST PIPING SUPPORT, AND AS
APPLICABLE TO THE INSTALLATION OF
THE P3 ENGINE 12" EXHAUST FOR RCP 22
1 RCP22 - INSTALL P3 ENGINE AND ECW SUPPLY RMR 7/25
1
6/16/2026
ISSUED FOR PERMIT
JUNE 2026
P2 ENGINE
ENLARGED FLOOR PLAN
1/4"=1'-0"
8x5 REDUCING
FLANGE TO
EQUIPMENT
P4 ENGINE
8x5 REDUCING
FLANGE TO
EQUIPMENT
P2 ENGINE EXHAUST
SILENCER
P1
P2P3P4
(SIMILAR TO SECTION FOR P4)A
GBX336004
GBX336002
GBX336001
NEW 1/2" DIESEL
FUEL RETURN PIPING
OF336-
1
2
3
4
5
DESIGNED/DRAWN:
PROJECT ENGINEER:
PROJECT MANAGER:
CONTRACT NO:
DRAWING NO:SCALE:
PROJECT FILE NO:
DATE:
SHT NO / TOTAL REV
NO:
1
2
3
4
5
E F G HBCDA
CHECKED:
RE
F
E
R
E
N
C
E
1"
0
NO REVISION DESCRIPTION BY APVD DATE
E F G HBCDA
DEPARTMENT OF NATURAL RESOURCES & PARKS
WATER AND LAND RESOURCES DIVISION
APPROVED BY:
58
Know what's below.
R
Call before you dig.
BLACK RIVER PUMP STATION IMPROVEMENTS
HIGH-USE ENGINES
OCTOBER 2020
T. BEAN KC000011
1129574
BO
R
D
E
R
F
I
L
E
E
D
I
T
I
O
N
:
1
1
2
9
5
7
4
-
D
s
i
z
e
-
T
B
-
B
o
r
d
e
r
C:
\
p
w
_
w
o
r
k
d
i
r
\
d
e
n
0
0
3
\
j
e
g
_
f
r
o
d
e
c
\
d
0
4
6
9
8
6
8
\
1
1
2
9
5
7
4
-
O
F
3
3
6
-
M
-
1
0
0
0
1
.
d
w
g
|
L
a
y
o
u
t
:
M
-
1
0
0
0
1
PL
O
T
T
E
D
:
M
a
r
1
3
,
2
0
2
6
-
0
9
:
4
1
:
2
2
a
m
B
y
F
R
O
D
E
C
XR
E
F
S
:
1
1
2
9
5
7
4
-
D
s
i
z
e
-
T
B
.
D
W
G
;
1
0
-
D
-
x
P
P
n
0
1
_
D
3
1
6
4
9
0
0
.
d
w
g
;
P
E
-
E
L
B
-
W
A
_
_
E
r
i
k
_
s
t
a
m
p
.
d
w
g
;
1
0
-
D
-
x
P
P
n
0
1
_
h
d
l
_
D
3
1
6
4
9
0
0
.
d
w
g
;
2
2
-
1
2
0
J
a
c
o
b
s
-
F
i
s
h
P
a
s
s
a
g
e
_
P
R
_
R
2
1
-
F
l
o
o
r
P
l
a
n
-
P
H
F
L
O
O
R
P
L
A
N
-
S
O
U
T
H
.
d
w
g
;
2
2
-
1
2
0
J
a
c
o
b
s
-
R
C
P
2
2
_
F
i
s
h
P
a
s
s
a
g
e
_
P
R
_
R
2
1
-
F
l
o
o
r
P
l
a
n
-
P
H
F
L
O
O
R
P
L
A
N
-
S
O
U
T
H
.
d
w
g
IM
A
G
E
S
:
9
0
6
9
1
A
1
0
6
_
P
r
e
m
i
u
m
L
o
w
-
P
r
e
s
s
u
r
e
3
0
4
S
t
a
i
n
l
e
s
s
S
t
e
e
l
P
i
p
e
F
i
t
t
i
n
g
8
0
8
1
c
8
9
5
.
p
n
g
;
9
0
6
9
1
A
1
0
6
_
P
r
e
m
i
u
m
L
o
w
-
P
r
e
s
s
u
r
e
3
0
4
S
t
a
i
n
l
e
s
s
S
t
e
e
l
P
i
p
e
F
i
t
t
i
n
g
f
a
6
f
2
1
a
f
.
p
n
g
;
9
0
6
9
1
A
1
1
6
_
P
r
e
m
i
u
m
L
o
w
-
P
r
e
s
s
u
r
e
3
0
4
S
t
a
i
n
l
e
s
s
S
t
e
e
l
P
i
p
e
F
i
t
t
i
n
g
1
5
e
e
e
7
7
f
.
p
n
g
;
9
0
6
9
1
A
1
1
6
_
P
r
e
m
i
u
m
L
o
w
-
P
r
e
s
s
u
r
e
3
0
4
S
t
a
i
n
l
e
s
s
S
t
e
e
l
P
i
p
e
F
i
t
t
i
n
g
b
c
e
0
4
5
e
c
.
p
n
g
;
9
0
6
9
1
A
1
1
7
_
P
r
e
m
i
u
m
L
o
w
-
P
r
e
s
s
u
r
e
3
0
4
S
t
a
i
n
l
e
s
s
S
t
e
e
l
P
i
p
e
F
i
t
t
i
n
g
5
0
5
4
c
0
0
1
.
p
n
g
;
9
0
6
9
1
A
1
1
7
_
P
r
e
m
i
u
m
L
o
w
-
P
r
e
s
s
u
r
e
3
0
4
S
t
a
i
n
l
e
s
s
S
t
e
e
l
P
i
p
e
F
i
t
t
i
n
g
7
e
6
d
7
c
c
5
.
p
n
g
;
P
a
g
e
s
f
r
o
m
C
D
(
1
)
2
6
7
7
9
4
b
1
.
p
n
g
;
ENLARGED FLOOR PLAN M-10001
D. SUNSERI
E. BRODAHL
S. DORAN
AS NOTED
5
T. DAVIS
P4 ENGINE EXHAUST
SILENCER
SIL336004 SIL336002
SIL336003
MTR336001
P1
200 HP
ELECTRIC MOTOR
P5
NOTES:
1.ALL EQUIPMENT NOT SPECIFICALLY IDENTIFIED FOR
REFURBISHMENT OR REPLACEMENT SHALL BE PROTECTED
AND REMAIN OPERATIONAL WITHOUT DISTURBANCE DURING
CONSTRUCTION.
2.DIAMOND PLATE SHOWN IS MADE UP OF SMALLER INDIVIDUAL
PANELS FOR REMOVAL (NOT SHOWN), CONTRACTOR SHALL
VERIFY LIMITS AS NEEDED.
R
3
2
1
QNLJPMK
(RE-USE)
REMOVE, REFURBISH
AND REINSTALL P2 PUMP
AND GEAR DRIVE
REMOVE, REFURBISH AND REINSTALL
P1 PUMP AND GEAR DRIVE(RE-USE)
BB
CHG336004 CHG336002
PUMP 4 DIESEL
DAY TANK
PUMP 3 DIESEL
DAY TANK
PUMP 2 DIESEL
DAY TANK
HEX336001
EXHAUST PIPE SUPPORTS.
SEE DWG S-40003 (TYP.)
CONSTRUCT NEW
EQUIPMENT PAD.
SEE DETAIL
2
S-40002
EXHAUST PIPE SUPPORTS
AND WALL PENETRATION.
SEE DWG S-40003 (TYP.)
INTERMEDIATE
STOP LOG COVER
PLATES (TYP)
KEY NOTES:
EXTENDED RANGE METAL EXPANSION JOINT, REFER TO
SPECIFICATION 40 05 44.
STANDARD METAL EXPANSION JOINT IN VERTICAL, REFER
TO SPECIFICATION 40 05 44.
PUMP COATING PER SPECIFICATION 09 06 90 - COATING
SYSTEM A-1.
GEAR DRIVE COATING PER SPECIFICATION 09 06 90 -
COATING SYSTEM B-1.
SUPPORT FRAME COATING PER SPECIFICATION 09 06 90 -
COATING SYSTEM C-1.
REINSTALL LUBE OIL SYSTEM PER KEY NOTE 7 ON D-10001.
CONNECT DIESEL FUEL SUPPLY AND RETURN PIPING TO
CONNECTIONS ON ENGINE SKID.
X
1
2
3
4
P3 ENGINE EXHAUST
SILENCERCONSTRUCT NEW
EQUIPMENT PAD,
SEE DETAIL
(TYP. 2
LOCATIONS)
2 2
5
3
4
4
5
5
5
5
5
3
4
P10
P9
8" EESILENCER SUPPORT
FRAME. SEE
(TYP.)2
S-40001
2
S-40002E336005
TSH336001A
SV336001
6
3
6
(RE-USE)
6
6
NEW 1/2" DIESEL
FUEL SUPPLY PIPING
NEW 1/2" DIESEL FUEL
RETURN PIPING
SILENCER SUPPORT
FRAME. SEE
(TYP.)1
S-40001
NEW 1/2" DIESEL FUEL
SUPPLY PIPING
5
T336103
T336102
T336104
GBX336005
(REFURBISH)
(REFURBISH)
1
1
2
7
7
P336004A
P336002A
P336001A
(REFURBISH)
7LCP336004
8
LCP336002
8
8
TE336001A
8
P9A
P336009A
P336009
PUMP BASE PLATE,
SEE DETAIL,
1
M-10002
UPSTREAM FISH
MIGRATION
BACKUP PUMP
C
M-30003
9
9
(TYP)
(TYP)
CONNECT NEW TE AND TSH TO NEW TIC. SEE E-10002.
AIR HOSE CONNECTION FOR INFLATABLE SEAL FOR NEW FRP
STOP LOGS (TYP OF 14 FOR EXTERIOR SLOTS AND 6 FOR
INTERIOR SLOTS). SEE DWG M-40001 FOR STOP LOG DETAILS.
CONNECT TO EXISTING 1/2" IA IN THIS AREA AND INSTALL
NEW 1/2" IA TO NEW STOP LOG INFLATABLE SEAL AIR SUPPLY
PANEL. SEE DWG M-40003.
COAT THE SUPPORTS FOR THE IA LINE AND POWER CONDUIT
PER SPECIFICATION 09 06 90, COATING SYSTEM C-1.
APPROXIMATE LOCATION (NOT SURVEYED) OF EXISTING FISH
SCREEN CONTROL PANEL LCP336102, SEE DWG E-10002.
REPLACE EXISTING WYE STRAINER WITH NEW BASKET
STRAINER ME336010 .
E336004
4
M-90001
10
10
1/2" IA AND POWER CONDUIT TO
STOP LOG INFLATABLE SEAL AIR
SUPPLY PANEL, SEE DWG G-10002
3
M-90001
2
M-90001 1
M-90001
1/4" STEEL PLATE. DIMENSION AS REQUIRED TO
SUIT EQUIPMENT. DRILL PLATE FOR NUMBER OF
HOLES REQUIRED. HOT DIP GALVANIZE COMPLETE
ASSEMBLY AFTER FABRICATION
3/8" RADIUS (TYP.)
CONCRETE FLOOR
1" NS GROUT, MIN.
1/2"x10"x10" MIN. BASE PLATE WITH
4-1/2"Ø SST ADHESIVE CONCRETE
ANCHORS, EMBED 5" MIN.
4'
-
6
"
M
A
X
.
1 1/2"7"
(TYP.)(TYP.)
1
--SCALE:
MOUNTING STAND
NONE
A
--
CONTROL STATION A
--SCALE:
DETAIL
NONE
316C6x10.5
316
NOTES:
1.ALL MOUNTING HARDWARE SHALL BE STAINLESS STEEL.
USE WASHERS AND SPLIT-LOCK WASHERS UNDER ALL
NUTS AND BOLTS.
2.FOR MOUNTED EQUIPMENT EXCEEDING 200 LBS, SIZE
POST AND CONNECTIONS FOR LATERAL LOADS. EXTEND
POSTS TO STRUCTURE ABOVE WHERE REQUIRED BY
CALCULATION.
1
--1
--5
5
12 111/2" IA
MTS336009
11
12
1
M-10001
1 KB EB 08/16/21
1
M-30006
13
139
2 JM EB 01/25/22
P1 BAY BUBBLER PANEL, SEE
PNL336140
1/4" IA
M-40006
1
E
M-40004
2
M-40004
INSTALL JUNCTION BLOCK AND ZERK FITTINGS AT GRATING
LEVEL PER DWG M-40007 FOR P2 AND P4 FLAP GATES.
14
OCTOBER 2020
F
M-30009
3 CF EB 05/03/22RCP 11 - INSPECT FLAP GATES P2-P8 AND INSTALL REMOTE LUBRICATION
RCP 08 - PUMP P1 BAY BUBBLER ADDITION
RCP 04 - SCREEN CLEANING SYSTEM IMPROVEMENTS
NEW DRIVE SHAFT
COVER/HOUSING,
TYP 3 LOCATIONS
8
14
14
E336002
M-30002A
D
4 RR EB 12/19/22UPDATED TO REFLECT AS-BUILT CONDITIONS
AFTERCOOLER
HEAT EXCHANGER
JACKET WATER
HEAT EXCHANGER
5 CF EB 03/02/26RCP 22 - INSTALL P3 ENGINE AND ECW SUPPLY
5
INSTALL ECW
PUMP, P16
1
M-30013
5
LCP336003
CHG336003
HEX336003A
F
5
5
1
REMOVE,REFURBISH
AND REINSTALL P4
PUMP AND GEAR DRIVE
M-10007
M-30002B M-30001M-30002,M-40001 M-30002,M-40001
1/2" FOS
P3 ENGINE
E336003
7
HEX336003B
1/2" FOR
LCP336216
TE336004A
SV336004
TSH336004A
HEX336004
P16
G
M-30002B
5
5 HEX336002
TSH336002A
SV336002
TE336002A
STRAINER BACKWASH
ASSIST PUMP
8" EE CV336003
12" EE
LCP336416
BTV336016C
P336016
P336216
SV336003
ISSUED FOR PERMIT
JUNE 2026
6/18/2026
M
ENLARGED FLOOR PLAN
1/2"=1'-0"
OF336-
1
2
3
4
5
DESIGNED/DRAWN:
PROJECT ENGINEER:
PROJECT MANAGER:
CONTRACT NO:
DRAWING NO:SCALE:
PROJECT FILE NO:
DATE:
SHT NO / TOTAL REV
NO:
1
2
3
4
5
E F G HBCDA
CHECKED:
RE
F
E
R
E
N
C
E
1"
0
NO REVISION DESCRIPTION BY APVD DATE
E F G HBCDA
DEPARTMENT OF NATURAL RESOURCES & PARKS
WATER AND LAND RESOURCES DIVISION
APPROVED BY:
58
BLACK RIVER PUMP STATION IMPROVEMENTS
HIGH-USE ENGINES
OCTOBER 2020
T. BEAN KC000011
1129574
BO
R
D
E
R
F
I
L
E
E
D
I
T
I
O
N
:
1
1
2
9
5
7
4
-
D
s
i
z
e
-
T
B
-
B
o
r
d
e
r
C:
\
p
w
_
w
o
r
k
d
i
r
\
d
e
n
0
0
3
\
j
e
g
_
f
r
o
d
e
c
\
d
0
4
6
9
8
6
8
\
1
1
2
9
5
7
4
-
O
F
3
3
6
-
M
-
1
0
0
0
7
.
d
w
g
|
L
a
y
o
u
t
:
M
-
1
0
0
0
7
PL
O
T
T
E
D
:
J
u
n
1
8
,
2
0
2
6
-
0
1
:
0
0
:
5
1
p
m
B
y
F
R
O
D
E
C
XR
E
F
S
:
1
1
2
9
5
7
4
-
D
s
i
z
e
-
T
B
.
D
W
G
;
P
E
-
E
L
B
-
W
A
_
_
E
r
i
k
_
s
t
a
m
p
.
d
w
g
;
1
0
-
D
-
x
P
P
n
0
1
_
h
d
l
_
D
3
1
6
4
9
0
0
.
d
w
g
;
2
2
-
1
2
0
J
a
c
o
b
s
-
R
C
P
2
2
_
F
i
s
h
P
a
s
s
a
g
e
_
P
R
_
R
2
1
-
F
l
o
o
r
P
l
a
n
-
P
H
F
L
O
O
R
P
L
A
N
-
S
O
U
T
H
.
d
w
g
;
2
2
-
1
2
0
J
a
c
o
b
s
-
F
i
s
h
P
a
s
s
a
g
e
_
P
R
_
R
2
1
-
F
l
o
o
r
P
l
a
n
-
W
o
r
k
i
n
g
P
H
F
L
O
O
R
P
L
A
N
-
S
O
U
T
H
.
d
w
g
IM
A
G
E
S
:
P3 ENGINE
ENLARGED FLOOR PLAN M-10007
C. FRODE
E. BRODAHL
S. NELLIGAN
AS NOTED
0
N. EBBS
KEY NOTES:
4" EJWC, HOT SIDE SUPPLY/RETURN. SUPPORT FROM
FLOOR WITH PIPE STANDS PER DWG. M-40009.
CONNECT TO EXISTING 3" ECW, 45 DEG ELBOW, GE X GE,
AT EDGE OF TRENCH.
3" ECW FOR JACKET WATER, COLD SIDE SUPPLY. SUPPORT
ON FLOOR.
2" EACC, HOT SIDE SUPPLY/RETURN. SUPPORT ON FLOOR.
3" ECW FOR JACKET WATER, COLD SIDE RETURN.
SUPPORT ON FLOOR.
4" SST HIGH-TEMPERATURE BALL VALVE, FL x FL
(VERTICAL).
CONNECT 3" ECW DRAIN, GE x GE, TO EXISTING 3", 45 DEG
ELBOW, GE x GE, AT EDGE OF TRENCH.
EXTENDED RANGE METAL EXPANSION JOINT, REFER TO
SECTION 40 05 44.
SECURE HEAT EXCHANGER TO CONCRETE BASE USING
CONCRETE ANCHOR BOLTS PER MANUFACTURER'S
RECOMMENDATIONS.
CAP 2" SA AT MAIN IN TRENCH.
CAP 3" x 1-1/2" SERVICE SADDLE INSTALLED ON 3" ECW
DRAIN.
CAP VERTICAL 2" ECW AT 2-1/2" x 2" TEE NEAR FLOOR.
3" ECW FOR AFTERCOOLER, COLD SIDE SUPPLY
INSTALL CUSTOM REMOVABLE BLANKET TYPE PIPING
INSULATION ON EACC AND EJWC SUPPLY AND RETURN
LINES (HOT) BETWEEN P3 ENGINE AND HEAT EXCHANGERS,
INCLUDING INSULATING VALVES AND FITTINGS, PER
SECTION 40 42 00. NOTE THAT THE PIPING INSULATION IS
NOT SHOWN ON THIS DRAWING, SO THAT THE PIPING IS
MORE VISIBLE.
INSTALL NEW 1/2" DIESEL FUEL SUPPLY AND RETURN
PIPING FROM UTILITY TRENCH TO NEW ENGINE SKID.
VERIFY AND ADJUST CONNECTION LOCATIONS, AS
NEEDED.
PROTECT AND RE-USE EXISTING SILENCER SUPPORT
PREVIOUSLY INSTALLED UNDER THIS CONTRACT.
COORDINATE SILENCER INSTALLATION WITH STRUCTURAL
MODIFICATIONS, REFER TO DWG S-40001.
CONNECT HEAT EXCHANGER PIPING TO ENGINE WITH
FLANGED FLEX CONNECTOR. (4 LOCATIONS), PER SECTION
40 05 44.
4" RESTRAINED EXPANSION JOINT, FLxFL.
4" SPOOL PIECE, FLxFL. 6" LONG.
4" SST HIGH-TEMPERATURE BALL VALVE, FLxFL.
4" x 2" REDUCER, FLxFL.
2" RESTRAINED EXPANSION JOINT, FL x FL.
2" SST HIGH-TEMPERATURE BALL VALVE, FLxFL.
4" x 3" REDUCER, FLxFL.
INSTALL 1/2" MANUAL AIR VENT VALVE AND PRESSURE
GAUGE WITH 1/2" BALL VALVE IN SPOOL PIECE.
INSTALL AFTERCOOLER EXPANSION TANK ON TOP OF
EXHAUST SILENCER SUPPORT FRAME. REFER TO
STRUCTURAL DRAWINGS FOR DETAILS.
1" STUNT LINE FROM 2" NPT PORT AT BOTTOM OF
EXPANSION TANK. CONNECT TO 2" EACC RETURN WITH A
WELDED PORT. SUPPORT PIPE FROM EXHAUST SILENCER
FRAME.
1-3/4" OVERFLOW LINE. CONNECT FLEXIBLE TUBE TO
EXPANSION TANK FILL NECK, ROUTE AND SUPPORT DOWN
EXHAUST SILENCER FRAME AND TERMINATE 12" ABOVE
FLOOR.
1/2" VENT LINE FROM 1/2" NPT PORT AT END OF EXPANSION
TANK. CONNECT TO 1/2" EACC VENT CONNECTION ON TOP
OF ENGINE. TRANSITION TO FLEXIBLE PIPE AT ENGINE
CONNECTION. SUPPORT PIPE FROM EXHAUST SILENCER
FRAME.
INSTALL TUBULAR GLASS LIQUID LEVEL GAUGE ACROSS
TWO 1/2" NPT PORTS AT THE END OF EXPANSION TANK.
X
1
2
3
MARCH 2026
PUMP P3 ENGINE
EXHAUST SILENCER
10
3
GBX336003
PUMP P3
GEAR DRIVE
E336003
PUMP P3
ENGINE
JACKET WATER
HEAT EXCHANGER
5
1
4
5
6
7
8
9
10
11
12
NEW CONCRETE PEDESTAL, PER
STRUCTURAL DWG. S-40002.
9
AFTERCOOLER
HEAT EXCHANGER9
11
2
8
12
1
P336010
HEX336003B
HEX336003A
LCP336003
CHG336003
4
P336009A
T336103
13
13
0 RCP22 - INSTALL P3 ENGINE AND ECW SUPPLY CF EB 03/02/26
MTS336009
23
14
CV336003
15
M-10001
15
27
16
17
17
17
G
21
22
6
18
19
12" EE
18
19
20
21
22
23
23
TYP
24
24
TYP
D
M-50001
C
M-50001
B
M-50001
A
M-50001
1/2" FOR1/2" FOS
7
25
16
AFTERCOOLER
EXPANSION TANK 26
17
25
26
27
M-30002B
28
28
14
14
29
30
30
29
SIL336003
M
SV336003
F
M-30002B
ISSUED FOR PERMIT
JUNE 2026
6/18/2026
PH FLOOR PLAN - SOUTH
28.55
Walkway Plan - North
23.55
ACCESS WALKWAY
9.55
1231.8
PH FLOOR PLAN - SOUTH
2 31.8
NORMAL (P1 ON) HIGH WATER
NORMAL (P1, P2, P4 OFF) LOW WATER
P3 (OR FIRST LARGE PUMP) ON EL: 9.50
LARGE PUMPS OFF EL: 9.00
P4 (OR P2) ON EL: 8.50
P2 (OR P4) ON EL: 8.00
SURFACE EL: 7.50
SURFACE EL: 6.00
28.55
EL: -6.45
OF336-
1
2
3
4
5
DESIGNED/DRAWN:
PROJECT ENGINEER:
PROJECT MANAGER:
CONTRACT NO:
DRAWING NO:SCALE:
PROJECT FILE NO:
DATE:
SHT NO / TOTAL REV
NO:
1
2
3
4
5
E F G HBCDA
CHECKED:
RE
F
E
R
E
N
C
E
1"
0
NO REVISION DESCRIPTION BY APVD DATE
E F G HBCDA
DEPARTMENT OF NATURAL RESOURCES & PARKS
WATER AND LAND RESOURCES DIVISION
APPROVED BY:
58
Know what's below.
R
Call before you dig.
BLACK RIVER PUMP STATION IMPROVEMENTS
HIGH-USE ENGINES
OCTOBER 2020
T. BEAN KC000011
1129574
BO
R
D
E
R
F
I
L
E
E
D
I
T
I
O
N
:
1
1
2
9
5
7
4
-
D
s
i
z
e
-
T
B
-
B
o
r
d
e
r
PUMP 3 SYSTEM
SECTIONS M-30002B
C. FRODE
E. BRODAHL
S. NELLIGAN
AS NOTED
0
N. EBBS
KEY NOTES:
METAL EXPANSION JOINT FURNISHED WITH P3 ENGINE.
EXTENDED RANGE METAL EXPANSION JOINT, REFER TO
SPECIFICATION SECTION 40 05 44.
REPLACE EXISTING PIPE CLAMP WITH 12" SST PIPE CLAMP
AT EXISTING EXHAUST PIPE SUPPORT NEAR ROOFLINE.
SEE 2/S-40003
INSTALL PIPE CLAMP AROUND SILENCER BEFORE
INSULATING SILENCER. ATTACH PIPE CLAMP TO EXHAUST
SUPPORT FRAME. SEE 2/S-40003
INSTALL CUSTOM REMOVABLE BLANKET TYPE PIPING
INSULATION ON EACC AND EJWC SUPPLY AND RETURN
LINES (HOT) BETWEEN P3 ENGINE AND HEAT EXCHANGERS,
INCLUDING INSULATING VALVES AND FITTINGS, PER
SECTION 40 42 00.
INSTALL 1" GROUT PAD UNDER DRIVE SHAFT STAND.
4" EJWC, HOT SIDE SUPPLY/RETURN, SUPPORT FROM
FLOOR WITH PIPE STANDS PER DWG. M-40009.
3" ECW FOR JACKET WATER, COLD SIDE RETURN.
EQUIPMENT PROVIDED BY ENGINE MANUFACTURER IN RCP
21 (PER SECTION 44 43 00), TO BE INSTALLED BY
CONTRACTOR.
1-3/4" OVERFLOW LINE. CONNECT FLEXIBLE TUBE TO
EXPANSION TANK FILL NECK, ROUTE AND SUPPORT DOWN
EXHAUST SILENCER FRAME AND TERMINATE 12" ABOVE
FLOOR.
1/2" VENT LINE FROM 1/2" NPT PORT AT END OF EXPANSION
TANK. CONNECT TO 1/2" EACC VENT CONNECTION ON TOP
OF ENGINE. TRANSITION TO FLEXIBLE PIPE AT ENGINE
CONNECTION. SUPPORT PIPE FROM EXHAUST SILENCER
FRAME.
1" STUNT LINE FROM 2" NPT PORT AT BOTTOM OF
EXPANSION TANK. CONNECT TO 2" EACC RETURN WITH A
WELDED PORT. SUPPORT PIPE FROM EXHAUST SILENCER
FRAME.
MOUNT AC EXPANSION TANK TO WELDED STEEL PLATE,
PER PLAN 2 ON DWG. S-40001".
X
1
2
3
MARCH 2026
0 CF EB 03/02/26RCP 22 - INSTALL P3 ENGINE AND ECW SUPPLY
SIL336003
PUMP P3 ENGINE
EXHAUST SILENCER
2
1 P3 DRIVE SHAFT AND
EQUIPMENT GUARD
(NOT SHOWN)GBX336002
PUMP P3
GEAR DRIVE
E336003
PUMP P3
ENGINE
EXHAUST PIPE SUPPORT
AND WALL PENETRATION
TO BE REUSED AND
ENLARGED AS NEEDED.
REFER TO S-40003. FOR
ADDITIONAL DETAILS
12" EE
3
SECTION
1/4"=1'-0"
F
M-10001
NEW PEDESTAL,
REFER TO S-40002
CL EL. 40.55'
2" EACC, HOT SIDE
SUPPLY/RETURN
FG336003
P3 ENGINE
BATTERY RACK
WITH 4 BATTERIES
4
4
5
5
6
6
1
12" EE
4
2
7
8
HEX336003B
JACKET WATER HEAT
EXCHANGER
HEX336003B
AFTERCOOLER HEAT
EXCHANGER
7
8
SECTION
1/4"=1'-0"
G
M-10001, M-10007
GBX336002
PUMP P3
GEAR DRIVE
9
9
9
9
9
9
AFTERCOOLER
EXPANSION TANK
9
9
9
10
11
12
12
10
11
13
13
SV336003
ISSUED FOR PERMIT
JUNE 2026
6/18/2026
OF336-
1
2
3
4
5
DESIGNED/DRAWN:
PROJECT ENGINEER:
PROJECT MANAGER:
CONTRACT NO:
DRAWING NO:SCALE:
PROJECT FILE NO:
DATE:
SHT NO / TOTAL REV
NO:
1
2
3
4
5
E F G HBCDA
CHECKED:
RE
F
E
R
E
N
C
E
1"
0
NO REVISION DESCRIPTION BY APVD DATE
E F G HBCDA
DEPARTMENT OF NATURAL RESOURCES & PARKS
WATER AND LAND RESOURCES DIVISION
APPROVED BY:
58
Know what's below.
R
Call before you dig.
BLACK RIVER PUMP STATION IMPROVEMENTS
HIGH-USE ENGINES
OCTOBER 2020
T. BEAN KC000011
1129574
BO
R
D
E
R
F
I
L
E
E
D
I
T
I
O
N
:
1
1
2
9
5
7
4
-
D
s
i
z
e
-
T
B
-
B
o
r
d
e
r
C:
\
p
w
_
w
o
r
k
d
i
r
\
d
e
n
0
0
3
\
j
e
g
_
f
r
o
d
e
c
\
d
0
4
6
9
8
6
8
\
1
1
2
9
5
7
4
-
O
F
3
3
6
-
M
-
3
0
0
1
3
.
d
w
g
|
L
a
y
o
u
t
:
M
-
3
0
0
1
3
PL
O
T
T
E
D
:
M
a
r
1
3
,
2
0
2
6
-
1
0
:
0
2
:
1
6
a
m
B
y
F
R
O
D
E
C
XR
E
F
S
:
1
1
2
9
5
7
4
-
D
s
i
z
e
-
T
B
.
d
w
g
;
P
E
-
E
L
B
-
W
A
_
_
E
r
i
k
_
s
t
a
m
p
.
d
w
g
;
1
0
-
D
-
x
S
C
n
0
6
_
D
3
1
6
4
9
0
0
.
d
w
g
;
1
0
-
D
-
x
S
C
n
1
0
_
D
3
1
6
4
9
0
0
.
d
w
g
;
1
0
-
D
-
x
S
C
n
1
1
_
D
3
1
6
4
9
0
0
.
d
w
g
;
1
0
-
D
-
x
P
P
n
0
1
_
D
3
1
6
4
9
0
0
.
d
w
g
;
S
E
C
T
I
O
N
A
T
P
U
M
P
P
1
6
.
d
w
g
;
2
2
-
1
2
0
J
a
c
o
b
s
-
F
i
s
h
P
a
s
s
a
g
e
_
P
R
_
R
2
1
-
F
l
o
o
r
P
l
a
n
-
P
H
F
L
O
O
R
P
L
A
N
-
S
O
U
T
H
.
d
w
g
;
2
2
-
1
2
0
J
a
c
o
b
s
-
R
C
P
2
2
_
F
i
s
h
P
a
s
s
a
g
e
_
P
R
_
R
2
1
-
F
l
o
o
r
P
l
a
n
-
P
H
F
L
O
O
R
P
L
A
N
-
S
O
U
T
H
.
d
w
g
IM
A
G
E
S
:
P
a
g
e
s
f
r
o
m
P
1
6
1
2
.
2
4
.
2
0
2
5
-
J
T
S
9
L
C
-
3
s
t
a
g
e
C
a
n
n
e
d
O
p
t
i
o
n
-
2
1
5
g
p
m
@
5
0
'
(
0
0
2
)
6
f
2
4
f
4
d
8
.
p
n
g
;
P
a
g
e
s
f
r
o
m
P
1
6
1
2
.
2
4
.
2
0
2
5
-
J
T
S
9
L
C
-
3
s
t
a
g
e
C
a
n
n
e
d
O
p
t
i
o
n
-
2
1
5
g
p
m
@
5
0
'
(
0
0
2
)
d
f
2
f
8
d
0
6
.
p
n
g
;
9
0
6
9
1
A
1
0
6
_
P
r
e
m
i
u
m
L
o
w
-
P
r
e
s
s
u
r
e
3
0
4
S
t
a
i
n
l
e
s
s
S
t
e
e
l
P
i
p
e
F
i
t
t
i
n
g
8
0
8
1
c
8
9
5
.
p
n
g
;
9
0
6
9
1
A
1
0
6
_
P
r
e
m
i
u
m
L
o
w
-
P
r
e
s
s
u
r
e
3
0
4
S
t
a
i
n
l
e
s
s
S
t
e
e
l
P
i
p
e
F
i
t
t
i
n
g
f
a
6
f
2
1
a
f
.
p
n
g
;
9
0
6
9
1
A
1
1
6
_
P
r
e
m
i
u
m
L
o
w
-
P
r
e
s
s
u
r
e
3
0
4
S
t
a
i
n
l
e
s
s
S
t
e
e
l
P
i
p
e
F
i
t
t
i
n
g
1
5
e
e
e
7
7
f
.
p
n
g
;
9
0
6
9
1
A
1
1
6
_
P
r
e
m
i
u
m
L
o
w
-
P
r
e
s
s
u
r
e
3
0
4
S
t
a
i
n
l
e
s
s
S
t
e
e
l
P
i
p
e
F
i
t
t
i
n
g
b
c
e
0
4
5
e
c
.
p
n
g
;
9
0
6
9
1
A
1
1
7
_
P
r
e
m
i
u
m
L
o
w
-
P
r
e
s
s
u
r
e
3
0
4
S
t
a
i
n
l
e
s
s
S
t
e
e
l
P
i
p
e
F
i
t
t
i
n
g
5
0
5
4
c
0
0
1
.
p
n
g
;
9
0
6
9
1
A
1
1
7
_
P
r
e
m
i
u
m
L
o
w
-
P
r
e
s
s
u
r
e
3
0
4
S
t
a
i
n
l
e
s
s
S
t
e
e
l
P
i
p
e
F
i
t
t
i
n
g
7
e
6
d
7
c
c
5
.
p
n
g
;
P
a
g
e
s
f
r
o
m
C
D
(
1
)
2
6
7
7
9
4
b
1
.
p
n
g
;
PUMP 16
PLAN, SECTIONS AND DETAILS M-30013
C. FRODE
E. BRODAHL
S. NELLIGAN
AS NOTED
0
N. EBBS
A
--
SCALE:1/2"=1'-0"M-10001
1
MARCH 2026
CF EB 02/23/260
KEY NOTES:
3" SPOOL PIECE. GE x GE, LENGTH AS REQUIRED.
3" 90 DEGREE ELBOW, GE x GE.
6" x 4" ECCENTRIC REDUCER (FL x FL)
4" X 4" X 3" TEE, GE X GE X GE.
DRUM SCREEN CONTROL PANEL.
4" SPOOL PIECE, GE X GE. LENGTH AS REQUIRED.
4" GE FLANGE ADAPTER.
4" BUTTERFLY VALVE, FL x FL
3" AUTOMATIC, SELF-CLEANING STRAINER, FL X FL.
3" BUTTERFLY VALVE, FL x FL
3" GE FLANGE ADAPTER.
4" 45 DEGREE ELBOW, GE X GE.
CUT NEW 4" X 4" X 4" GE x GE TEE INTO EXISTING ECW
MANIFOLD IN TRENCH, WITH 4" BUTTERFLY VALVE, FL x FL AND
TWO GE x FL ADAPTERS. CUT OUT FRP GRATING TO
ACCOMMODATE CONNECTION TO P16 DISCHARGE. REINFORCE
THE GRATING OPENING.
4" MAGNETIC FLOW METER, FL X FL, WITH TRANSMITTER
MOUNTED TO BODY. PROVIDE (MIN.) 20" UPSTREAM AND 8"
DOWNSTREAM STRAIGHT PIPE.
3" SPOOL, FL x FL, 13.13" LONG, TO MATCH LENGTH OF P10
STRAINER (TO BE INSTALLED BY OTHERS UNDER SEPARATE
CONTRACT).
4" x 3" ECCENTRIC REDUCER, FL x FL.
4" 90 DEGREE ELBOW, GE x GE.
1-1/2" DRAIN LINE FROM AUTOMATIC STRAINER BACKWASH
ASSIST PUMP.
AUTOMATIC STRAINER CONTROL PANEL.
STANCHION PIPE SUPPORT, SEE DETAIL 2/M-40009.
4"x4"x3" (GE x GE x GE) TEE, 3"x2" REDUCER BUSHING (TE x TE)
INSTALL 2" THREADED AIR/VAC VALVE ON TEE.
AUTOMATIC STRAINER BACKWASH ASSIST PUMP
1" X 2" CONCENTRIC REDUCER TH x TH
1" 90 DEGREE ELBOW, TH x TH
1" SPOOL PIECE, TH x TH
1.5" 90 DEGREE ELBOW, TH x TH.
ACTUATED BACKWASH VALVE - PROVIDED BY STRAINER
SUPPLIER.
3/4" MANUAL DRAIN LINE, TH x TH.
3/4" 90 DEGREE ELBOW, TH x TH.
3/4" NPT BALL VALVE.
NEW STRAINER CONCRETE PEDESTAL,
SEE DETAIL 7 ON DWG. S-40002.
1
SCALE:1/2"=1'-0"
SECTION
-
A
RCP 22 - INSTALL P3 ENGINE AND ECW SUPPLY
2
3
4
5
6
7
8
9
10
11
12
13
14
9
MTR336016
ME336216 P16
8
4" ECW
13
P336016
9 ME336216
BTV336016B
14
4
8
10
10
6
7
13
1
T336104
FIT336016
FE336016
6
8
7
6
16
15
11
1
2
1
7
3
BTV336016C
BTV336216B 4
BTV336216A
BTV336016A
CHG336004
LCP336004
FE336016
6
17
8
18
16
INTAKE SUCTION BELL EL -1.45
15
16
17
18
P336016
PUMP P16 DISCHARGE PIPING
16
7
16
19LCP336216
19
20
EL: 17.0
INSTALL P16 PUMP COLUMN
IN LOCATION OF EXISTING
P12 PUMP COLUMN. VERIFY
ADEQUATE CLEARANCE FOR
NEW PUMP THROUGH BUMP-OUT
IN CATWALK.
6
7
20
8'
-
7
"
10
'
-
0
"
0'
-
4
3
/
4
"
6"
8" STEEL PIPE,
WELD x FL
18" DIAM x 30" DRUM SCREEN
WITH BRUSH 12-MESH, MOTOR
DRIVEN
12
11
CHV336016
PROVIDE PIPE RELIEF
IN CONCRETE
PEDESTAL (3" WIDE)14" STEEL,
VERTICAL
TURBINE PUMP
CAN
14" FLANGE, CLASS D
(TYP)
TURBINE CAN, 3 SEGMENTS
TO BE SUPPLIED BY PUMP
MANUFACTURER.
INCREASE BORE
DIAMETER TO 1'-2 1/2"
INSTALL P16 TURBINE CAN
THROUGH FLOOR BEFORE
INSTALLATION OF PUMP P16
INSTALL FIRST FLANGE IN-PLACE
AFTER INSTALLATION OF THE
TOP P16 TURBINE CAN SECTION
1/2" STEEL PLATE
FLAT BOTTOM
2" ECW ROUTING TO PUMP
AS SHOWN. ROUTE BENEATH
P16 DISCHARGE PIPE
7
7
21
MTR336216
CV336216
P336216 22
18
MTR336216A
1.75" BORE HOLE
THROUGH FLOOR
FIT336016
CHV336016
BTV336216A
BTV336016A
MTR336216
3
C
--
ME336216MTR336216
SCALE:1/2" = 1'-0"
SECTION
-
B
CL
EL. 1.35 (MAX)
2'
-
3
"
ELEVATE PUMP STAND 1"
ABOVE FLOOR, ENSURE
LEVEL AND FILL
SPACE WITH GROUT
SHOP FABRICATED PIPE
SUPPORT PER DETAIL
XXXX-XX
10
'
-
8
"
ANCHOR PIPE TO WALL AND
CEILING USING 1-1/2" SST PIPE
STRAP @ 3' O.C. FASTEN WITH
DRIVE-IN CONCRETE ANCHORS
21
22
23
246
20
2
6
1
23
0'-6"
6 1'-6"
25
1'-6"
26
MTR336016
26
TYP.1'
-
0
"
TYP.
9.44"
0'
-
9
3
/
4
"
LCP336416 5
9"
M
I
N
8" x 12"
REDUCER FL x FL
8" 22.5°
ELBOW, FL x FL
8" SPOOL, 8" LONG, FL x FL
DRUM SCREEN
SCALE:1/2" = 1'-0"
SECTION
-
C
MTR336416
SCN336416
27
KEY NOTES:
1. SHOP DRAWINGS FOR TURBINE CAN SUPPORTS AND DRUM
SCREEN DISCHARGE SUPPORT SHALL BE PROVIDED BY
CONTRACTOR AS A DEFERRED SUBMITTAL.
27
MTR336416
SCN336416
9'
-
0
"
DRUM SCREEN
JUNCTION BOX
1'
-
3
"
7
6 7
7
6
7
21
28
29
30
24
25
1'
-
3
3
/
4
"
30
29
28
CAV336016
30
CAV336016
0'-6"
B
--
ANTI-VORTEX STRINGER,
INSTALLED BY MANUFACTURER
31
31
ISSUED FOR PERMIT
JUNE 2026
6/18/2026
PUMP 3 ENGINE COOLING
SYSTEM DETAILS M-40009
51
C. FRODE
J. MCMURREN
S. DORAN
AS NOTED
0
E. BRODAHL
GALVANIZED STEEL CHANNEL,
2-7/16"H x 1-5/8"W. ANVIL FIG.
AS 150, OR EQUAL.
ALL
EXTERIOR
WALLS
CONCRETE ANCHORS
5/8" BOLT
MIN 6" EMBEDMENT
1" MIN. NON-
SHRINK GROUT
EXISTING CONCRETE SLAB
HE
I
G
H
T
A
S
R
E
Q
U
I
R
E
D
TO
C
E
N
T
E
R
T
H
E
P
A
N
E
L
3
F
E
E
T
AB
O
V
E
T
H
E
F
L
O
O
R
3/
8
"
MI
N
PANEL FLOOR SUPPORT
SCALE: 3" - 1' - 0"
OF336-
1
2
3
4
5
DESIGNED/DRAWN:
PROJECT ENGINEER:
PROJECT MANAGER:
CONTRACT NO:
DRAWING NO:SCALE:
PROJECT FILE NO:
DATE:
SHT NO / TOTAL REV
NO:
1
2
3
4
5
E F G HBCDA
CHECKED:
RE
F
E
R
E
N
C
E
1"
0
NO REVISION DESCRIPTION BY APVD DATE
E F G HBCDA
DEPARTMENT OF NATURAL RESOURCES & PARKS
WATER AND LAND RESOURCES DIVISION
APPROVED BY:
58
Know what's below.
R
Call before you dig.
BLACK RIVER PUMP STATION IMPROVEMENTS
HIGH-USE ENGINES
OCTOBER 2020
T. BEAN KC000011
1129574
BO
R
D
E
R
F
I
L
E
E
D
I
T
I
O
N
:
1
1
2
9
5
7
4
-
D
s
i
z
e
-
T
B
-
B
o
r
d
e
r
3"
1 1/4"
BASE PLATE,
6"x6"x3/8" PL
STEEL CHANNEL,
2 7/16"Hx1 5/8"W
1" REMOVABLE FIBERGLASS
INSULATION BLANKET
2"
1"
2 1/2" SCH 40 SST
CONCRETE PAD
1/2" SST AB,
4" EMBED (TYP)
1/2" SST PL, 8" x 4"
1/2" GROUT (MIN)
5"
4" EJWC
3/16" SST PL, BEND
TO CONFORM TO EXTERIOR
OF SILICONE JACKET3"
2 1/2" SCH 40 SST
2" SCH 40 SST, ADJUST
LENGTH AS NECESSARY
A
-
1/4"
1/4"
1/2" SST PL, 6" x 4"
1/2" GROUT (MIN)
1/2" SST AB,
4" EMBED (TYP)
140°3/16" SST PL, BEND
TO CONFORM TO EXTERIOR
OF SST JACKET
1" REMOVABLE FIBERGLASS
INSULATION BLANKET
2" EJCW
1 1/4" SCH 40 SST
1" SCH 40 SST ADJUST LENGTH
AS NECESSARY
1 1/4" SCH 40 SST
CONCRETE PAD
2"
1"
B
-
1/4"
1/4"
4"
140°
1
E-90002
4" INSULATED PIPE SUPPORT
SCALE: 3" - 1' - 0"
1 SECTION
SCALE: 3" - 1' - 0"
A
M-10007, M-30002B, M-50001
2" INSULATED PIPE SUPPORT
SCALE: 3" - 1' - 0"
2 SECTION
SCALE: 3" - 1' - 0"
B
-M-10007, M-30002B, M-50001-
MARCH 2026
RCP 22 - INSTALL P3 ENGINE AND ECW SUPPLY0 CF EB 03/02/26
ISSUED FOR PERMIT
JUNE 2026
6/18/2026
OF336-
1
2
3
4
5
DESIGNED/DRAWN:
PROJECT ENGINEER:
PROJECT MANAGER:
CONTRACT NO:
DRAWING NO:SCALE:
PROJECT FILE NO:
DATE:
SHT NO / TOTAL REV
NO:
1
2
3
4
5
E F G HBCDA
CHECKED:
RE
F
E
R
E
N
C
E
1"
0
NO REVISION DESCRIPTION BY APVD DATE
E F G HBCDA
DEPARTMENT OF NATURAL RESOURCES & PARKS
WATER AND LAND RESOURCES DIVISION
APPROVED BY:
58
Know what's below.
R
Call before you dig.
BLACK RIVER PUMP STATION IMPROVEMENTS
HIGH-USE ENGINES
OCTOBER 2020
T. BEAN KC000011
1129574
BO
R
D
E
R
F
I
L
E
E
D
I
T
I
O
N
:
1
1
2
9
5
7
4
-
D
s
i
z
e
-
T
B
-
B
o
r
d
e
r
C:
\
p
w
_
w
o
r
k
d
i
r
\
d
e
n
0
0
3
\
j
a
c
o
b
.
g
i
l
l
i
a
m
@
j
a
c
o
b
s
.
c
o
m
\
d
0
4
6
9
8
6
8
\
1
1
2
9
5
7
4
-
O
F
3
3
6
-
M
-
5
0
0
0
1
.
d
w
g
|
L
a
y
o
u
t
:
M
-
1
0
0
1
4
PL
O
T
T
E
D
:
M
a
r
0
2
,
2
0
2
6
-
0
6
:
3
3
:
3
5
a
m
B
y
G
I
L
L
I
A
J
2
XR
E
F
S
:
1
1
2
9
5
7
4
-
D
s
i
z
e
-
T
B
.
D
W
G
;
P
E
-
E
L
B
-
W
A
_
_
E
r
i
k
_
s
t
a
m
p
.
d
w
g
IM
A
G
E
S
:
P3 ENGINE
PIPING ISOMETRICS M-50001
C. FRODE
E. BRODAHL
S. NELLIGAN
AS NOTED
0
N. EBBS
KEY NOTES:
INSTALL 1" DRAIN VALVE.
4" RESTRAINED EXPANSION JOINT, FL X FL.
4" SST HIGH-TEMPERATURE BALL VALVE, FL X FL.
2" RESTRAINED EXPANSION JOINT, FL X FL.
2" SST HIGH-TEMPERATURE BALL VALVE, FL X FL.
4" SST FLEX CONNECTOR, FL X FL.
2" SST FLEX CONNECTOR, FL X FL.
4" X 2" REDUCER, FL X FL.
3/4" DRAIN VALVE.
5" X 4" FLANGED REDUCER.
4" X 3" REDUCER, FL X FL.
P3 ENGINE BATTERY RACK.
INSTALL CUSTOM REMOVABLE BLANKET TYPE PIPING
INSULATION ON EACC AND EJWC SUPPLY AND RETURN
LINES (HOT) BETWEEN P3 ENGINE AND HEAT EXCHANGERS,
INCLUDING INSULATING VALVES AND FITTINGS, PER
SECTION 40 42 00. NOTE THAT THE PIPING INSULATION IS
NOT SHOWN ON THIS DRAWING, SO THAT THE PIPING IS
MORE VISIBLE.
X
1
2
3
MARCH 2026
ISOMETRIC
NTS
A
-
4
5
6
7
0 RCP22 - INSTALL P3 ENGINE AND ECW SUPPLY CF EB 03/02/26
ISOMETRIC
NTS
B
-
ISOMETRIC
NTS
C
-
ISOMETRIC
NTS
D
-
8
9
10
7
9
1
1
4
2
TYP
9
4
TYP
TYP
TYP
3
2
3
2
5
54
5
5
7
10
6
6
3
10
6
3
3
8
8
11
11
11
JACKET WATER
HEAT EXCHANGER
HEX336003B
JACKET WATER
HEAT EXCHANGER
HEX336003B
JACKET WATER
HEAT EXCHANGER
HEX336003A
AFTERCOOLER
HEAT EXCHANGER
HEX336003A
AFTERCOOLER
HEAT EXCHANGER
HEX336003A
AFTERCOOLER
HEAT EXCHANGER
HEX336003A
4" EJWC SUPPLY/RETURN
4" EJWC SUPPLY/RETURN
2" EACC
SUPPLY/RETURN
2" EACC SUPPLY/RETURN
2" EACC SUPPLY/RETURN
2" EACC SUPPLY/RETURN
4" EJWC SUPPLY/RETURN
13
13
12
12
12
13
TYP
ISSUED FOR PERMIT
JUNE 2026
6/18/2026
P2
P3
P9
P9A P12
LCP336002
SV336002A
J-BOX
M
M
MTS336009
P336009
P336009A
TSH336002A
SV336002
NOTES 1, 2, 3
P9A
P9
ELECTRICAL
MISCELLANEOUS DETAILS E-40001
D. SUNSERI
D. WAGNER
S. DORAN
AS NOTED
2
M. KUTZ
P3 P2
MAIN LEVEL ENLARGED FLOOR PLAN
1/4"=1'-0"
S
S
G
N
NEW 1XX
5 AMP
1XX
N
1/2" RADIUS, TYP
3/8" STEEL PLATE
10
"
10"
1 1/2", TYP
PLAN
(3/16 )
1/4
(3/16 )
1/2" RADIUS, TYP
3'
-
0
"
M
A
X
1/4" THICK STEEL MOUNTING
PLATE SIZED PER EQUIPMENT
DIMENSIONS
4" SQUARE STEEL TUBE
(HSS 4"x4"x0.25")
NON-SHRINK
GROUT
FLOOR OR
PLATFORM
ELEVATION
1/2" TYPE 316 SST EPOXIED
ANCHORS WITH A MINIMUM OF 6"
EMBEDMENT INTO THE
STRUCTURAL SLAB, TYP OF 4
TYP
R=0
R=0
2
OF336-
1
2
3
4
5
DESIGNED/DRAWN:
PROJECT ENGINEER:
PROJECT MANAGER:
CONTRACT NO:
DRAWING NO:SCALE:
PROJECT FILE NO:
DATE:
SHT NO / TOTAL REV
NO:
1
2
3
4
5
E F G HBCDA
CHECKED:
RE
F
E
R
E
N
C
E
1"
0
NO REVISION DESCRIPTION BY APVD DATE
E F G HBCDA
DEPARTMENT OF NATURAL RESOURCES & PARKS
WATER AND LAND RESOURCES DIVISION
APPROVED BY:
Know what's below.
R
Call before you dig.
BLACK RIVER PUMP STATION IMPROVEMENTS
HIGH-USE ENGINES
OCTOBER 2020
T. BEAN KC000011
1129574
BO
R
D
E
R
F
I
L
E
E
D
I
T
I
O
N
:
1
1
2
9
5
7
4
-
D
s
i
z
e
-
T
B
-
B
o
r
d
e
r
C:
\
p
w
_
w
o
r
k
d
i
r
\
d
e
n
0
0
3
\
j
e
g
_
e
x
-
m
a
y
k
1
\
d
0
4
6
9
8
4
5
\
1
1
2
9
5
7
4
-
O
F
3
3
6
-
E
-
4
0
0
0
1
.
d
w
g
|
L
a
y
o
u
t
:
E
-
4
0
0
0
1
-
R
C
P
2
2
PL
O
T
T
E
D
:
M
a
r
1
2
,
2
0
2
6
-
0
1
:
3
7
:
4
4
p
m
B
y
k
m
a
y
XR
E
F
S
:
1
0
-
D
-
x
P
P
n
0
1
_
D
3
1
6
4
9
0
0
.
d
w
g
;
1
0
-
D
-
x
P
P
n
0
1
_
G
R
A
T
I
N
G
_
2
_
D
3
1
6
4
9
0
0
.
d
w
g
;
1
1
2
9
5
7
4
-
D
s
i
z
e
-
T
B
.
D
W
G
;
2
2
-
1
2
0
J
a
c
o
b
s
-
F
i
s
h
P
a
s
s
a
g
e
_
P
R
_
R
2
1
-
F
l
o
o
r
P
l
a
n
-
P
H
F
L
O
O
R
P
L
A
N
-
S
O
U
T
H
.
d
w
g
;
2
2
-
1
2
0
J
a
c
o
b
s
-
R
C
P
2
2
_
F
i
s
h
P
a
s
s
a
g
e
_
P
R
_
R
2
1
-
F
l
o
o
r
P
l
a
n
-
P
H
F
L
O
O
R
P
L
A
N
-
S
O
U
T
H
.
d
w
g
IM
A
G
E
S
:
9
0
6
9
1
A
1
0
6
_
P
r
e
m
i
u
m
L
o
w
-
P
r
e
s
s
u
r
e
3
0
4
S
t
a
i
n
l
e
s
s
S
t
e
e
l
P
i
p
e
F
i
t
t
i
n
g
8
0
8
1
c
8
9
5
.
p
n
g
;
9
0
6
9
1
A
1
0
6
_
P
r
e
m
i
u
m
L
o
w
-
P
r
e
s
s
u
r
e
3
0
4
S
t
a
i
n
l
e
s
s
S
t
e
e
l
P
i
p
e
F
i
t
t
i
n
g
f
a
6
f
2
1
a
f
.
p
n
g
;
9
0
6
9
1
A
1
1
6
_
P
r
e
m
i
u
m
L
o
w
-
P
r
e
s
s
u
r
e
3
0
4
S
t
a
i
n
l
e
s
s
S
t
e
e
l
P
i
p
e
F
i
t
t
i
n
g
1
5
e
e
e
7
7
f
.
p
n
g
;
9
0
6
9
1
A
1
1
6
_
P
r
e
m
i
u
m
L
o
w
-
P
r
e
s
s
u
r
e
3
0
4
S
t
a
i
n
l
e
s
s
S
t
e
e
l
P
i
p
e
F
i
t
t
i
n
g
b
c
e
0
4
5
e
c
.
p
n
g
;
9
0
6
9
1
A
1
1
7
_
P
r
e
m
i
u
m
L
o
w
-
P
r
e
s
s
u
r
e
3
0
4
S
t
a
i
n
l
e
s
s
S
t
e
e
l
P
i
p
e
F
i
t
t
i
n
g
5
0
5
4
c
0
0
1
.
p
n
g
;
9
0
6
9
1
A
1
1
7
_
P
r
e
m
i
u
m
L
o
w
-
P
r
e
s
s
u
r
e
3
0
4
S
t
a
i
n
l
e
s
s
S
t
e
e
l
P
i
p
e
F
i
t
t
i
n
g
7
e
6
d
7
c
c
5
.
p
n
g
;
P
a
g
e
s
f
r
o
m
C
D
(
1
)
2
6
7
7
9
4
b
1
.
p
n
g
;
ENGINE ROOM IS UNCLASSIFIED
PER NEC GUIDELINES.
1/2" RADIUS, TYP
3/8" STEEL PLATE
10
"
10"
1 1/2", TYP
PLAN
3/16
3/16
3/16
1/2" RADIUS, TYP
3'
-
0
"
M
A
X
1/4"x7 1/2"x9" STEEL
MOUNTING PLATE
4" STEEL
CHANNEL
NON-SHRINK
GROUT
FLOOR OR
PLATFORM
ELEVATION
1/2" CONCRETE
ANCHORS OR ANCHOR
BOLTS WITH LEVELING
NUTS, TYP OF 4
NOTES:
1.INTERCEPT POWER TO PUMP P9, ROUTE TO MTS336009.
ROUTE POWER FROM MTS336009 TO PUMPS P9 AND P9A. NEW
CONDUITS SHALL BE RGS AND LIQUID TIGHT FLEXIBLE METALLIC
CONDUIT.
2.ADD THE FOLLOWING NAMEPLATES TO MTS336009.
"MTS336009, 480 VOLTS FED FROM MCC336101"
"DO NOT OPERATE MTS336009 WHILE EITHER PUMP IS RUNNING"
3.MOUNT MTS336009 PER DETAIL 1 ON THIS SHEET. MAINTAIN CODE
CLEARANCE IN FRONT OF THE MTS.
P9001 1" C 3#6 1#6G
CONDUIT AND CONDUCTOR SCHEDULE
1
---
---
1DETAIL
NTSSCALE:SCALE:
DEVICE MOUNTING, CONTROL
STATION PEDESTAL
P336102 3/4" C 2#12 1#12G
KEY NOTES
1
2
CONNECT TO 120V POWER IN LCP336102,
AS-BUILT TERMINAL BLOCKS USED
USE SAME TERMINAL BLOCK NUMBER IN
THE CS
CS336120 NEMA 4 ENCLOSURE MOUNTED
INSIDE OF PNL336120
MOMENTARY PUSHBUTTONS SHALL BE
INTERLOCKED SO THAT BOTH CANNOT BE
ACTIVE AT THE SAME TIME
WIRE BETWEEN CS336120 AND THE
SOLENOID VALVES SHALL BE MC #14-2
CABLE WITH GROUND
3
4
5
4 5
3
21
---
2DETAIL
NTSSCALE:SCALE:
ON/OFF
EXISTING FISH SCREEN
CONTROL PANEL
LCP336102
STOP LOG SEAL AIR SYSTEM
CONTROL STATION
CS336120
LOCATED IN PNL336120
SV336120B HIGH PRESSURE AIR
SV336120A LOW PRESSURE AIR
TRI UNITY 24024930
D E V I N H U R
S
O
N
R
EGIST E R E D
P
R
OF
ESSIONA L E N G IN EER
STAT E O F WASHIN
G
T
ON
1 GC 05/06/22JTRCP 10 - UPSTREAM FISH COUNTER INSTALLATION SUPPORT
2 DH 09/12/25JTRCP 22 - INSTALL P3 ENGINE AND ECW SUPPLY
E-90002
3DETAIL
NTSSCALE:SCALE:
ELECTRICAL EQUIPMENT
MOUNTING PEDESTAL
ENGINEER'S STAMP APPLIES TO REVISIONS FOR RCP 22 ONLY
2
P336102
WELD A 4"x4" CAP ON TOP
6/18/2026
ISSUED FOR PERMIT
JUNE 2026